Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
... double rotating unit that thorughan innovative design, allows not to collect stones nor dust during the raking process.This novel technology allows farmers to collect hay free from stones and dust (+50% less) preventing contamination and turf damage, provide top-quality fodder for optimal milk and meat production. Furthermore, RA-RAKE represents an efficient and cost effective innovation (67% che ...
Voir le projet

 1

 TERMINÉ 
... of biodegradable waste to landfill, and the recently revised Waste Framework Directive (WFD) sets new targets for recycling construction and demolition (C&D) waste (70% by 2020) and household waste (50% by 2020). The Sixth Community Environment Action Plan calls for measures aimed at ensuring the source separation, collection and recycling of priority waste streams. Moreover, the WFD lays out a f ...
Voir le projet

 2

 TERMINÉ 
...mpact and results: 1. Our own view towards the current model of training, training in companies and under supervisors, and also the school's development potential, changed. For the time being about 50% of our students have joined the dual training system. At the beginning of the project there were no apprenticeship opportunities, but now the number of such groups is increasing. 2. Through the pro ...
Voir le projet

 2

 TERMINÉ 
... with ‘flexibility, thinness, light-weight and robustness’, at an ‘economical price’. It will allow to reduce the manufacturing cost of smart flexible electronic circuits by up to 50% compared with the current hybrid solutions.
Voir le projet

 1

 TERMINÉ 
... (Picoides tridactylus), 90-110 wood grouse (Tetrao urogallus), 10-20 pairs of black woodpecker (Dryocopus martius) and one to five pairs of the red-throated diver (Gavia stellata). Each year over 50,000 hikers visit the forests which also boast a tradition of scientific research going back over 100 years. The problems affecting it included the lack of an overall management and conservation pla ...
Voir le projet

 6

 TERMINÉ 

EuroApprentissage

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

.../ 45 Apprentices (mobility 2-3 weeks) and 20 recent graduates (mobility 3 to 6 months)of the skilled craft sector 2 / Personnel responsible for vocational training (MEDIAT EUR ) (mobility of 3 days) 50 participants from APCMA, the CRMA / CMAR / CMA / CFA, officials from regional University of trades and crafts ( URMA ), representatives of professional organisations and companies in the sector (el ...
Voir le projet

 21

 TERMINÉ 

"Social, open-minded and political Europe - review to European elections 2014"

Date du début: 1 oct. 2014, Date de fin: 31 déc. 2014,

...ourage young people to form their own opinion about Europe and to participate in its designing - we wanted to show that Europe is diverse and opens up new and positive possibilities for young people. 50 young people at the age of 16-18 from Finland, Lithuania, Sweden, Netherlands and Germany in company of their leaders were working on this project. - Young people in Europe informed other youngst ...
Voir le projet

 5

 TERMINÉ 
...sociated with increased risk of heart attack, cardiac arrhythmia, stroke, daytime sleepiness, depression and poor neurocognitive performance. Estimated annual economic costs of the disease are €60-150b. Established therapeutic options are uncomfortable with unpleasant side effects and/or ineffective; they can also require invasive surgery. Compliance is a major problem with the first line treatmen ...
Voir le projet

 1

 TERMINÉ 

PRIMERA+

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

...8-week placement. 3 - Recent graduates of less than one year and first-time job seekers will have the possibility to participate in 13-week mobility placements in businesses. This target group of 50 beneficiaries includes: - INSUP FORMATION recent graduates with diplomas from level V to III - ALTEA FORMATION recent graduates holding Higher Technical diplomas - Recent graduates from other instituti ...
Voir le projet

 9

 TERMINÉ 

Boost your English and your spirits

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

We are a branch of British School, a nationwide language school, based in a Warsaw suburb, Poland. We teach foreign languages to adults from 20+ to 50+. Our school has been on the market for 3 years and it has been constantly developing and achieving better results. Within the project we desire to further develop our company by increasing qualifications of our personnel. We strongly believe it wil ...
Voir le projet

 1

 TERMINÉ 

H2POWER_Hydrogen in fuel gas (H2POWER)

Date du début: 1 sept. 2010, Date de fin: 31 oct. 2013,

...ed sensors. A comparative analysis of economic and environmental performance was conducted, in terms of regular day-to-day bus operating activities. For this, the project team conducted tests on 50 days, for the development of the minibus on the road, and 41 test drives with the hydro-methane mix in different conditions. These tests were replicated during the spring and summer of 2013 on a 10 km ...
Voir le projet

