Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Transforming Transport (TT)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Voir le projet

 48

 TERMINÉ 

Innovative Intelligent Rail (IN2RAIL)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Voir le projet

 56

 TERMINÉ 

PANACHE

Date du début: 2 janv. 2014, Date de fin: 2 janv. 2018,

Pilot line for Advanced Nonvolatile memory technologies for Automotive microControllers, High security applications and general Electronics :The PANACHE project objective is to set-up a pilot line for embedded Flash technology design and manufacturing platform for the prototyping of innovative µcontrollers in Europe.The current 40nm technology platform as well as the already defined 55nm technolog ...
Voir le projet

 21

 TERMINÉ 

Eyes of Things (EoT)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

Vision, our richest sensor, allows inferring big data from reality. Arguably, to be “smart everywhere” we will need to have “eyes everywhere”. Coupled with advances in artificial vision, the possibilities are endless in terms of wearable applications, augmented reality, surveillance, ambient-assisted living, etc. Currently, computer vision is rapidly moving beyond academic research and factory aut ...
Voir le projet

 9

 TERMINÉ 

Service Programing and Orchestration for Virtualized Software Networks (SONATA)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

Virtualisation and software networks are a major disruptive technology for communications networks, enabling services to be deployed as software functions running directly in the network on commodity hardware. However, deploying the more complex user-facing applications and services envisioned for 5G networks presents significant technological challenges for development and deployment. SONATA addr ...
Voir le projet

 17

 TERMINÉ 

5G Enablers for Network and System Security and Resilience (5G-ENSURE)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2017,

5G-ENSURE will define and deliver a 5G Security Architecture, shared and agreed by the various 5G stakeholders. It will specify, develop and release an initial set of useful and usable security enablers for 5G. These enablers will be selected for their relevance in addressing some of the foremost security concerns in order to generate the trust and confidence necessary for 5G to be widely adopted ...
Voir le projet

 16

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Behavioral Based Forwarding (BEBA)

Date du début: 1 janv. 2015, Date de fin: 31 mars 2017,

BEBA challenges a very ambitious goal: can we deploy wire-speed-reactive control/processing tasks inside the network switches, while retaining i) centralized control of their specification/operation, ii) high performance and scalability, and - crucial for real world adoption - iii) platform independency, i.e., consistency with the vendors’ need for closed platforms? BEBA’s answer revolves around t ...
Voir le projet

 7

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 

Future Internet - Core (FI-Core)

Date du début: 1 sept. 2014, Date de fin: 30 sept. 2016,

FI-WARE has started to materialize as a powerful foundation for the Future Internet. FI-WARE is an innovative, open cloud-based infrastructure for cost-effective creation and delivery of services, at a scale not seen before. FI-WARE is now well under way to successfully achieve its goals of boosting the effectiveness of creating new services of high economic and societal value, reinforcing EU comp ...
Voir le projet

 33

 TERMINÉ 

COgnitive & Perceptive CAMeraS (COPCAMS)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2016,

Vision systems are becoming ubiquitous in our daily lives. Complex analysis of images from multiple cameras will become the norm in the future, from cars to industrial systems, from smart cities to facility monitoring, aimed at extracting meaningful, context-dependent information.Today’s market is dominated by a combination of relatively simple, fixed function, configurable cameras that stream vid ...
Voir le projet

 25

 TERMINÉ 

Advanced pRotection of critical buildinGs by Overall anticipating System (ARGOS)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2015,

"Socioeconomic activities such as supply and distribution of gas or electricity and the Infrastructures that generate it or transport it (power plants, gas pipes), are vital to the day-to-day functioning of any country. Due to several factors, the social and financial European situation, or supply constraints, energy & utilities have become, over the last years, a prominent issue in Europe.In this ...
Voir le projet

 15

 TERMINÉ 

Authentication and Authorisation for Entrusted Unions (AU2EU)

Date du début: 1 déc. 2013, Date de fin: 30 nov. 2015,

...support its objectives by executing aligned activities defined in the TDL strategic research agenda. The project brings together a strong collaboration of leading industry (such as Philips, IBM, NEC, Thales), SMEs (such as Bicore) and research organizations of Europe (such as Eindhoven University of Technology) and Australia (such as CSIRO, Edith Cowan University, RMIT University, University of Ne ...
Voir le projet

 13

 TERMINÉ 

Mobile OpportunisTic Traffic Offloading (MOTO)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

To support the booming demand in mobile 4G data services, the MOTO project proposes to design, dimension, implement, and evaluate a new network architecture in support of dynamic traffic offloading strategies to relieve a congested 4G/LTE network. Going far beyond present infrastructure based offloading approaches, MOTO explores an additional layer of disruptive offloading protocols that make use ...
Voir le projet

