Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...o in -omics applications. An early version of Ebiomix was designed and tested for proteomics (e-proxemis.expasy.org). It was developed with a free content management system and contains light textual information complemented with numerous screenshots and visual information in a user-friendly environment. A collection of case studies is indexed for finding representative and practical usages of eac ...
Voir le projet

 3

 TERMINÉ 

Improvement of Industrial Hazardous Waste Management in Turkey (HAWAMAN)

Date du début: 1 janv. 2007, Date de fin: 30 avr. 2009,

...ion system at national scale. For this, extensive preparation efforts were required, as the existing data on hazardous waste generating industries were not harmonised between the different sources of information. Close cooperation with the Turkish Union of Chambers and Commodity Exchanges and with the Turkish Statistical Institute was required to obtain reliable data and to ensure the harmony of t ...
Voir le projet

 2

 TERMINÉ 

Capacity building for sustainable tourism development (CBSTD)

Date du début: 22 janv. 2007, Date de fin: 21 déc. 2009,

...Label to strengthen particularly SMEs active in the tourism sector; Promoting greater awareness among the Albanian tourism sector of international environmental standards and other environmental information; Creating an effective link between the scientific community involved in tourism and decision makers; Supporting the establishment of a new administrative structure dealing with sustainable ...
Voir le projet

 6

 TERMINÉ 

From Treated Wastewater to Alternative Water Resources in Semi-Arid Regions (PURE)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2014,

... people; poor infrastructure means that the treated wastewater is not fairly or equally distributed (enhanced controls could result in an estimated 30-35% increase in the area irrigated); there is no information about how to safely use the treated wastewater; and there is no pricing for this alternative water resource, resulting in a lack of funds for maintenance of the distribution system. Theref ...
Voir le projet

 4

 TERMINÉ 
...erybody, and solves the problem of lacking skills and knowledge required in the EU labormarket.During the project life time, the course materials were developed and piloted by the target group. The information on the course has been disseminated in project partner countries and international conferences in Europe, in order to ensure the sustainability and mainstreaming of the project results.The p ...
Voir le projet

 6

 TERMINÉ 
... analysis and training design leading to the recognition of professional competencies.The tangible outcome of the project is MapCom software (professional competencies mapping) - an information tool which allows to apply a model of training needs analysis based on the work process analysis. The process analysis is carried out through the simplified schemes aiming at highlight the key steps in the ...
Voir le projet

 4

 TERMINÉ 
...ngual (EL, EN, ES, FR, NO, PL) course modules in fish health/diseases and a multilingual fish health/diseases glossary, part of web-delivered blended learning which included language modules, as much information exists only in English. Aims: 1)To transfer the PESCALEX materials to wider geographic/linguistic areas (Turkey, Hungary, Galicia,Spain); 2)To translate all PESCALEX materials into HU, TR ...
Voir le projet

 7

 TERMINÉ 
...n certify training institutions with the new standard NP 4512:2012.The consortium of Q-Cert-VET was coordinated and led by Portuguese Centre for Research and Innovation in Business Sciences and Information Systems (CIICESI). It included nine partners from four countries: Germany, Luxembourg, Portugal, and Romania. The University of Duisburg-Essen, Germany, one of the Q-Cert-VET project partners an ...
Voir le projet

 8

 TERMINÉ 
...the Thematic Monitoring Group 3 and proposes the valorisation of existing quality practices and approaches at institute and project level, through the development of a sustainable portal, an advanced information system-showcase of quality models and approaches and the networking of stakeholders. The project consist of 3 phases:1)Analysis:Identification and review of quality models and practices. I ...
Voir le projet

 7

 TERMINÉ 
... and others are planned, including a collector tunnel which will drain the overflow from unitary collectors. In order to operate this equipment, periodic effluent analyses are insufficient. Real time information on the state of the natural environment and the quality of collected water is needed. Objectives The general o ...
Voir le projet

