Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...he method OKO-CPB 4.0 for treating industrial wastewaters which is unique worldwide. A holistic and sustainable concept for treating industrial wastewaters is put into effect here for the first time. Energy consumption and carbon dioxide emissions are reduced by more than 90 % compared to the conventional methods in an average treatment plant, which corresponds to the annual electricity consumptio ...
Voir le projet

 1

 TERMINÉ 
...t dissimilar technologies ‘Logic’, ‘DRAM’, and ‘FLASH’ in one cost-effective solution. The nvSRAM IP blocks offer unlimited and fast (< 20ns access) read and write operation and a reduced energy demand by factor 10,000 compared to a conventional Flash. No comparable solutions on the market provide such scalable high energy efficiencies, application areas and cost saving opportunities. This will en ...
Voir le projet

 1

 TERMINÉ 

SUSTAINABLE ENERGY MANAGEMENT

Date du début: 31 déc. 2008, Date de fin: 30 déc. 2012,

... public at the open house days. For these days, in addition to the own visual aidsto present the achievements, demo equipment was used, made available by the EOS, the autonomous municipal company for energy savings of the city of Oostende.
Voir le projet

 2

 TERMINÉ 

Õpirände kogemus aluseks professionaalsetele kompetentsidele

Date du début: 1 sept. 2014, Date de fin: 31 août 2016,

...icipation which is registered by the memorandum of mutual trust. In the framework of EFMTTPC project 2014-2016, 48 students from such curriculum groups as textile, leather products manufacture, energy and automatics, transportation vehicles and beauty services are sent for practical training and placements in enterprises. The project partners of TTHK are long-term friendship schools from Finland ...
Voir le projet

 4

 TERMINÉ 

Solar energy and pressure sensor based solution for truck weighing (Sensolweighs)

Date du début: 1 févr. 2016, Date de fin: 31 mai 2016,

...s encouraged Cogo Bilance s.r.l., an innovative company fruit of the merger of major brands in the Italian weighing industry, to develop Sensolweighs. Sensolweighs is a truck scale powered by solar energy (with wireless connection) giving the possibility to work off-grid in remote locations, based on an innovative hydraulic system to measure weight. Its light resistant materials make its relocatio ...
Voir le projet

 1

 TERMINÉ 

Environmental COoperation model for Cluster (ECO-CLUSTER)

Date du début: 1 oct. 2010, Date de fin: 31 mars 2014,

...lation than larger firms. In general, the smaller the company, the more difficult it is. Although there is a cost implication in compliance, companies that do take action can benefit from lower energy bills and greater efficiency in their operations. Objectives The main objective of the ECO-CLUSTER project was to impro ...
Voir le projet

 5

 TERMINÉ 
...to water saving techniques, technology development ofinnovative mapping and plant growth monitoring systems. SenSOP-II aims are to provide this tool for advanced smartfarming operations and water and energy saving techniques.SenSOP-II optimises irrigation, fertilizer- and pesticide application and soil treatment focused on grapes, hop plants, fruitsand vegetables and extensive wheat production are ...
Voir le projet

 1

 TERMINÉ 

Rotating bioreactors for sustainable hydrogen sulphide removal (Biosur)

Date du début: 1 juil. 2012, Date de fin: 31 déc. 2015,

...he Santa Croce sull’Arno tannery district in Tuscany produces more than 80% of all Italian footwear and leather goods. The tannery district currently requires very large amounts of chemicals and energy to control sulphide emissions and odours. The industrial wastewater is characterised by a very high organic load (COD > 15 000 mg/l), typically with large amounts of natural and synthetic tannins. ...
Voir le projet

 5

 TERMINÉ 
Deep renovation – the idea of capturing the full economic energy efficiency potential of existing buildings with focus on building envelopes – leads to remarkable energy savings. As nearly all of Latvia’s stock of multifamily residential buildings continues to rapidly deteriorate due to harsh weather conditions and lack of proper maintenance, the idea is attractive.Realizing this potential require ...
Voir le projet

 7

 TERMINÉ 

Calitate si relevanta in formarea specialistilor in domeniul automaticii

Date du début: 1 sept. 2014, Date de fin: 31 août 2015,

... project " Quality and relevance in training of the specialists in automation " answers to the training needs of students and school needs which are recorded as strategic objectives undertaken by the Energy Technical College . These are : - Increasing the general skills and the development of technical skills and competencies specific to electronic - automation ; - Developing the capacity of educa ...
Voir le projet

