Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Integrated territorial strategies for Services of General Interest (INTESI)

Date du début: 16 déc. 2015, Date de fin: 15 déc. 2018,

Description (EN): Services of general interest (SGI) are in the competence of authorities at different levels. Up to now, authorities and the service providers tend to have a strictly sectorial approach to SGI which leads to isolated solutions, neither taking benefit of potential synergies nor optimizing the expense of public money. Therefore there is a need for a better horizontal ...
Voir le projet

 10

 TERMINÉ 

ALPPRENTISSAGE

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

Statistics show that the number of apprenticeship in Rhône-Alpes and Piemonte is low regarding the number of companies. They also show that apprenticeship is declining, especially in the SMEs.This situation is mainly due to the complexity of the procedures and regulation concerning apprenticeship, and also to the fact that they are subject to frequent changes.This situation is particularly difficu ...
Voir le projet

 2

 TERMINÉ 

Construisons ensemble l'Europe

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

Our lycée is a “ polyvalent “ lycée. It is both a senior high school and a vocational school and is located in the Auvergne Region. The lycée proposes 13 vocational "baccalauréats professionnels" which are mainly concerned with the construction and building industries. Our project is called "Let’s build Europe together". Its two fundamental themes are building a new European identity that is acc ...
Voir le projet

 5

 TERMINÉ 

Num@uvergne

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

This new project aims to make mobility one of the main strategies of our school development. The team that drives it and who is in charge of the preparation and organization process is now familiar with the mobility projects and is getting more and more accurate from a professional point of view, with the different actions conducted . The opening of a European class in September 2015 is a new guar ...
Voir le projet

 2

 TERMINÉ 

MOTIV+

Date du début: 1 juil. 2016, Date de fin: 30 juin 2018,

The project MOTIV+, for a period of 24 months, is supported by Le LP Germaine Tillion that offers training in the tertiary and industrial sectors (professional VAT Management Administration, electrical engineering, plastics and Composites, CAP polyvalent staff catering, carpentry and metalwork) and a European professional class. It is located in Auvergne, Thiers, city of 12,500 inhabitants. The sc ...
Voir le projet

 5

 TERMINÉ 

Se former en Europe

Date du début: 30 juin 2016, Date de fin: 29 juin 2018,

The project « Training in Europe » which was created at Pierre Boulanger secondary school for vocational training is our first application for the Erasmus + program.The pupils involved in this project are from the second and third year of baccalauréat professionnel of mechanics, driving, logistics and transport. The pupils will be placed into companies in accordance with the text of reference of ...
Voir le projet

 4

 TERMINÉ 

ALLIER MOBILITE PLUS 4

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

The 'ALLIER MOBILITE PLUS 3' application enables to root our actions of mobility plan between our three Schools which have made international co-operation a priority in each School Policy.This project also strengthens the link between our three vocational colleges which face the same issues which are economical -youth unemployment-geographical – enclosure-, and are addressing the same school popul ...
Voir le projet

 13

 TERMINÉ 

Démarche académique d'échange d'expertises éducatives européennes

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

DA4E (« Démarche académique d’échange d’expertises éducatives européennes » - « Regional approach based on the exchange of European educational expertises”) is a collective project with a regional dimension, spread out over two school years (2016-2017 and 2017-2018) and whose main purpose is to grasp the international dimension of education in order to enrich the knowledge andknow-how of our staff ...
Voir le projet

 10

 TERMINÉ 

European Initial Vocational Placements 2016

Date du début: 1 sept. 2016, Date de fin: 31 janv. 2018,

Context:The Departament d'Ensenyament (Ministry of Education of Catalonia), considering (1) the experience gained in 16 years in VET mobility projects, (2) the launch of the Erasmus+ program and (3) aware of the remaining barriers to the promotion of mobility, launched during the last academic year 2014-2015 the “Program for training mobility and international cooperation in VET institutions” to g ...
Voir le projet

 32

 TERMINÉ 

European Quality Assurance for in company learning mobility (for apprentices)

