Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

motion of Open Specifications and Standards in Europe (POSSE)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...ity Management Areas. At the same time public sector budgets are being cut due to the tight economic conditions whilst public authorities are required to deliver more for less. It is imperative that cost effective solutions must be found in these challenging times. Urban Intelligent Transport Systems (ITS) are a key element in the delivery of sustainable transport policies at the local level and ...
Voir le projet

 9

 TERMINÉ 

Rheumatoid Arthritis and Periodontal Inflammatory Disease (RAPID) (RAPID)

Date du début: 1 avr. 2012, Date de fin: 31 mars 2016,

...f both increases substantially with age, and given both the Europe-wide ageing population and the impact of both diseases upon the economy, health and quality of life, it is clear that novel and more cost effective approaches to management are urgently required.A key research goal of this project is to improve understanding of the pathogenesis of RA and PD and their inter-relationships, through th ...
Voir le projet

 15

 TERMINÉ 

A Toolkit for Developing, Implementing and Monitoring Adult Education Strategies

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2017,

...tools to assess and increase the efficiency of public expenditure and the investment in education, training and youth, including through new funding models such as public-private partnerships, cost-sharing, etc. (Erasmus + , horizontal priority) - Evaluating the effectiveness of adult education policies at national, regional and local levels level (Erasmus +, field specific priority). - EU bench ...
Voir le projet

 6

 TERMINÉ 
...anging the paradigm in data and fare collection systemsEUROPTIMA addresses the need for implementing data and fare collection systems adapted to the requirements of mass transit operators in terms of cost of implementation, cost of operation, modularity of the system and flexibility in terms of fare evolutions, interoperability and customer relationship. In particular, EUROPTIMA targets the small ...
Voir le projet

 7

 TERMINÉ 

Water Enhanced Resource Planning "Where water supply meets demand" (WatERP)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

...comprises 3 tools: (a) Data Warehouse, using semantics and common language, (b) DSS, for coordinating actions, prioritizing water uses, improving distribution efficiency, and saving water, energy and costs, and (c) Demand Management, supporting socio-economical analyses and policies. Open standards will be used to maximize interoperability and data sharing. WatERP technologies will be developed un ...
Voir le projet

 11

 TERMINÉ 
...son to set exposure limit values. Without clear guidance and support, SMEs in the fabrication industry will be put at a competitive disadvantage as they incur a heavy and disproportionate financial cost in order to meet the required standards and ensure a safe working environment for their workers. EMFWELD will significantly lower SMEs’ cost of compliance to Directive 2004/40/EC by providing an in ...
Voir le projet

 7

 TERMINÉ 

Collective awareness platform for outdoor air pollution (hackAIR)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

...stations and open data• user-generated sky-depicting images (either publicly available geo-tagged and time-stamped images posted through social media platforms, or images captured by users• low-cost open hardware devices easily assembled by citizens using commercial off-the-shelf partsA data fusion algorithm and reasoning services will be developed for synthesising heterogeneous air quality data i ...
Voir le projet

 6

 TERMINÉ 

Development of COMBInatorial BIOmarkers for subclinical atherosclerosis (COMBI-BIO)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2014,

... combinatorial set of biomarkers and risk scores for subclinical atherosclerosis. This research should lead to identification of a novel set of combinatorial biomarkers, with potential to develop low-cost tests for subclinical atherosclerosis, for translation into clinical practice."
Voir le projet

 6

 TERMINÉ 
...ject's ultimate aim is to demonstrate that the creation of the new professions of "Building Surveyor" and "Building Maintenance Technician" in accession countries could be both practically useful and cost-efficient in managing building stock. As a first step, the project will develop a new, flexible, learner-centred education system, for graduate professionals or young graduates, combining traditi ...
Voir le projet

 9

 TERMINÉ 

motion of sustainable fishery in Northern Adriatic sea (ADRI.FISH)

Date du début: 31 mars 2002, Date de fin: 29 oct. 2005,

...tional feasibility study for the identification of strategic areas suitable for structural interventions was made, focused on the technical evaluation of a proposal for the right typology, dimension, cost of logistics and commercial structures in the Northern Adriatic Sea. In addition to this, the first Fishers' Association in the Istrian region and the first Fishers' Centre in Izola were establis ...
Voir le projet

