Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...he implementation of European standards in each stage of production of biological products. The practice will be implemented for a period of two weeks in April 2015 in certified organic farms in the Piedmont region of Italy. Expected results are improving the professional competence of participants in the field of organic farming - the management of the "closed cycle farm" for growing organic cro ...
Voir le projet

 4

 TERMINÉ 

Wood Energy Exploitation for Entrepreneurship (WOODE3)

Date du début: 31 mai 2010, Date de fin: 30 déc. 2012,

... a company to deepen the technical mechanisms and bureaucratic of construction of a forest-energy chain, even when similar issues have been addressed previously by adjacent realities. The task of the Piedmont Region is to take a census of the greatest number of studies, research, business ventures, both in its territory, and in that the project partners. With the predisposition of Territorial Port ...
Voir le projet

 7

 TERMINÉ 
...s of employment. GOVERNET wants identifying operational governance models for rural development in specific case study areas, covering various typologies of CADSES region, such as: mountainous areas, piedmont areas, lowland areas along river valleys, peri-urban/ peri-industrial areas, coastlands. For each case study area seminars for the starting up of the governance system, dissemination on the w ...
Voir le projet

 8

 TERMINÉ 

Regions for Better Broadband connection (B3 Regions)

Date du début: 31 août 2008, Date de fin: 30 oct. 2010,

... of EU funding hereby detailed. UK:24 mln euro (ERDF); EXTREMADURA: 118,6 mln euro out of which 17 mln euro of EU financing; STEREA ELLADA: 1,95 mln euro out of which 1,46 mln euro of EU financing; PIEDMONT REGION: 71,29 mln euro out of which 32,29 of EU financing; SARDINIA REGION: 172,5 mln euro out of which 136,5 mln euro of EU financing; LOWER SILESIA: 57,4 mln euro of ROP EU funds; BULGARIA: 2 ...
Voir le projet

 15

 TERMINÉ 
... Founded in 1978, the Alpe Veglia – Alpe Devero Park, located in the mountain valley of Val d’Ossola on the Italian-Swiss border, is the first regional nature park to be established in the Piedmont region. The park is made up entirely of high-altitude mountain habitats, dominated by two Alpine valleys (in Italian "Alpe") that have for thousands of years been used as summer pastureland and whi ...
Voir le projet

 1

 TERMINÉ 
...adicate threats caused by grey squirrel (and other non-native squirrel species) in different socio-ecological contexts, in three different regions of northern Italy: Lombardy (Lombardia), Liguria and Piedmont (Piemonte). The aim was to produce a decision support system to identify the most efficient management strategy in each case, and to elaborate best practice guidelines for grey squirrel contr ...
Voir le projet

 3

 TERMINÉ 
...rity for conservation and is listed in the IUCN Red List as ‘vulnerable’. The beetle is only found in two neighbouring localities in Sella dell’Alta Valle Sessera in the mountainous Piedmont region of northern Italy. Objectives To reduce the risk of extinction of Olympia's ground beetle through habitat restoration ...
Voir le projet

 1

 TERMINÉ 
Background The hydrographic network of creeks and streams that drain water from the hills and mountains of Emilia-Romagna are often characterised by small watersheds and narrow stream beds prone to flooding. As a consequence, creeks and streams are characterised by steep slopes and very few floodplains. Thus, it is not always easy to consider the expansio ...
Voir le projet

 5

 TERMINÉ 
... To convert the unusable, greasy wool into an effective soil conditioner fertiliser using a pilot unit, specially designed and built to cope with one-third of the annual wool shearing of the Piedmont region (1 tonne/day); and To demonstrate that unusable coarse wools, which represent a by-product estimated at more than 150 million tonnes/yr (about 75% of the greasy wool shorn annually), can be ...
Voir le projet

 3

 TERMINÉ 
...promote learning transparency and its implementation processes. These are the needs that this transfer proposal intends to address. The project aims at transferring to an Italian region and province (Piedmont and Lecce) and Germany (Berlin), a model - built and tested by the Province of Treviso and Lepido Rocco within the Regional system action DGR nr.1758/2009 implemented by the Veneto Region – f ...
Voir le projet

 10

 TERMINÉ 

Erasmus+ crossing the borders

Date du début: 1 sept. 2014, Date de fin: 1 janv. 2015,

...ill develop learnings about the new “Erasmus+ program, and the concrete possibility to set up common strategies for new actions in youth policies field. The trainining will take place in Verbania, Piedmont region, Italy and will have the aim to promote different approaches towards cross sectorial education for those who are in charge of the learning activities targeted at youth. This training is ...
Voir le projet

