Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The general aim of InMotion is to continue the reform of the system of higher education in the Engineering in Malaysia and Russian Federation to improve quality of education and teaching according to the priorities established in the Bucharest and Yerevan Communiqués and to meet the demands of Strategic Framework for European Cooperation in Education and Training (ET 2020).When implemented the pro ...
Voir le projet

 10

 TERMINÉ 
Over the past 15 years, EU-funded cohorts and collaborations (EuroSIDA, CASCADE and PENTA), have played a central role in developing our understanding of HIV progression and the effects of ART, enabling European expertise to contribute directly to the advances in patient diagnosis and management worldwide, and providing a continued surveillance mechanism for detection of emerging problems at a Eur ...
Voir le projet

 26

 TERMINÉ 

New Algorithms for Host Pathogen Systems Biology (SYSPATHO)

Date du début: 1 oct. 2010, Date de fin: 31 mars 2015,

SYSPATHO focuses on the development of novel and generally applicable mathematical methods and algorithms for systems biology. These methods and algorithms will be applied to study the complex interactions of hepatitis C virus (HCV), a human-pathogenic virus of high medical relevance, with its host at the systems level. Using a multidisciplinary, integrative approach, PATHOSYS will (a) develop met ...
Voir le projet

 11

 TERMINÉ 
The aim of the project is to link the findings of the project to the outcomes of the earlier projects to support decision making by producing tools for marine spatial planning and management, including demonstrating a prototype of a marine spatial planning tool for decision making at an international, national and regional level. The aim is to test the possibilities of current technology to produc ...
Voir le projet

 9

 TERMINÉ 

Finnish-Russian Forest Academy 2 - Extension and Piloting

Date du début: 30 nov. 2012, Date de fin: 29 nov. 2014,

Overall objective of the project is to continue and extend the first phase project of Finnish-Russian Forest Academy Preparation with the aim of establishing the Finnish-Russian coordination center of joint activities in education, research and business development in forestry and forest industry, and with the aim of piloting joint activities. The aim is to support and enhance Finnish-Russian coll ...
Voir le projet

 4

 TERMINÉ 

Efficient Energy Management (EFEM)

Date du début: 30 nov. 2012, Date de fin: 29 nov. 2014,

The aim of the project is to develop a multistage practical program which supports energy efficiency actions especially for existing public building stock in St.Petersburg. The program will be based on results of pilot buildings representing typical public buildings from 50`s to 80`s (schools, kindergartens, health centers etc.). New concepts will be created and tested in collaboration with Finnis ...
Voir le projet

 5

 TERMINÉ 
Objective of the projectTo increase regional tourism attractiveness by developing e-tourism solutions using state-of the-art information technologies. The e-tourism framework and applications, developed in the Project, were targeted to foster the use of regional infrastructure and services, increase organized tourism, and facilitate tourism marketing activities.Main activities • Application develo ...
Voir le projet

 5

 TERMINÉ 

Moving Towards Wellbeing

Date du début: 31 mars 2012, Date de fin: 29 sept. 2014,

The objective of the project is to advance sustainable economic development of the area of the wellbeing. The project supports the Leningrad Region, Päijät-Häme, St Petersburg and Kymenlaakso regional entrepreneurial activities. It aims to develop cooperation in social and health care sector and its entrepreneurship, to build business and education (in entrepreneurship). The objective is also to r ...
Voir le projet

 4

 TERMINÉ 

Waste Management

Date du début: 15 mars 2012, Date de fin: 14 sept. 2014,

Overall objective of the project is to develop and maintain a modern sustainable ecological system for waste management and recycling technologies of industrial and domestic waste in the programme region. Specific objective is to improve waste management systems efficiency through creation of the Waste Exchange in the programme area based on selected best practices in Russia and Finland.
Voir le projet

 3

 TERMINÉ 

Innovation and Business Cooperation

Date du début: 8 juil. 2011, Date de fin: 7 juil. 2014,

The Project is stimulating the regional cooperation by promoting the accumulated practices to the EU-Russia policy level turning the growing process from bottom up. Objectives of the project are based on Triple Helix approach combining the efforts of business-university-government cooperation to the systematic and regular practices. The project is utilising the existing cooperation, which were sta ...
Voir le projet