 6

 TERMINÉ 

Cross-Mediterranean Environment and Health Network (CROME- LIFE)

Date du début: 1 juil. 2013, Date de fin: 31 déc. 2016,

...l and national authorities in the four demonstration sites. It will thus provide a more reliable scientific basis for environmental and public health protection decision-making, leading to more cost-efficient and effective environmental and public health management. Expected results: Operational demonstration of the use of human biomonitoring data for aggregated and cumulative health impact ass ...
Voir le projet

 4

 TERMINÉ 
... from third countries, the obligation to secure and economic standardization, certification and the need to diversify impose immediate reorganization of the sector’s supply chain, since most of the cost in an agricultural product is the logistics cost. The project submitted by the consortium AGROLOGISTICS ( participating Chambers of Larissa, Magnesia, Trikala, Karditsa and Larissa Farmers Agricult ...
Voir le projet

 9

 TERMINÉ 

Music and Resilience Support

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

Music And Resilience Support (MARS) responds to an urgent and ever increasing need to develop efficient and cost-effective strategies in support of deprived, marginalized communities in diaspora due to military/political/social conflict, both within Europe and farther afield. The project develops of a full training course in psychosocial music intervention, for community musicians, music therapist ...
Voir le projet

 6

 TERMINÉ 

Sustainable Aquaculture of Arctic Charr 2.12 (Northcharr)

Date du début: 31 mai 2008, Date de fin: 30 mai 2011,

... (Norway). -Financing the breeding program of Arctic charr in order to improve the performance of the fish (Sweden and Iceland). -The expensive environmental controls which are much higher than the cost for environmental control of agricultural farms. (Sweden). -The lack of knowledge and interest on matters concerning fish farming in general among the authorities (Sweden). -Help with marketing ...
Voir le projet

 4

 TERMINÉ 
... deliver improvement in water body status in the North West (England) River Basin District; Demonstrate improvements in delivery, through improvement by increasing mobilisation of relevant funds and cost-benefit through the identification of multiple benefits; Demonstrate reduction of technically infeasible measures by addressing difficult issues in river basin management, including diffuse rura ...
Voir le projet

 5

 TERMINÉ 
...requirements which allow them to be sold, distributed and used in the industry.The project will thus develop three innovative processes (water-based synthesis, mechanosynthesis, spray-drying) for cost-effective production of NPMs meeting industrial expectations with improved reliability and repeatability at pilot-scale. The industrial relevance of these NPMs will be demonstrated in four applicatio ...
Voir le projet

 12

 TERMINÉ 
... activity interventions have focused mostly on organizational and behavioural aspects, with disappointing results. In these studies, physiological aspects such as cardiorespiratory capacity or energy cost of activities, were not taken into account or were assumed to be similar to the general population. However, abnormalities in the autonomic response to exercise and higher energy cost of activiti ...
Voir le projet

 1

 TERMINÉ 
Today’s passenger, baggage, and goods security screening works, but at great cost to public authorities and to passengers. Given the continuously evolving and shifting security threats, and passengers being increasingly dissatisfied with queues and intrusive measures, the industry agrees that today’s model is not sustainable in the long term.Goal of the overall ART initiative is the exploitation o ...
Voir le projet

 1

 TERMINÉ 

Towards Integrated Management of Ensis Stocks (TIMES)

Date du début: 28 févr. 2007, Date de fin: 29 juin 2008,

...s the potential changes in abyssal communities depending on the intensity of razor clam fishing. - Major events: The project organised 3 seminars between 2007 and 2009 for a total cost of 11,531.60 euros. It also took part in 2 seminars for which it was not the organiser.
Voir le projet

 4

 TERMINÉ 
...at water management is poor. Technical assistance is needed in issues such as water management, water consumption, wastewater treatment. Institutional and legal assistance are also needed on tariffs, cost recovery, legal representation etc. Objectives The project aimed to improve the sustainable use of water resources in ...
Voir le projet

