Rechercher des projets européens

39 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
... climate adaptation strategy for Warsaw; A series of local conferences and an international conference to promote the climate change adaptation measures implemented in Warsaw; A study tour to Stuttgart to allow Polish cities representatives to learn from German initiatives and solutions; Three study tours to exchange experience with other LIFE+ projects working on the issue; A manual on clima ...
Voir le projet

 4

 TERMINÉ 

Berufliche Weiterbildung in der Toskana/Volterra/Italien - TEAM VOLTERRA

Date du début: 1 juil. 2016, Date de fin: 30 juin 2018,

In all areas of previous activities in international mobility is to be seen that the willingness of students and young workers is very little, to make use of these mobility opportunities. In addition, it is also difficult to convince companies to allow their apprentices and workers to go in an other state or take foreign apprentices. Therefore must in the craft the responsible manager in the compa ...
Voir le projet

 4

 TERMINÉ 

Learning routes and tools for individual training

Date du début: 1 janv. 2015, Date de fin: 30 juin 2017,

The European instruments, like EQF and ECVET have an impact and force the training organizations all over Europe to engage in re-design their operational learning environments to reply to this new dimension and requirements of training. But the easiest and most common approach to face this change seems no more than a splitting of the former and more extensive training courses, into more basic and ...
Voir le projet

 5

 TERMINÉ 

Berufliche Weiterbildung in der Toskana/Volterra/Italien

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

In all areas of previous activities in international mobility is to be seen that the willingness of students and young workers is very little, to make use of these mobility opportunities. In addition, it is also difficult to convince companies to allow their apprentices and workers to go in an other state or take foreign apprentices. Therefore must in the craft the responsible manager in the compa ...
Voir le projet

 4

 TERMINÉ 

MObility for Vocational and Educational Training 2.0

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

The project MOVET 2.0 combines the Province of Reggio Emilia, 9 technical and professional high schools of the province, the Emilia-Romagna Region, the Chamber of Commerce, the main local trade associations, in addition to receiving partners and many European SMEs interested in a transnational dimension of business and labor market. The project develops mobility experiences for 90 students and 36 ...
Voir le projet

 30

 TERMINÉ 

Clean Hydrogen in European Cities (CHIC)

Date du début: 1 avr. 2010, Date de fin: 31 déc. 2016,

The Clean Hydrogen in European Cities (CHIC) Project is the essential next step to full commercialisation of hydrogen powered fuel cell (H2FC) buses. CHIC will reduce the ‘time to market’ for the technology and support ‘market lift off’ – 2 central objectives of the Joint Undertaking.CHIC will:- Intensively test the technology to generate learning for the final steps towards commercialisation by o ...
Voir le projet

 26

 TERMINÉ 
SMEs are the driving force of economic growth and job creation in Europe: 20.7 million SMEs in the non-financial business economy make up ~99% EU enterprises. 85% of new jobs in the private sector created by SMEs provide more than two thirds of total jobs (more than 87 million). And SMEs account for more than 58% of the total gross-value added in Europe. For SMEs, the backbone of European industry ...
Voir le projet

 9

 TERMINÉ 
PROJECT’s BACKGROUND MOVE4TRADE is a trans-regional project developed in Emilia Romagna, Piedmont and Tuscany, three Italian regions characterized by a similar economic and social system. In times of financial and economic crisis, the project aims to develop internationalization strategies for SMEs, in order to promote their survival, the growth of the local communities and the increasing of the ...
Voir le projet

 27

 TERMINÉ 

Transitioning towards Urban Resilience and Sustainability (TURAS)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2016,

The “TURaS” project aims to bring together urban communities, researchers, local authorities and SMEs to research, develop, demonstrate and disseminate transition strategies and scenarios to enable European cities and their rural interfaces to build vitally-needed resilience in the face of significant sustainability challenges. To ensure maximum impact, the TURaS project has developed an innovati ...
Voir le projet

 34

 TERMINÉ 
Background Medium-sized and large rivers flowing through densely populated urban areas typically fall under more than one jurisdiction in Germany. The national level is guardian of waterways development and security, whilst the local municipality has responsibility for local requirements. Their interests can overlap and compete in the management of rivers ...
Voir le projet