 7

 TERMINÉ 

European Initial Vocational Placements 2014

Date du début: 1 sept. 2014, Date de fin: 31 août 2015,

...n and Training and Specialised Education of DE. Students are organized into a single flow of 20 students and three accompanying teachers, for a work placement period of 2 weeks in the region of Piedmont (Italy). They belong to the professional fields of Cooking, Restaurant Service, Trade and Marketing. NEEDS: This project answers the need of improving the transversal and professional competences, ...
Voir le projet

 52

 TERMINÉ 

OENOLOGICAL PROJECT

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2016,

...ated in the small city of Cristelo, close to Porto; the French school is in a small town located in the region of Haute Garonne and the Italian School is in Novara, an average city located in the Piedmont. They are therefore four schools with a similar social and cultural environment. The project is an experience that seeks to foster in students the entrepreneurial spirit. Students will create an ...
Voir le projet

 4

 TERMINÉ 

Production, Processing, Packaging, Promotion in the Territory

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

...ks Education / Production to promote integrated , flexible and multifunctional Learning Modules with LOs in KSC and soft skills with ECVET points, Europass Mobility certification and validated by USR Piedmont, for easy portability and investment on professionalism, essential pre-requisite for effective job placement and social identity. 4PT is a STRUCTURED EDUCATIONAL PROJECT for COOPERATIVE WORK, ...
Voir le projet

 20

 TERMINÉ 

SMART MOBILITY - MOVE BETTER, LEARN FASTER

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

...m) and will begin the third year of training, when they will carry out from 200 to 320 hours of stage. The sending organizations belong to the system of vocational education and training (IFP) of the Piedmont Region, applying the same organizational, management and credit certification procedures/processes. The partners have agreed to use the Participatory Approach and Project Cycle Management in ...
Voir le projet

 32

 TERMINÉ 

INTERNAZIONALIZZAZIONE DELLA SCUOLA

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

...eeds of the Comprehensive Institute "Innocenzo IX", one of the few public "verticalised" institutions (since it is a mountain school) including 11 schools of Valli Antigorio and Formazza (Verbania, Piedmont region) from kindergarten to upper secondary school. Supervised by the Headmaster, the plan implies the mobility of 10 people including the Headmaster, teachers (at least one teacher ...
Voir le projet

 1

 TERMINÉ 

Acteurs du territoire pour une éducation à la citoyenneté mondiale

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

...d training systems, to regionalize the issues the project tackles especially with EGD-IS, to promote the exchange of good practices related to REDDSO.The participants are three local governments: Piedmont Region (Italy), Rhône Alpes (France), South-West Oltenia Regional development Agency Judet of Dolj (Romania), three universities: University of Craiova, Faculty of Education Turin, Lyon ESPE, thr ...
Voir le projet

 19

 TERMINÉ 

GIOVANI A 360°

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2016,

The project GIOVANI A 360° arises from the sharing of objectives between Rete Europa Piemonte (a network represented by the Cooperative O.R.So.) and the Piedmont Region. The common interest is to promote active participation and direct meetings between decision-makers and young adults to address issues relevant to the youth population, making a path whose results will be used to revise the regiona ...
Voir le projet

 10

 TERMINÉ 

VET open to others countries= More sinergie

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

...ironment with which it collaborates.The third activity is a job shadowing for teachers of all branches of our center in several vocational training center in northern Italy in the region of Piedmont, through the CNOS -FAP Association . these centers are engaged in a project icnos Scuola Duepuntozero - Istruzioni e primi passi con l' iPad, and iPad Didattica di un anno sperimentazione , which are ...
Voir le projet

 4

 TERMINÉ 
...rofessional inclusion of the participants into the labor market.The project is designed in the context out bonded by 2 Region in the South of Italy, Calabria and Campania and 1 in northern Italy, the Piedmont. In fact, some analysis conducted on this sector, even though indicating clearly a low and inadequate investment in new technologies, showed a good growth in terms of employment opportunities ...
Voir le projet

 8

 TERMINÉ 

Mobilità transnazionale per il settore del TErmale e del BEnessere

Date du début: 1 déc. 2016, Date de fin: 31 mai 2018,

...vantage of the opportunities to grow . The project TE.BE. intends to respond to this need, by offering an opportunity to the students and graduates of Lazio, Tuscany, Lombardy, Puglia, Veneto and Piedmont region to obtain an educational and professional experience in foreign companies that operate in the tourism sector of spa and wellness in the following areas :- Tourist services: specific ...
Voir le projet

