Rechercher des projets européens

37 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Strategy for the Natura 2000 Network of the Umbria Region (SUN LIFE)

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2017,

Background Italy’s central region of Umbria hosts transitional areas located between the Mediterranean and Continental biogeographical regions. These areas are rich in biodiversity and include many endemic species. Such diversity is reflected in the 104 SCI and SPAs located in the region, accounting for more than 15% of its land surface. However, the co ...
Voir le projet

 7

 TERMINÉ 

ADDY: Addicted to Europe – Competences through Mobility

Date du début: 1 sept. 2014, Date de fin: 31 août 2016,

...crease in the quality of our courses and to optimize the methods used in adult education and training of employees of C & Q training center. The partner Gruppo L2 S.r.l. is a training provider of the region of Umbria in Italy. The company works as a language school, translation agency and in different areas of vocational training and further qualification. The owners and staff are experts in didac ...
Voir le projet

 2

 TERMINÉ 

Zero-Impact Cultural Heritage Event Network (ZEN)

Date du début: 31 déc. 2011, Date de fin: 29 sept. 2014,

...ion of open-air events that attract large numbers of people. The findings of the project will be transferred at policy level through the development of an implementation plan for each participating region, and by assuring: A)exchange of experiences and best practices among all PPs, based on individualknow-how and on experiences to be researched in European regions and transferred to the PPs; B ...
Voir le projet

 13

 TERMINÉ 
Ecosystems have gradually been converted through the expansion of human activities and the introduction/invasion of new species. As a result, species and genetic diversity have declined. Regional and local authorities can organise land planning and regulate human activities in order to preserve biodiversity (natural area protection, greens corridors, conservation and valorisation of species and va ...
Voir le projet

 14

 TERMINÉ 

European Places of the Spirit (EST)

Date du début: 31 déc. 2003, Date de fin: 30 juil. 2006,

The project main objective is the creation of a European network of areas and regions that are rich in spiritual and cultural traditions and heritage. The network will link together territories in Umbria (Italy), a region known as the ‘land of Saints’ for its stunning religious heritage, Marche (Italy), whose concentration of ‘sacred place’ is one of the highest in the Country and where there is o ...
Voir le projet

 9

 TERMINÉ 
Background The Umbria region is located in the heart of the Italian peninsula. It is threatened by the presence of the non-native Eastern grey squirrel (Sciurus carolinensis) that has spread since it was accidentally released in the city of Perugia in the early 2000s. The introduction of the grey squirrel in Europe is one of the most well-known and studie ...
Voir le projet

 7

 TERMINÉ 
...ribing the models adopted and their evaluation. A key methodology was based on major stakeholder involvement and assessment. This was mostly effectuated by promoting co-operation and synergy between regional institutions, and by regrouping into a single action all the different sectors and area operators involved in agriculture and the environment. ...
Voir le projet

 1

 TERMINÉ 
...ities for use with waste from farms, food factories or wine producers. Integration of the technique as an official procedure under Italian law has not yet been achieved but the Umbria region is seeking to explore the matter further. Some limiting factors have been identified: The system does not appear suitable for the large quantities of waste from the biggest producers, and visual impact may o ...
Voir le projet

 5

 TERMINÉ 
...t fruition, offers concrete and expanding job opportunities to a large number of people, in a very large and quite diversified range of activities and qualifications across the European countries and regions (hiking guides, speleological guides, horse trials guides, environmental awareness educators, etc.), often not clearly defined in terms of learning outcomes but also frequently regulated, in t ...
Voir le projet

 9

 TERMINÉ 

CreatIVe Eco Thinking

Date du début: 17 juin 2014, Date de fin: 16 déc. 2014,

...a as partners, while the project activities were financed under the Erasmus + programme. The activities were carried out from 19th to 26th of January 2015 in Perugia, Italy, the capital of Umbria Region which is a medieval hill town with old-stone buildings and cafes located in the historical part of the city. Perugia is particular for its charming city centre full of small streets where art assoc ...
Voir le projet

 5

 TERMINÉ 

Europas Zukunft: DAS BIST DU!

