Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

IN SITU ACT

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2020,

Art Context TerritoryThe IN SITU ACT project is a tool for structuring artistic creation in public space across Europe. Art in public space is a developing discipline which mixes performance, visual and digital arts, creators and local people, artists and audience. It is an artform built around sharing, where involvement is part of the creative act; a contemporary, contextual artform for a broad ...
Voir le projet

 18

 TERMINÉ 

CLean INland SHipping (LIFE CLINSH)

Date du début: 1 sept. 2016, Date de fin: 31 août 2020,

Background Inland Waterway Transport (IWT) causes considerable emissions of the air pollutants NOx and PM10. Many European regions are struggling to tackle air quality problems, though the often expensive measures implemented to meet air quality limit values are mainly directed at industry and road transport. However, it is increasingly recognised that in ...
Voir le projet

 17

 TERMINÉ 
"NanoPack will demonstrate a solution for extending food shelf life by using novel smart antimicrobial surfaces, applied in active food packaging products. It will run pilot lines in operational industrial environments to manufacture commercially feasible antimicrobial polymer films, accepted by consumers. It will minimize the amount of preservatives required to maintain freshness, add value and a ...
Voir le projet

 19

 TERMINÉ 
CREATE-IoT’s aim is to stimulate collaboration between IoT initiatives, foster the take up of IoT in Europe and support the development and growth of IoT ecosystems based on open technologies and platforms. This requires synchronisation and alignment on strategic and operational terms through frequent, multi-directional exchanges between the various activities under the IoT Focus Areas (FAs). It a ...
Voir le projet

 20

 TERMINÉ 
SynchroniCity represents the first attempt to deliver a Single Digital City Market for Europe by piloting its foundations at scale in 11 reference zones - 8 European cities & 3 more worldwide cities - connecting 34 partners from 11 countries over 4 continents. Building upon a mature European knowledge base derived from initiatives such as OASC, FIWARE, FIRE, EIP-SCC, and including partners with le ...
Voir le projet

 35

 TERMINÉ 
BRIDGES (Bringing together Research and Industry for the Development of Glider Environmental Services) will provide a necessary tool for further understanding, improved monitoring, and responsible exploitation of the marine environment while assuring its long-term preservation. This new tool, a robust, cost-effective, re-locatable, versatile and easily-deployed ocean glider, will support autonomo ...
Voir le projet

 21

 TERMINÉ 

Intelligent Assessment of Pharmaceutical in the Environment (IPIE)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

Active pharmaceutical ingredients (APIs) can be released to the natural environment during the manufacturing process, following use by patients or when unused medicines are disposed of. As APIs are biologically active compounds concerns have been raised about the potential effects of APIs in the environment on human and environmental health. Over the past 15 years, a substantial amount of work has ...
Voir le projet

 29

 TERMINÉ 

Be SpectACTive!

Date du début: 1 déc. 2014, Date de fin: 30 nov. 2018,

BeSpectACTive! is an action-research and production-based project focused on the contemporary performing arts. It aims to develop new models of co-creation involving artists, audiences and cultural organizations on an equal footing. The project will facilitate the development of sustainable creative relationships between artists, audiences and organizations at both a local and transnational level ...
Voir le projet

 13

 TERMINÉ 

Accelerated Development of Vaccine benefit-risk Collaboration in Europe (ADVANCE)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2018,

Aim: The ADVANCE vision is focused on Timely and Best Evidence on Vaccine Effects. Our mission is to establish a best practice framework to rapidly provide robust data on vaccine benefits and risks to support accelerated decision-making.Approach: To achieve this vision through a public-private partnership, ADVANCE partners 1. establish common grounds and rules for collaboration between public and ...
Voir le projet

 30

 TERMINÉ 

YOULEARN!

