Rechercher des projets européens

42 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

III Researchers in Real Life (ESC)

Date du début: 1 avr. 2013, Date de fin: 31 oct. 2013,

... (15% increases to 13.500), more social impact through appropriate awareness campaign and more researchers involved in the project (100% of researchers working in Aragon as potential participant).Esciencia Science Events, which will coordinate this project, will use all tools of success of the first edition. Esciencia is a SME which born a spin-off of University of Zaragoza, and nowadays coordinat ...
Voir le projet

 4

 TERMINÉ 

European Security Challenge (ESC)

Date du début: 1 mars 2011, Date de fin: 29 févr. 2012,

"New and innovative technologies are needed more than ever to solve existing and emerging security gaps. Europe is falling behind in addressing these gaps with European inventions. Therefore, we will deliver a study about running a competition in one of these key risk domains to incentivize European innovators to take development risk and conceive disruptive technical solutions, raise awareness of ...
Voir le projet

 3

 TERMINÉ 

European Reseearchers Night: Researchers in Real Life. (ESC)

Date du début: 1 mai 2014, Date de fin: 30 nov. 2015,

...eers to pupils, and we will show researchers in industry and playing different roles; Researchers are everywhere among us.The management team of project will be the same as last editions: Esciencia Eventos Cientificos as coordinator, the University of Zaragoza, ARID Foundation (Government of Aragon), which have half of researchers of Aragon. Cooperating bodies such as The Spanish National Research ...
Voir le projet

 3

 TERMINÉ 

Setting up and Operational Unit under the Environmental Steering Committee (ROSA)

Date du début: 11 nov. 2002, Date de fin: 30 sept. 2004,

...Bosnia Herzegovina (FBiH) and the Republika Srpska (RS), respectively. The two Entities have signed a Memorandum of Understanding in 1998 and established a joint Environmental Steering Committee (ESC) at the national level to remedy the lack of common strategy and policy in environmental management. However, the ESC does not have the capacity and trained personnel to be able to develop inter- ...
Voir le projet

 1

 TERMINÉ 
The enhancement of the street Locarno-Milan-Venice is a perspective of interest in developing tourist areas of Italian-svizzeri.L 'waterway is a journey from the many tourist attractions: a lake, river, parks, city centers and resort cultural and artistic value. Currently the lands are characterized by tourist important matters that concern the city of Locarno, Lake Maggiore, Milan and other c ...
Voir le projet

 2

 TERMINÉ 
...for a sustainable development of the whole areas, and to do is also through "capitalisation on good practices". After 2 planning meetings in 2008 (after VITOUR I) they decided together with 4 other UNESCO world heritage wine growing areas (from P - Pico island, I - Montalcino/Orcia Valley, A - Wachau and CH - Lavaux) to present a new INTERREG IVC project to improve and innovate local and regional ...
Voir le projet

 9

 TERMINÉ 

El Instituto Canarias Cabrera Pinto en Europa

Date du début: 18 déc. 2014, Date de fin: 17 déc. 2016,

This is a project for the Canarias Cabrera Pinto High School, an institution which is located in a beautiful historical building, with important collections inside. Both, the education heritage and the development through different generations is reflected in them. The environment in which young people learn is very important . It is also a center where multilingual education , and exchanges wi ...
Voir le projet

 3

 TERMINÉ 

A novel epigenetic modification in pluripotent stem cells (EpiPluS)

Date du début: 1 sept. 2012, Date de fin: 31 août 2016,

... epigenetic modification that can facilitate DNA demethylation and is associated with pluripotency. I further demonstrated that Tet1 and Tet2 are highly expressed in mouse embryonic stem cells (ESCs) and regulate cell fate specification. ESCs depleted of Tet1 by RNAi show diminished expression of the Nodal antagonist Lefty1, resulting in hyperactive Nodal signaling and skewed differentiation towar ...
Voir le projet

 1

 TERMINÉ 
...e two other networks operating in the field of recognition: the Enic network (European Network of Information Centres) and the Meric network. The former was established by the Council of Europe and Unesco to implement the Lisbon Recognition Convention and, more generally, to develop policies and practices for the recognition of qualification; the latter was launched during the 7th session of the I ...
Voir le projet

 5

 TERMINÉ 
...manufacturers and operators can be confident that rolling stock made of a new material will perform as intended and will be at least as safe as a vehicle made out of the material it replaces. The REFRESCO project aims to achieve this goal by creating the regulatory framework for the use of new structural materials in rail car bodies. The existing certification procedures will be analysed, gaps ide ...
Voir le projet

