Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The management of febrile patients is one of the most common and important problems facing healthcare providers. Distinction between bacterial infections and trivial viral infection on clinical grounds is unreliable, and as a result innumerable patients worldwide undergo hospitalization, invasive investigation and are treated with antibiotics for presumed bacterial infection when, in fact, they ar ...
Voir le projet

 19

 TERMINÉ 

LIFE SUSTAINHUTS: SUSTAINABLE MOUNTAIN HUTS IN EUROPE (LIFE SUSTAINHUTS)

Date du début: 1 juil. 2016, Date de fin: 30 juin 2020,

Background Measures to increase the energy resilience of mountaineering tourism infrastructure are vital for the development of mountainous regions. Recent studies suggest important impacts of climate change on the energy sector and underpin the need for adaptation, notably in the electricity sector. Mountain huts are usually isolated from heating and e ...
Voir le projet

 8

 TERMINÉ 

Citizen Led Air pollution Reduction in Cities (CLAiR-CITY)

Date du début: 1 mai 2016, Date de fin: 30 avr. 2020,

CLAiR-City will apportion air pollution emissions and concentrations, carbon footprints and health outcomes by city citizens’ behaviour and day-to-day activities in order to make these challenges relevant to how people chose to live, behave and interact within their city environment. Through an innovative engagement and quantification toolkit, we will stimulate the public engagement necessary to a ...
Voir le projet

 17

 TERMINÉ 

PEOple-centred development approaches in Practical and Learning Environments

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

PEOPLE brings together Higher Education Institutions from the social sciences and industries from the sustainable living and energy sector to jointly develop and integrate people-centred development approaches into research, teaching and learning practices. At the core of the project is the idea that understanding people should become an indispensable part of industrial development processes, as a ...
Voir le projet

 9

 TERMINÉ 
Over the past decade, earthquakes proved to be the deadliest of all European disasters, with almost 19,000 fatalities and direct economic losses of approx. €29 billion. Earthquake Induced Liquefaction Disasters (EILDs) is responsible for tremendous amounts of the structural damages and fatalities; with experiences from recent events giving example of where approx. half of the economic loss was dir ...
Voir le projet

 11

 TERMINÉ 
Hybrid and Full Electric Vehicles ((H)EVs) are essential for the transition towards sustainable e-mobility. The permanent magnets in motors/generators of (H)EVs are either NdFeB or SmCo magnets, which contain large quantities of rare earths, which are critical metals with the highest supply risk for Europe. As highlighted by the European Rare Earths Competency Network, recycling of rare-earth magn ...
Voir le projet

 7

 TERMINÉ 
Background Conflicts between humans and brown bear (Ursus arctos) populations in Slovenia remain an ongoing threat to the conservation status of bears and steps must be taken to improve coexistence. Measures need to tackle such challenges as a lack of understanding of bears’ socio-economic and environmental value, inflated estimations of the risk of bea ...
Voir le projet

 9

 TERMINÉ 

an Orchestra Network for Europe - ONE® is more

Date du début: 1 juil. 2015, Date de fin: 31 mars 2019,

...echnologies, interacts with visual arts and graphic design to support the intangible heritage of tomorrow. A larger network of eight partners including seven classical symphony orchestras and one university for the creative arts will develop more innovative and interdisciplinary classical music experiences for larger audiences across Europe: Orchestre de Picardie (FR), Jenaer Philharmonie (DE), Sl ...
Voir le projet

 8

 TERMINÉ 

Integrated territorial strategies for Services of General Interest (INTESI)

Date du début: 16 déc. 2015, Date de fin: 15 déc. 2018,

Description (EN): Services of general interest (SGI) are in the competence of authorities at different levels. Up to now, authorities and the service providers tend to have a strictly sectorial approach to SGI which leads to isolated solutions, neither taking benefit of potential synergies nor optimizing the expense of public money. Therefore there is a need for a better horizontal ...
Voir le projet

 10

 TERMINÉ 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Voir le projet

 38

 TERMINÉ 
"Traumatic brain injury (TBI) is among the leading causes of death and disability and the main cause of death among the under-45s. Most patients with moderate to severe TBI are admitted to intensive care units (ICUs)The “PROSAFE” ICU network was recently established in 6 European countries through EU funding (PHEA 2007331), and has continued to collect high-quality data beyond the grant duration. ...
Voir le projet