Date du début: 20 juin 2014, Date de fin: 20 oct. 2014,

...t YOU are! That's the motto of the youth-exchange 2014, a come-together of 48 young people from Italy and Germany. The actual financial crisis has affected the municipality of Nocera Umbra in Umbria (region in the middle of Italy), but also the whole region. Already since the hard earthquake in 1997 different youth-camps and internati.onal youth-exchanges have setted impulses and more public atten ...
Voir le projet

 2

 TERMINÉ 

Food4Thought 4

Date du début: 25 juin 2014, Date de fin: 25 déc. 2014,

35 participants from 18 to 25 years old and 7 leaders coming from France, Malta, Italy, Romania, Poland, Hungary and Bulgaria will join in an environmental education center in Umbria region, in Italy at the end of August for a 9 days youth exchange. The themes of the activities will be food as a tool for intercultural learning and education about environment and healthy lifestyle . Each groups wil ...
Voir le projet

 7

 TERMINÉ 

Stages Léonardo

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

Context and objectives The Brussels-Capital Region is affected by an important social divide. On one hand, its higher education graduate rate is one of the highest in Europe (37%). On the other hand, an important proportion of the population is underqualified (35’5%), the early school leaving rate is significant (20%) and the youth unemployment rate is worrisome (30 %)*. Due to the deindustrializa ...
Voir le projet

 12

 TERMINÉ 

Wellbeing and Inclusion for New Educational Resources

Date du début: 1 sept. 2014, Date de fin: 31 août 2016,

...,the Romanian community constitutes one fifth of the foreign population in Italy(1.110.848 Romanian residents January 1st 2011).From these,according to the ISTAT statistics,24.4% are living in Umbria Region(24321 persons). On the other side,in Romania there are two phenomena:the children left alone at home,their parents working abroad and the re-migrated children with their families because of the ...
Voir le projet

 2

 TERMINÉ 
...kills which is one of the main goals of the plan. The fact that the professional training seminar attended by the trainees will take place under the approval, recognition and certification of the Region of Umbria in Italy, shows its importance for the participants’ professional development. The project will help our organization meet its targets relating to contemporary adult education, online lea ...
Voir le projet

 2

 TERMINÉ 

"SHARP, Sharing Researchers' Passions - Umbria Researchers' Night 2013" (SHARP)

Date du début: 1 mai 2013, Date de fin: 30 nov. 2013,

"SHARP stands for Sharing Researchers’ Passions and is the name of the first European Researchers’ Night in Umbria, a region in the centre of Italy, a long night with researchers that will take place on the 27th of September 2013. Locations for the event will be the three Umbria main cities: Perugia, Terni and Foligno, where departments of the 700 year old University and public and private researc ...
Voir le projet

 3

 TERMINÉ 

Sharing lives, Linking schools, Connecting future: The first year with Erasmus +

Date du début: 1 déc. 2014, Date de fin: 30 nov. 2016,

Our school, 2° circolo didattico, is located in Perugia, state capital of Umbria region, and is made up of 3 pre-primary schools ( two of them with special Montessori teaching method) and 4 primary schools. Nearly 860 pupils are attending our schools, in which works 75 teachers, 5 staff members in the aministrative office and 13 custodians. Our mission is to provide a high quality education in a ...
Voir le projet

 1

 TERMINÉ 
...lian cuisine and organic food production and also to enable them to acquire the basic skills related to this issue. The training took place on a family farm Fattoria Biologica Patrice Spoleto (Umbria region , province of Perugia ). During the four-week internship, the trainees studied the methods of preparing regional Italian dishes and the ecological methods of growing plants. They also learnt ab ...
Voir le projet

 2

 TERMINÉ 
...lt living conditions of large urban centers prefer to spend their holidays in the countryside. The policy for development of agro-tourism is a central guiding EU policy, in response to issues such as regional development, the multi-functionality of agriculture, strengthening rural income, environmental protection, and the application of modern man for quality of life. In our country, while develop ...
Voir le projet