 1

 TERMINÉ 
...sting, descriptive information on contamination risk/levels, decision support and practical economically-sound suggestions for intervention. Tools and methodologies will be strategically targeted for cost-effective application in the field and during storage, processing and transportation. Alternative and safe ways to use contaminated batches will be also delivered. The focus of Mycokey will be: i ...
Voir le projet

 32

 TERMINÉ 

Juvenil Neuronal Ceroid Lipofuscinosis and Education

Date du début: 1 déc. 2014, Date de fin: 30 nov. 2017,

...available as PDF files. The textbook will be submitted to relevant institutions of higher education, relevant service providers and peer organisations in all participating countries at no cost. Longer term benefits The Working/Steering committee will assist higher education and relevant service providers in preparing curriculums and service portfolios based on the textbook. Training of profession ...
Voir le projet

 7

 TERMINÉ 
...ctromechanical actuation system with health monitoring for primary-control-surface of a small aircraft. It is well-known that the electromechanical actuation will lead to weight saving and life-cycle cost reduction but some critical issues of this technology need to be addressed. The REPRISE project will thus be focused on overcoming these issues and improving technology performance, reliability a ...
Voir le projet

 3

 TERMINÉ 

Capitalising on Partner Initiatives in Mobility Management Services (PIMMS CAPITAL)

Date du début: 31 déc. 2009, Date de fin: 29 nov. 2012,

...ties are split between functions and between different levels of administration. Many budgets need to be engaged in order for mostmobility management actions to be funded – even though they are low-cost. Regions have a crucial lead-role.So the overall objective of PIMMS CAPITAL is to stimulate modal shift towards more sustainable forms of transport by increasing the implementation of high quality ...
Voir le projet

 18

 TERMINÉ 
...he reduced fertility associated particularly with autism and schizophrenia may, through selection pressure, maintain these variants at very low frequency. CNVs are large enough to be identified using cost efficient genome-wide search techniques, such as oligonucleotide arrays. In contrast, rare DNA mutations might confer a large proportion of the overall genetic risk, but cannot be easily identifi ...
Voir le projet

 8

 TERMINÉ 
...the estate level, such as: waste collection; flows of people, matter and energy; landscaping; and wastewater discharges. The intention was thus to identify more sustainable solutions, and at lower cost, thanks to potential scale-savings. These common solutions would deliver economic and environmental benefits that are greater than the savings that each company would realise from optimizing only it ...
Voir le projet

 2

 TERMINÉ 

Mediterranean Intermodal Transit (TRANSit)

Date du début: 30 avr. 2009, Date de fin: 29 sept. 2011,

...iciently operate and fulfill their mission. Furthermore, an online platform for enhancing the optimization of trade-offs between all the components of supply chains as well as between the service and cost aspects of the intermodal modes within them, has been developed and is available through the web address www.transit-med.com. The newsletters developed and more information can be obtained from t ...
Voir le projet

 7

 TERMINÉ 
...investigate” name of Project. The problems becomes for which disuse mechanisation and advanced technology during Harvesting of olive in province Mersin. These problems is become such as high cost, yield loss,deterioration of olive oil. Olive areas in Province Mersin expands growth as of years . Associated with this growth have been become in Olive Marketing problems. This Project is aimed ...
Voir le projet

 1

 TERMINÉ 
...f training. The Leonardo da Vinci programme aims at helping people improve their skills throughout their lives. “the European automotive industry is losing competitiveness as challengers from lower-cost economies have increased their share of world automotive markets” (CLEPA, European Association of automotive supplier’s White paper 2005) . A European solution is required to this problem. EADIS wi ...
Voir le projet

 5

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...anning. - They have you determined the indexes of reliability, availability and maintainability of a production line and its machines. - They have established levels of quantity, availability and cost of spare parts of a machine to ensure compliance with the program of preventive maintenance and repair operations. - Correction of errors and breakdowns in a machine functioning. - Modification of t ...
Voir le projet

 1

 TERMINÉ 

Młodzieżowy animator sportu i rekreacji osób niewidomych.

