Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Motorway of the Sea Rostock-Gedser (MoS Rostock-Gedser)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2013,

The Action is part of a global project, covering infrastructure initiatives on the transport axis Copenhagen-Berlin: extension of railway Rostock-Berlin, upgrading of European road E55 into the port of Rostock, introduction of new ferries. The wider project links to TEN-T priority project 1.This transport axis has seen a growing demand. The current ferries are operating at capacity limits and have ...
Voir le projet

 1

 TERMINÉ 

Intercultural work in Rostock

Date du début: 1 août 2016, Date de fin: 31 mars 2018,

Four volunteers (two from Hungary, one from Poland, one from Austria) work in two hosting projects (12 months) in the city Rostock.Project 1 - " Institut für neue Medien": The project is located in the area of youth work and aims at promoting media education and media culture in the region. In courses and study groups young people receive instruction in the production and design their own audio-v ...
Voir le projet

 7

 TERMINÉ 

Intercultural work in Rostock

Date du début: 1 août 2015, Date de fin: 31 juil. 2017,

Five volunteers (two from Hungary, one from France , one from Poland, one from Demark) work in three hosting projects (10 months and 12 months) in the city Rostock. Project 1 - " Institut für neue Medien": The project is located in the area of youth work and aims at promoting media education and media culture in the region. In courses and study groups young people receive instruction in the produc ...
Voir le projet

 9

 TERMINÉ 

Brownfield's Europe Regeneration Initiative (BERI)

Date du début: 31 mars 2004, Date de fin: 30 déc. 2007,

...xplored thoroughly and in a practical manner. Most of the seminars took already place in the previous milestone. An environment seminar was held in Belfast and Lyon facilitated an economic seminar in Rostock and one in Flanders. Rostock hosted a heritage seminar support by an expert from Tallinn and Stockholm accommodated a heritage expert from Dublin. Follwing the seminars 12 specific workshops t ...
Voir le projet

 10

 TERMINÉ 

Cultural diversity & Freedom at sea.

Date du début: 17 juin 2014, Date de fin: 17 déc. 2014,

...versity and Freedom at Sea Young people from 8 different countries; Germany, The Netherlands, Norway, Denmark, Portugal, Ireland, UK and France, have set the sail from Bergen (NO) to Esbjerg (DK) and Rostock (DE). It has been their challenge to sail the ship together, as means to exchange cultures (in the broadest sense) and develop themselves. The group has been together for 14 days and done ma ...
Voir le projet

 8

 TERMINÉ 
...ago de Compostella being exposed to cultural diversity, new ideas and development trends. St. James Route also used to exist in the SB Region stretched from Konigsberg through Gdańsk and Szczecin to Rostock and further on westward. The project aims at restoration of this particular Route and joining the existing heritage with broader European network. This is not a simple tourist project. It aims ...
Voir le projet

 9

 TERMINÉ 

licy and Public-Private Partnerships for Offshore Wind EneRgy (4 POWER)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

... and/or knowledge to implement OSW in the short term.PARTNERSHIP REPRESENTING DIVERSITY, STRONG INTERREGIONAL COOPERATION4POWER stimulates knowledge exchange between front-runner regions (Rostock, Dundee), regions underway (Emden, Groningen, Rimini) and regions in the stage of orientation (Azores, Malta, Latvia) to create common understanding on current and future regional challenges in OSW develo ...
Voir le projet

 11

 TERMINÉ 

REGIONAL WIND TECHNOLOGY AND KNOWLEDGE TRANSFER STRATEGIES (WIND-TECH-KNOW)

Date du début: 31 déc. 2004, Date de fin: 30 déc. 2007,

... regions. Guidelines and recommendations on wind energy marketing for international use were elaborated and distributed all over Europe. Public events such as Regional Wind Energy Days in Ha-velland, Rostock and Bad Doberan Region were organised to address citizens and also young people. Study trips for pupils on Crete, training material for pupils, distributed in all partner countries, and photo ...
Voir le projet

 8

 TERMINÉ 

Baltic Culture Wave - Popular Music (Baltic Culture Wave)

Date du début: 29 févr. 2012, Date de fin: 29 sept. 2013,

...ill widen the perspectives of the agents and provide ideas and chances for new and durable co-operations to stabilize the sector. Here, the connection will be made between the cultural communities of Rostock, Gdynia, Klaipeda, Malmö and Sjaelland as relevant coastal centres in South Baltic area with a focus on Popular Music.As this is a cultural sector cross-border co-operations are quite reasonab ...
Voir le projet