 4

 TERMINÉ 
The European Manufacturing Industry competitiveness and sustainability strongly depends on Innovation, targeting new consumer needs and societal challenges. This calls for significant public and private investments in R&D, but also a growing capability to transform the created knowledge into new products, processes, services and business models.Many of these challenges are multi-sectorial as the t ...
Voir le projet

 14

 TERMINÉ 

VALUEADDED (VALUE+)

Date du début: 30 juin 2010, Date de fin: 29 juin 2015,

Cities throughout North West Europe (NWE) welcome the challenge to increase public involvement in decision-making and planning. However. the major problems facing Europe cannot be addressed using entirely local approaches. This also requires strategic. coordinated responses. VALUE+ will demonstrate how cities can best integrate bottom-up and top-down approaches. It will show how we can both deepen ...
Voir le projet

 13

 TERMINÉ 
SMEs are the driving force of economic growth and job creation in Europe: 20.7 Million SMEs in the non-financial business economy make up ~99% EU enterprises. 85 % of new jobs in the private sector created by SMEs provide more than two thirds of total jobs (more than 87M). And SMEs account for more than 58% of the total gross-value added in Europe. For SMEs, the backbone of the European Industry, ...
Voir le projet

 2

 TERMINÉ 

Towards Regional spEcialisation for Smart growth spirit (TRES)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

Europe faces a moment of global transformation and must now take charge of its future. In the meantime, the world is moving fast and long-term challenges – globalisation, pressure on resources, ageing – intensify. Europe can succeed if it acts collectively, as a Union. Regions need a strategy to come out stronger from the crisis, overcome structural weaknesses and contribute to turn the EU into a ...
Voir le projet

 10

 TERMINÉ 

Electromobility solutions for cities and regions (ELMO`s)

Date du début: 1 déc. 2011, Date de fin: 30 nov. 2014,

The overall goal of the proposed project is to promote more sustainable transport through the development of electromobility solutions for cities and regions (ELMOS). The projects aims at delivering concepts for a better exchange of electromobility knowledge at regional and EU level, concepts for new business models and for cross-border field tests which should lead to an improved standardisation ...
Voir le projet

 10

 TERMINÉ 

Sustainable Freight Transport - Now and Tomorrow (SusFreight)

Date du début: 31 août 2013, Date de fin: 29 nov. 2014,

The Alps are a unique region at the heart of Europe, to be protected and remain attractive for its inhabitants. However, they are also a major natural bottleneck, increasingly challenging the dynamic economies in the region and their transport demand. The ever-growing transport across the Alps, in particular freight transport, has over decades led to an environmentally and also economically threat ...
Voir le projet

 6

 TERMINÉ 
As population of our cities grow, so does land area and this result in increase of an average temperature. The buildings and roads absorb temperature produced during the day, like giant heaters, and store it. The energy is then released during the night time. This often means a big difference in the temperature between city and its surrounding areas.This phenomenon is called the Urban Heat Island ...
Voir le projet

 18

 TERMINÉ 
"The European Commission has identified poor diets and low physical activity levels as health challenges wich should be adressed by actions across policy areas and engaging a range of public and private actors. Research points to a necessary link between nutrition and physical activity, but regional health economies need better collaboration between triple-helix actors to tap this potential.This p ...
Voir le projet

 16

 TERMINÉ 

European Collaborative and Open Regional Innovation Strategies (EURIS)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2013,

...f OI policy implications demands a high level of cooperation, reason why a Mini Programme has been designed, by a partnership made up by some of the EU powerhouses on the OI field (Stuttgart, Eindhoven), and catching up regions (Navarra, Lodz and West-Pannon), allowing, by the means of Subprojects, the further research, analysis and exchange of existing Good Practices, and the joint development of ...
Voir le projet

 5

 TERMINÉ 

Removing barriers to regional rail transport (INTER-Regio-Rail)

Date du début: 31 mars 2010, Date de fin: 30 mars 2013,

Facing an increasing intermodal competition and radical social and demographical changes, Regional Rail Transport (RRT) in Central Europe has to be improved. Traditionally RRT has focused on large groups of passengers such as commuters and tourists. With settlement structures and places of employment dispersing and leisure activities diversifying RRT more and more has to adapt its offer to passeng ...
Voir le projet