 5

 TERMINÉ 

SCRI In Action (SCRI in Action)

Date du début: 31 juil. 2005, Date de fin: 30 juil. 2006,

... Expected Results: • Identify and assess 20 projects using a simple form of audit• Select and work with approximately 50% of these projects• Aid the development process of 5 new companies• Complete the process of at least 2 new spin-out (trading company and/or limited company)• Complete the process of at least 2 licensin ...
Voir le projet

 4

 TERMINÉ 

Feasibility Study on Decentralised Heat Recovery (DeReco)

Date du début: 1 oct. 2014, Date de fin: 28 févr. 2015,

...burg-Western Pomerania, Germany, has developed an expansion device for small scale Waste Heat Recovery systems (WHR-systems). Small scale means a net AC power rating of the WHR-system from about 1 to 50 kW. EN3’s WHR-system is based on the Clausius Rankine Cycle (CRC) or alternatively on the Organic Rankine Cycle (ORC) technology and can substantially improve the efficiency of industrial processes ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...ity to live and work in a foreign country and to get in contact with other cultures. Briefly, to make Europe part of the training process of our students. During these years, 7 teachers and more than 50 students of our vocational school and its different professional branches. We have undertaken different activities but all targeted on the student internships and the different countries where we ...
Voir le projet

 1

 TERMINÉ 

LINKING INNOVATION WITH SME PERFORMANCE IN EASTERN SERBIA AND NORTHWEST BULGARIA

Date du début: 21 août 2011, Date de fin: 21 août 2012,

...ve profiles for 300 SMEs were produced;- A study on innovation potential of SMEs in the region was developed and 4000 copies of the study were printed and distributed;- Developed innovative plans for 50 SMEs that participated in the surveys and interviews;- Three press conferences were held and 3000 promotional leaflets were produced and distributed.
Voir le projet

 3

 TERMINÉ 
...ange Materials (PCM) will be the base for manufacture high efficiency heat exchangers in terms of energy capture and storage. Two Borehole Thermal Energy Storage (BTE) areas(low temperature range (30-50ºC) and medium (50-80ºC) will support a energy cascading concept where energy will be sequentially used and finally stored for further use or commercialized to third parties. The methodology aspec ...
Voir le projet

 9

 TERMINÉ 

Kreowanie kompetencji niezbędnych na europejskim rynku pracy

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

...azmus+ creates an opportunity to organize three-week apprenticeships for ten economics college students in German companies from May 2nd to May 20th, 2016. The participants of the project will be 50% of students with disability certificate. The project’s partners are: - on Polish side: Zespół Szkół Nr 5 im. Stefana Kisielewskiego (sending partner); - on German side:Vitalis Betreuungsgesell ...
Voir le projet

 2

 TERMINÉ 
...n many European countries pesticides contaminate the drinking water. The regional economy of the Adour-Garonne River Basin District is more dependent on agriculture than in the rest of France, as 50% of its total area is dedicated to agricultural activities. Not surprisingly, high levels of nitrate, as well as atrazine, simazine, diuron, alachlor and lindane have been found in over 40% of sites r ...
Voir le projet

 13

 TERMINÉ 

TRAINING EXPERIENCIE IN EUROPE ALHAMBRA II

Date du début: 1 sept. 2016, Date de fin: 31 déc. 2017,

... for STUDENTS OF THE SECOND YEAR OF THEIR VOCATIONAL TRAINING to develop the obligatory traineeship in companies (FCT) abroad and RECENT GRADUATES: ITALY (50), CZECH REPUBLIC (5), UK (10). EXPECTED RESULTS:- Overcoming the FCT Module and obtaining the Official Certification of their vocational studies.- Developing the key skills necessary for the transition from the field of education and training ...
Voir le projet

 20

 TERMINÉ 

THE LIVING UNIVERSE

Date du début: 25 nov. 2015, Date de fin: 24 mai 2019,

Since the dawn of man we have peered into the night sky and wondered. And the more we’ve looked, the further we’ve seen. In the last 50 years, we have broken the shackles of gravity and ventured to the limits of the Solar System for the very first time. It’s been both a revelation and a revolution.We now stand poised to cross the greatest threshold of all. Humanity’s finest minds have begun workin ...
Voir le projet