 2

 TERMINÉ 
... collection and the “Fashion business clinic” setting up a environment for collaboration among fashion entrepreneurs. Furthermore, business cooperation events in Vilnius, Riga, Gdynia and Rostock were held, bringing together fashion companies from all along the Baltic fashion production chain. In the course of the project, fashion innovations and their applications were analysed and disseminated ...
Voir le projet

 14

 TERMINÉ 
...cused on cohesion in the area through improved accessibility. Selected corridors and bottlenecks were investigated and concrete investments prepared. Development along the corridors Øresund-Gedser-Rostock-Berlin, Copenhagen-Ystad-Swinoujscie-Wroclaw, Copenhagen-Blekinge-Klaipeda-Vilnius, were studied. Road telematics installations for variable speed limits were installed and tested on road E22 in ...
Voir le projet

 38

 TERMINÉ 

Baltic amateur championship in team games (Baltic rally)

Date du début: 31 déc. 2011, Date de fin: 29 nov. 2014,

...ranslation into English; international tournament in Lębork, Holiday Valleyball tournament in Lębork, tournament for children in Lębork, sports day & health day in Greifswald, tournament Rostock-Warnemünde, 2 beach volleyball championships, seminar for coaches-volunteers in Kretinga, junior valleyball championship, 1 famous sportsman, updating website.Fourth Steering Group Meeting in Lębork with p ...
Voir le projet

 3

 TERMINÉ 

Mobile together

Date du début: 31 déc. 2012, Date de fin: 29 avr. 2015,

...ing an own system (www.wir-fahren-zusammen.de), Tingsryd chosing a system out of several established suppliers and, as a side effect, Bützow establishing an own free-of-charge system for a part of Rostock region based on the German FLINC system. Resulting from all these preparation activities, 4 launching events took place in Tingsryd and Rostock region on 23./24.11.2013 and all system started the ...
Voir le projet

 4

 TERMINÉ 
...5 CAPA SMR students will go to Schwerin in the Land of Mecklenburg-Western Pomerania to work for two weeks in the hotel, catering, personal services or sales industry. They can visit Hamburg and Rostock on the Baltic coast, Lübeck... Their accommodation will be self-catering in the house belonging to the partner institution. A partnership with the Schweriner Bildungswerkstatt It is a centre for v ...
Voir le projet

 4

 TERMINÉ 

South Baltic Offshore Wind Energy Regions (South Baltic OFFER)

Date du début: 28 févr. 2010, Date de fin: 30 mai 2013,

...hore wind energy exhibition in Germany officially opened on 24th of April 2013 within the framework of the international conference and exhibition Wind &Maritim and the final SB OFF.E.R event in Rostock. Another hightlight is the marketing investment in Guldborgsund where a Visitor Centre for Renewable Energy Sources including an OWE section is installed. Last but not least, the Final publication ...
Voir le projet

 10

 TERMINÉ 
...iled project planning, structure, task sharing, budget and project components etc. preparation of the application form by the leadpartner, circulation to all partners: - presentation at the JTS North Rostock, discussing details - continious contact with all project partners in terms of the budget and the application form - project partners supporting Leadpartner with information - each partner is ...
Voir le projet

 5

 TERMINÉ 

Ciconia - Cross-border Cultural Co-operation (Ciconia)

Date du début: 31 déc. 2012, Date de fin: 30 déc. 2014,

...tant and relevant know-how and extended network and network capabilities. A small network of groups was introduced which will continue to expand. Network Meetings have been held in Växjö and in Rostock. The administration and collaboration between the partners has been smooth even if some steps have taken quite long time, such as the partnership agreement.
Voir le projet

 7

 TERMINÉ 

Wind energy in the BSR 2: Demonstrators - the Upgrade (WEBSR2 Upgrade)

Date du début: 31 déc. 2010, Date de fin: 29 juin 2013,

...areness - for the competition, the objects and, via all this, for wind energy. To reach this effect, the project team, consisting of wind energy experts and artists from the 3 involved sites(Kalmar, Rostock and Gdansk), will organise and implement an international art competition where invited artists and designers from different countries will be evaluated by an international jury comprising of ...
Voir le projet

 5

 TERMINÉ 
... how to prepare a research proposal and manage it" (Klaipeda, 2011), "Green Healthcare: DIN ISO regulations" (Szczecin, 2012) and “FDA regulartion for medical devices US-Market access” (Rostock, 2013) with a large total number of participants were part of a Eco4Life training curriculum. Three Letter of Intent with Partner networks were signed for collaboration on the projects pilot topics: with th ...
Voir le projet

