Rechercher des projets européens

17 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...ng solutions for the intermodal transport of dangerous goods in Central and Eastern Europe. Partners from public authorities, chemical companies and research organisations from Germany, Poland, Czech Republic, Slovakia, Hungary, Austria, Slovenia and Italy have initiated the project in July 2012 by implementing a deeper analysis of the needs for tracking and tracing of dangerous goods by companies ...
Voir le projet

 15

 TERMINÉ 
...mples: In Poland the pilot action focuses on telemedicine. In Hungary a study aims to identify the most efficient solution for the distribution of childcare facilities across the pilot region. In the Czech Republic the focus is on saving energy costs in public buildings. The experiences from the pilot actions are so far summarized in two documents, firstly a “Regional Guidebook - Methods to adapt ...
Voir le projet

 11

 TERMINÉ 

Upgrading of Inland Waterway and Sea Ports (INWAPO)

Date du début: 30 sept. 2011, Date de fin: 31 août 2014,

...o so the project will focus on 3 main systems of waterways: the Northern Adriatic ports (Venice, Trieste and Koper), the Danube river ports (Vienna, Budapest, Bratislava, Komarno and Sturovo) and the Czech and Polish inland waterways (Elbe, Vistula and Oder systems), with an extension towards Baltic ports. ...
Voir le projet

 13

 TERMINÉ 
The Alpine and the Carpathian Conventions state sustainable tourism mobility as a challenge and call for cooperation on this topic among the countries of these mountain regions. In particular sustainable tourist mobility is not well-developed in mountainous regions, especially in South-East Europe, as mountain regions are lacking sufficient sustainable transport facilities and facing major ecologi ...
Voir le projet

 32

 TERMINÉ 

Introduction of Regional Energy Concepts (CEP-REC)

Date du début: 30 sept. 2011, Date de fin: 31 mars 2014,

...rgy Concepts (REC), tools that support the implementation of Renewable Energies at regional level, where change matters. 15 Partners as representatives of nine model regions set in Austria, Germany, Czech Republic, Hungary, Italy, Poland, Slovakia and Slovenia started to elaborate possible strategies for regional energy demand and supply. For all nine pilot regions individual Regional Energy Conc ...
Voir le projet

 15

 TERMINÉ 
...ing biodiversity preservation and ecological connectivity in Serbia• Analysis of the institutional and legal framework affecting biodiversity preservation and ecological connectivity in the Czech Republic• Analysis of the institutional and legal framework affecting biodiversity preservation and ecological connectivity in the Slovak Republic• Analysis of the institutional and legal framework affect ...
Voir le projet

 24

 TERMINÉ 

South East Transport Axis (SETA)

Date du début: 31 déc. 2010, Date de fin: 30 déc. 2013,

Together with the projects SoNorA, BATCo, SCANDRIA North and SEETAC (Central Europe, Baltic Sea, SEE Programme), SETA is aiming on the analysis and development of the transport corridors from Scandinavia to South-East Europe. Competitive Accessibility of regions is one of the most important preconditions for their economic growth and development (as the project SIC! has shown). Fluent transport of ...
Voir le projet

 25

 TERMINÉ 
The ESPONTrain Project is aiming at making ESPON2013 knowledge operational in a coordinated and transnational way for practical use at regional and local level, and translating ESPON Europe-wide information and findings to the regional/local level. Specifically, the project is aiming at: •Stimulating a transnational educational and training ESPON activity facilitated by both an e-learning procedur ...
Voir le projet

 10

 TERMINÉ 

SOuth-NORth Axis (SoNorA)

Date du début: 31 oct. 2008, Date de fin: 27 févr. 2012,

SONORA addresses the need for improved multimodal accessibility in Central Europe in South-North dimensions. Building upon past project experiences which focused on the landscape and general transport conditions and plans within the area, SONORA targets to incisively bring forward the state of the art on the deployment of primary transport infrastructure and services, through trans-national collab ...
Voir le projet

 25

 TERMINÉ 

ion and valorisation of the longest habitat system in Europe (GREEN BELT)

Date du début: 31 mars 2006, Date de fin: 29 mai 2008,

Borders separate, nature unites: Along the former "Iron Curtain", the longest European system of habitats has been preserved due to decades of inaccessibility. However, the location within border areas did not only help to protect nature, but also limited the economic development of the adjacent regions. GREEN BELT aims at transforming the former "death belt" into a green "life line" by focusing o ...
Voir le projet

 17

 TERMINÉ 
Problems addressed• Regional and institutional disparities in capacity and knowledge on cross border cooperation• Differences and obstacles posed by dissimilar legislative and administrative frameworks and planning approaches• Inadequate coordination across the border and complexities imposed by Enlargement and AccessionObjectives• Know How dissemination from EU internal and/or former external bo ...
Voir le projet

 8

 TERMINÉ 
REPUS focuses on new EU Member States and addresses the challenge of a more balanced and sustainable urban development. The European Spatial Development Perspective (ESDP) points out that urban polycentric systems are essential for a balanced and sustainable economic development of Europe. The main aim of the project is to build a Regional Polycentric Urban System (REPUS) in Central-Eastern Europe ...
Voir le projet

 6

 TERMINÉ 
The target of ODERREGIO is the production of a transnational agreed action program of spatial planning for preventive flood protection between the countries Czech Republic, Poland and Germany for the complete Oder river catchment area. This action program contains concrete realisable actions agreed between the project partners. These cover the preparation of enlargement of retention areas by spati ...
Voir le projet

 6

 TERMINÉ 

SUSTRAIN Implement Corridor (SIC!)

Date du début: 31 déc. 2002, Date de fin: 30 juil. 2006,

With the 2004 enlargement the EU area has increased by about 75 million people. A GDP of only 23-68% of the EU average and long transport routes do not only increase the imbalance between Europe's economic core area - London, Paris, Milan, Munich (Blue Banana) and Hamburg and periphery, the regional development and growth opportunities of the new EU countries are also on the decline. However, the ...
Voir le projet

 18

 TERMINÉ 

flood management measures by transnational spatial planning (ELLA – ELBE – LABE)

Date du début: 30 juin 2003, Date de fin: 30 juil. 2003,

The ELLA project is the transnational co-operation of nearly all regional spatial planning authorities in the Elbe basin. This partnership between national and regional partners that are responsible for spatial planning, water management and agriculture, realises almost full spatial coverage of the catchment area of the Elbe and even neighbouring regions. Flood prevention and common management app ...
Voir le projet

 23

 TERMINÉ 

Chemical Logistics Cooperation in Central and Eastern Europe (ChemLog)

Date du début: 31 oct. 2008, Date de fin: 30 oct. 2001,

...lopment of pipeline systems for the connection between the location of raw material and production in this context play an important role . Furthermore the important chemical locations in Poland, the Czech Republic, Slovakia, Austria, and Hungary are lacking a direct access to sea harbours, which provides them with competitive disadvantages due to higher costs which arise, compared to chemical loc ...
Voir le projet

 10

 TERMINÉ 
Although there are no exhaustive figures on mobility in IVT, the number of apprentices undertaking training in another Member State is nonetheless estimated at 1% on average, even if the number of opportunities for mobility doubled between 2002 and 2005 thanks to the European Commission’s incentive policy. An in-depth study (Move it) has identified several obstacles to mobility, including legal ...
Voir le projet

 23