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

Background The EQAMOB project addresses the crucial issue of strengthening the quality of in-company learning mobility, notably for apprentices. Building on their experience in learning mobility and on the results of the EuroApprenticeship network, EQAMOB project identified two main issues to support the integration of "in company" leaning mobility in the regular training curricula: first, improve ...
Voir le projet

 8

 TERMINÉ 

European Initial Vocational Placements 2015

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

Context: The Departament d'Ensenyament (Ministry of Education of Catalonia), considering (1) the experience gained in 15 years in VET mobility projects, (2) the launch of the Erasmus+ program and (3) aware of the remaining barriers to the promotion of mobility, has launched during this academic year 2014-2015 the “Program for training mobility and international cooperation in VET institutions” to ...
Voir le projet

 30

 TERMINÉ 

South Ostrobothnia Works

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

South Ostrobothnia is a region in progress what comes to internationalisation. Promotig entrepreneurship and new partnerships between educational institutions ane industry are keys to success. This project is to support this process by offereing international learning environments for students and teachers from six South-Ostrobothnian VET providers to develop their knowledge, skills and compete ...
Voir le projet

 25

 TERMINÉ 

AUvergne: Développer et Acquérir des Compétences avec l'Europe +

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

“AUDACE+ is a mobility project led by a consortium, coordinated by the Auvergne Regional Council, the sending partners being the 14 “Missions Locales” of the Auvergne region and Pôle Emploi International. The consortium wishes to offer work placements in European companies for VET learners that experience difficulties in entering the job market, and also short job-shadowing/observation periods for ...
Voir le projet

 14

 TERMINÉ 

AURASME

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2016,

The EURORAA consortium is committed to stimulating high potential SMEs to enhance their innovation capacity and their managerial practices, in order to maximize their smart, sustainable and inclusive growth. The AURASME project is a subset of the COSME EURORAA consortium, based in the Rhône-Alpes and Auvergne regions in France. An integrated coordination within the existing activities in the work ...
Voir le projet

 4

 TERMINÉ 

La Mobilite des Actifs de l'Apprentissage en Auvergne

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

The values of Crafts are established on experiment of the knowledge, transmission and passion of the job. That is why apprenticeship, is an answer to the needs for the sector in terms of resources human beings. The European mobility allows to optimize the training of the young apprentices, also future leaders of companies, and actors of the learning. The European mobility allows to improve the E ...
Voir le projet

 17

 TERMINÉ 

Réseau Viva-Bois II.

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

...lso meant to enable post-high school diploma students to go for a six months’ internship abroad just after passing of their final examination, thanks to a specific partnership with the Conseil Régional of Auvergne. Finally, the organization of mobilities, the follow-up of trainees, their support during internship periods and the meetings with the foreign partners are meant to be an opportunity fo ...
Voir le projet

 5

 TERMINÉ 

EuroApprentissage

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

The context and objectives of the project APCMA accompanies since 2003 Chambers of Trades and Crafts (CMA) and apprentice training centers (CFA) in the development of partnerships and European training projects. In a transition phase APCMA maintaining its grouped project for limited number of CFA who have not yet found a place in a regional scheme. The needs for grants have been identified for the ...
Voir le projet

 21

 TERMINÉ 

ALLIER MOBILITE PLUS

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

Our three vocational schools have made International Openness a key priority in their school project. Working together in a consortium for the second year,all three schools want ,with the 'ALLIER MOBILITY PLUS'project,to improve students' employability chances through work placements in European companies and to enhance the European dimension of their schools by receiving young people from Europea ...
Voir le projet

 13

 TERMINÉ 
The French Vocational High School Marie Laurencin is situated in Riom in Auvergne. Our Erasmus+ project concerned 25 students from our school. There were training periods for the students from the initial vocational training (vocational A level and DTMS). The participants, men and women from 17 to 32, were in training for the Commerce vocational A level (European class), Management and administrat ...
Voir le projet

 5

 TERMINÉ 

MOOV

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

Our mobility project, which highlights the European and international dimension in our school has been renewed annually since 2001. At first, his project was aimed exclusively at Terminales students in the European section English class, whether they study sales, commerce, reception or office administration. Now it is also open to all other students willing to train abroad. The 2014 ERASMUS + proj ...
Voir le projet

