Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Due to lack of targeted interventions, compliance issues, insufficient effect sizes and a high non-responder rate to currently available interventions, there is an urgent need to develop innovative and new interventions for chronic paediatric neuropsychiatric disorders, such as Attention-Deficit/Hyperactivity Disorder (ADHD) and Autism Spectrum Disorder (ASD). Transcranial direct current stimulati ...
Voir le projet

 12

 TERMINÉ 

GrowSmarter

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2019,

GrowSmarter aims to:• Improve the quality of life for European citizens by better mobility, housing and the quality of urban infrastructure while improving the citizens economy by lower energy costs and creating as much as 1500 new jobs (on the demonstration level).• Reduce the environmental impact by lower energy needs by 60 % and increased use of renewable energy thus reducing GHG emissions eve ...
Voir le projet

 41

 TERMINÉ 
Despite the fact that iodine deficiency (ID) can easily be prevented by iodine fortification of table salt, industrial salt and cattle food, Europe belongs to the worst regions in terms of access to iodized salt and is seriously ID, resulting in the perpetuation of the single most important, preventable cause of brain damage. European ID is due to significant heterogeneity in prevention and monito ...
Voir le projet

 33

 TERMINÉ 

European Bus System of the Future 2 (EBSF_2)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

"The objective of the EBSF_2 project is to validate different innovative solutions that combine efficiency of the bus system with more attractiveness. Such solutions are meant to represent the most innovative in the areas indicated by the Call: the project will proceed to their final validation before their introduction in the market, avoiding pure simulations or large use of prototypes. Following ...
Voir le projet

 43

 TERMINÉ 

Training Course on Alternative Conflict Resolution in Youth Projects

Date du début: 19 août 2016, Date de fin: 18 déc. 2016,

‘CONNECTORS 2.0’ is an 9 days training course for 35 youth workers, activist, volunteer from 13 countries that aims to equip them with a set of professional tools and methods that can help support dialogue, integration and cooperation despite boundaries in youth projects. Intercultural barriers, issues in communication, lack of understanding of interests, radicalisation and focus only on their own ...
Voir le projet

 13

 TERMINÉ 
Be Wiser examines organisation and technical research challenges in some of Europe’s best known RTD regions. The technology focus is on wireless internet security; while the organisational challenge is to more effectively utilise Triple Helix clusters in regional innovation processes. This approach will strengthen Europe’s position in wireless rollout and address the challenges set out in the Digi ...
Voir le projet

 14

 TERMINÉ 
The project in briefThe generation of organic solid waste is rising significantly everywhere in the Mediterranean region due to populations increase and development of industrial and agricultural sectors. This situation causes growing pressure on groundwater, soil and air and calls for strategies allowing for sound waste management systems.In addition to the lack in some Mediterranean countries of ...
Voir le projet

 8

 TERMINÉ 

The Green MED Initiative (GMI)

Date du début: 1 déc. 2012, Date de fin: 30 nov. 2015,

The project in briefThe approach to waste management as well as the common values of the European Union and the Mediterranean Partner Countries are based on three principles: waste prevention, recycling and re-use, improvement of final disposal and waste monitoring. The success of the strategy is highly dependent on the effective implementation of unified actions at Mediterranean level creating op ...
Voir le projet

 12

 TERMINÉ 

The Intelligent, Innovative, Integrated Bus Systems (3iBS)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2015,

3iBS is a project conceived to continue striving for increased performance, accessibility and efficiency of urban bus systems. 3iBS is participating directly in the objective of the European Commission to develop “high quality public transport”.Based on the EBSF results and innovations as well as on previous and ongoing research projects and activities, 3iBS is committed to raise the image of the ...
Voir le projet

 11

 TERMINÉ 
The COMBIOSERVE consortium aims to identify the conditions and principles of successful community-based conservation in selected locations in Mexico, Brazil and Bolivia, working in partnership with local Civil Society Organisations (CSOs) and indigenous communities. Many Latin American and Caribbean rural and indigenous communities have historically developed strategies to regulate land use and co ...
Voir le projet

 11

 TERMINÉ 

Climate Neutral Urban Districts in Europe (CLUE)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