 19

 TERMINÉ 
...nderwater habitats. Considerable space is devoted retraining of fishermen and the dissemination of results. / Il progetto riguarda la valorizzazione dei prodotti ittici dei laghi insubrici, dove la pesca ha tradizioni antichissime e oggi occupa piu di 400 pescatori di mestiere. Affronta con metodi scientifici la filiera della pesca, definendone la sostenibilita a medio-lungo termine, anche alla l ...
Voir le projet

 10

 TERMINÉ 
The Square Kilometre Array (SKA) is a revolutionary telescope programme that will address a broad range of key science areas in astronomy and fundamental physics. For the past 2.5 years, radio astronomers and funding agencies have joined forces to explore the legal, policy, and technical framework required for the SKA in a Preparatory Phase study called PrepSKA. The principal deliverable of the Pr ...
Voir le projet

 4

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

Erasmus+ Key Action "Mobility of Individuals" activities at Groupe ESC Dijon Bourgogne include Higher education student mobility for studies, placements, staff mobility for teaching and staff mobility for training. STUDENT MOBILITY FOR STUDIES (SMS) Student mobility for studies is an important part of the School's two main degree programmes, mandatory for the Grande Ecole programme students and st ...
Voir le projet

 1

 TERMINÉ 
...tion of the ERA-Net Co-fund proposal. This process is supported by CardioScape an EU-funded survey of the European cardiovascular research landscape coordinated by the European Society of Cardiology (ESC). The current ERA-CVD proposal will extend and strengthen the transnational cooperation of the current 23 ministries/institutions/foundations from 18 European, associated and third countries. Furt ...
Voir le projet

 23

 TERMINÉ 

Restoration of Sentina coastal wetlands (Re.S.C.We.)

Date du début: 15 sept. 2010, Date de fin: 14 mars 2013,

..., with the involvement and support of local stakeholders including tourist organisations. In particular, the project successfully reintroduced native plant species – (Artemisia caerulescens, sea lavender (Limonium narbonense), Plantago cornuti and Ravennagrass (Erianthus ravennae) – and the European pond turtle (Emys orbicularis) that had become extinct due to the disappearance or deteriora ...
Voir le projet

 4

 TERMINÉ 

European Platform for Innovation and Collaboration between Engineer Students

Date du début: 1 sept. 2014, Date de fin: 31 janv. 2017,

EPICES (European Platform for Innovation and Collaboration between Engineer Students) will allow developing a European collaborative at a distance project-based learning framework and method, based on already existing and still developing technical platforms, i.e. collaborative and engineering tools. A special focus will be made on teachers' role and students' coaching, from the analysis of what a ...
Voir le projet

 8

 TERMINÉ 

Development of rescue operations in the Gulf of Finland

Date du début: 21 mars 2011, Date de fin: 20 mars 2014,

...f the crews are the key factors in minimizing risks and thus a major element of safety. The competence of crews is essential to ensure safe, secure and environmentally sound shipping operations. The RescOp project aims to improve maritime training standards. Achievements: ...
Voir le projet

 11

 TERMINÉ 
...ng materials, tools and proceduresThe envisaged impact comprises the reduction of the carbon footprint of SMEs through the promotion of a Corporate Social Responsibility within SMEs rewarded by the "PeSCoS Certified" website badge signifying a reward for diminishing their negative impact on the planet.
Voir le projet

 7

 TERMINÉ 

EU_UP_KA101 - Erasmus Update _ Upskilling People _ KA101

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

The Secondary School of Taipas (SSST) is located in the village of Caldas das Taipas, in the northern part of the Municipality of Guimarães, in the Vale do Ave region. Currently attend the school about 1200 students, spread over 29 classes of the scientific-humanities courses and 19 classes of the Vocational Courses for a total of 763 and 438 students respectively. The school, based on its experie ...
Voir le projet

 1

 TERMINÉ 
Background Wastewater treatment plants can be affected by problems relating to environmental efficiency and the cost/benefit ratio of their operation. Many existing plants do not meet quality requirements and have to be renovated or replaced by new ones. Large plants often cause high local recipient load and eutrophication. Smaller plants may suffer fr ...
Voir le projet

 2

 TERMINÉ 

Education for Sustainable Consumption: a global challenge

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

...narios (LS) about sustainable life – environmental and economic. These LS will be used by pupils between 6 – 12 years old (the developers are older students and teachers); - ESC a global Challenge Magazine - we will test and monitor the Learning Scenarios and the results of the LS application will be showed in local, national and international meetings and in Scientific Congresses; - APPS for tabl ...
Voir le projet