 1

 TERMINÉ 

Novel GAsification REactor for combined heat and power Plant (GAREP)

Date du début: 1 juin 2015, Date de fin: 30 nov. 2015,

Drawbacks related to central large scale power production due to high cost of infrastructure and transmission loss resulting in high cost of energy have created a need for small scale local power production. By implementing combined head and power (CHP) solutions local biomass could be used to provide low cost energy. However large scale CHP plants (>10MWe) require large investments while technolo ...
Voir le projet

 1

 TERMINÉ 

Conservation of Otis tarda in Hungary (OTISHU)

Date du début: 1 oct. 2004, Date de fin: 30 sept. 2008,

... The LIFE project’s main objective centred on increasing the size of Hungary’s great bustard population by 10% in the project area during the project lifespan, and by 50% within 10 years. Stakeholder cooperation was considered essential to achieve these targets so the project involved partners from five National Parks, four NGOs, a university and the Ministry of Environment. A ...
Voir le projet

 9

 TERMINÉ 
... refrigerated storage units, designed to keep the vaccine at a constant temperature. The system frequently fails for a variety of reasons, some technical and some simply due to human error. Currently 50% of the world’s vaccines are rendered useless due to the failings of the present refrigerated ‘cold chain’ delivery systems.Stablepharma has a vision to eliminate the global cold chain and unnecess ...
Voir le projet

 1

 TERMINÉ 
...tively; and the Thematic Strategy on Prevention and Recycling of Waste (COM 2005 (666) final) and the Waste Framework Directive (2008/98/EC), in relation to the goal of recovering and recycling 50% of household waste by 2020 and, specifically, to Article 21 of the latter which specifically focuses on waste oil. The main message of the project for policymakers was that the P.P.P.4I.RE. COLL approa ...
Voir le projet

 1

 TERMINÉ 

Clean energy from ocean waves (CEFOW)

Date du début: 1 juin 2015, Date de fin: 31 mai 2020,

...ce system, and create an efficient supply chain to support larger wave power projects in the future. To reach these targets, the CEFOW consortium will improve the wave energy converter performance by 50% and raise its availability to 70%; develop new types of dynamic mooring and electrical connections suitable for multi-device deployment and deploy 3MW (three 1MW units) wave energy converters in r ...
Voir le projet

 10

 TERMINÉ 
... Cell Biology in Newcastle, to promote the recovery of basic science on model bacterial cells and has recruited several world leading experts to the Centre. Over his career he has helped train nearly 50 graduate students and post-docs, many of whom have gone on to become independent group leaders. He is an elected Fellow of several internationally important Academies."
Voir le projet

 1

 TERMINÉ 

Employment OpportuNEETy

Date du début: 1 sept. 2016, Date de fin: 30 avr. 2017,

...t and develop positive attitude towards building a career based on their competences and desires. 4. During and after this project, at least 85% of the participants will apply to min 15 jobs, 50% will be called for a job interview and minimum 30% will obtain an employment.All the activities of this project based on variety of non formal methods (games, teambuildings, visual methods, competitions, ...
Voir le projet

 7

 TERMINÉ 

Sustainable Together through Environmental Management (STEM II)

Date du début: 31 août 2012, Date de fin: 27 févr. 2015,

...mme Achievements: Energy savingsAimed to save businesses approx. £2,850 per annum• Kids play resource saved £3,000 per annum• Local Armagh Engineering Company saved £15,000 per annum• Bakery in Ards saved £10,000 per annum• Food Manufacturer in Craigavon saved £10,000 p ...
Voir le projet

 1

 TERMINÉ 

Incomaker - intelligent marketing management automation for SME (INCMAK)

Date du début: 1 juil. 2016, Date de fin: 31 déc. 2016,

NetCampaigner was established as a Czech SME company by the group of experts with about 50 years of combined experience in marketing, small-business, and statistical data analysis. It develops Incomaker, an innovative marketing automation tool for SMEs that uses our artificial intelligence technology to suggest, plan and perform marketing management activities.Just 34% of SMEs use CRM, 14% use acq ...
Voir le projet

 1

 TERMINÉ 

International Work Experience 2014-16

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

...ent for 16 days in France. Two further participants went to London for a long-term internship. In two individual cases the stay had to be shortened due to illness. There were several groups: Approx. 50 people take part in the training programme "AusbildungPlus" as assistants in industry, wholesale and foreign trade, office or a forwarding agent or specialist for warehouse logistics with the addit ...
Voir le projet