The project idea Climate Neutral Urban Districts in Europe (CLUE) was formulated by a team of experts at the City of Stockholm and KTH Royal Institute of Technology in Stockholm. The project idea was first presented during the EU Interregional Cooperation Forum, 20/21 September 2007, Lisbon. The objective of the CLUE regional development project is increased regional capacity in policy development ...
Voir le projet

 12

 TERMINÉ 

INNOvating entrepreneurship policies in the CRAFTS sector (INNOCRAFTS)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

... and Crafts (France); Public Foundation The Legacy of al-Andalus; Bistrita Municipality; Regional Association of Municipalities Central Stara Planina; Municipality of Burgas; Chamber of Commerce of Barcelona; Budapest Entreprise Agency; Aalto University School of Art and Design-University of Vaasa; Municipality of Riga; Vilnius Old Town Renewal Agency; Craft Council Ireland; Municipality of Reims ...
Voir le projet

 15

 TERMINÉ 

Green IT Network Europe (GreenITNet)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...e. The vastness of the task requires strong cooperation and exchange of experience to pool resources and expertise. The main objective of GreenITNet is to support 10 partners (Riga, Manchester, Rome, Barcelona, Amsterdam, Catania, Oresund, Malta, Kranj, Czestochowa) and a large network of other cities and regions to develop a systematic Green IT policy framework and select a number of good practis ...
Voir le projet

 11

 TERMINÉ 

Green Infrastructure Network (GreenInfraNet)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...he topic and is now developing a green infrastructure strategy (due 2011).In order to learn from and apply this experience, a team of 12 partners has been formed: Flevoland Province (NL), Barcelona Province (ES), Fingal County (IE), Plovdiv Regional Development Agency (BG), Azores Regional Government (PT), Nicosia Development Agency (CY), Emilia-Romagna Region (IT), Ghajnsielem Municipality (MT), ...
Voir le projet

 12

 TERMINÉ 

Furthering Strategic Urban Research (URBAN-NEXUS)

Date du début: 1 sept. 2011, Date de fin: 31 août 2014,

European cities face many significant challenges, including the current economic crisis, urban sprawl, and the longer-term implications of climate change and resource scarcity. To face up to and overcome these challenges, it has become urgent for all concerned stakeholders to collaborate.URBAN-NEXUS, a coordination action, will develop and use structured dialogues to encourage communication, exch ...
Voir le projet

 14

 TERMINÉ 
... gastronomy, traditional skills & trades, cycling for tourists in heritage destinations). Thematic Workshops have been scheduled and partner roles confirmed. 4. Joint Training Course has been held in Barcelona, organised by partner Ibertur-University of Barcelona where partners contributed both as speakers/trainers and trainees, on the selected good practices.
Voir le projet

 13

 TERMINÉ 
"Many efforts have been deployed for developing Integrated Coastal Zone Management (ICZM) in the Mediterranean and the Black Sea. Both basins have, and continue to suffer severe environmental degradation. In many areas this has led to unsustainable trends, which have impacted, on economic activities and human well-being. An important progress has been made with the launch of the ICZM Protocol for ...
Voir le projet

 24

 TERMINÉ 
The aim of MEDIWAT is to provide innovative and sustainable technical, operational and managerial solutions for tackling problems caused by water resources -quality worsening and -shortage in Med insular context. The main deliverables will be: 1) a web database and advisory platform through which realizing and maintaining an inter-islands network of expertises and cooperation 2) two strategic mas ...
Voir le projet

 10

 TERMINÉ 
The Black Sea Catchment is internationally known as one of ecologically unsustainable development and inadequate resource management, which has led to severe environmental, social and economic problems. EnviroGRIDS @ Black Sea Catchment aims at building the capacities of regional stakeholders to use new international standards to gather, store, distribute, analyze, visualize and disseminate crucia ...
Voir le projet

 30

 TERMINÉ 

CREATIVE REGIONS (CREA.RE)

Date du début: 31 déc. 2009, Date de fin: 30 mars 2013,

The renewed Lisbon strategy for growth and jobs in the EU is based on the notion that Europe’s potential for future economic development is directly linked to its ability to create and promote high-value, innovative and research-based economic sectors. The Creative Sector (CS) contributed to 2.6% of EU GDP in 2003, whereas in the same year food, beverage and tobacco manufacturing sector accounted ...
Voir le projet