 16

 TERMINÉ 

CESBA ALPINE SPACE – SUSTAINABLE TERRITORIES (CESBA Alps)

Date du début: 16 déc. 2015, Date de fin: 15 déc. 2018,

Description (EN): Currently available sustainability assessment tools cover buildings and small urban areas, with no support for the territorial scale, typical in the rural, low density Alpine regions. The project aims to facilitate the development, exchange, and implementation of innovative policies and plans at territorial level based on common assessment tools. By developing a tr ...
Voir le projet

 11

 TERMINÉ 

Alpine Ecosystem Services – mapping, maintenance and management (AlpES)

Date du début: 16 déc. 2015, Date de fin: 15 déc. 2018,

Description (EN): Ecosystems and their services go beyond national borders and need a transnational approach for their dynamic protection, sustainable use, management and risk prevention. As a basis for joint action, public authorities, policy makers, NGOs, researchers and economic actors – the AlpES target groups – need a common understanding of ecosystem services, comparable infor ...
Voir le projet

 10

 TERMINÉ 

ling Energy ACtion plans and Enhancing their implementation in the Alps (PEACE_Alps)

Date du début: 16 déc. 2015, Date de fin: 15 déc. 2018,

Description (EN): PEACE-ALPS tackles the problems related to the implementation of Sustainable Energy Action Plans (SEAPs) or any other Energy concepts already endorsed by Local Authorities (LAs) in Alpine Space Area (ASA) by supporting LAs, about 100, in developing concrete actions with an inter-municipal approach. This is the core aim of the project and the way for reaching main o ...
Voir le projet

 11

 TERMINÉ 

Capitalizing Alpine Building Evaluation Experiences (CABEE)

Date du début: 30 juin 2012, Date de fin: 29 juin 2015,

CABEE is a transnational Alpine project that aims to create and implement an Alpine-wide guideline for definition, procurement, production, assessment and promotion as well as learning about new and refurbished Nearly-Zero-Emission-Buildings (NZEB) and their neighbourhoods. CABEE capitalizes wisdom from finished and on-going EU-projects but also projects from the Alpine Space program. It focuses o ...
Voir le projet

 12

 TERMINÉ 

Sustainable Mobility Information Network for the Alpine Space (AlpInfoNet)

Date du début: 30 juin 2012, Date de fin: 29 juin 2015,

Lacking information about public transport is often an obstacle for travellers to use public transport at all. This is an even bigger challenge when travelling by sustainable transport modes to and within destinations of the Alpine Space, where often cross-border information is needed. This project aims to provide travellers with comprehensive information about sustainable transport modes beyond r ...
Voir le projet

 13

 TERMINÉ 
SedAlp contributes to integrated management of sediment transport in Alpine basins directed to an effective reduction of sediment-related risk while promoting the enhancement of riverine ecosystems and reducing the impacts of hydropower plants (balancing the implementation of EU Directives e.g. RES, Floods and WFD). The project includes piloting actions in various representative Alpine river basin ...
Voir le projet

 14

 TERMINÉ 
The main problem to be faced through the project is the poor efficiency and effectiveness of the policies to offset the relation among urban and rural areas and their development model. Such an inefficiency is due to the complexity to merge in an organic whole a lot of sectorial policies which have been carried out to tackle the critical situation in terms of loss of competitiveness, landscape deg ...
Voir le projet

 14

 TERMINÉ 

Capitalising Climate Change Knowledge for Adaptation in the Alpine Space (C3-Alps)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

C3-Alps will synthesize, transfer and implement in policy and practice results of previous Alpine Space projects on climate change adaptation. The capitalisation approach aims at a) generating new and directly usable forms of state-of-the-art synthesis adaptation knowledge in the Alps, harmonised across sectors and useful to adaptation decision-makers, b) its effective and tailor-made communicatio ...
Voir le projet

 17

 TERMINÉ 

Boosting European Games Industry (BOO-Games)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

Once the economic force of Creative Industries (CI) was showcased by several studies,the development of strong digital+interactive media strategies is still high on the agenda throughout Europe. Especially the digital games market is a fast growing market within CI:The global demand for digital games is expected to grow 10% annually in the next years.Today the production of dig.games is an interna ...
Voir le projet