 6

 TERMINÉ 

Virtual Education Network for Austrian Companies in Bulgaria

Date du début: 31 déc. 2011, Date de fin: 29 mai 2014,

...ll as from technical assistance granted by the consultancy company ÖSB Consulting GmbH.Five Austrian companies in Bulgaria joined the Qn, which was set up in June 2013. With the support of MLSP, a 50% co-financing for trainings for Qn members was made available from the national Budget, with qualification measures being carried out in 2014.
Voir le projet

 1

 TERMINÉ 

İnternet Reklamcılığı ve Girişimcilik Stajı

Date du début: 31 déc. 2015, Date de fin: 30 déc. 2016,

...f workshop, laboratory, applied course and internship in the relevant industry, by providing events such as courses, seminars, conferences for those who are successful in professions. There are about 50,000 SMEs in Gaziantep. About 50% of them are in a position to use the Internet advertising field in their work. Internet advertising field offers opportunities for SMEs, which have to follow the la ...
Voir le projet

 3

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...et and Chilly-Mazarin to sign a partnership agreement with the Lycée Marguerite Yourcenar aiming at projects of exchange and mobility of students for training, which 386 students have made use of: - 50 inbound students in the former Leonardo Programme (the current KA1- VET) for training. - 16 outbound students in the former Erasmus Programme (the current KA103). - 320 inbound students in school ex ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 30 sept. 2016,

...hout the Erasmus+ program, Ecole centrale could not accomplish its goals of compulsory mobility. For more than 45 years, Europe has definitely been one of the favourite destinations. Every year, 50% of the outgoing students going for a SMS mobility benefit from the Erasmus+ program, then the students in SMP mobility can be added to that number. In 2015-2016, out of 125 students on an academic mo ...
Voir le projet

 1

 TERMINÉ 
...ty by site-directed mutagenesis and directed evolution. Novel enzymes will be discovered by mining for new genes from available genomes. An inventory of novel FAEs and GEs will be developed including 50 fungal and 500 bacterial esterases, 25 site-directed and 20 directed evolved mutants. Enzymatic performances will be optimized to enhance the yield (up to the theoretical yield of 100%) and product ...
Voir le projet

 16

 TERMINÉ 

Education - Employment Partnership for VET in the fashion sector

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2018,

...aries greatly by country. Those enrolled in apprenticeships in the strict sense, represent33% of secondary VET students. 24 EU countries have schemes in place where learners spend more than 50% of their time learning in the workplace, but the scope of the schemes varies widely. - the permeability between iVET and cVET often represents an important challenge for individuals in pursuing their profes ...
Voir le projet

 9

 TERMINÉ 

Story of my heart

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

...ship will lead to a continuing collaboration on a larger project in the future.One of the emphasis of the project is gender equality and there will be put effort into keeping gender ratio as close to 50 / 50 as possible. The two groups will be lead by the film production companies New Age Icelandic Films, who will provide main support and management of the project, and Lithuanian VsI Sviestas, who ...
Voir le projet

 2

 TERMINÉ 

Large Format Textile Printing (LaForte)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2016,

...in Large Format Textile Printing. Our idea is to use controlled vacuum to fix it. As a result, the customers will not need to clean the glue from the surface pad with consequent saving in 50 kg dissolvent per operation batch and about 50 litres water per hour of operation. This equals to global 100.000 litres of water/year, giving our project an environmental relevant move forward.
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

..., since the academic year 2012-2013. After the achivement of the Erasmus+ Charter in 2014, we have requested a KA103 project, for Higher Education, for the period 2014-2015. The eligible students, 40-50 per year, for the Erasmus Programme are enrolled in the Degree "Higher Technician in Networked Computer Systems Management" (forward CFGS). Most of the teachers who teach to the CFGS belong to the ...
Voir le projet

 1

 TERMINÉ 

Internacionalización, Innovación, Empleo y FP en Alternancia

Date du début: 31 juil. 2015, Date de fin: 30 juil. 2016,

The situation of the labor market in Spain , where youth unemployment exceeds 50% , makes it difficult for young people to find their first job. Mobility projects facilitate and expand the expectations of accessing the labor market , both national and European , of students who are finishing their training and recent graduates . The IIEFP project has been created in answer to the need for schools ...
Voir le projet

 5