 12

 TERMINÉ 

EMMA-Entrepreneurship Methodology Mediterranean Assistance (EMMA)

Date du début: 31 mai 2010, Date de fin: 29 nov. 2012,

EMMA project born by the necessity to sustain the public-private cooperation process in the field of SMEs with women management, particularly in this period of economic worldwide crisis. The milestones of project are: Development of a Public-Private Med Round Table for defining guidelines for improve SMEs environment; Realisation of Guidance Points on territories; Setting up of 4 transnational ...
Voir le projet

 9

 TERMINÉ 

Low Cost Zero Waste Municipality (ZERO WASTE)

Date du début: 30 avr. 2009, Date de fin: 29 avr. 2012,

The project Zero Waste aims at developing an integrated zero-waste management system with the aim to maximize resources and energy and to reduce the amount of waste that ends up in landfills, deviating the amount of materials and resources in order to re-use them and include them in recycling schemes and processes that act as drivers of economic activity and sustainable development of the regions. ...
Voir le projet

 7

 TERMINÉ 

Sharing Experience Europe - policy innovation design (SEE)

Date du début: 30 sept. 2008, Date de fin: 29 juin 2011,

As Europe strives to develop a knowledge-based economy and exploit innovation as a tool for economic growth, it is vital to ensure that innovative ideas actually manifest as successful products and services. Investment in R&D and innovation must be encouraged, but it is equally important for countries to be prepared to convert this knowledge into commercial products and services. Design is seen ar ...
Voir le projet

 12

 TERMINÉ 
The Intergovernmental Panel on Climate Change (IPCC) has been pivotal in raising awareness on the costs of human inaction and interference with the climate system. The IPCC also indicated the urgency for studies disaggregated to the regional and even local scale. Furthermore, the IPCC identified a strong need for scenarios at regional and local scales to enable appropriate impact assessments. In i ...
Voir le projet

 13

 TERMINÉ 

Future Orientations for Cities (FOCI)

Date du début: 31 juil. 2008, Date de fin: 30 nov. 2010,

Cities and urban development are a focal point of current territorial development policy. Against the background of the Lisbon Agenda’s aim of growth and jobs, cities are seen as the main potential motors for the achievement of the set goals, which was also acknowledged in EU Cohesion policy documents for 2007 – 2013, including the Community Strategic Guidelines, as well as the Territorial Agenda ...
Voir le projet

 7

 TERMINÉ 
SRNs ultimate aim is to ensure that Structural Fund programmes are delivered more effectively. It is achieving this by creating an arena in which partners can exchange experience and identify good practice that can improve the delivery of Structural Funds and be used in the development of new projects. The network is focusing on delivering programmes in sub-regional areas – those containing fewer ...
Voir le projet

 12

 TERMINÉ 
Background The world's water resources are under increasing pressure as a result of a growth in demand. The EU defines water, not as a commercial product, but as a heritage that must be protected, and water is a critical development factor in many countries. For example, the overuse of water supplies can result in desertification in some areas. A recogn ...
Voir le projet

 9

 TERMINÉ 

Strategic development and co-operation between airport regions (STRAIR)

Date du début: 31 déc. 2004, Date de fin: 30 oct. 2007,

...iness development indirectly related to airports: -Developing a Joint Action Plan for Business Development around Stockholm-Arlanda Airport, -Encouraging Aerospace Cluster Development-The Case of the Barcelona Airport Area,-Professional Profiles and Education and Training Needs in the Aerospace Sector,Challenges&opportunities offered in Catalonia's Aerospace Park, -Analysis of flow of goods in the ...
Voir le projet

 16

 TERMINÉ 

Greening Regional Development Programmes (GRDP)

Date du début: 30 juin 2004, Date de fin: 30 oct. 2007,

GRDP’s overall aim is to deal with this issue by enabling regions to collaborate and share best practice on how the environment can be better integrated into all programmes benefiting from Structural Funds. This is intended to lead to the development of more effective regional programmes that deliver sustainable results for local people. GRDP will also draft a common European methodology for integ ...
Voir le projet

 18

 TERMINÉ 

Impacts of cultural heritage and identity (Cultural heritage)