 14

 TERMINÉ 

Castle to Castle

Date du début: 20 avr. 2011, Date de fin: 19 avr. 2014,

To establish an internationally recognizable Castle to Castle cultural route between Finnish and Russian castles and a related network of experts and entrepreneurs. Culture tourism is one of the fastest growing sectors of the tourism business and a future mega trend of the industry. Cultural tourism resorts are constantly developing into more attractive, memorable and profitable destinations. A un ...
Voir le projet

 5

 TERMINÉ 

Improving availability of medical information and counselling (MEDINF)

Date du début: 31 déc. 2010, Date de fin: 30 mars 2014,

...unselling via Internet, telephone and other means; *The use of new forms of Medical Counselling by using ICT solutions; 2 Counselling Centres in Russia established: in Pskov and in Kolpino, St. Petersburg; Existing Counselling Centre ready for work via internet in Estonia; 10 work places in Counselling Centres in Russia established; Increased awareness of local communities about medical consultati ...
Voir le projet

 5

 TERMINÉ 

BLESK

Date du début: 22 mars 2011, Date de fin: 21 mars 2014,

... cross-border region, which will increase the overall competitiveness of the cross-border region in business and energy.BUSINESS WP: SME sector of the cross-border regions covering Southeast Finland, St. Petersburg and Leningrad oblast, particularly innovation-intensive companies, which plan international-lisation. They will receive new support infrastructure, improved internationalisation service ...
Voir le projet

 6

 TERMINÉ 

Development of rescue operations in the Gulf of Finland

Date du début: 21 mars 2011, Date de fin: 20 mars 2014,

The main objective of the project is to enhance Finnish-Russian cooperation regarding risk management to improve maritime safety and reduce transboundary environmental risks through research, development and training. The project aims at strengthening the competitiveness and sustainable economic development of the maritime transport system around the Gulf of Finland. The aim is to develop knowledg ...
Voir le projet

 11

 TERMINÉ 
Security has always been a stepchild to the developers of embeddedsystems. In the past they were able to rely on physicalprotection. Due to the connectivity and ubiquity of today's embeddedsystems this is no longer possible. The aim of SecFutur is to developand establish a security engineering process for embedded systems. Inorder to achieve this overall goal SecFutur will provide a set ofimplem ...
Voir le projet

 11

 TERMINÉ 

Improving Social Services

Date du début: 28 avr. 2011, Date de fin: 27 avr. 2013,

...rganizing e-communities. Promoting education co-operation in the sphere of social and computer sciences via intensification of joint Russian-Finnish students interdisciplinary research cooperation in St.Petersburg and South-East Finland. Achievements: The main objective ...
Voir le projet

 7

 TERMINÉ 

Finnish-Russian Forest Academy preparation

Date du début: 27 avr. 2011, Date de fin: 26 avr. 2013,

To support Finnish-Russian co-operation in research, education and innovations by founding an organisation which will enhance co-operation, modernization actions in pulp and paper plants, and optimal use of wood material in Finnish and Russian forest industries. Specific objectives: To build the common ground and map the needs of partners and other relevant organisations in foundation of Finnish-R ...
Voir le projet

 3

 TERMINÉ 
Description The EU-RU.NET Project targets strengthened cooperation between leading European and Russian scientists in research and industry in the important field of Nanoelectronics Technology.For the purpose of strengthening the EU-Russia cooperation in nanoelectronics technology a large number of leading European and Russian scientists ...
Voir le projet

 10

 TERMINÉ 

Stimulating Semiconductor Design Cooperation between Europe and Russia (SEMIDEC)

Date du début: 1 déc. 2009, Date de fin: 30 nov. 2011,

...and capabilities spanning research, design and production of microelectronics and integrated circuits. Despite these strengths, there were no Russian semiconductor organisations participating in FP6 IST. Meanwhile, EU faces challenges in addressing the research priorities for semiconductor design methods and tools identified in the FP7 ICT WP and ENIAC SRA. This situation offers a favourable oppor ...
Voir le projet

 6

 TERMINÉ 

Marine protected areas in the Eastern Baltic Sea (Baltic MPAs)