 9

 TERMINÉ 

Clusters & Cooperation for Regional Development in Central Europe (CLUSTERS-CORD)

Date du début: 28 févr. 2010, Date de fin: 27 févr. 2013,

The project general objective is to strengthen the cooperation among clusters from the same thematic field but different geographical origin, through the creation of 5 Strategic Cooperation plans which will result in creation at least 3 so called “meta-clusters”. The project has selected 10 key industries that will be closely examined: Mobility & Logistics; Professional Services; ICT; Automotive & ...
Voir le projet

 10

 TERMINÉ 

Making Knowledge Work (MKW)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

... approaches, methodologies and activities. Examples of good practices include Creative Conversion Factory (CCF, Brainport Eindhoven), Innoscope SME innovation tool (region Lille), Competence Centres (Stuttgart Region) and Innovative Public Procurement (Helsinki Region). Intensive exchanges of experiences took place during fact-finding missions that provided first hand experience, while project par ...
Voir le projet

 15

 TERMINÉ 

ducer Services for European Sustainability and Competitiveness (PROSESC)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

...Climate Change), et al.In first half of 2012 PROSESC carried out a series of activities in the field of creative engineering. For example a e-car sound competition was carried out in the region of Stuttgart with more than 50 sound designers experimenting on future sound of mobility. The results were presented at the Elektromobiler Jahresauftakt of the Region and gained a lot of publicity -the Prim ...
Voir le projet

 8

 TERMINÉ 

Valuing Attractive Landscapes in the Urban Economy (VALUE)

Date du début: 30 juin 2008, Date de fin: 29 sept. 2012,

AIM: To demonstrate the economic value of green infrastructure at the city/region scale and to show how to target green investments to maximise competitive benefits to communities throughout NWE. Green infrastructure* is a valuable part of our urban economy. However. as urbanisation increases throughout NWE. public and private greenspaces are being lost to housing and commercial developments. A ...
Voir le projet

 9

 TERMINÉ 

SHARE - Sustainable Hydropower in Alpine Rivers Ecosystems (SHARE)

Date du début: 31 juil. 2009, Date de fin: 30 juil. 2012,

Hydropower is the most important renewable resource for electricity production in alpine areas: it has advantages for the global CO2 balance but creates serious environmental impacts. RES-e Directives require a renewable electricity enhance but, at the same time, the Water Framework Directive obliges member States to reach or maintain a water bodies "good" ecological status, intrinsically limiting ...
Voir le projet

 13

 TERMINÉ 

Transalpine Transport Architects (TRANSITECTS)

Date du début: 30 juin 2009, Date de fin: 29 juin 2012,

In TRANSITECTS public institutions design common transnational intermodal solutions for freight transport in the Alpine Space. In the partnership different interests (economy, environment and transport) are integrated which is of crucial importance for a sustainable solution. Main aim of the project is to make the rail network more attractive and hence to foster its accessibility and functionality ...
Voir le projet

 16

 TERMINÉ 

CASTLE - Cooperation Among SMEs Toward Logistic Excellence (CASTLE)

Date du début: 31 oct. 2008, Date de fin: 30 oct. 2011,

... Achievements: The thematic pillars of project were investigated by selecting and capitalising 20 BPs in the CASTLE Regions (Emlia-Romagna, Valencia, Stuttgart, Wielkopolska, Crete, West Transdanubia and Maribor/Slovenia). Other 30 BPs were deeply investigated outside the Partners' Regions by means of a EU survey & site visits, based on a commong m ...
Voir le projet

 10

 TERMINÉ 
...ects of the MCP, in particular the impact on local competitiveness due to re-location effects. The theoretical framework will be then tested in the four urban areas of Genova, Stuttgart, Lisboa and Craiova through simulations and a first demonstration pilot; results will be compared for finalizing the MCP scheme both for the participating cities and for other European municipalities."
Voir le projet

 9

 TERMINÉ 
Background Some sectors of the agro-food industry generate a significant amount of waste containing high organic content. Environmental problems associated with decomposing organic waste and manure include surface and groundwater contamination and air pollution caused by methane, as well as ammonia and unpleasant odours. Landfills already produce a third ...
Voir le projet

