Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Voir le projet

 31

 TERMINÉ 

Market Uptake of Sustainable and Competitive Carbons for Energy Storage (CareSTOR)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

...reSTOR project will provide evidence (TRL8), at techno-economic perspectiveical and financial perspectives, and validate a business case based on a ground-breaking solution for ultra-cheap Capacitive Energy Storage (CES). The solution is enabled by an innovative intensified (hydrothermal) technology for the low-cost production of Advanced Nanoporous Carbons (Figure 1).Supercapacitor manufacturers ...
Voir le projet

 4

 TERMINÉ 

wer-to-fleX (Power-to-fleX)

Date du début: 1 avr. 2016, Date de fin: 30 oct. 2019,

In Noordwest-Duitsland en Noord-Nederland is de afgelopen jaren volop ingezet op duurzame energie. Het nadeel van zon en wind als energiebron is dat het aanbod ervan fluctueert en niet gelijk loopt met de energievraag. Het bufferen van deze elektriciteit (Power) in een andere energiedrager, zoals water-stofgas, methaan, methanol, warmte of batterij (X) is een oplossing voor dit probleem. Het doel ...
Voir le projet

 19

 TERMINÉ 
...te owners of MagLs, who can provide knowledge on land availability and are responsible for managing these. Furthermore foresters, farmers and the civil society affected by transformation of MagL into energy crop plantations are important cooperation partners for the project’s success.The initial challenge of the project is to define MagL. In order to achieve high yields on the MagL the goal is to ...
Voir le projet

 8

 TERMINÉ 
"Known as either "Industrial Revolution 4.0" or as "Industrial Renaissance", the need for new manufacturing approaches is widely accepted in the EU. SatisFactory aims to contribute to the transformation of traditional industrial environments using cutting-edge technologies in ways that are both productive and appealing to youth.The fundamental component of the proposed system will be the assessmen ...
Voir le projet

 11

 TERMINÉ 
...ned coordination and support measures:1. Coordination: Engaging with a diverse range of stakeholder groups representing particularly the Horizon 2020 societal challenges Health, Food & Agriculture, Energy, Transport, Climate, Social Sciences and Security; Collecting requirements for the ICT infrastructure needed by data-intensive science practitioners tackling a wide range of societal challenges; ...
Voir le projet

 15

 TERMINÉ 
The scientific targets of the EUROSUNMED project are the development of new technologies in three energy field areas, namely photovoltaics (PV), concentrated solar power (CSP) and grid integration (GI), in strong collaboration with research institutes, universities and SMEs from Europe in the north side of the Mediterranean sea and from Morocco and Egypt from the south of the sea. The focus in PV ...
Voir le projet

 18

 TERMINÉ 
In line with the objectives of the Europe2020 Strategy and ET2020, through "Mobil-ITA Senza Frontiere", the consortium, led by the Agricultural Technical School "F.lli Agosti" of Bagnoregio (VT), aims to improve the quality of education and vocational training, giving a European dimension to the educational paths and thus providing the young participants the opportunity to test and improve their s ...
Voir le projet

 30

 TERMINÉ 

Open Project for the European Radiation Research Area (OPERRA)

Date du début: 1 juin 2013, Date de fin: 31 mai 2017,

"Within the OPERRA project, it is proposed that the MELODI Association, as a well-advanced network, takes the lead in establishing the necessary structures able to manage the long-term European research programmes in radiation protection, also taking advantage of the valuable experience gathered through the DoReMi network of excellence. Whilst in fields adjacent to low-dose risk research (radioeco ...
Voir le projet

 71

 TERMINÉ 
The target of the Smartonics project is the development of Pilot lines that will combine smart technologies with smart nanomaterials for the precision synthesis of Organic Electronic (OE) devices.The Smartonics objectives are:1.Development of smart Nanomaterials for OEs (polymer & small molecule films, plasmonic NPs and super-barriers) by process and computational modeling optimization.2.Developme ...
Voir le projet