Date du début: 12 oct. 2004, Date de fin: 30 nov. 2006,

The concept of cultural heritage and identity includes a multitude of tangible as well as intangible components. The project has to focus mainly on tangible components, such as cultural landscapes, sites, monuments, cultural facilities, but also on more intangible components, such as events, identity, cultural jobs, intellectual productions, which are all considered as key assets for territorial d ...
Voir le projet

 12

 TERMINÉ 
The Comenius network "Partnership and Participation for a Sustainable Tomorrow",SUPPORT, has been established in order to address the need to enhance the quality ofeducational practices and material in line with the challenges of sustainabledevelopment (SD). The overall objective is to promote education for sustainabledevelopment (ESD) in European schools. The project will bring concepts and issue ...
Voir le projet

 31

 TERMINÉ 

Media Cottage

Date du début: 1 déc. 2008,

The multicultural youth exchange Media cottage is a project within the Youth in Action program and will take place on the mountain of Velika Planina near Kamnik, Slovenia. The main theme of the project will be intercultural dialogue through multimedia (video, photography and internet). Participants will get a basic knowledge on how to use media to express their ideas and learn how to perceive medi ...
Voir le projet

 6

 TERMINÉ 
We are building a community in our own network by using European stimulants with all envisioned stakeholders to collaborate for sustainable development. We all live the development circle within the multilateral network. We aim to collect and examine existing good practices of school-community collaboration in order to foster the formation of similar networks working together for sustainability th ...
Voir le projet

 29

 TERMINÉ 

Learn for Work and Life! One Step Up.

Date du début: 1 déc. 2011,

The LeWeL Up project (Learn for Work and Life! One Step Up) seeks to tackle the question of how education and training can facilitate work migration for disadvantaged individuals and motivate them to embark on novel learning opportunities. In theory, new job opportunities may be appealing, but the process can be confusing or intimidating. “Learning is learnable” must become a reality for these les ...
Voir le projet

 7

 TERMINÉ 
MEDLAND2020 has as main objective to promote international cooperation towards a common integral land management scheme to protect natural resources in synergy with social and economical valorisation in the Mediterranean. The specific objectives of the project are: 1. Create synergies among projects and partners and build up a -network of networks-� in the Mediterranean context, with all its speci ...
Voir le projet

 14

 TERMINÉ 
Les objectifs principaux du dossier Pirineos 21 partie A consistent a : - sensibiliser les populations locales aux activités économiques des Pyrénées - sensibiliser les visiteurs ( alpinistes, touristes …)a la qualité de lenvironnement et aux ressources naturelles existant dans les Pyrénées - faire en sorte que ces destinataires adherent aux principes du programme et participent a son exécution en ...
Voir le projet

 7

 TERMINÉ 

Cultural clusters - to be discovered

Date du début: 2 déc. 2007,

Cultural clusters - to be discovered is an EVS group project that requires the involvement of 52 EVS volunteers from 15 states, but also 26 local volunteers. The project is coordinated by the Millennium Center Association whom also takes the responsibility as a hosting organisation, the number of sending organisations being in a number of 24.The project is structured in two stages each of 6 months ...
Voir le projet

 35

 TERMINÉ 
COASTGAP springs after more than 10 years of shared experiences among many Mediterranean coastal Administrations and Institutions in the field of coastal adaptation to CC effects and other natural/anthropogenic threats. In 2011 these actors established the cluster FACECOAST (www.facecoast.eu) and propose COASTGAP in order to capitalize 12 Best Practices from 9 projects of the cluster (from MED and ...
Voir le projet

 15

 TERMINÉ 
A key objective of smart cities is the development and implementation of intelligent and sustainable mobility solutions. Urban areas consume up to 70% of the energy produced and transport is a leading sector consuming non renewable energy and producing the biggest amount of GHG emissions in cities (30% of total emissions). Within this context, urban freight distribution requires for innovative sol ...
Voir le projet

 11

 TERMINÉ 
The project Q.LIME has the objet to develop a vocational training opportunity related to "IRP and licensing management". Specifically the project aims at producing innovative training materials that will be designed by a partnership made up of six partners.In order to achieve quality of the above mentionned materials ther partnershipwill share their experience of "creating sustems" sa as to encour ...
Voir le projet

 10