Date du début: 1 févr. 2015, Date de fin: 30 juin 2016,

...e Blind, as well as blind organizations from other European countries have difficulties in organizing this type of small projects. Using specialist contractors and event organizers really boosts the cost of this type of event, and the quality of services often do not meet the expectations in terms of adapting to the requirements of such events. Safety of the blind. On the labor market lacks appro ...
Voir le projet

 3

 TERMINÉ 

MovEUrope - Europe moved by youth

Date du début: 1 janv. 2015, Date de fin: 31 août 2015,

...quite possible that this project generates trustworthy relationships and friendship relations between young people of different nationalities, who can materialize themselves in low cost holiday in the home of one another, in studying abroad, in future projects, working outside the country, that is, together they can have a new world of experiences. KEY WORDS: Active citizenship; Healthy living; ...
Voir le projet

 3

 TERMINÉ 
...alth care services in our country. Irrational use of medicines, which is increasingly becoming a world-wide problem, needs to be handled more carefully due to the increase in both health problems and costs. Physicians’ consciousness and responsibility for evidence-based and cost-effective prescription should be emphasized; physicians should be regularly informed on technology-based new treatment m ...
Voir le projet

 6

 TERMINÉ 
...al variation. They are particularly useful when inbred lines are available because once these lines have been genotyped they can be phenotyped multiple times, making it possible (as well as extremely cost-effective) to study many different traits in many different environments, while replicating the phenotypic measurements to reduce environmental noise. Here we propose to continue our groundbreaki ...
Voir le projet

 1

 TERMINÉ 

South Baltic Offshore Wind Energy Regions (South Baltic OFFER)

Date du début: 28 févr. 2010, Date de fin: 30 mai 2013,

Offshore wind energy (OWE) has enourmous potential, and its production is highly cost efficient compared to other renewable energy sources (RES). The EC has therefore identified OWE to be of strategic importance with regard to the EU energy targets and reducing dependence on energy imports. OWE has become a competitive alternative to fossil sources of energy, and therefore large-scale investments ...
Voir le projet

 10

 TERMINÉ 

Shrewsbury College HTAC Athens

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

...ortunities do not automatically present themselves to our young people, instead they had been more likely to be offered trips and visits instead, which would be optional and involve a cost. There are also very few work placement opportunities in the tourism sector with large tourist hotels few and far between. The students were placed mostly in the Palmyra Beach and Emmentina Hotel with additional ...
Voir le projet

 2

 TERMINÉ 
...sessions.Zero emission buildings are a main goal in various country roadmaps for 2020. The demonstration buildings within the project may not completely reach this level as the aim of the call is cost efficiency and multiplication potential. The retrofit concepts will, however, result in buildings with far lower energy consumption than in regular retrofits with high indoor environment quality - th ...
Voir le projet

 14

 TERMINÉ 

MUTLU HAYVANLAR, MUTLU ÇİFTÇİLER (HAPPY ANIMALS, HAPPY FARMERS)

Date du début: 31 déc. 2015, Date de fin: 30 déc. 2016,

...welfare is not only for the EU but also for our own people. Livestock is a sector that develops our countries economy, constitutes the highest added value and employment opportunities at the lowest cost. Konya is the heart of the agriculture and animal husbandry in Turkey for reasons such as sophistication of the arable agricultural industry, climatic and topographic structure. However, national a ...
Voir le projet

 2

 TERMINÉ 

Career Tree

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

...testing, Phase 5 – Psychometric validation and tool standardization. Prince2 Methodology will be used. Project Leader will be responsible for managing and reporting on the project’s cost and deadlines throughout the duration of the project, for preparation of the description of each phase of project's implementation, planning of the timeline for each task, and resources needed to implement each pr ...
Voir le projet

 5

 TERMINÉ 
...the causes of aquifer deterioration, to assess the quality and quantity of surface water, and to develop a panel of possible solutions for the recovery of surface and ground water bodies with high cost/benefit ratios. Well-known methodologies (e.g. GIS database and data mapping, biological and geological monitoring) and innovative ones were used, the latter including isotopic analysis of precipita ...
Voir le projet

 9