 11

 TERMINÉ 
Background After their eradication in the Alps in the first half of the 20th Century, wolves have started returning again, following the protection measures and the improvement of ecological conditions in Western Europe that have occurred in recent decades. Currently, the natural expansion of wolves in the Alps presents wildlife managers with the challeng ...
Voir le projet

 12

 TERMINÉ 

FORMACIÓN, MOVILIDAD, EMPLEO III/TRIANING, MOBILITY & EMPLOYMENT III

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

Our specific needs and requirements are to provide a better training quality in the vocational fields of health care, beauty, personal image and textiles. Although in our college the facilities have been modernized for the last 20 years, we believe that our students should test new technologies and equipment. The number of participants will be 16 students. Genral objectives: Promote lifelong leran ...
Voir le projet

 8

 TERMINÉ 

EU experience for nursing students and teachers

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

The applying organization is Secondary School of Nursing Ljubljana with 90 employees, aproximately 950 students in youth education and 250 students in adult education unit. The school offers two programmes: health care and nursing assistant. So far, the school has been involved as a partner organization in two mobilty projects with SŠFKZ and co-ordinated an LdV VETPRO mobility project. This projec ...
Voir le projet

 8

 TERMINÉ 

Effective Mobility II - Genuine Worklife Co-operation

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

Effective Mobility II – Genuine Worklife Co-operationThe objective of the mobility project is to enhance the co-operation with work-life partners in order to support the business target achievement of corporate and public sector organizations. This is achieved by effective co-operation within international mobility projects in full alignment with each participant organizations business equation. T ...
Voir le projet

 15

 TERMINÉ 
Despite the fact that iodine deficiency (ID) can easily be prevented by iodine fortification of table salt, industrial salt and cattle food, Europe belongs to the worst regions in terms of access to iodized salt and is seriously ID, resulting in the perpetuation of the single most important, preventable cause of brain damage. European ID is due to significant heterogeneity in prevention and monito ...
Voir le projet

 33

 TERMINÉ 

Open social transport network for urban approach to carpooling (SocialCar)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

SocialCar is an Intelligent Transport System based on an innovative approach to transport demand management, and more specifically to carpooling in urban and peri-urban areas. SocialCar’s main objective is devopping a new communication network for intelligent mobility, sharing information of car-pooling integrated with existing transport and mobility systems. It will be achieved by means of powerf ...
Voir le projet

 28

 TERMINÉ 
...rough intensive training programs as being our direct target group. Our direct target group also includes students with deafness and hearing impairments and their families. Indirect target groups are university institutions, academics, in-service teachers, mentors, tutors, education authorities, rehabilitation services for students with deafness and hearing impairments and health field workers. An ...
Voir le projet

 5

 TERMINÉ 

Developing Employability Skills Through INnovative education using MOOCs for Youth

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2017,

Our consortium consists of 4 HEIs and 4 Youth Organisations in 4 EU countries: STAFFORDSHIRE UNIVERSITY, Bitjam Limited (UK) UNIVERSIDAD DE LA LAGUNA, EVM Project Management Experts S.L. (Tenerife) TECHNOLOGICAL EDUCATIONAL INSTITUTE OF CRETE, Sentiment Analysis Market Research(Crete) DOBA Fakulteta za uporabne poslovne in druzbene studije Maribor, KADIS, kadrovsko izobrazevalni inzeniring d.o.o., ...
Voir le projet

 8

 TERMINÉ 

House of Brains

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

...aluation process of suitable arguments, resultant of the consultation between the participating universities and the business organizations. This process will help preventing the gap between what the university provides - in terms of knowledge and skills - and what the labour market demands. The basic idea of this project proposal has been formulated on assessments that are the result of several y ...
Voir le projet

 10

 TERMINÉ 
Cardiogenic shock (CS) complicating acute myocardial infarction (AMI) represents a major European health care concern with mortality rates between 40-70%. Approximately 70-80% of these patients present with multivessel disease defined as coronary lesions in more than one vessel. The clinician is faced with the decision to either 1) intervene only on the culprit lesion acutely responsible for the i ...
Voir le projet