 3

 TERMINÉ 

Mládež a tradície otvárajú hranice

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

...hods, technological processes and forms of work. An integral part of the project is to improve the training of students and teaching staff completing the 21-day professional training in Italy, in the region of Umbria. Location of the project will be small and medium-sized restaurant, café and hairdressing businesses. Attainment of goals we are able to strengthen the position of our school in ...
Voir le projet

 2

 TERMINÉ 

Go&Learn - network enhancement

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2017,

...roups have been set up in Friuli Venezia Giulia, Metropolitan area of Bologna, Umbria, Marche; in the EU, agencies have been set up in Belgium (East Flanders), Germany (Constance Lake), Poland (Gdanz region), Hungary, Slovakia , Slovenja, Turkey. The Agencies/Workgroups organize G&L study visits for both local customers (local catalogue) and foreign groups ((international catalogue). It is now v ...
Voir le projet

 10

 TERMINÉ 

PODWYŻSZENIE KWALIFIKACJI NAUCZYCIELI Z łOSIC

Date du début: 31 déc. 2015, Date de fin: 30 déc. 2016,

...aign, which be followed by final recruitment of participants. Next, participants will take part in mobility preparatory classes. After competing preparation course, participants will leave to Umbria region in Italy, where they will take part in 6-day long course improving their professional qualifications. The course will involve series of lectures and workshops about: development of students key ...
Voir le projet

 2

 TERMINÉ 
...ine and organic food production and also to enable them to acquire the basic skills related to this issue. The training will take place on a family farm Fattoria Biologica Patrice Spoleto (Umbria region , province of Perugia ). During the four-week internship, the trainees will study the methods of preparing regional Italian dishes and the ecological methods of growing plants. They will also learn ...
Voir le projet

 2

 TERMINÉ 

Podporme fantáziu mládeže v kaderníckom umení a hotelierstve

Date du début: 1 juin 2016, Date de fin: 31 mai 2017,

...for field of study hotel academy. Students will always be accompanied by two teaching staff.The project will be organized in 2 terms, each will take 21 days.Mobility will take place in the Italian region of Umbria in Spoleto, in the month of September 2016 and March 2017.The main objective of the project " Support youth fantasy in the art of hairdressing service and hospitality " is the improv ...
Voir le projet

 2

 TERMINÉ 
...ipate in 2 accompanying trainers or employees in connection with the organization of the educational process. The project will take place in the practice of social institutions in Italy (Umbria region) and Spain (Valencia region).The practice will be in social institutions and pupils will get knowledge’s about European Union social policy system to improve practical skills for assessing the human ...
Voir le projet

 3

 TERMINÉ 

UmbriaNet: Internazionalizzazione della formazione professionale in Umbria

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

...adaptability”, and highlights the need of making “periods of learning abroad — both within Europe and the wider world — the rule rather than the exception”. Regarding this aspect, the Region Umbria is supporting the introduction of a systemic approach on European mobility for VET students in upper secondary schools, aiming at integrating mobility in the curricula and encouraging local actors to co ...
Voir le projet

 8

 TERMINÉ 

Z Europą po sukces w zawodzie.

Date du début: 1 sept. 2016, Date de fin: 30 juin 2018,

...es of development of the students during the month-long internships in Portsmouth on the south coast of England, in San Salvo on the east coast of the Adriatic Sea in Italy and Foligno in the Italian region of Umbria. There will be eight 10-and 6-person groups going in spring - autumn interval. In total in two years in eight groups there will leave 56 students. Each group will be accompanied by a ...
Voir le projet

 5

 TERMINÉ 
...e and environment care. The mobility projects aims at the involvement of 100 students from the 3rd, 4th and 5th year of secondary school (five disables and ten from the inner Valnerina region), 14 helpers (+5) and 24 teachers from the school institutions involved in the Consortium. The project is coherent with the regional politics, with the strategic marketing plan for tourism 2014-2020, with the ...
Voir le projet