Date du début: 5 sept. 2016, Date de fin: 4 sept. 2018,

As School strongly rooted in the context of membership, but at the same time the bearer of uniqueness / special national character, the institute B. Lotti has always expressed well and met the training needs of the territory, ensuring, for much of the twentieth century, training technicians highly specialized in the field of mining at first and then also the chemical, with marketability of the tit ...
Voir le projet

 24

 TERMINÉ 

Ervaringen veraf, Leren dichtbij

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

The application ' Experiences far away, learning close ' of ROC Arcus college in Heerlen the Netherlands appeals to goals for students and professionals. This to experience influences from abroad that enriches learning not alone as a human being but also as a professional. This will lead to dept of knowledge and improvement.Objectives of the project are:-Study success as overall objective. Aim: to ...
Voir le projet

 9

 TERMINÉ 

Accueil Relation COMmerce Vente de l'Académie de Lyon

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

The consortium presented here has for objective to contribute to the updating and upgrading of the professional skills of all the participants. The main theme chosen for this project is to “deal with customers’ and clients’ greeting procedures”. The targeted public is students in Bac Pro in sales professions (Retail studies, Reception, Sales and trade). We want to give them an International experi ...
Voir le projet

 33

 TERMINÉ 

PRACTICUM DEPO 2016

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

The Pontevedra Provincial Council does not hesitate when it comes to promoting measures that develop employment and entrepreneurship, through the broadcasting of job placement programmes. Nevertheless, we find unmotivated young people, with difficulty in accessing the labour market, with little or no knowledge of a second language, with little knowledge of and experience in ICT and whose concerns ...
Voir le projet

 42

 TERMINÉ 

An integrated pilot line for micro-fabricated medical devices (InForMed)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

The goal of the InForMed project is to establish an integrated pilot line for medical devices. The pilot line includes micro-fabrication, assembly and even the fabrication of smart catheters. The heart of this chain is the micro-fabrication and assembly facility of Philips Innovation Services, which will be qualified for small/medium-scale production of medical devices. The pilot facility will be ...
Voir le projet

 40

 TERMINÉ 

Cyber Physical System based Proactive Collaborative Maintenance (MANTIS)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no longer a necessary evil that costs what it costs, but an important function that creates additional value in the business proces ...
Voir le projet

 47

 TERMINÉ 

Consistently Optimised Resilient Secure Global Supply-Chains (CORE)

Date du début: 1 mai 2014, Date de fin: 30 avr. 2018,

CORE will consolidate, amplify, extend and demonstrate EU knowledge and capabilities and international co-operation for securing supply chains whilst maintaining or improving business performance, with specific reference to key Supply Chain Corridors.CORE will be driven by the requirements of:• the Customs, law enforcement authorities, and other agencies nationally and internationally to increase ...
Voir le projet

 72

 TERMINÉ 

INtegrated TOol chain for model-based design of CPSs (INTO-CPS)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The aim of the INTO-CPS project is to create an integrated tool chain for comprehensive model-based design of Cyber-Physical Systems (CPSs). The tool chain will support the multidisciplinary, collaborative modelling of CPSs from requirements, through design, down to realisation in hardware and software. This will enable traceability at all stages of the development.INTO-CPS will support the holist ...
Voir le projet

 12

 TERMINÉ 
Innovation is at the heart of Europe’s growth strategy. However, Europe lags behind its international competitors in converting investment in Public Research Organisation PRO research into commercial returns via innovation. The solution lies in improving the transfer of technology from PROs to industry but there are many barriers to effective technology transfer, including: Most Technology Transfe ...
Voir le projet

 9

 TERMINÉ 
"The concept of the proposed project lies in the development of lightweight and flexible protective clothing, incorporating smart functionalities and designated for law enforcement authorities.Up to now, research on the protective gear of this group concentrated on the ballistic properties of the body armour. However, in spite of the improvements, modern body armours still have some of the same dr ...
Voir le projet

 10

 TERMINÉ 

“E.T.HO.S.” – Empowerment in the Tourism and Hospitality Sector

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

The project ETHOS is a ERASMUS + KA1 mobility project which offers Mobility actions to VET learners. The mobility of VET learners is aimed at recent graduates from VET schools aged between 18 and 28 years old (the participants will undertake their training placement abroad within one year of their graduation) and they will realize a VET training abroad in the general vocational field in the projec ...
Voir le projet

 56

 TERMINÉ 

Joint Operation for Ultra Low Emission Shipping (JOULES)