 3

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

...NE RESEARCH CENTER). Our expectations have been exceeded: both institutions agreed on future cooperation in other research and development projects in the field of environmental protection and information technology. We are discussing the possibility of inviting experts from these institutions to our school in order to organise lecturers in the mentioned fields. Both institutions already agreed to ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...l subjects of the programs were: For the studies mobilities : - Environmental and geomatic engineering - Basic airport planning and design - Sustainable city planning - Land management - Geographical Information systems and cartography For the training mobilities, the students had: - Practical training in aquaculture, with the implementation of a water treatment system, or the implementation of ab ...
Voir le projet

 1

 TERMINÉ 

ΕΚΠΑΙΔΕΥΣΗ ΕΚΠΑΙΔΕΥΤΙΚΩΝ ΣΤΗΝ ΤΕΧΝΙΚΗ KNX

Date du début: 1 juin 2014, Date de fin: 31 mai 2015,

...site to follow the course: None Duration of course: 30 hours Training documentation: standardized Notes to pass both exams: 50 % Course given by: KNX Certified Tutor b) Exchange of information and practices to improve services, machinery, construction and c) The dialogue of experts (qualified teaching staff and corporate) on know-how - automation technology and security systems. The place of im ...
Voir le projet

 2

 TERMINÉ 

Formation professionnelle eu Europe

Date du début: 1 juil. 2014, Date de fin: 30 juin 2015,

...er passed language certification in 2012 in order to teach her subject (management) in English. The course will enable her: - to improve her language skills - to increase her knowledge in the use of information and communication technologies and to discover new tools - to innovate in her teaching practices - to gain greater understanding of educational systems - to talk with other European teach ...
Voir le projet

 1

 TERMINÉ 

Sustainability in Healthcare

Date du début: 1 juil. 2014, Date de fin: 30 juin 2015,

...er the training abroad, the participants will make a report and an action plan to incorporate arguments and insights on sustainability into their lectures targeting the wider public and to spread the information to the complementary care network and authorities. They will also apply these principles as best as possible in the management of their own organization.
Voir le projet

 1

 TERMINÉ 

Teacher Development

Date du début: 1 août 2014, Date de fin: 31 juil. 2015,

...l. They aim to develop professional skills necessary for teaching and learning using modern, interactive, student-centered methods, and digital skills so important in the management and processing of information in acquiring knowledge and adapting to new approaches that will enhance the abilities, skills and European awareness to both teachers and pupils. The project aims to train, through mobilit ...
Voir le projet

 3

 TERMINÉ 

Strategic Partnership for Creativity and Entrepreneurship

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

...nt will have an opportunity to learn about real enterprises activities and interact with coaches from enterprises which shall allow them to easier enter the labor market. Teachers will receive information about student qualification progress and actual enterprises needs, it is important for further training activities and developing training programs. Enterprises will receive required knowledge an ...
Voir le projet

 6

 TERMINÉ 

IT on the Move

Date du début: 1 sept. 2014, Date de fin: 30 août 2015,

The project will involve Information Technology students from Monaghan Institute (MI). They will undertake a three week work placement in Holland in Jan / Feb 2015. In addition, they will participate in a language and cultural awareness programme prior to and during their placement. The project will involve 15 students from MI. They will be students on the FETAC/QQI Level 5 and Advanced Level 6 In ...
Voir le projet

 2

 TERMINÉ 

Culture, Nature and Tourism network (KNOT)

Date du début: 31 déc. 2003, Date de fin: 30 déc. 2006,

...to promote sustainable tourism and rural development. The partners aim to increase their competences in cultural and natural heritage management and to create joint tools for easier access to tourist information via the Internet and mobile phone. Achievements: The opera ...
Voir le projet

 11

 TERMINÉ 
...ntil autonomy of their residence. As well, WIDER aims at supporting the selected local SMEs capacities of local, national, European and international cooperation, clustering and networking to share information, create synergies, capitalize and disseminate experiences and results. Besides, it will be strengthened the cooperation between SMEs, research, innovation centres, intermediary bodies to fos ...
Voir le projet

 10

 TERMINÉ 

WARELA (Water Retention by Land Use) (WARELA)