 19

 TERMINÉ 
Southern Europe and the Mediterranean region are facing the challenge of managing its water resources under conditions of increasing scarcity and concerns about water quality. Already, the availability of fresh water in sufficient quality and quantity is one of the major factors limiting socio economic development. Innovative water management strategies such as the storage of reclaimed water or ex ...
Voir le projet

 23

 TERMINÉ 
One of the central ideas underlying European Lifelong Learning policies is that international mobility should become a natural part of education and training schemes. This helps learners to achieve higher qualification levels which are crucial for a successful first step into the labour market or for career improvements. The EU Member States are fully committed to helping young people take advanta ...
Voir le projet

 42

 TERMINÉ 
...mponents based on data acquired by a cost-effective wind turbine condition monitoring system implemented by custom-designed dependable computing systems. This technology will reduce the total cost of energy and advance the deployment of large scale offshore and onshore wind energy by increasing availability and reducing downtime due to unplanned maintenance. Predictive maintenance will also reduce ...
Voir le projet

 13

 TERMINÉ 
"European oceans will be subject to massive development of marine infrastructure in the near future. The most obvious is the energy facilities e.g. offshore wind farms, exploitation of wave energy, expansion of electricity connections, and also further development and implementation of marine aquaculture. This will also lead to an increased need for marine infrastructure to support installation an ...
Voir le projet

 29

 TERMINÉ 

lar Renewables: Independent Energy Supply (POLARIS)

Date du début: 27 nov. 2012, Date de fin: 30 oct. 2015,

The project will support cross-border cooperation of the participating Russian and Finnish neighbouring regions in wider use of renewable energy sources. POLARIS will assist in the evaluation of the possibilities of wind energy production and use in cross-border regions of Russia, and promote on the local level in Russia the use of wind energy. ...
Voir le projet

 3

 TERMINÉ 
...ementation of participative governance processes and consultancy instruments for policy makers and regional authorities. AlpBC capitalizes on the outcomes of previous projects on building culture and energy efficiency (e.g. project AlpHouse). Achievements: The main acti ...
Voir le projet

 13

 TERMINÉ 
The project aims at the development of the long term water supply strategy of Érmellék region in the area of the cross-border water body. The bottleneck of the strategy is the low level of information on the groundwater reserves in the region. The existing waterworks suffer from inadequate water quality, obsolete water supply structures and machinery, lack of supply in several settlements. The on- ...
Voir le projet

 2

 TERMINÉ 
Coal mining and utilisation results in release of significant amounts methane and represent an important threat to the fight against climate change. Coal Mine Methane drainage processes can be set up to recover methane from the emissions during coal production. Methane can also be extracted from virgin coal seams trough primary and enhanced coalbed methane recovery. The main objective of the prop ...
Voir le projet

 12

 TERMINÉ 
FOTsis (European Field Operational Test on Safe, Intelligent and Sustainable Road Operation) is a large-scale field testing of the road infrastructure management systems needed for the operation of seven close-to-market cooperative I2V, V2I & I2I technologies (the FOTsis Services), in order to assess in detail both 1) their effectiveness and 2) their potential for a full-scale deployment in Europe ...
Voir le projet

 30

 TERMINÉ 

Multipurpose Applications by Thermodynamic Solar (MATS)

Date du début: 19 juil. 2011, Date de fin: 18 janv. 2015,

The proposed MATS Project aims at promoting the exploitation of concentrated solar energy through small and middle scale facilities, suitable to fulfil local requirements of power and heat, and easily to back-up with the renewable fuels locally already available or that can be expressly produced. The implementation of the project will allow to test the CSP (Concentrating Solar Power) technology in ...
Voir le projet

 11

 TERMINÉ 

GREEN RENOVATION CLUSTER (GREENOV)

Date du début: 31 mars 2009, Date de fin: 31 déc. 2014,

...will improve the knowledge and expertise on sustainable renovation of existing buildings. Partners of this project are key stakeholders involved in the fields of eco-innovation (eco-construction. energy…). The partners want to set-up a European cluster on sustainable renovation based on the structuring of a supply chain (supply side lever) and the engagement of the public sector (demand side l ...
Voir le projet