 14

 TERMINÉ 

Towards Regional spEcialisation for Smart growth spirit (TRES)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

Europe faces a moment of global transformation and must now take charge of its future. In the meantime, the world is moving fast and long-term challenges – globalisation, pressure on resources, ageing – intensify. Europe can succeed if it acts collectively, as a Union. Regions need a strategy to come out stronger from the crisis, overcome structural weaknesses and contribute to turn the EU into a ...
Voir le projet

 10

 TERMINÉ 
The Alpine Space economy is largely based on manufacturing SMEs and clusters are a powerful tool to enhance competitiveness. The establishment of transnational clusters networks is a step forward to favour cross-border cooperation although poor awareness of the potentialities from the addressees and the lack of self-sustainability in the medium and long term are still real barriers. AlpClusters202 ...
Voir le projet

 7

 TERMINÉ 
The building sector is a cornerstone of the EU climate protection program and has an important role to play in the achievement of the Europe2020 strategy. However, the plethora and mismatch of building regulations at EU and national levels leads to considerable administrative burdens. There is today a clear need for a harmonisation of tools and processes for an integrated perspective on nearly zer ...
Voir le projet

 5

 TERMINÉ 

Observatory Network to Enhance ICT Structural Funds Absorption (ONE)

Date du début: 31 déc. 2011, Date de fin: 29 juin 2014,

...d not provide it centrally. With regard to ONE core activity, the first good practice theme was analysed during the Turin workshop by CSI-Piemonte: master indicators management. The experience of the Piedmont ICT observatory was presented in detail, and partners were asked to contribute to the discussion answering a short questionnaire on the ICT indicators they monitor and publish in some way. Po ...
Voir le projet

 11

 TERMINÉ 

Regions benefitting from returning migrants (Re-Turn)

Date du début: 30 avr. 2011, Date de fin: 29 avr. 2014,

Economically motivated migration of people from the New Member States to high-income countries is currently dominating international migration flows in Europe thanks to the free right to work in any other EU Member State. This is intensifying a brain drain process of many regions. On the other hand statistics show willingness of people to come back to their countries, however this process is ofte ...
Voir le projet

 12

 TERMINÉ 

Mediterranean Building Rethinking for Energy Efficiency Improvement (MARIE) (MARIE)

Date du début: 31 mars 2011, Date de fin: 30 mars 2014,

MARIE aims to establish the socio-economic conditions for Energy Efficiency (EE) improvement in the MED. Building Stock in the framework of EU policy objectives, overcoming barriers and creating sustainable development opportunities in the MED region. Pil Achievements: ...
Voir le projet

 22

 TERMINÉ 

Alps 4 EU

Date du début: 31 août 2011, Date de fin: 28 févr. 2014,

Alps4EU aims to overcome clusters initiatives fragmentation and favour the emergence of meta-clusters, applying a macro-regional vision and driving Alpine area clusters to be more competitive in the European scenario for the benefit of all Alpine Space’s economy.The project will address both policy making and cluster management activities, with a trans-regional approach and it will impact on phas ...
Voir le projet

 13

 TERMINÉ 

REVITALISING AND PROMOTING TRADITIONAL MARKETS IN CENTRAL EUROPE (CENTRAL MARKETS)

Date du début: 30 juin 2012, Date de fin: 30 déc. 2012,

A majority of traditional markets are nowadays experiencing a serious decline, thus threatening a tradition that stretches back to medieval times and in some cases even beyond. Markets have indeed been the backbone of many towns and city centres as well as the oldest form of commercial exchange. They still can play an important role in the regeneration of city centres and promoting 'greener' lifes ...
Voir le projet

 9

 TERMINÉ 

Alpine Forest FIre waRning System (ALP FFIRS)

Date du début: 31 août 2009, Date de fin: 30 août 2012,

The project aims to improve forest fire prevention in the AS with the creation of a shared warning system based on weather condition affecting fire potential. Main goal is the development of a decision support tool for actors involved in forest fire prevention and suppression, consisting in a daily fire danger level assessment and forecast to identify critical periods in advance of their potential ...
Voir le projet

 14

 TERMINÉ 
Demographic Change is a main driving force all over Europe. The population within most mountain regions of the Alpine Space already today differs from the surrounding metropolitans. Beside the general trend of the aging of the Europeans there exist additional Alpine specific factors of regional different influence: migration (in – out), commuting (rural to urban areas) settlement and housing (cost ...
Voir le projet

 13