Date du début: 31 août 2003, Date de fin: 30 déc. 2006,

... excursions into the demonstration areas. Effective land-use measures to retain water, wherever it was possible, were explored and implemented in the WaReLa-test-sites. With the help of a geographic information system (GIS)-based tool flood generating areas can be visualized as hot spots for run-off mitigating and delaying measures. Also the spatial flood and retention potential within the low-mou ...
Voir le projet

 10

 TERMINÉ 

Sustainable Uses of Baltic Marine Resources (SUBMARINER)

Date du début: 10 juin 2010, Date de fin: 9 sept. 2013,

...ns to further promote beneficial uses of Baltic marine resources.IV. BSR Network: Bringing relevant players together through cooperation events, roundtables and seminars and a virtual information and exchange platform, by developing a selfstanding Network structure (mission, business plan, etc.) which has successfully gained flagship project status under the EU Strategy for the Baltic Sea Region ( ...
Voir le projet

 19

 TERMINÉ 

Intelligent Transport Systems in South East Europe  (SEE-ITS)

Date du début: 30 sept. 2012, Date de fin: 29 sept. 2014,

... of TERN is a fundamental pre-requisite for SE Europe regional cohesion and development. On the other hand, ITS applications are key tools to support efficient infrastructure management and traveller information on TERN. In order to maximise benefits out of ITS deployment, SEE-ITS aims at stimulating co-operation and interoperability between isolated ITS applications so as mobility is supported se ...
Voir le projet

 8

 TERMINÉ 
...forest protection on the local forest and tourism industry were investigated. An MSc thesis on implications of tourism in protected areas as a source of local, forest-based income was completed. More information can be found at: www.northerntosia.org/portal/case_study_in_norway More information on ToSIA, all cases and the project is available on the Northern ToSIA website (www.northerntosia.org) ...
Voir le projet

 5

 TERMINÉ 

NOFDP - Nature-Oriented Flood Damage Prevention (NOFDP)

Date du début: 30 sept. 2002, Date de fin: 29 juin 2008,

...partners from Germany and the Netherlands including four waterboards, the German Federal Institute of Hydrology and a group of outside experts. The main output of the project is the development of an Information and Decision Support System" (IDSS) software which will couple databases and integrated modelling techniques. This combined toolbox of hydraulic, hydrologic and ecological models will prov ...
Voir le projet

 7

 TERMINÉ 

Mitigation in Urban areas: Solutions for Innovative Cities (MUSIC)

Date du début: 8 avr. 2009, Date de fin: 29 juin 2014,

...ments. hospitals. school boards. businesses. building owners and energy agencies. 2 Integrating Energy in urban planning and enable monitoring of effects - development of a Geospatial Urban Energy Information and Support System (WP2). Development and testing of a GIS-based system for developing energy maps and scenarios to obtain an insight in opportunities for energy reduction in urban plannin ...
Voir le projet

 7

 TERMINÉ 
... Expected Results: 2 trainings and 3 experience exchange visits fro the project partners, 1 seminar and 1 workshop on dissemination of project results, 1 information campaign on raising environmental awareness, development and execution of the joint environmental monitoring programme
Voir le projet

 4

 TERMINÉ 

TechSchools@Europa

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2016,

...ustrialization of Fashion Product; Processes of Staining and Finishing of Textiles; Industrial Production – Ornamental and Industrial Stones; Mechatronics Technology; Technologies & Programming of Information Systems, Telecommunications & Networks; Technical & Functional Textiles; Environmental Tourism. The diversity of sectors corresponds to a variety of destinations – Germany, Austria, Bulgaria, ...
Voir le projet

 51

 TERMINÉ 
...ies across the MED Basin, ii) all relevant actors in the maritime transfers and iii) ports and their logistic activities areas, through the use of modern ICT technologies that will be used to enhance information management systems - Define an integrated management model involving public and private organizations (in ports and their logistic activities areas) and devise a common and harmonized MED ...
Voir le projet

 8

 TERMINÉ 
...n.3 INTERREG.TRAINING SESSION to support policymakers to better understand their requirements and facilitates the transfer of GP,relative success and durability3.comm.activities supporting pj through information+publicity activities to ensure pj results disseminat. Achievements: ...
Voir le projet

