Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Mitigation in Urban areas: Solutions for Innovative Cities (MUSIC)

Date du début: 8 avr. 2009, Date de fin: 29 juin 2014,

...ments. hospitals. school boards. businesses. building owners and energy agencies. 2 Integrating Energy in urban planning and enable monitoring of effects - development of a Geospatial Urban Energy Information and Support System (WP2). Development and testing of a GIS-based system for developing energy maps and scenarios to obtain an insight in opportunities for energy reduction in urban plannin ...
Voir le projet

 7

 TERMINÉ 
...feguarded 10 more. ECOREG proved that Industrial Symbiosis can deliver environmental, economic and social benefits in one of the poorest regions in Romania. Further information on the project can be found in the project's layman report and After-LIFE Communication Plan (see "Read more" section).
Voir le projet

 4

 TERMINÉ 

Capacity building for sustainable tourism development (CBSTD)

Date du début: 22 janv. 2007, Date de fin: 21 déc. 2009,

...Label to strengthen particularly SMEs active in the tourism sector; Promoting greater awareness among the Albanian tourism sector of international environmental standards and other environmental information; Creating an effective link between the scientific community involved in tourism and decision makers; Supporting the establishment of a new administrative structure dealing with sustainable ...
Voir le projet

 6

 TERMINÉ 

Improvement of Industrial Hazardous Waste Management in Turkey (HAWAMAN)

Date du début: 1 janv. 2007, Date de fin: 30 avr. 2009,

...ion system at national scale. For this, extensive preparation efforts were required, as the existing data on hazardous waste generating industries were not harmonised between the different sources of information. Close cooperation with the Turkish Union of Chambers and Commodity Exchanges and with the Turkish Statistical Institute was required to obtain reliable data and to ensure the harmony of t ...
Voir le projet

 2

 TERMINÉ 
... benefit of all partners and was to ensure the multiplication and the durability of the project’s results. Another important component of the project comprised the activities for dissemination of information and raising the public awareness of the need for the rational use of energy. This provided a good visibility of the project’s activities and improved the understanding between the producers of ...
Voir le projet

 11

 TERMINÉ 
...ntil autonomy of their residence. As well, WIDER aims at supporting the selected local SMEs capacities of local, national, European and international cooperation, clustering and networking to share information, create synergies, capitalize and disseminate experiences and results. Besides, it will be strengthened the cooperation between SMEs, research, innovation centres, intermediary bodies to fos ...
Voir le projet

 10

 TERMINÉ 

WARELA (Water Retention by Land Use) (WARELA)

Date du début: 31 août 2003, Date de fin: 30 déc. 2006,

... excursions into the demonstration areas. Effective land-use measures to retain water, wherever it was possible, were explored and implemented in the WaReLa-test-sites. With the help of a geographic information system (GIS)-based tool flood generating areas can be visualized as hot spots for run-off mitigating and delaying measures. Also the spatial flood and retention potential within the low-mou ...
Voir le projet

 10

 TERMINÉ 

RECO Baltic 21 Tech (RB21T)

Date du début: 16 sept. 2010, Date de fin: 15 déc. 2013,

... The target group for the Investment Concept is municipalities with the aim to strengthen their capacity fulfilling the EU-/national-legislation. RB21T has sett up a database with waste related information on experts, equipment, financing options as well as reference objects (that can be visited). The long awaited database (Envirobase) aims, for problem owners facing waste management investment, t ...
Voir le projet

 14

 TERMINÉ 
...forest protection on the local forest and tourism industry were investigated. An MSc thesis on implications of tourism in protected areas as a source of local, forest-based income was completed. More information can be found at: www.northerntosia.org/portal/case_study_in_norway More information on ToSIA, all cases and the project is available on the Northern ToSIA website (www.northerntosia.org) ...
Voir le projet

 5

 TERMINÉ 

NOFDP - Nature-Oriented Flood Damage Prevention (NOFDP)