 3

 TERMINÉ 
This first grouped project of 5 MFR from Auvergne aimed at the 5th mission of the agricultural education of cooperation, on the orientations of the institution of the MFR regarding the opening to the world and to the others. It aimed at developing new professional skills for these people, at structuring mobility in the territorial environment and allowed the acknowledgement of the network. The obj ...
Voir le projet

 14

 TERMINÉ 

MOVIL'APP mobilité européenne et apprentissage

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

Apprenticeships A European priority... To combat youth unemployment and to increase the quality and supply of apprenticeships opportunities across Europe, the European Commission launched in July 2013 the "European Alliance for Apprenticeships". The goal is to secure commitment of stakeholders (public authorities, companies, CCIs and social partners) through concrete pledges to achieving the goals ...
Voir le projet

 68

 TERMINÉ 

Initiative de mobilité, pédagogie alternative, citoyenneté et territoires 7

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

This project « Impact 7 » follows the previous ones which were aimed at strengthening knowledge and skills required for professionals working in the youth sector, and developing language, social and intercultural competences through a quality European mobility in the field of adult learning and non-formal education. Since 10 years, the project’s aims were also to reinforce the recognition of non-f ...
Voir le projet

 25

 TERMINÉ 

Sustainable Mobility Information Network for the Alpine Space (AlpInfoNet)

Date du début: 30 juin 2012, Date de fin: 29 juin 2015,

Lacking information about public transport is often an obstacle for travellers to use public transport at all. This is an even bigger challenge when travelling by sustainable transport modes to and within destinations of the Alpine Space, where often cross-border information is needed. This project aims to provide travellers with comprehensive information about sustainable transport modes beyond r ...
Voir le projet

 13

 TERMINÉ 

Networking Alpine Health for Continuity of Care (NATHCARE)

Date du début: 31 août 2012, Date de fin: 29 juin 2015,

Demographic change is a global trend which particularly affects the Alps. A rising number of elderly brings to a significant growth of patients with chronic co-morbidities and age-related conditions. Changing society calls for political actions able to answer to new needs coming from an ageing society to ensure its wellbeing. NATHCARE aims to design, consolidate and validate an healthcare local co ...
Voir le projet

 12

 TERMINÉ 
Alpine Space regions are all characterized by the need of increasing and improving sustainable development policies, to cope with the consequences of the international crisis. Starting from the capitalization of partners' experiences, and considering the high "eco-innovation" potential of the Alpine Space, the FIDIAS project aims to provide Local Regional Authorities, green-tech SMEs and Local Fin ...
Voir le projet

 11

 TERMINÉ 
The main problem to be faced through the project is the poor efficiency and effectiveness of the policies to offset the relation among urban and rural areas and their development model. Such an inefficiency is due to the complexity to merge in an organic whole a lot of sectorial policies which have been carried out to tackle the critical situation in terms of loss of competitiveness, landscape deg ...
Voir le projet

 14

 TERMINÉ 

RISKNET

Date du début: 13 janv. 2013, Date de fin: 13 janv. 2015,

Lobjectif du projet est la capitalisation et le développement du réseau transfrontalier sur les risques naturels dans les territoires des Alpes Occidentales pour développer une identité transfrontalière. La stratégie retenue est de mener une réflexion commune sur des concepts tels que la «culture du risque» (facteur important didentité transfrontalière) et le «risque soutenable».
Voir le projet

 10

 TERMINÉ 
The scope of this proposal is to develop and implement new services in enhancing innovation management capacity of SMEs and Key Account Management services for beneficiaries of SME Instruments in Rhône-Alpes Auvergne France.
Voir le projet

 4

 TERMINÉ 
The building sector is a cornerstone of the EU climate protection program and has an important role to play in the achievement of the Europe2020 strategy. However, the plethora and mismatch of building regulations at EU and national levels leads to considerable administrative burdens. There is today a clear need for a harmonisation of tools and processes for an integrated perspective on nearly zer ...
Voir le projet

 5

 TERMINÉ 

Mobility and Residential Costs (MORECO)