 3

 TERMINÉ 
... The basis for the project work was to explore the international state-of-the-art and on jointly "importing" knowledge to the five forerunner cities / towns in the South Baltic area (Rostock / DE, Växjö/ SE, Karlskrona / SE, Malbork / PL, Trabki Wielkie / PL), which are newcomers in the field of electric mobility and small & medium sized. Activities included e.g. experts lectures at proje ...
Voir le projet

 9

 TERMINÉ 

Maritime Tourism Marketing in the Baltic Sea Region (MARITOUR)

Date du début: 31 déc. 2005, Date de fin: 30 déc. 2007,

...t this leaves valuable potential untapped. It is to exploit this potential to the full that the MariTour Initiative has been launched. Headed by the local authority Klützer Winkel and the Hanse Sail Rostock, it enables marina operators, event organisers and operators of traditional vessels to pool their marketing activities under the sailBALTIC label and thus improve the market conditions for all ...
Voir le projet

 22

 TERMINÉ 
...pment) Achievements: Documents/reports:Signature Sheet: Network Mtg - Rostock 29 May 0820/02/2015Signature Sheet: Partner meeting Kaunas 23 Sept 0820/02/2015Signature Sheet: WG Pillar II & PE Medway May 0920/02/2015Signature Sheet: WG Pillar III Utrecht September 200920 ...
Voir le projet

 11

 TERMINÉ 
Within the framework of Erasmus+, 10 students of Minerva Technical School for Graduates attended the six-week, "Nursing and change of experience" internship in Rostock, Germany, between 12. 07. 2015. and 24. 08. 2015. The applicants were all from course 13 studying nursing, baby and child nursing, and child care. The program took place in 5 institutes of AWO-Sozialdienst Rostock, where the studen ...
Voir le projet

 2

 TERMINÉ 
...e project aims to support the advised SMEs in their efforts, encourage them and give advice to achieve jointly defined targets.The consortium of four partners, the Industrie- und Handelskammer zu Rostock, the ATI Kueste GmbH, the Steinbeis Forschungszentrum Nordost and the Technologiepark Warnemünde will work on the mentioned activities. The IHK zu Rostock acts only as a coordinator for this speci ...
Voir le projet

 4

 TERMINÉ 

Developing and implementing European Public Sector Accounting modules

Date du début: 1 oct. 2016, Date de fin: 31 août 2019,

...(Developing and implementing European Public Sector Accounting modules) is a cooperation between the Johannes Kepler University Linz (Austria), the University of Tampere (Finland), the University of Rostock (Germany), the University of Leicester (UK) and the University of Coimbra (Portugal). Each key personen of the strategic partners has significant expertise in the field of public sector accoun ...
Voir le projet

 5

 TERMINÉ 
...al offer. Regional analyses of maritime labor markets in partners countries has started. GB project established a cooperation with the SB Professionals project by having bilateral meetings at Rostock (2012) and attending SBP meetings and workshops (SBP Career days etc.). Harmonized actions are planned for 2013 in connection with the GB study programme.The 2nd project meeting was held in Rostock ...
Voir le projet

 8

 TERMINÉ 
...om this program where the PKR functions as the sending partner, we also take part in the program as a receiving partner for Leeds College students who participate in an internship in kindergartens in Rostock.
Voir le projet

 4

 TERMINÉ 

Innovative ECVET Tour in Europe

Date du début: 1 juin 2016, Date de fin: 31 mai 2017,

... class 13-14 will be sent to Berlin and Dresden to do their hotel internship- 4 students of class 13 will be sent to Osterode to do their nursing internship- 10 students of class 13 will be sent to Rostock to do their nursing internship- 10 students of class 13 will be sent to Rostock to do their hospitality internshipGreece:- 16 students (in 2 shifts) of class 13-14 will be sent to Greece to do t ...
Voir le projet

 6

 TERMINÉ 

"Ápolás és tapasztalatszerzés Németország 3 tartományában"

Date du début: 1 juin 2016, Date de fin: 31 mai 2017,

...high-level and certified professional practice abroad.Within this project we would like to send 14 students to Germany for a 4-6 week practice in the period of 15.07.2016.-03.09.2016.AWO Sozialdienst Rostock : 4 person (4 weeks)JugendSozialwerk Nordhausen : 4 person (6 weeks)Stiftung ICP München: 6 person ( 6 weeks) The students are "Practising nurse", "Practising baby nurse", "Medical and sport m ...
Voir le projet

 4

 TERMINÉ 

Green bridge on Nordic corridor (DE-SE)

Date du début: 31 déc. 2010, Date de fin: 30 déc. 2014,

... electricity in the ports of Travemünde and Trelleborg. Together with the environmental performance upgrades and operational improvement respectively extension of the intermodal terminal capacity in Rostock and Trelleborg, the Action will contribute to a better integration of the upgraded maritime services within multimodal transport chains. Embedded in the wider development framework, the Action’ ...
Voir le projet