 3

 TERMINÉ 

European Business and Biodiversity Campaign (B+B Campaign)

Date du début: 1 janv. 2010, Date de fin: 30 avr. 2013,

...sentations. Biodiversity checks were implemented in 30 companies from various sectors and of different sizes, such as the automotive manufacturer Daimler, the tour operator TUI, energy company Iberdrola and the outdoors outfitter VAUDE, as well as the extraction industry in Germany. The aim of these biodiversity checks was to evaluate biodiversity issues in the companies and to give recommendatio ...
Voir le projet

 7

 TERMINÉ 

"Domy pasywne - przyszłość branży budowlanej"

Date du début: 1 sept. 2016, Date de fin: 31 août 2017,

...man construction companies. They will also find out more about passive building technologies, which will improve their professional skills and academic level. What is more, they will learn more about energy-saving devices and power engineering industry as well as how to use computing techniques in construction sector. During their 4-week apprenticeship, being supervised by their German colleague, ...
Voir le projet

 2

 TERMINÉ 

Sustainable Together through Environmental Management (STEM II)

Date du début: 31 août 2012, Date de fin: 27 févr. 2015,

...able economic development business networking programme Achievements: Energy savingsAimed to save businesses approx. £2,850 per annum• Kids play resource saved £3,000 per annum• Local Armagh Engineering Company saved £15,000 per annum• Bakery in Ards saved £10,000 per a ...
Voir le projet

 1

 TERMINÉ 
...(SMEs) cannot easily be decreased. Many SMEs do not have the critical size or capacity, nor the necessary resources to develop sustainable management. However, by collectively organising the flow of energy and matter at the level of an industrial estate, SMEs can achieve economies of scale and degrees of effectiveness in their environmental management that exceed those attainable through the sepa ...
Voir le projet

 2

 TERMINÉ 
...cessful way of achieving its objective. In particular the project focused on the following six main areas of business operations, to reduce operating costs: (a) Supply Chain, (b) Sensors, Utilities & Energy Saving, (c) People & Processes, (d) Green Building, (e) Renewable Energy (f ) Marketing and Social Media. These six areas were further segmented into a total of 14 cost sub-areas.The objectives ...
Voir le projet

 9

 TERMINÉ 

Powerstar Virtual Power Station (PVPS) solution - Powerstar Virtue (PVPS)

Date du début: 1 juil. 2015, Date de fin: 30 juin 2017,

EMSc(UK) Ltd is the designer and manufacturer of the Powerstar voltage optimization (VO) system, one of the top recognised energy saving technologies. Powerstar, is the only VO system in the world with a Patent granted on its design (Pat. No.1014460.8.), and is a global leader in the VO market. With more than 6.500 Powerstar installations worldwide, the company is in an ideal position to expand it ...
Voir le projet

 1

 TERMINÉ 

H2POWER_Hydrogen in fuel gas (H2POWER)

Date du début: 1 sept. 2010, Date de fin: 31 oct. 2013,

...ce hydrogen from electrolysis with zero greenhouse gas emissions. This process can be implemented entirely on-site, thus avoiding transport costs typical of other kind of fuels, and allowing complete energy resource planning. Objectives The general aim of the H2POWER project was to demonstrate the conversion of a methan ...
Voir le projet

 5

 TERMINÉ 

Clean energy from ocean waves (CEFOW)

Date du début: 1 juin 2015, Date de fin: 31 mai 2020,

...howed the feasibility of power generation with single device deployments and MW-scale performance within several testing periods of several years. The next step beyond this is to deploy multiple wave energy converters in MW-scale with improved power generation capability and demonstrate that they are able to survive rough sea conditions over a period of several years. Clean Energy From Ocean Waves ...
Voir le projet

 10

 TERMINÉ 

OPTILIFT offshore lifting and logistics (OPTILIFT)

Date du début: 1 mai 2015, Date de fin: 30 sept. 2015,

...feasibility study will perform risk assessment for different parts of the system, determine possible technical improvements, provide in-depth analysis on potential customers in oil /gas and renewable energy industries, analyze worldwide regulatory and/or standard requirements, and perform assessments related to IPR.
Voir le projet