Date du début: 30 sept. 2002, Date de fin: 29 juin 2008,

...partners from Germany and the Netherlands including four waterboards, the German Federal Institute of Hydrology and a group of outside experts. The main output of the project is the development of an Information and Decision Support System" (IDSS) software which will couple databases and integrated modelling techniques. This combined toolbox of hydraulic, hydrologic and ecological models will prov ...
Voir le projet

 7

 TERMINÉ 
... developed for seed collection and storing of wild vascular plants, assessing the existing seed collection and ex-situ storage methodologies; Develop a computer-based information system for data management of the Pannonian Seed Bank; Establish storage capacity capacities for duplicates at two geographically different locations: in a mine in the Aggtelek National Park, and at the Institute of Ec ...
Voir le projet

 3

 TERMINÉ 

Culture, Nature and Tourism network (KNOT)

Date du début: 31 déc. 2003, Date de fin: 30 déc. 2006,

...to promote sustainable tourism and rural development. The partners aim to increase their competences in cultural and natural heritage management and to create joint tools for easier access to tourist information via the Internet and mobile phone. Achievements: The opera ...
Voir le projet

 11

 TERMINÉ 
...ies across the MED Basin, ii) all relevant actors in the maritime transfers and iii) ports and their logistic activities areas, through the use of modern ICT technologies that will be used to enhance information management systems - Define an integrated management model involving public and private organizations (in ports and their logistic activities areas) and devise a common and harmonized MED ...
Voir le projet

 8

 TERMINÉ 
...n.3 INTERREG.TRAINING SESSION to support policymakers to better understand their requirements and facilitates the transfer of GP,relative success and durability3.comm.activities supporting pj through information+publicity activities to ensure pj results disseminat. Achievements: ...
Voir le projet

 15

 TERMINÉ 

Borders for people (HUSKROUA/0901/069)

Date du début: 28 sept. 2010, Date de fin: 27 sept. 2012,

... Achievements: 1. Developed methodology of international monitoring of transborder cooperation which will contribute to obtainment of maximally full and objective information about the actual status of transborder cooperation and its scientific forecasting 2. Based on accumulated experiences of neighboring countries, an established and efficiently functional inte ...
Voir le projet

 2

 TERMINÉ 

Development of Hereditary Cancer Prevention Measures in Pskov Region (HeCaPrev)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2013,

...ed hereditary cancer screening and management system model and combating hereditary cancer in border regions. More specifically the project will address the following specific objectives 1) to ensure information and experience exchange about HC, its preventitive measures and management; 2) to raise awareness on HC as managable and curable disease; 3) to identify high HC risk individuals through HC ...
Voir le projet

 2

 TERMINÉ 

Sustainable Management of Urban Rivers & Foodplains (Smurf)

Date du début: 1 août 2002, Date de fin: 31 juil. 2005,

... the project generated. The innovative river modelling aspect of the project is continuing to be evaluated. The system used during the project was the Geographical Information System (GIS), which manages and analyses the environment by linking recorded data to geographic information such as maps. While difficulties remain in applying this technology, the organisers say that the project demonstr ...
Voir le projet

 5

 TERMINÉ 
... and others are planned, including a collector tunnel which will drain the overflow from unitary collectors. In order to operate this equipment, periodic effluent analyses are insufficient. Real time information on the state of the natural environment and the quality of collected water is needed. Objectives The general o ...
Voir le projet

 3

 TERMINÉ 

Habitat Management and Raptor Conservation in Nestos Delta and Gorge (Nestos)

Date du début: 1 juil. 2002, Date de fin: 31 déc. 2006,

...rame of the project. A more positive experience of cooperation was the networking with four other LIFE-Nature projects undertaken in Ramsar sites: Prespa; Evros; Amvrakikos; and Kotychi. Further information on the project can be found in the project's layman report and After-LIFE Conservation Plan (see "Read more" section).
Voir le projet