 1

 TERMINÉ 

European Education in Advanced Ship Design

Date du début: 1 sept. 2015, Date de fin: 28 févr. 2019,

...rships are offered to the best qualified candidates.DiplomaThis Master Course leads to a Double Master Degree (from ULG-Liege, Belgium and ECN-Nantes, France) and a supplement education from Germany (Rostock), Italy (Genoa), Poland (Szczecin), Romania (Galate) or ICAM (France). Website: http://www.emship.eu/
Voir le projet

 6

 TERMINÉ 

Maritimes Erbe und Kongelig Classic 1855

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...inein als ein Teil der Wanderausstellung Der Tod und das Meer in Flensburg gezeigt und soll der Ausstellung in den kom-menden Jahren nach Hamburg, Carolinensiel, Cuxhaven und Rostock folgen. Als ein Teil des Programms auf See arrangierte das Projekt Publikumsboote, welche die Regatta begleiten sollten und den Besuchern die Möglichkeit geben sollten, die Regatta auch vom Wasser aus zu verfolgen.Die ...
Voir le projet

 7

 TERMINÉ 
...ts & port cities. Partnership reflects practicability, sustainability & interoperability.Project activities are focused on the transport axes Karlskrona-Gdynia, Gdansk-Kaliningrad & Trelleborg/Gedser-Rostock but consider ports in the whole SBA as well.Interface improves the service quality for foot passengers in ferry ports by analysing their service infrastructure in the light of customers needs ...
Voir le projet

 12

 TERMINÉ 
... innovation systems and selecting comparable innovation performance indicators in Tampere Region, South Ostrobothnia, Tartu, 5 planning regions in Latvia, Kaunas, Podlaskie, Brandenburg and Bentwisch-Rostock. Common development challenges, opportunities for transnational cooperation in innovation promotion and a joint development vision for 2017 were identified in the joint approach.2) Regional tr ...
Voir le projet

 18

 TERMINÉ 

Perspektiva mladih v navtični industriji

Date du début: 1 sept. 2014, Date de fin: 31 août 2016,

...Bau GmbH, EGB ELEKTROGESELLSCHAFT für Baustrom GmbH, Segelschulschiff Greif, Wismar University - WINGS - Wismar International Graduation Services GmbH - Maritime Education and Training Center and Rostock-Warnemünde. With the mobility of the staff we wanted to work on topics such as assembling an innovative learning curriculum and extra-curricular activities and adapting learning contents to meet ...
Voir le projet

 3

 TERMINÉ 
...d. Achievements: The museum partners of the project - Maritime Museum Rostock, the Polish Maritime Museum, the Swedish Naval Museum and the Lithuanian Sea Museum - collaborate for setting up an exhibition, which is one of a kind. The common travelling exhibition "1 Sea ...
Voir le projet

 13

 TERMINÉ 

Intercultural work in Mecklenburg

Date du début: 1 août 2014, Date de fin: 31 déc. 2015,

Five volunteers (three from Hungary, one from France , one from Poland) work in three hosting projects (10 months and 12 months) in the city Rostock and in the village Cammin . Project 1 - " Institut für neue Medien": The project is located in the area of youth work and aims at promoting media education and media culture in the region. In courses and study groups young people receive instruction i ...
Voir le projet

 9

 TERMINÉ 

Joining Hands - Part4

Date du début: 1 août 2014, Date de fin: 31 juil. 2016,

... project "Joining Hands" shall build a bridge between the German association and the Polish and Italian association. For a period of twelve months a polish volunteer is to support the organisation in Rostock in preparing youth projects on topics such as cultural diversity, environmental protection or the discussion of German hostory. Moreover the person should work with disadvantaged young people ...
Voir le projet

 3

 TERMINÉ 
The Krusenstern-School is one of two schools for pupils with a migration background in Rostock. Because of the laws in the EU there are more and more children coming to our school who have learned Englisch as a second language in their home country. This project will enable a math and chemistry teacher to better her skills in the pedagogical use of ICT. This in turn will supplement the lessons f ...
Voir le projet

 1

 TERMINÉ 
...hese trends in motion. The parent project was approved in the 2nd Call for Proposals. INTERFACE PLUS complements the INTERFACE initiative in two ways: • The services for foot passengers on the axis Rostock – Gedser are further improved. In close cooperation with the Rostock – Gedser ferry line operator Scandlines, the Public Transport Association Warnow, the Public Transport Operator Movia and Gul ...
Voir le projet

 7