Date du début: 1 juin 2013, Date de fin: 31 mai 2017,

Reducing emissions from shipping has increasingly become a challenge over the last years, both as a counter measure against global climate change and to protect local environments and population from waste, gas emissions and noise.This challenge has been documented both in policy papers, like the Europe 2020 initiative or the Transport White Paper, and in rules and regulations issued by IMO as wel ...
Voir le projet

 44

 TERMINÉ 

LNG-BC: Liquefied Natural Gas Blue Corridors (LNG BLUE CORRIDORS)

Date du début: 1 mai 2013, Date de fin: 30 avr. 2017,

"LNG Blue Corridors unites/mobilizes the critical mass of experience (know-how, expertise, (industrial) parties and stakeholders) in LNG transport and infrastructure technology. It involves cooperation between heavy duty vehicle manufacturers, fuel suppliers, fuel distributors and fleet operators. The project includes a first definition of European LNG Blue Corridors, with strategic LNG refuelling ...
Voir le projet

 27

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 

Entrepreneurship: a gateway to a growing education

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2016,

The ENGAGED (Entrepreneurship: a gateway to a growing education) project involves the collaboration among IIS Scalcerle, other schools in the area, Xena for competence monitoring, City Hall and the Province of Padova, Fòrema from Confindustria. The partners are in 9 European countries.With some there is a situation of reciprocity, both in the Mobility and other LLP programs; the foreign network ...
Voir le projet

 26

 TERMINÉ 
The project SKILL JOB MATCH PLUS is a ERASMUS + KA1 mobility project that comprise VET learners mobility and also VET STAFF mobility. The mobility of VET learners is aimed at recent graduates from VET schools aged between 18 and 28 years old (the participants will undertake their training placement abroad within one year of their graduation) and they will realize a VET training abroad in the follo ...
Voir le projet

 67

 TERMINÉ 

Let's Go! Mobilità Trasnazionali e Formative per i Giovani

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2016,

The project Let's Go inserts in the wide context of the objectives of Europe 2020 with the aim of integrating policies for education and training in the Strategy, the mandate that the European Union has given to all operators in the sector. Two key aspects of the Strategy: 1) the promotion of a "sustainable, smart and inclusive" economic growth; 2) the reduction of early dropout in charge of young ...
Voir le projet

 38

 TERMINÉ 
To solve the energy dilemma, research effort was concentrated on stand-alone buildings weakly tight to their immediate environment. Specifically in each building only key sub-systems were considered individually. Such individual systems were made more effective by becoming pervasive into any building area (the reign of “boxes” and “controllers”). Importing parameters from other sub-systems allowed ...
Voir le projet

 18

 TERMINÉ 
5 major global semiconductor companies Intel, Samsung, TSMC, IBM and Global Foundries, have decided to work closely together to bring 450 mm semiconductor processing to a mature level, within a consortium called G450C. This operation, based in Albany N.Y., is currently ordering and installing the first wave of 450 mm systems. The major drivers of this effort are Intel and TSMC, which have provide ...
Voir le projet

 13

 TERMINÉ 
ERASMUS PLUS Key Action 1: Learning Mobility of Individuals MOBILITY PROJECT FOR VET LEARNERS AND STAFF ” HOTEL@WBL-VET . WORK BASED LEARNING ( WBL) IN VOCATIONAL TRAINING FOR CATERING AND HOTEL MANAGEMENT The mobility project referring Key Action 1- Learning Mobility of individuals-mobility project for VET learners and staff” HOTEL@WBL-VET . WORK BASED LEARNING ( WBL) IN VOCATIONAL TRAIN ...
Voir le projet

 55

 TERMINÉ 
PETROBOT will open the oil-, gas and petrochemical markets by developing two key new robot inspection technologies and validating these in use cases:1. Off-line internal inspection of pressure vessels: avoiding the high cost for human entry as well as reducing plant down-time.2.In-line inspection of storage tanks: avoiding lost revenue by keeping tanks in full operation.Currently, inspections are ...
Voir le projet

 10

 TERMINÉ 

Critical System Engineering Acceleration (CRYSTAL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Voir le projet