 7

 TERMINÉ 
Regenerating large bone defects is a great challenge in regenerative medicine. Embryonic stem cell (ESC) therapies are an attractive option due to their unlimited proliferation and ability to produce the cell types needed for bone repair. Here, we propose creating a three-dimensional alginate hydrogel that displays bioactive epitopes and has mechanical properties that induce osteogenic different ...
Voir le projet

 2

 TERMINÉ 
Background The presence of the lesser spotted eagle (Aquila pomarina) in Schorfheide-Chorin, northeast Germany, is of great significance. The species can be found 25 km away from the project area, but it has very complex habitat requirements. As a result its numbers are in decline in Brandenburg and Mecklenburg-West Pomerania, where there is increasing lo ...
Voir le projet

 5

 TERMINÉ 

Eastern Mediterranean Biodiversity Panorama (EMBD PANORAMA)

Date du début: 31 mai 2006, Date de fin: 29 avr. 2008,

...ms, local collections, by qualified institutions, will be encouraged and know-how will be provided by the network. A test case on this aspect will be realized through the collaboration with the ESC. All the procedures for this action will be coded to serve as a roadmap for future cases. NHMC will be responsible for coordinating and realizing the part of the project regarding its physical element ( ...
Voir le projet

 3

 TERMINÉ 
We are six schools in six different countries involved in this European Partnership project: France (coordinator country), Estonia, Greece, Italy, Turkey and Iceland. All involved schools have already carried out European partnerships projects. 
We all have an obvious interest in the essential skills of school, but also in the welfare, human and social skills, respect of each other in a good schoo ...
Voir le projet

 6

 TERMINÉ 

Bioavailability of trace metals in anaerobic granular sludge reactors (BIOTRAC)

Date du début: 1 juin 2008, Date de fin: 31 mai 2010,

Research objectives and contentThe effects of the metals Co and Ni on the treatment performance of a continuously operated methanogenic UASB reactor fed with methanol as the substrate will be investigated. The contracted research fellow will carry out a work program to characterize the bioavailable metal fractions in methanogenic granular sludge from an UASB reactor treating a wastewater containin ...
Voir le projet

 1

 TERMINÉ 

European network for the Security of Control and Real-Time Systems (ESCoRTS)

Date du début: 16 juin 2008, Date de fin: 15 déc. 2010,

ESCoRTS is a joint endeavour among EU process industries, utilities, leading manufacturers of control equipment and research institutes, under the lead of CEN, to foster progress towards cyber security of control and communication equipment in Europe. ESCoRTS will be intersectoral, embracing the following industrial fields: power, gas, oil, chemicals and petrochemicals, pharmaceuticals, manufactur ...
Voir le projet

 12

 TERMINÉ 
...dual patient as resulting from clinical-biohumoral and multi-imaging assessment. Overall results will be disseminated in cooperation with the European Society of Cardiology (ESC) and will guide the work of a dedicated ESC Commission which will release specific European Recommendations.
Voir le projet

 22

 TERMINÉ 
...y necessary if climate change proceeds as expected. Objectives The main objective of the Futurescapes project was to encourage the development and implementation of landscape-scale conservation initiatives, involving many partners, in 38 priority areas across the UK. These Futurescape areas cover a total area of over 2. ...
Voir le projet

 1

 TERMINÉ 
"Building on the experience of the PASR SeNTRE and STACCATO, the 2 year CRESCENDO Coordination Action intends to respond to the request of the users and the experts who attended these first workshops to continue working together and to enlarge their activities. They raised concerns on how to improve the innovation process, how to create a real European security market and how to strengthen Europea ...
Voir le projet

 23

 TERMINÉ 

Mobility Support Centre Macedonia (MSC-MACEDONIA)

Date du début: 1 juil. 2008, Date de fin: 30 juin 2011,

...ognized the above-mentioned initiative as a very important issue and appointed the working group to submit the proposal which aims at establishing the Macedonian Network of EURAXESS Services Centres (ESC). The Network will be constituted by the Bridgehead Organization (BHO) itself functioning as EURAXESS Services Centre and four additional EURAXESS Services Centres (ESC) located in each of the fou ...
Voir le projet

 1

 TERMINÉ 

EUROPEAN PHYTOSANITARY RESEARCH COORDINATION II (EUPHRESCO)