Date du début: 1 août 2005, Date de fin: 30 nov. 2009,

Background The Baltic Sea is a unique and fragile marine ecosystem hosting many species and habitats of European and global interest, including the Steller's Eider (Polysticta stelleri) which has its own European Species Action Plan. It is believed that the by-catch of birds and seals in fishing nets is a problem in the Baltic Sea and assumed that habitat ...
Voir le projet

 22

 TERMINÉ 

East-West Window (EastWest Window)

Date du début: 30 avr. 2007, Date de fin: 30 oct. 2008,

The main aim of the East West Window project was to accelerate the Baltic Sea Region (BSR) development through better connecting of the existing potentials within the Region. Achievements: * Assessment of unused innovation potential in NW Russia and recommendations ...
Voir le projet

 10

 TERMINÉ 

Baltic Metropolises Innovation Strategy (BaltMet Inno)

Date du début: 2 janv. 2005, Date de fin: 1 janv. 2008,

... Inno Project was initiated by the major cities in the Baltic Sea Region. The project consortium consists of thirteen partner organisations from Berlin, Copenhagen, Helsinki, Malmö, Riga, Stockholm, St. Petersburg and Tallinn. In addition, organisations from Oslo, Warsaw and Vilnius participate in the project as observers. The project was started in the beginning of 2005 and will be finalised by t ...
Voir le projet

 15

 TERMINÉ 
Background The City of St. Petersburg’s Municipality stored, in various databases, many environmental data on local issues ; there was no efficient data management system by the Municipality, which was not equipped with appropriate software tools. Objectives The overall object ...
Voir le projet

 4

 TERMINÉ 

AGORA -Network Sustainable Tourism Development in the Baltic Sea Region (AGORA)

Date du début: 30 juin 2005, Date de fin: 30 déc. 2007,

The BSR is characterised by large areas of unspoilt countryside. Because of strong economic problems just in these rural areas tourism seems to be a promising opportunity to support regional development. Sustainability considered as a guiding principle can ensure that such a development will lead to economical benefits without threaten the nature and the social structure. Consequently a lot of sus ...
Voir le projet

 46

 TERMINÉ 

Coastal Zone Management in the Baltic Sea Region / COASTMAN (COASTMAN)

Date du début: 13 juin 2004, Date de fin: 12 sept. 2007,

The COASTMAN project is aimed on developing approaches for conflicts resolution in coastal zone areas. The project partners’ group with representatives from Sweden, Germany, Latvia, Lithuania, Estonia and Russia aimed at investigating conditions under which spatial conflict resolution in coastal zone management can be handled in a bottom up perspective in different countries around Baltic Sea. The ...
Voir le projet

 17

 TERMINÉ 

Domestication of Northern Berries - Northern Berries (Northern Berries)

Date du début: 31 mai 2002, Date de fin: 29 mai 2005,

Northern Berries aims to develop and improve cultivation techniques for berries that are native to northern periphery areas, particularly cloudberries. The aim is to increase consumption and use of these native berries by improving growing and handling techniques, and by promoting the positive health attributes of the berries. A number of studies are being carried out across the project area to as ...
Voir le projet

 5

 TERMINÉ 

Oulu South Know-How Bridge with Russia

Date du début: 10 juin 2001, Date de fin: 29 oct. 2004,

...of the region, to get them to assess cooperation opportunities and, ultimately, begin cooperation with Russians. In accordance with the project plan, the focus areas were manufacturing in Karelia and St. Petersburg, RTD projects, expertise projects, training, personnel and recruitment, construction, the forestry and wood industry, and agriculture. In particular, technological expertise and associa ...
Voir le projet

 4

 TERMINÉ 

Exercise and Cultural Cooperation & Exchange

Date du début: 31 déc. 2001, Date de fin: 30 déc. 2003,

The project goal was to plan an operational model that could be used to promote cooperation in sports education culture between Joensuu and Russian Karelia and the St. Petersburg area. Different types of exercise camp trips from Russia to Joensuu for children, young people and senior citizens would be implemented in the project. The intention was to plan a sports-related programme for the camps wh ...
Voir le projet