 7

 TERMINÉ 
...vation. As a consequence, systematic management often loses its focus, from continual performance improvement to certification requirements. The increasing requirement for different environmental information means that the collation and aggregation of environmental data between numerous stakeholders is becoming increasingly impractical. In addition, EMS in itself does not always solve many of ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...y providing support services and monitoring, and issuing the relevant final certificates/transcripts at the end of the mobility period. As far as outgoing mobility is concerned, we provided detailed information on all the opportunities available to students and staff through the Programme and, after the signature of the Interuniversity Agreements with its network of consolidated partners, candida ...
Voir le projet

 1

 TERMINÉ 
...ourses provide very limited or no possibilities to experience new forms of training courses or to attend training courses in other European countries. In spite of that there is no influence of the information, practical attitudes, methods and didactic information from other regions/countries which would allow a quality development of the range of the local educational courses. The aim of this proj ...
Voir le projet

 2

 TERMINÉ 

Teacher Development

Date du début: 1 août 2014, Date de fin: 31 juil. 2015,

...l. They aim to develop professional skills necessary for teaching and learning using modern, interactive, student-centered methods, and digital skills so important in the management and processing of information in acquiring knowledge and adapting to new approaches that will enhance the abilities, skills and European awareness to both teachers and pupils. The project aims to train, through mobilit ...
Voir le projet

 3

 TERMINÉ 

DEVELOPMENT OF NEW TEACHERS SKILLS

Date du début: 20 juil. 2014, Date de fin: 19 juil. 2015,

...include: 1) to foster the awareness of the European dimension of the training system, including the certification of skills and credits, through training courses for teachers and the dissemination of information materials (paper and / or digital); 2) to encourage the international mobility of teachers and exchange of educational and training experiences; 3) to activate courses according to CLIL (C ...
Voir le projet

 2

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juil. 2014, Date de fin: 31 oct. 2015,

...y they are more able to adapt to and act in new situations (94%), to cooperate with people from other backgrounds and cultures (95%), to reach decisions (89%), to think and analyse information critically (87%). Also they are more confident and convinced of their abilities (96%) more interested in European topics (82%), more open-minded and curious about new challenges (97%), tolerant towards other ...
Voir le projet

 1

 TERMINÉ 
...this new activity the teaching staff needs to improve their skills in working with the students of special needs and with the disabled. It is very important for the teachers to get to know the newest information about the possibilities of VR for disabled, teaching methods and apply the best practices while working with disabled and the students of special needs. The aims of the project was:1. To i ...
Voir le projet

 9

 TERMINÉ 

ΕΚΠΑΙΔΕΥΣΗ ΕΚΠΑΙΔΕΥΤΙΚΩΝ ΣΤΗΝ ΤΕΧΝΙΚΗ KNX

Date du début: 1 juin 2014, Date de fin: 31 mai 2015,

...site to follow the course: None Duration of course: 30 hours Training documentation: standardized Notes to pass both exams: 50 % Course given by: KNX Certified Tutor b) Exchange of information and practices to improve services, machinery, construction and c) The dialogue of experts (qualified teaching staff and corporate) on know-how - automation technology and security systems. The place of im ...
Voir le projet

 2

 TERMINÉ 
... and disciplines of the school unit, will participate to the project, with 6 accompanying teachers, in three flows. In the flow with destination Italy will participate 15 students from the fields of Information Technology, Engineering and Vehicles. In the flow with destination Germany will participate 15 students from the fields of Structural Engineering, Electronic, Electrology. In the flow with ...
Voir le projet

 4

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...tional value. The staff involved ensures the necessary support for the preparation, implementation and recognition of the activities carried out during the period of mobility as well as disseminates information about the Programme; it is involved not only in program management but also in a more large internationalization process that identifies the raising of networks of excellence and joint pro ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...bution of the available funds from Italian Ministry of Education, Universities and Research in proportion to students' income ranges, in order to encourage the participation of less wealthy students. Information and disclosure activities will be intensified, regarding principles and contents of the Erasmus+ Programme, and the benefits that an international mobility experience can produce for the q ...
Voir le projet