 12

 TERMINÉ 
The EU, its Member States and EU regions have defined ambitious energy strategies, setting firm targets for an increased share of renewable energy sources, more energy efficiency and less carbon emissions in order to make Europes energy supply sustainable and future proof.An important obstacle for wide-spread introduction of renewable energy production capacity and energy efficiency measures is th ...
Voir le projet

 16

 TERMINÉ 

motion of Resource Efficiency in SMEs in Central Europe (PRESOURCE)

Date du début: 31 mai 2012, Date de fin: 29 nov. 2014,

Resource efficiency means to use the Earth's limited resources in a sustainable manner while minimising impacts on the environment. The European Union must use natural resources in a more convincing manner and the answers must go beyond existing policy actions. The situation within the central Europe area is even more alarming, since productivity in most of the countries joining the EU after 2004 ...
Voir le projet

 8

 TERMINÉ 

Adriatic - Danube - Black Sea multimodal platform (ADB multiplatform)

Date du début: 31 mars 2012, Date de fin: 29 sept. 2014,

The idea of the project is to develop and promote environmentally friendly, multimodal transport solutions from the ports in the SEE programme area (Black Sea, Aegean, Adriatic) to inland countries and regions along a selected pilot transnational network. This will be done by developing and establishing a "multimodal transport development platform", which integrates different regions and stakehold ...
Voir le projet

 43

 TERMINÉ 
...sport as an efficient strategy to limit the impact from traffic on climate change. Biogas can be produced from biodegradable materials (waste, manure, sewage sludge and landfill gas) thereby creating energy autonomy and jobs. Through purification it reaches the same quality and characteristics as natural gas (methane) and can be used as fuel for vehicles. Biogas buses have a much lower impact on i ...
Voir le projet

 10

 TERMINÉ 
The EE-QUARRY project emerges from the necessity to control a very demanding energy-intensive industry, which characterizes from its high energy demands and enormous CO2 emissions. The goal is to improve energy efficiency and to reduce CO2 on quarries, through the develop of a new and highly effective modeling and monitoring Energy Management System technique. The use of crushed stone could increa ...
Voir le projet

 12

 TERMINÉ 

Green Intermodal Freight Transport (GIFT)

Date du début: 29 févr. 2012, Date de fin: 30 août 2014,

The main aim of the current project is to map, analyze, and evaluate the status of the transport sector in the GIFT transport network and propose new policies and strategies in infrastructure, processes, assets, ICT, legislation, norms and harmonization/ standardization issues, in order to promote innovative green intermodal freight transport corridors. GIFT project will drill down in three Pan-Eu ...
Voir le projet

 27

 TERMINÉ 

Aquatic resources for green energy realization (AQUAREL)

Date du début: 15 oct. 2012, Date de fin: 14 juin 2014,

Objective of the projectThe objective of the project was to develop and introduce an innovative and efficient concept for green energy production and recycling of bio-waste to fish farms and other local actors in the Karelia ENPI programme area. Main activities• Analyse and estimate the quantity and quality of fish production bio-waste in the area. • Research how to amalgamate fish waste productio ...
Voir le projet

 8

 TERMINÉ 
...ractive web portal and web info kiosks, to providing information on the areas, with capability for online communication with tourism enterprises, services etc. Info kiosks will operate with solar energy and be spread in all project areas. Ex ...
Voir le projet

 7

 TERMINÉ 
...e-qualifying marginal areas through investments programmes that focus on the installation of RES (PV, Wind, Biomass, geothermal, biogas, etc) that will contribute to a significant amount of renewable energy.This approach will hereinafter be called M2RES(From marginal to renewable energy sources sites). M2RES can boost EU's sustainable development, giving back social and economic value to areas tha ...
Voir le projet

 14

 TERMINÉ 
The sector of distribution and logistics of agricultural and food products in the Adriatic area lacks institutional and economic governance such as to make it possible to establish an Adriatic transnational economic cooperation system capable of balancing and harmonizing technical, managerial, financial and innovation service (certification) issues among the two Adriatic coasts (eastern and wester ...
Voir le projet