 8

 TERMINÉ 

Cooperation of Regions for Innovation (CORINNA)

Date du début: 30 juin 2004, Date de fin: 30 déc. 2007,

The operation “Corinna - Cooperation of Regions for Innovation” focuses on intensifying cross-border co-operation in the field of technology and innovation along the borders of Italy, Slovenia, Austria and Hungary. Recent studies of these regions show strong potential for capitalizing on development opportunities through cross-border cooperation in particular in the field or research, development ...
Voir le projet

 9

 TERMINÉ 

Network of automotive regions (Automotive regions)

Date du début: 30 juin 2005, Date de fin: 30 déc. 2007,

...he studyvisits and seminars have highlighted examples of good private and public sector practices and policies throughout the network, eg. Dedicated competence and innovation centres in Stuttgart Region (D), promotion and internationalisation of (car)design in Turin (I), supplier parks and dedicated logistics infrastructure in Flanders (B), strong regional cluster and technology centre in Galicia ...
Voir le projet

 16

 TERMINÉ 

European Network of Logistics Competence Centres (ENLoCC)

Date du début: 31 déc. 2003, Date de fin: 30 déc. 2007,

...ctor and public administrations and as a base for cooperation among regions. For this purpose, the ENLoCC project was set up to establish regional competence centres, following the example of KLOK in Stuttgart Region. A first set of competence centres in Emilia Romagna Region, Carinthia and Wielkopolska was created during the first years of ENLoCC. It was planned from the beginning that there shou ...
Voir le projet

 5

 TERMINÉ 

InterMETREX

Date du début: 31 mars 2003, Date de fin: 29 nov. 2007,

The achievement of the objectives of the European Spatial Development Perspective (ESDP), of harmonious, balanced and sustainable development, depends to a large extent on the effectiveness of metropolitan governance and spatial planning and development practice. InterMETREX offers practical benefits by enhancing the competence, capability and processes of existing metropolitan planning, and by pr ...
Voir le projet

 31

 TERMINÉ 
Information technologies are an ideal tool for improving citizens quality of life, but they have to be affordable, reliable and user-friendly. The regions and cities in the consortium are all interested in the use and promotion of new technologies and citizen training. This interest is evident in regional plans and policies on information technologies (ICT). Such plans of action have been supporte ...
Voir le projet

 6

 TERMINÉ 

lyMETREXplus - Vers une Europe Métropolitaine Polycentrique (PolyMETREXplus)

Date du début: 29 févr. 2004, Date de fin: 29 nov. 2007,

The idea of the project is to provide a specific, effective answer to the Scheme for Developing the Community Area, and especially to the three Political Options that refer directly to metropolitan areas. • To strengthen several large, global, economic integration areas in the EU. • To develop a more balanced, multi-central system for metropolitan regions and town networks. • Complementarity: to h ...
Voir le projet

 17

 TERMINÉ 
Since competitiveness in most industries is now determined on a global scale, companies need to continuously develop their products and production processes to stay ahead of the game. However, innovation and development processes are becoming more and more complex, calling for resources and competences often beyond the reach of an individual company, especially if that company is small. Cooperatio ...
Voir le projet

 4

 TERMINÉ 
This project, led by the Association of Local Authorities in the Ruhr District, and bringing on board 15 partners from Germany, the UK and Netherlands, aims to restore 16 ‘riverscapes’ (river landscapes) as the arteries of the regions involved. It also looks at ways to improve access to the rivers and revitalise them as focal points for recreation and regional economic development. The partner reg ...
Voir le projet

 16

 TERMINÉ 
URBAN EMPATHY will consolidate a permanent structure to work on transforming existing results from preselected MED projects and key European programmes into effective policies related to Sustainable Urban Models (SUMO). - 1st (WP3), the results will be evaluated through a set of transferability criteria and cross checked to ensure that they comply with the SUMO shared by the partners. In parallel, ...
Voir le projet

 13

 TERMINÉ 
Archaeological archives consist of all material deemed worthy of retention generated by any type of archaeological project. This includes the historic artefacts as well as the written, drawn, and photographic records and the digital data about the site and its associated finds collection. The successful preservation of the archive for the future benefit of the people of Europe depends on the imple ...
Voir le projet

 8