 1

 TERMINÉ 
... About 252 million tonnes of municipal waste is generated each year in the EU (2010 statistics), of which 37% are landfilled, 24% recycled, 14% composted and the rest incinerated with or without energy recovery. Although the EU has built a strong set of waste legislation, adequate implementation is still missing in many parts of the EU. The most important deviation from the EC waste managem ...
Voir le projet

 6

 TERMINÉ 
...to be presented at Supercomputing’11. Copernicus completely removes the need to deal with single simulations, and allows users to specify workflows - directly on their laptop - in terms of free energy calculations or sampling of complex processes such as protein folding. Workflows are transparently uploaded to a server and split into distributed calculation workunits (e.g. in a company), computer ...
Voir le projet

 2

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 30 sept. 2016,

...engineering students do a 3-month minimum stay abroad in a university or in a company to be granted the Diplôme d’Ingénieur of Ecole centrale de Lyon. In September 2012, ECL launched a degree in Energy Engineering open to apprenticeship and continuous professional training. To get the trainees ready to work in a global environment, foreign language training and a minimum 2-month stay abroad are p ...
Voir le projet

 1

 TERMINÉ 

Innovation Enterprise Initiative (Innovate)

Date du début: 31 déc. 2003, Date de fin: 30 déc. 2008,

...is the strong links between academic institutions and industry to create a Cross Border Innovation Research Network. This action learning approach meant that busy owner/managers could devote time and energy on real ideas for their business. This will continue to transfer knowledge to industry and vica versa. The impact can be seen on the ground with many local Omagh and Leitrim firms using new pro ...
Voir le projet

 1

 TERMINÉ 

RENewable AdvancEd GAsification FeedstockS (RENEGAS)

Date du début: 1 août 2015, Date de fin: 31 déc. 2015,

Refgas Limited has found a unique combined solution addressing both – energy and waste – issues. Company has developed an advanced gasification system that uses bio-waste to produce clean and high quality synthetic gas that can be used for power generation for electricity and heat. The Refgas system uses downdraft gasification technology that is widely accepted as the cleanest and most efficient ...
Voir le projet

 1

 TERMINÉ 
...tion, instrumentation and testing, and modelling (DTU-Risoe, Imperial College, ECN, EIFER and CEA) and also from a fuel cell stack manufacturer that can produce electrolyser stacks (TOFC) and from an energy company (HELION) that can specify the operation conditions and assess the competitiveness of the innovative electrolyser prototype and its potential integration. The main issue addressed in t ...
Voir le projet

 7

 TERMINÉ 

Towards Autonomous Large Area Mass Production Sputtering Plants (OUTERMOST)

Date du début: 1 avr. 2016, Date de fin: 30 sept. 2016,

... inefficient human labor. There are no commercially available solutions on the market enabling full automation of thin film production plants. That explains low production rates, waste of materials & energy, high operating costs, and increased overall inefficiency of thin film industry, which also has a direct negative impact on other industries dependent on using thin film components for goods th ...
Voir le projet

 1

 TERMINÉ 

EUROMETIERS REGION CENTRE-VAL DE LOIRE 2015

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

...étiers Région Centre 2015 project is based on network partners and companies whose role it is to welcome, integrate and train the beneficiaries. This project relies on regional drive and energy. It addresses the training institutes mounting interest in transnational mobility actions which are aimed at encouraging beneficiaries to integrate the working world. The project corresponds to regional st ...
Voir le projet

 7

 TERMINÉ 
SusPIRE project assimilates in its conception the sustainable energy use challenge described in the European SETPLAN and in SPIRE road map. It addresses its efforts to energy intensive industries and within this segment market to energy recovery from residual heat streams. To achieve this goal a two clearly differentiated working areas will be key aspects of this project. Technology area will in ...
Voir le projet

 9

 TERMINÉ 

oPtimized zero-defect high-tech AuTomatic WRAPping machine (PAT WRAP)

Date du début: 1 août 2016, Date de fin: 31 janv. 2017,

...esigned automatic wrapping machine, will ensure higher productivity, onsite and remote monitoring of the whole machine and of the single components, safety process both for machine and operators, energy consumptions and waste reduction. The main result of PAT WRAP will be a reliable, scalable, flexible and customizable wrapping process, which allows to improve the manufacturing process with a redu ...
Voir le projet

 1

 TERMINÉ 
...a series of biopolymers or bioplastics have been developed from natural sources (e.g. wheat, corn and sugarcane); these have environmental benefits, through reduced greenhouse gas emissions and lower energy consumption, economic benefits as alternatives to expensive petroleum products, and reduce reliance on fossil fuels. The European bakery sector produces 3.5 million tonnes of retrodegradated st ...
Voir le projet