 23

 TERMINÉ 

Team works better

Date du début: 1 août 2016, Date de fin: 30 juin 2017,

Project Team works better is a project of mobility of young people and youth workers, and it is built on our previous project called Let's play. In this project we want to focus on developing key competencies to teamwork, because we consider this competence as a necessary for successful functioning in the community and society, including the successful integration into the labor market. The curren ...
Voir le projet

 11

 TERMINÉ 

FORMACIÓN, MOVILIDAD, EMPLEO II/ TRAINING, MOBILITY & EMPLOYMENT II

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

Our specific needs and requirements are to provide a better training quality in the vocational fields of health care, beauty, personal image and textiles. Although in our college the facilities have been modernized for the last 20 years, we believe that our students should test new technologies and equipment. The number of participants will be 16 students. Genral objectives: Promote lifelong leran ...
Voir le projet

 5

 TERMINÉ 

Developing University Sport in Europe

Date du début: 1 sept. 2015, Date de fin: 1 janv. 2017,

The main aims of the projects are wider promotion of university sports and its values, on European level in general, and in particular working on ensuring the best conditions for the European Universities Games 2016. Together, we wish to develop and upgrade national level of the university sport in European countries and adding European dimensions. Through the service in this project, the EVS volu ...
Voir le projet

 3

 TERMINÉ 

ATHENA

Date du début: 1 déc. 2013, Date de fin: 30 nov. 2016,

The ATHENA project brings together major user communities with world leading experts in crisis management and experts and technology developers of mobile and social media use and development. The goal of the ATHENA project is to deliver two major outputs that will enable and encourage users of new media to contribute to the security of citizens in crisis situations and for search and rescue actio ...
Voir le projet

 14

 TERMINÉ 

REduction of DIsease risk” CLAIMs on food and drinks (REDICLAIM)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

REDICLAIM (Understanding the impact of legislation on “REduction of DIsease risk” CLAIMs on food and drinks) seeks to understand the way in which the European Regulation (EC) No. 1924/2006 of the European Parliament and of the Council of 20 December 2006 on nutrition and health claims made on foods and associated legislation has had and continues to have an impact on the substantiation and use of ...
Voir le projet

 4

 TERMINÉ 

New permanent magnets for electric-vehicle drive applications (MAG-DRIVE)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

"The future of road transport is electric - within the foreseeable future, pure electric vehicles (EVs) will populate our roads. Vital to the success of this transition is improved, next-generation motors based on improved magnetic materials; which provide high levels of flux at elevated temperatures, while retaining resistance to reverse magnetic fields and the corrosion problems associated with ...
Voir le projet

 7

 TERMINÉ 
Background The ecological functioning of the Ljubljanica River corridor – upstream and downstream of the Ljubljana urban area – towards the confluence with the Sava, and further upstream along the Sava, has been heavily degraded. This section of the river is also a habitat for a fragmented and heavily endangered population of Danube salmon (Hucho huch ...
Voir le projet

 2

 TERMINÉ 

My international skills Pro

Date du début: 1 août 2014, Date de fin: 31 juil. 2016,

The project aims to respond to the challenging vision of the North Karelia Educational Development document to become known as a national and international player by the excellent learning outcomes and competences. This means to get PKKY to be known as an active international partner for trustful cooperation and further educational development. The aim of the project is to promote the goals of No ...
Voir le projet

 16

 TERMINÉ 

Rare Earth Magnet Recovery for Environmental and Resource Protection (REMANENCE)

Date du début: 1 janv. 2013, Date de fin: 30 juin 2016,

"The REMANENCE concept is to develop new and innovative processes for the recovery and recycling of rare earth (RE) containing neodymium iron boron magnets (NdFeB) from a range of waste electronic and electrical equipment (WEEE). Advanced sensing and mechanical separation techniques combined with innovative processes based on hydrogen decrepitation will recover the rare earth magnets in the WEEE. ...
Voir le projet