Date du début: 30 juin 2011, Date de fin: 29 juin 2014,

Insufficient accessibility to public transport services is one of the results of urban sprawl arising out of the dynamic settlement development in the hinterland of Alpine cities. This forces people to motorised private transport which causes environmental pollution, traffic congestion, high follow-up costs for infrastructure, high individual mobility costs and high time expenditure for commuting ...
Voir le projet

 10

 TERMINÉ 

Alps 4 EU

Date du début: 31 août 2011, Date de fin: 28 févr. 2014,

Alps4EU aims to overcome clusters initiatives fragmentation and favour the emergence of meta-clusters, applying a macro-regional vision and driving Alpine area clusters to be more competitive in the European scenario for the benefit of all Alpine Space’s economy.The project will address both policy making and cluster management activities, with a trans-regional approach and it will impact on phas ...
Voir le projet

 13

 TERMINÉ 
Le projet vise à réaliser des actions transfrontalières entre les Régions Piémont et Rhône-Alpes, les clusters de l'Energie et les Associations industrielles pour le soutien à l'innovation et à la diversification productive des filières industrielles locales vers le marché des nouvelles énergies
Voir le projet

 6

 TERMINÉ 

Cities Actions for Sustainable Housing (CASH)

Date du début: 18 juil. 2010, Date de fin: 18 janv. 2013,

Sustainable renovation of housing stocks with a view to reduce energy consumption in existing buildings Achievements: Documents/reports:CASH URBACT Local Support Groups Presentation (FR)20/01/2015CASH URBACT Local Support Group Presentation (EN)20/01/2015CASH Kick Off M ...
Voir le projet

 10

 TERMINÉ 
In the global context of fighting against climate change, the European Union has committed itself to reduce its greenhouse gas emissions by at least 20% by 2020. The main decisions are taken at the European and national levels but the results have to be achieved in the field. The regional and local levels have therefore a crucial role to play. The starting point of the project is a study on greenh ...
Voir le projet

 11

 TERMINÉ 

European Clusters and Regions for Eco-Innovation Network Plus (ECREIN+)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

In 2006, 6 European regions (Rhone-Alpes, Andalusia, Baden-Wuerttemberg, Ile de France, Lombardy, and Malopolska) decided to work together to propose innovative financial instruments to support eco-innovation and SMEs at the regional level. The ECREIN network (European Clusters and Regions for Eco-investments Network) was created with the support of the DG ENV G3 Unit within the European Environme ...
Voir le projet

 13

 TERMINÉ 

Alpine Hospitals Networking for Improved Access to Telemedicine Services (ALIAS)

Date du début: 31 juil. 2009, Date de fin: 30 juil. 2012,

ALIAS project addresses medical services and information inadequacy to ensure Health Care (HC) provisions in Alpine Space (AS) where telemedicine services are not widely exploited and linguistic barriers represent an obstacle. AS touristic vocation during some periods of the year makes its HC structures “periodically” inadequate to face a widened request of services supply. On the other hand, a ma ...
Voir le projet

 10

 TERMINÉ 
The strong increase of total transalpine traffic and its further growth is a heavy strain for Alpine regions. Effective measures are necessary for enabling a sustainable development.iMONITRAF!s objectives are to develop common strategies for transalpine traffic and to put them into action. A long-lasting political network shall be established, which serves as common voice of the Alpine regions and ...
Voir le projet

 10

 TERMINÉ 
The maintainance of a spatially and socially equal accessibility to services of general interest (SGI) is a core issue to the functionality of mountain areas. However, the ongoing territorial concentration of SGI leads to a vicious circle of further deterioration in the quality of provision which in turn causes a decreasing demand in the existing services. The withdrawal of SGI has many negative c ...
Voir le projet

 11

 TERMINÉ 

Platform for Integration of Trans regional Energy R&D activities (PITER)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2010,

"The project aims at creating a trans-national platform to facilitate the exchanges between the members of the consortium in terms of: research, technological development and transfers, joint political and economical actions for the development and diffusion of renewable energy. This project contributes to the implementation, at a local and national level, of the European directives concerning a b ...
Voir le projet

 5