 70

 TERMINÉ 

Supporting the driver in conserving energy and reducing emissions (ecoDriver)

Date du début: 1 oct. 2011, Date de fin: 31 mars 2016,

ecoDriver addresses the need to consider the human element when encouraging "green" driving, since driver behaviour is a critical element in energy efficiency. The focus of the project is on technology working with the driver. The project aims to deliver the most effective feedback to drivers on green driving by optimising the driver-powertrain-environment feedback loop. It will carry out a substa ...
Voir le projet

 16

 TERMINÉ 
European IC manufacturers are on the way to become suppliers of customized products for OEM companies, which means high flexibility and product diversity. The project aims at conducting research to support the development of new manufacturing procedures, new organizations and new information and control tools to enable IC production lines to efficiently manage a high product and technology mix and ...
Voir le projet

 29

 TERMINÉ 

Providing Active Skills for Tourism

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2015,

In the context of the global economic crisis and of the employment crisis, the tourism sector is one of the few areas showing a countertrend. The most recent data (European Commission) indicate that the tourism industry in Europe shows an increase of 5% in the first half of 2013, confirming Italy in second place among the most visited countries. In our country, the sector provides employment to 11 ...
Voir le projet

 21

 TERMINÉ 
PHAEDRUS addresses the complete scope and objectives of Topic SP1-JTI-FCH.2011.1.8. A new concept and new technologies for a hydrogen retail refuelling system are developed.The major objective is to develop and validate a new concept for 70 MPa hydrogen refuelling retail stations by showing the applicability of electrochemical hydrogen compression technology in combination with a PEM electrolyser, ...
Voir le projet

 10

 TERMINÉ 

Open MIC for Young Entrepreneurs, Erasmus+

Date du début: 1 mai 2015, Date de fin: 30 sept. 2015,

'Open MIC for Young Entrepreneurs, Erasmus+' 19th-26th of July, 2015 (County Wicklow/ Dublin City) Having formal education in current labour market doesn't guaranty employment. People require to have a full set of social skills and creative approach to stand a chance of getting fulfilling employment position or/and to take on rewording ...
Voir le projet

 13

 TERMINÉ 

Unbiased Biomarkers for the Prediction of Respiratory Disease Outcomes (U-BIOPRED)

Date du début: 1 oct. 2009, Date de fin: 30 sept. 2015,

RationaleThe inability of pre-clinical studies to predict clinical efficacy is a major bottleneck in drug development. In severe asthma this bottleneck results from: a lack of useful and validated biomarkers, underperforming pre-clinical models, inadequate and incomplete sub-phenotyping, and insufficient disease understanding.HypothesisThe use of biomarker profiles comprised of various types of hi ...
Voir le projet

 42

 TERMINÉ 

Enabling information re-Use by linking clinical REsearch and CAre (EURECA)

Date du début: 1 févr. 2012, Date de fin: 31 juil. 2015,

Description EURECA (Enabling information re-Use by linking clinical REsearch and Care) aims to enable seamless, secure, scalable and consistent linkage of healthcare information, which resides in electronic health record (EHR) systems with information in clinical research information systems, such as clinical trials. Achieving semantic inter ...
Voir le projet

 20

 TERMINÉ 
Recent pharmacovigilance (PV) issues have led to questions regarding the ability of the current PV system to meet the global needs. Controversies around the assessment of spontaneous reports and conflicting results from pharmacoepidemiology studies may lead to delay in, or inappropriate, regulatory decisions. The PROTECT consortium, consisting of 20 core partners lead by the European Medicines Age ...
Voir le projet

 36

 TERMINÉ 

Transitions to the Urban Water Services of Tomorrow (TRUST)

Date du début: 1 mai 2011, Date de fin: 30 avr. 2015,

The European project initiative TRUST will produce knowledge and guidance to support TRansitions to Urban Water Services of Tomorrow, enabling communities to achieve sustainable, low-carbon water futures without compromising service quality. We deliver this ambition through close collaboration with problem owners in ten participating pilot city regions under changing and challenging conditions in ...
Voir le projet

 33