 11

 TERMINÉ 

Crossing the National Borders - Working Possibilities in Europe

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

A two year long project is organized and coordinated by Srednja šola za farmacijo, kozmetiko in zdravstvo (SŠFKZ - Secondary School for Pharmacy, Cosmetics and Health Care) from Ljubljana, Slovenija in the partnership with Srednja zdravstvena šola Ljubljana (SZŠ - Secondary School of Nursing Ljubljana). Project includes seven educational institutions with five study programs (beauty therapist, ph ...
Voir le projet

 7

 TERMINÉ 

EUscreenXL, the pan-European audiovisual aggregator for Europeana (EUscreenXL)

Date du début: 1 mars 2013, Date de fin: 29 févr. 2016,

EUscreenXL is a three-year project that aggregates a comprehensive body of professional audiovisual content and makes it accessible through Europeana and the EUscreenXL portal. The project consortium consists of 20 leading audiovisual archives, excellent media scholars, skilled technical service providers and the EBU. The partnership has established alliances with key stakeholders as the Europeana ...
Voir le projet

 31

 TERMINÉ 

SPORT PLAYS MIXED

Date du début: 1 mai 2015, Date de fin: 30 nov. 2015,

... and sports project, which advocates for gender diversity and equality between girls and boys; between young men and women in sport. The project will run from 03/05 to 10/05/2015 on the campus of the University Paris-Sud, Orsay (91) within the UFR STAPS and the SUAPS. It is coordinated by the PASSE-SPORT and co organized logistically by AEMSO. SPORT PLAYS MIXED is a youth exchange built around a w ...
Voir le projet

 10

 TERMINÉ 

Experiencing University Sport

Date du début: 1 janv. 2015, Date de fin: 30 sept. 2015,

The main aims of the projects are wider promotion of university sports and its values, on European level, as well as focusing on some national projects and events to get local context. Together, we wish to develop and upgrade national level of the university sport in European countries and adding European dimensions. Through the service in this project, the EVS volunteers will be assisting in achi ...
Voir le projet

 3

 TERMINÉ 
...her with the ESS responsible for the needs analysis in the field of the identifications of key competences. A qualified evaluation and validation of the project results will be done by University of Leicester.The tangible outcomes are listed under “objectives of the project”. The main impact of the project is to contribute to the easier entrance of the unemployed into the labour market and to impr ...
Voir le projet

 9

 TERMINÉ 
SedAlp contributes to integrated management of sediment transport in Alpine basins directed to an effective reduction of sediment-related risk while promoting the enhancement of riverine ecosystems and reducing the impacts of hydropower plants (balancing the implementation of EU Directives e.g. RES, Floods and WFD). The project includes piloting actions in various representative Alpine river basin ...
Voir le projet

 14

 TERMINÉ 
The main problem to be faced through the project is the poor efficiency and effectiveness of the policies to offset the relation among urban and rural areas and their development model. Such an inefficiency is due to the complexity to merge in an organic whole a lot of sectorial policies which have been carried out to tackle the critical situation in terms of loss of competitiveness, landscape deg ...
Voir le projet

 14

 TERMINÉ 

Reconciling Renewable Energy Production and Nature in the Alps (recharge green)

Date du début: 30 sept. 2012, Date de fin: 29 juin 2015,

The growing demand for renewable energy (RE) will increase the pressure on the Alpine environment. It will strongly impact land use patterns, ecological connectivity and biodiversity. Both the demand for renewable energy and the need for the conservation of biodiversity, soil, and connectivity transcend national borders. A transnational dialogue to address multiple environmental objectives, interd ...
Voir le projet

 16

 TERMINÉ 

Accessibility and development for the re-launch of the Adriatic internal (ADRIA A)

Date du début: 30 déc. 2013, Date de fin: 29 avr. 2015,

The project ADRIA A, funded in range of the Cross-border Cooperation Programme Italy-Slovenia 2007-2013, aims to reorganize the accessibility and the transport of the entire cross-border Italy and Slovenia area and establish an integrated metropolitan area. Achievements: ...
Voir le projet

 28

 TERMINÉ 
Sun, water and biomass are a natural capital of the Alpine Space. It is a must to use them for the production of energy. Besides intelligent grids, storage systems will be key enablers for a future mostly renewable energy supply.Electric vehicles (EV) will be integral elements of the future energy system. Their batteries can be charged with excessive power from intermittent energy sources and elec ...
Voir le projet

 19