 15

 TERMINÉ 
...uce useful practical experiences, concerning questions of successful culture route structures, effective management and in the development of innovative marketing instruments for a wide spread of information.In the contact between the European INTERREG-IV-C-project CERTESS and FORTE CULTURA the experience exchange, important impulses and learning process for culture route development were generate ...
Voir le projet

 12

 TERMINÉ 
...avsko and Moravian Karst in the Czech Republic; Podravje Region in Slovenia and North Hessen in Germany. For these regions a renewable energy database, providing access to most up-to-date information on conventional and, most importantly, unconventional energy (such as biomass, biogas and biofuels, wind power, photovoltaics and solar thermal energy, hydropower, geothermal energy) plants or install ...
Voir le projet

 11

 TERMINÉ 

Cooperating 2 Foster Renewables and Energy Efficiency (CO2FREE)

Date du début: 30 sept. 2008, Date de fin: 29 sept. 2012,

...e actually implemented, both from the regional stakeholders and the Managing Authorities of the OP. 3. To involve regional and local stakeholders in the preparation of regional APs 4. To disseminate information about the project, its objectives, the approach, results and lessons learned to a large audience at local, regional, national and EU levelEach participating region will develop an AP to tra ...
Voir le projet

 10

 TERMINÉ 
...en and diversify musical education system. Problems and development aeas: - different approach and artistic and professional levels in teaching music, instrument and orchestra playing; - insufficient information and exchange on musical education system and musical activities in partner countries; - citizens and music schools are not well informed and acquainted with musical traditions and material ...
Voir le projet

 2

 TERMINÉ 
...vation. As a consequence, systematic management often loses its focus, from continual performance improvement to certification requirements. The increasing requirement for different environmental information means that the collation and aggregation of environmental data between numerous stakeholders is becoming increasingly impractical. In addition, EMS in itself does not always solve many of ...
Voir le projet

 1

 TERMINÉ 

Formación Europea y desarrollo profesional del profesorado

Date du début: 1 juil. 2014, Date de fin: 30 juin 2015,

...itute - Malta) on the enrichment of learning through technological tools which will last two weeks.Four participants are proposed from different areas: Spanish Language , Music, Economics , Computer Information Systems. A2 . JOB SHAWODING A2.1 Golborne High School ( UK) : 15-day visit of Spanish language teacher in groups of junior high . It seeks to implement , adapting to the characteristics of ...
Voir le projet

 5

 TERMINÉ 

A műszaki informatika gyakorlati alkalmazásai

Date du début: 1 juin 2016, Date de fin: 31 mai 2017,

...the PLC-controlled circuits set up, using and operation. The IT students will solve informatics problems with the help of ICT tools. During practice tasks they plan, choose, operate and control the information tools and network. They install technical informatics software, test them and control them. Our receiving partner is the VITALIS from Germany, and the "A Rocca" from Sicily. The main activi ...
Voir le projet

 3

 TERMINÉ 

Új kihívások Hannoverben - az 5. utazás

Date du début: 1 juin 2016, Date de fin: 31 mai 2017,

... management, precision, self-determination and cooperation. The further goals of the project are to get to know different educational systems, to adopt new methods and exchange information and experiences in connection with common topic and practice. It is also very important to improve our colleagues’ skills and professional competences during the project within an international environment, whic ...
Voir le projet

 2

 TERMINÉ 
... processes that the 2nd LC will provide will be updated and in tune with their respective European organizations, which is a national criterion, commitment and obligation.As stated in the information note of CEDEFOP (March 2015), "... The vocational education and training was considered a means to combat rising unemployment, since it allows people to acquire skills so they can find work. Almost ha ...
Voir le projet

 2

 TERMINÉ 
1. ICT FOR TEACHING: 11/07/2016 το 22/07/2016 . A practical course to incorporate Information Technology into Teaching (literacy, numeracy, science, etc.) Country of Destination: IRELAND Training venue: Institute of Public Administration (IPA), Dublin Duration (days): 10 training days Number of participants 3. ICT for teaching courses. Description: A structured course which provides participants ...
Voir le projet

 2