Date du début: 1 janv. 2011, Date de fin: 31 mars 2014,

... climate change and EU expansion (increased pathways). In comparison, resources for national plant health inspection services, science programmes and research are declining. For this reason, the EUPHRESCO Phytosanitary ERA-Net was established in 2006, with the full support of the EU Council Working Party of Chief Officers of Plant Health Services. It aimed to better coordinate national, trans-nati ...
Voir le projet

 37

 TERMINÉ 
... lately also pedestrians. Testing programmes for assessment of these passive safety measures have been established. ICT-based safety functions ("active safety") such as electronic stability control (ESC) and lane departure warning (LDW) have been introduced. The largest future improvements of road safety are expected to rely on such safety functions with the aim to prevent accidents from happenin ...
Voir le projet

 3

 TERMINÉ 
...ia a successful and proved tool is already in use, this project aims to transfer this tool, known as Entrepreneur Skills Certificate, to the Czech Republic and Poland.Entrepreneur Skills Certificate (ESC for short) is a conceptual educational program which was awarded European best practice in Oslo 2007 and Good Practice Exchange under the European charter for small enterprises 2008-2009. It consi ...
Voir le projet

 5

 TERMINÉ 
Embryonic stem cells (ESC) have a limitless capacity for self-renewal a remarkable ability to differentiate, promising a limitless source of cells for cell therapies and tissue engineering. Organ scarcity and lack of proliferative ability makes ESC-derived hepatocytes one of the few potential sources of cells for clinical applications and pharmaceutical drug discovery. However, current techniques ...
Voir le projet

 1

 TERMINÉ 

STYLE YOR FUTURE THROUGH EVS

Date du début: 1 janv. 2015, Date de fin: 1 janv. 2017,

...l book and blog page, to organize some activity with young people, to update web side/blok, youth information (EURODESK), outside activities , sport activies, media and communication activities esc., these activities will be substantiated by 10 volunteers who will participate. The project it is aimed: -to contribute to the interaction of cultures -collapse the wall of prejudices -to have a dat ...
Voir le projet

 4

 TERMINÉ 

Demonstration of wastewater treatment in Tunisian tanneries (EAUCUIR)

Date du début: 1 janv. 2005, Date de fin: 31 déc. 2007,

Background The leather sector is one of the most important economic sectors in Tunisia. The EU is the main export market . However, the industrial processes involved in leather production use high quantities of water and chemicals. Waste water containing high levels of organic matter and chemical residues have a very negative impact on the environment. I ...
Voir le projet

 2

 TERMINÉ 
... low and far from routine. Nevertheless, reprogramming with defined factors, Oct4, Sox2, Klf4 and c-Myc, is not a random event. Cells positive for SSEA-1, a marker of undifferentiated mouse ES cells (ESC), appear from cells which have lost the fibroblast marker Thy-1, prior to acquiring other pluripotent markers, e.g. Oct4, Nanog. Similarly, TRA-1-60 positive fully reprogrammed human iPSCs appear ...
Voir le projet

 1

 TERMINÉ 
Machine translation (MT) has increasingly become an indispensable tool for coping with Europe's linguistic diversity. However machine translation systems are complex software applications requiring significant levels of cooperation and coordination to enable research to continue to flourish, and to improve the usage rate amongst commercial translators, and public bodies. This project will provide ...
Voir le projet

 5

 TERMINÉ 
How embryonic stem cells (ESCs) maintain their dual capacity to self-renew and to differentiate into all cell types is one of the fundamental questions in biology. Although this question remains largely open, there is growing evidence suggesting that chromatin plasticity is a fundamental hallmark of ESCs, providing their necessary flexibility.Previously we found that ESCs possess a relatively open ...
Voir le projet

 1

 TERMINÉ 

Groundwater and Global Change - Impacts and Adaptation

Date du début: 15 oct. 2014, Date de fin: 14 oct. 2019,

...ater, surface water, climate and global change, and how we need to consider and can benefit from these interactions when dealing with adaptation.Course durationTwo years (120 ECTS credits).Brief descriptionAs the largest liquid freshwater reservoir on earth, groundwater has both a huge environmental and economic value and will be an essential resource for adaptation to climate change and reduction ...
Voir le projet

 3

 TERMINÉ 

Building peacebuilders through integrated formal and non-formal learning approaches

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

BUILDPEACE will boost the skills and competencies of Europeans in the public, third and private sectors to build peace and connect communities. It will improve the overall provision of teaching, learning and training within the peacebuilding industry by bringing together providers from the formal education (FE) and non-formal education (NFE) sectors in a community of practice. These partners will ...
Voir le projet

 7