 11

 TERMINÉ 

Sustainable use of former and abandoned landfills network for you (SufalNet4EU)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2013,

...rs presented their land use proposal(s) for having the landfill site(s) transformed into citypark, sports facility for biking, karting and golfing, open air theatre, pet area and in solar and wind energy parks. Step 3 focussed on environmental issues and technical aspects. This was presented and discussed during a plenary co-ordination conference on 8 & 9 December 2010 in Lavrio, Greece. Especiall ...
Voir le projet

 15

 TERMINÉ 

From strategies to activities (Bioenergy Promotion2)

Date du début: 28 sept. 2011, Date de fin: 27 déc. 2013,

The aim of the project "Bioenergy Promotion 2- from strategies to activities" was to promote and increase the sustainable production and use of bioenergy in the Baltic Sea Region.Bioenergy Promotion 2 was a follow-up to the Main stage project Bioenergy Promotion. The Main stage project started in 2009 and concluded in 2011. The initial project consortium consisted of 33 partners, who were involved ...
Voir le projet

 15

 TERMINÉ 

Ground Deformations Risk Scenarios: an Advanced Assessment Service (DORIS)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

"DORIS is an advanced downstream service for the detection, mapping, monitoring and forecasting of ground deformations, that integrates traditional and innovative Earth Observation (EO) and ground based (non-EO) data and technologies. The service delivers innovative products tailored for Civil Defense authorities. DORIS integrates state-of-the-art technological and scientific capabilities with exi ...
Voir le projet

 14

 TERMINÉ 
iNTeg-Risk is a large-scale integrating project aimed at improving the management of emerging risks in the innovative industry. This will be achieved by building a new risk management paradigm for emerging risks, which is a set of principles supported by a common language, commonly agreed tools & methods and Key Performance Indicators integrated into a single framework. As main impact, it will red ...
Voir le projet

 67

 TERMINÉ 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Voir le projet

 30

 TERMINÉ 

Integrated Renewable Energy Solutions for Seafood Processing Stations (ENERFISH)

Date du début: 1 oct. 2008, Date de fin: 31 mars 2013,

A new polygeneration application with renewable energy sources will be planned and demonstrated for the fishery industry. The distributed energy system utilizes cleaning waste of a fish processing plant to produce biodiesel. The biodiesel is used to produce the locally needed cooling/freezing and heating energy. In addition, a power surplus is generated for the electricity network or local industr ...
Voir le projet

 10

 TERMINÉ 

EXpAnding LTE for Devices (EXALTED)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2013,

...ications needs.The project will work towards meeting following main aims:• To develop and provide a new architecture to support efficient and cost-effective wireless M2M communications.• To provide energy efficient wide area coverage for M2M applications such as wireless sensor networks.• To extend the scalability of the LTE infrastructure with the aim to extend the range of applications to very c ...
Voir le projet

 16

 TERMINÉ 

Green Urban Transport Systems (GUTS)

Date du début: 28 févr. 2010, Date de fin: 27 févr. 2013,

...t was carried out via the development of a Baseline Study and the drafting of local/regional analyses by partners with the assistance of 2 knowledge partners, CERE (Center of Excellence for Renewable Energy, Energy Efficiency and Environment) and IBDiM (Road and Bridge Research Institute). The analysis phase was supported by a benchmark visit to the “model city” of Burgos (ES) where partners learn ...
Voir le projet

 8

 TERMINÉ 

mote Clean Public Transport (TROLLEY)

Date du début: 31 janv. 2010, Date de fin: 30 janv. 2013,

...oject partners consider trolleybus systems as a ready-to-use transport technology for the future; for both medium-sized and large urban areas. Locally, trolleybuses are zero-emission vehicles, highly energy-efficient, able to re-use braking energy, and not loosing energy while idling at bus stops. They have the lowest possible consumption of non-renewable resources (50% less compared to diesel bus ...
Voir le projet

 9