 8

 TERMINÉ 

RUSSIAN IT implementation survey

Date du début: 31 août 2002, Date de fin: 30 déc. 2003,

The purpose of the project was to support the availability of the workforce for IT companies, support the IT companies in cross-border cooperation and business activities, and profi le the university-level computer science education in Kajaani for cooperation with Russia. For that purpose, it was necessary to get to know the starting points for educational cross-border cooperation in the IT-sector ...
Voir le projet

 3

 TERMINÉ 

L05 - Russia

Date du début: 15 juil. 2009,

The consortium has already been selected under the 2006 and 2007 EM ECW calls and has implemented the network in 2007. During the first two years of the project implementation (academic years 2007/08 and 2008/09) 550 persons have been selected and are already participating in individual mobility flows. For the third phase of the project 261 mobility flows from Russia to the EU and vice versa are p ...
Voir le projet

 22

 TERMINÉ 
The project aims to the definition and adoption of an iQA system of SPs in the RF, consistent with the ESG and compatible with their organisation, and of an online documentation and monitoring system of their quality. The project will be especially addressed to technological education, but most topics are universal and can be applied to all fields of education as well. The first outcome of the pro ...
Voir le projet

 18

 TERMINÉ 
...research projects.The Aurora II mobility scheme is based on free mobility, implying that candidates in all target groups can apply freely to any European/Russian partner university of their interest. Free mobility and lack of pre-assigned mobility quotas allow the mobilities to be chosen on academic criteria. The thematic expertise of each partner can be fully appreciated and the interests of the ...
Voir le projet

 29

 TERMINÉ 
The objective of the project is to ensure sustainable development of Russian higher education through quality assurance structure for degree programmes in line with Bologna and EU 2020 strategic objectives.Specific objectives of the project are:1. To develop countrywide procedure for HE degree programme accreditation harmonized with ENQA 2. To establish independent Programme accreditation entit ...
Voir le projet

 14

 TERMINÉ 
Proposed DEFRUS project aims at development of sectoral Qualifications Framework for Food Science. It will contribute towards wider objective “Enhancement of quality and relevance of higher education in Russian Federation and increasing convergence with EU developments through elaboration of qualifications framework”. Three specific project objectives are:1- Comparative analyses of existing standa ...
Voir le projet

 21

 TERMINÉ 
The overall wider objective, to which the project will contribute, is to continue the reform of the system of higher education in the area of Applied Marine Science (AMS) in Russian Federation to comply with Bologna Declaration and according to the demands of Strategic Framework for European Cooperation in Education and Training (ET 2020), aimed at improving the quality and efficiency of education ...
Voir le projet

 8

 TERMINÉ 
The issues of environmental safety and “green” energy processing are being highly politicised and officially belong to prior economic and social development policies in Kazakhstan and Russia. However, the current economic realities and relevant educational infrastructure do not allow effective realization of these policies. Mostly, it is not the lack of financial resources or political will, but m ...
Voir le projet

 11

 TERMINÉ 
The initiative for the Erasmus Mundus Action 2, Strand 1, Lot 6 proposal Integration, Interaction, Institutions – Triple I is to enhance institutional capacity to understand the standards and demands of international educational cooperation, and to reinforce the interest in functions and policies for the development of structured international activities in academic institutions. Opportunities for ...
Voir le projet

 20

 TERMINÉ 
The project proposal, coordinated by the University of Barcelona, is integrated by 10 European institutions, 8 Russian institutions and associates partners. Key to this proposal is the successful cooperation and participation of all partners as a solid and coherent working group. To ensure smooth organisation of mobility flows and effective management of the partnership, the consortium will integr ...
Voir le projet

 17

 TERMINÉ 
The consortium has already been selected under the 2006 - 2008 EM ECW calls and has implemented the network in 2007. During the first three years of the project implementation 785 persons have been selected and are already participating in individual mobility flows. For the third phase of the project 254 mobility flows from Russia to the EU and vice versa are planned, involving all levels of the p ...
Voir le projet

 20

 TERMINÉ 
The Project aims to create the first national-level Postgraduate Training Network in Biotechnology of Neurosciences (BioN). The BioN will optimize the use of the limited recourses available for postgraduatelevel education in Russia, stimulate national and international cooperation, enhance mobility of students and teachers. The BioN will become a sustainable network of leading Russian universities ...
Voir le projet

 13