 1

 TERMINÉ 

NATURA 2000 in Slovenia - management models and information system (NATSLOMPIS)

Date du début: 1 janv. 2005, Date de fin: 31 déc. 2007,

...Deditel mare (Pulsatilla grandis), improving hydrological conditions, creating new educational trails and the construction of a bird-watching tower. The beneficiary would carry out an ambitious information and awareness raising national campaign, consisting of the setting up a Natura 2000 information system and the organisation of numerous workshops, both at local and national level. ...
Voir le projet

 8

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...rse 2015-2016, she will share her experience with the members of her department and will apply in her educational practice, the learnt technologies. The actions implemented to reach the aims are: ? Information on the program Erasmus + between Students and Teachers ? Diffusion of the Summons ? Search of suitable institutions ? Signature of agreements of formation ? Insurance of the linguistic comp ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...l subjects of the programs were: For the studies mobilities : - Environmental and geomatic engineering - Basic airport planning and design - Sustainable city planning - Land management - Geographical Information systems and cartography For the training mobilities, the students had: - Practical training in aquaculture, with the implementation of a water treatment system, or the implementation of ab ...
Voir le projet

 1

 TERMINÉ 

Módszertani megújulás a mányi Hársfadombi Általános iskolában

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

...ties, etc.), development; - The continuing professional development of methodological renewal efficiency of the institution to ensure that students gain adequate skills in the challenges of the information society (IKT, digital literacy) and the needs of labour markets (project, team, co-operation). For the planned two-year project we have implemented three kinds of activities with the participati ...
Voir le projet

 1

 TERMINÉ 
...o in -omics applications. An early version of Ebiomix was designed and tested for proteomics (e-proxemis.expasy.org). It was developed with a free content management system and contains light textual information complemented with numerous screenshots and visual information in a user-friendly environment. A collection of case studies is indexed for finding representative and practical usages of eac ...
Voir le projet

 3

 TERMINÉ 
...the Thematic Monitoring Group 3 and proposes the valorisation of existing quality practices and approaches at institute and project level, through the development of a sustainable portal, an advanced information system-showcase of quality models and approaches and the networking of stakeholders. The project consist of 3 phases:1)Analysis:Identification and review of quality models and practices. I ...
Voir le projet

 7

 TERMINÉ 
...n certify training institutions with the new standard NP 4512:2012.The consortium of Q-Cert-VET was coordinated and led by Portuguese Centre for Research and Innovation in Business Sciences and Information Systems (CIICESI). It included nine partners from four countries: Germany, Luxembourg, Portugal, and Romania. The University of Duisburg-Essen, Germany, one of the Q-Cert-VET project partners an ...
Voir le projet

 8

 TERMINÉ 
...™s Horizon 2020 programme. SEALEAU will be the technical coordinator of this project, with the Institute of Sustainable Process Technology (ISPT) as overall coordinator. Further information on the project can be found in the project's layman report and After-LIFE Communication Plan (see "Read more" section).
Voir le projet

 3

 TERMINÉ 
...ic component manufacturing processes are highly standardised throughout the industry and as the viability of using the innovative equipment and system has been demonstrated at real scale. Further information on the project can be found in the project's layman report and After-LIFE Communication Plan (see "Read more" section).
Voir le projet

 7

 TERMINÉ 

From Treated Wastewater to Alternative Water Resources in Semi-Arid Regions (PURE)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2014,

... people; poor infrastructure means that the treated wastewater is not fairly or equally distributed (enhanced controls could result in an estimated 30-35% increase in the area irrigated); there is no information about how to safely use the treated wastewater; and there is no pricing for this alternative water resource, resulting in a lack of funds for maintenance of the distribution system. Theref ...
Voir le projet

 4