 39

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...rative department and coordinator of European projects. Although initially intended to carry out the mobility training in a company in southern Italy Euroform finally, it took place in the Umbria region. Hence the difference in the distance and therefore the concept of travel grant. Prior to student mobility was granted a license OLS. He also received 44 training sessions under OS language of the ...
Voir le projet

 1

 TERMINÉ 

Europas Zukunft: DAS BIST DU! - Teil 2

Date du début: 18 mai 2015, Date de fin: 17 oct. 2015,

... the motto of the youth-exchange 2015, a come-together of 53 young people and their guides from Italy and Germany. The actual financial crisis has affected the municipality of Nocera Umbra in Umbria (region in the middle of Italy), but also the whole region. There is a lack of child- and youth-work-structures. Especially these structures would be important for giving young people assistance in di ...
Voir le projet

 2

 TERMINÉ 

European Region Entrepreneurship Connection – EFEB Network

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2017,

... in VET partnership with great potential for development and raising the public awareness, supporting women empowerment and providing new economic and social opportunities for a prosperous European Region. In this respect, among the project’s proposal main tasks is to enhance the new skills education and to create a climate that is favorable to increasing the number of women entrepreneurs and the ...
Voir le projet

 9

 TERMINÉ 
Parks, both historic and modern, are intensively managed, high quality environments. They add to the attractiveness and success of cities and regions and to the quality of life for citizens and visitors.The partnership includes many of those cities and regions energetically enhancing and using parks in a wider policy context such as economic development, rural diversification, protection of cultur ...
Voir le projet

 16

 TERMINÉ 

Joint easily wafted East laboratory Model  (JEWEL Model)

Date du début: 30 sept. 2012, Date de fin: 29 sept. 2014,

Background Crisis of the function and character of the historical town centre in the territory and the loss of identity of its renewed community. Overall aims Develop integrated strategies for metropolitan areas for contribute to the future development of South East Europe. Project wishes to contribute to innovative solutions to tackle crucial problems affecting metropolitan areas, such as local g ...
Voir le projet

 9

 TERMINÉ 

Mediterranean Building Rethinking for Energy Efficiency Improvement (MARIE) (MARIE)

Date du début: 31 mars 2011, Date de fin: 30 mars 2014,

...onditions for Energy Efficiency (EE) improvement in the MED. Building Stock in the framework of EU policy objectives, overcoming barriers and creating sustainable development opportunities in the MED region. Pil Achievements: State of the art of project implementation s ...
Voir le projet

 22

 TERMINÉ 

Adaptation of Mediterranean woodlands to climate change effects. (FOR CLIMADAPT)

Date du début: 31 mai 2010, Date de fin: 30 mai 2013,

...sThe project goes into a phase of regime in which the experimental actions will be pursued and capitalisation sharesd action will be stronger. We have had: the visit of the pilot site in North Aegean Region (Mytilene), and the technical seminar organized by North Aegean Region, with related reports. The 6th and 7th meeting of the peer group and minutes Reported decisions and the visit report. The ...
Voir le projet

 8

 TERMINÉ 

CREATIVE REGIONS (CREA.RE)

Date du début: 31 déc. 2009, Date de fin: 30 mars 2013,

...re a proven high potential to support the Lisbon objectives of the EU. This potential is not sufficiently taken into consideration in the EU Structural Funds programmes (2007-2013) in many European regions. Especially rural regions and regional urban centres are concerned. For this reason, CREA.RE was originated to combine (1) a better part of regions having faced such problems when starting to in ...
Voir le projet

 12

 TERMINÉ 
The MED TECHNOPOLIS is a project for 36 months which consists in: - the creation of technology interface structures (TISs) belonging to the technopolis generation, in all the participant regions - the completion of a cycle of Action-Training Programs (ATPs) and six Regional Action Plans (RAPs), based on INNOV/COMP and R&AT partnerships among the actors of these regions. At the closing Co ...
Voir le projet

 11