 5

 TERMINÉ 
...sume large amounts of water and chemicals, including alkalis, acids and disinfection agents. This generates large amount of contaminated wastewater and organic waste. Cleaning is also one of the most energy-consuming operations in the food industry, generating climate change inducing greenhouse gases, including from fuel combustion for steam production and high temperature processes. In both dairy ...
Voir le projet

 4

 TERMINÉ 

Zagraniczne praktyki zawodowe - nowe perspektywy dla uczniów technikum.

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

... Group ( Language in Totnes - branch of the company) - The United Kingdom. According to the project 24 students (students of nutrition and catering services, landscape architecture and renewable energy) will take part , in job training. The overall time frame of the project is 12 months, whereas each particular job training visit takes 2 weeks and will be carried out as a school practice according ...
Voir le projet

 4

 TERMINÉ 

ADDY: Addicted to Europe – Competences through Mobility

Date du début: 1 sept. 2014, Date de fin: 31 août 2016,

...Bildungszentrum Haberhauffe GmbH is a vocational training provider from Berlin. For over 20 years C & Q offers practice-oriented further qualification in growth industries (Biotech and Life Sciences, Energy and Environment, Knowledge and Content Management, Personality and Society, Knowledge and Organization, Occupational Health and Safety). Furthermore C & Q provides clients with comprehensive ad ...
Voir le projet

 2

 TERMINÉ 
...lants; (ii) in a collaboration with the University of Algarve, develop model-based predictive control systems able to maximise people's thermal comfort in buildings, while simultaneously minimise the energy spent in achieving it. The goal is contributing with methods able to decrease energy consumption by climate conditioning devices in buildings, a measure which is estimated to potentially save 8 ...
Voir le projet

 1

 TERMINÉ 
...of the project. 148 young people will participate in this internship project; they will be distributed by courses that cover the following areas: computer science; electricity and energy; administration and management; chemistry; tourism and hospitality; health and sports. Before the mobility takes place, an educational plan will be implemented which will include the different types of jobs carrie ...
Voir le projet

 6

 TERMINÉ 
...not so much the existence of proper tools but rather the lack of understanding and knowledge on how they should be applied and in which context. Furthermore, suitable tools for analysing resource and energy efficiency within the process industries and across the different sectors should be recognized.The aim of the SAMT project is to review and make recommendations about the most potential sustain ...
Voir le projet

 12

 TERMINÉ 

Internationale Kompetenzen für Auszubildende am Adolf-Kolping-Berufskolleg

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

...stants and design technology assistants) and in Lisbon (design technology assistants). This application aimed at trainees of initial vocational training of the dual system: - electronics technicians (energy and building technology); - electronics technicians (for industrial engineering); - IT system electronics technicians; - IT specialist (in system integration); - plant mechanics for sanitary, h ...
Voir le projet

 9

 TERMINÉ 
Europe aims at fully decarbonizing its economy by 2050. It requires the in-depth renovation of existing buildings to make them much more energy efficient through high quality refurbishment processes (design, construction and maintenance): high quality processes are needed to narrow down to-day’s measured energy performance gaps between what is foreseen for the refurbishment by design and the real ...
Voir le projet

 1

 TERMINÉ 

DEMOnstration for Tidal Industry DErisking (DEMOTIDE)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

...s at a critical stage. Successful demonstration of small-scale tidal arrays with lessons learnt for future large-scale projects is widely acknowledged as a key way to de-risk and kick-start the tidal energy industry. The DEMOTIDE project will design, build and operate a 4 x 1.5MW (6MW) turbine array at the MeyGen Phase 1B site, Pentland Firth, Scotland. The potential for build-out on the MeyGen si ...
Voir le projet

 6

 TERMINÉ 

The Greenest Tissue Paper in the World (ONEPLY)

Date du début: 1 déc. 2015, Date de fin: 31 mai 2017,

... in real time, allows the development of new products under custom-made orders. This is the background behind the OnePly® tissue paper, a monolayer product which reduces the need for raw materials, energy and water.Oneply is a product aiming to achieve the goals of TAD paper quality with a 80% cut in energy and 2.56 times in water. This product is designed with one single ply, unlike conventional ...
Voir le projet

 1