 12

 TERMINÉ 

Achieving The Trust Paradigm Shift (ATTPS)

Date du début: 1 juil. 2012, Date de fin: 31 oct. 2015,

Trust is an essential prerequisite for connecting people in effective transactions. It builds into the society on elements like security, privacy, transparency, accountability and reputation. European strategy must aim at a strong competitive position in producing trustworthy ICT that bring new attractive ways of living and working that are perceived as trustworthy.The Trust in Digital Life (TDL) ...
Voir le projet

 12

 TERMINÉ 

OPerational Trustworthiness Enabling Technologies (OPTET)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

The OPTET project plans through a multi-disciplinary and integrated approach to identify and address the drivers of trust and confidence also fight against its erosion (especially true on the Internet or Cloud). Focus of this project is on socio-technical systems connected to the Internet. The resulting technologies enabling trustworthiness would be verified on two distinct existing execution plat ...
Voir le projet

 10

 TERMINÉ 

eXperimental Infrastructures for the Future Internet (XIFI)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Voir le projet

 38

 TERMINÉ 

Self adaptive heterogeneous manycore based on Flexible Tiles (FlexTiles)

Date du début: 15 oct. 2011, Date de fin: 14 avr. 2015,

Description To develop an energy-efficient programmable heterogeneous manycore platform with self-adaptive capabilities that apply to cognitive radio, video processing, embedded devices and ambient computingA major challenge in computing is to leverage multi-core technology to develop energy-efficient high performance systems. This is cri ...
Voir le projet

 12

 TERMINÉ 

Container Security Advanced Information Networking (CONTAIN)

Date du début: 1 oct. 2011, Date de fin: 31 mars 2015,

CONTAIN will specify and demonstrate a European Shipping Containers Surveillance system which will encompass regulatory, policy and standardisation recommendations, new business models and advanced container security management capabilities. CONTAIN will:1. Support transport security stakeholders in managing container security threats as part of an integrated approach to the management of transpor ...
Voir le projet

 24

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

The iCore initiative addresses two key issues in the context of the Internet of Things (IoT), namely: (a) how to abstract the technological heterogeneity that derives from the vast amounts of heterogeneous objects, while enhancing context-awareness, reliability and energy-efficiency. (b) to consider the views of different users/stakeholders (owners of objects & communication means) for ensuring pr ...
Voir le projet

 28

 TERMINÉ 

Secured Urban Transportation - European Demonstration (SECUR-ED)

Date du début: 1 avr. 2011, Date de fin: 30 sept. 2014,

"SECUR-ED Project federates, with a delegated management and in a balanced manner, major operators and top industrial integrators to enhance the security of urban public transportation in medium and large cities, through live demonstrations.Based on the best practices, in a very diverse societal and legacy environment, SECUR-ED will aggregate a consistent and interoperable mix of technologies and ...
Voir le projet

 44

 TERMINÉ 
Facing the problem of enhancing the railway security with a systematic top-down approach (i.e. to search for an all-inclusive solution valid for all the conceivable threat scenarios) is judged by PROTECTRAIL members too ambitious even if it could generate potential economies of scale and effort rationalisation. The proposed PROTECTRAIL approach is therefore to split the problem of making the railw ...
Voir le projet

 31

 TERMINÉ 
"The vulnerability of urban environments remains an undeveloped theme. With half of the world’s population currently living in urban centres, and with this figure set to increase to two-thirds by 2050, the issue of security and citizen safety is of paramount importance and a growing concern. In view of the growing number of threats from global terrorism, natural disasters or crime, urban planning ...
Voir le projet

 12

 TERMINÉ 

Sea Border Surveillance (SeaBILLA)

Date du début: 1 juin 2010, Date de fin: 28 févr. 2014,

The SeaBILLA proposal aims to 1) define the architecture for cost-effective European Sea Border Surveillance systems, integrating space, land, sea and air assets, including legacy systems; 2) apply advanced technological solutions to increase performances of surveillance functions; 3) develop and demonstrate significant improvements in detection, tracking, identification and automated behaviour an ...
Voir le projet

 29

 TERMINÉ 
"The aim of this project is to develop a demonstrable, modular and “close-to-market” demonstrator of a stationary rapid reliable vehicle-portable Two Stage Rapid Biological Surveillance and Alarm System for Airborne Threats (TWOBIAS) with extremely low false alarm rates. TWOBIAS will provide reliable information to command control systems (CCS) and first responders within seconds, enhancing securi ...
Voir le projet

 11

 TERMINÉ 

UniverSelf

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

The internet of today is fragmented into loosely interacting domains. Future Networks will be pervasive: people, machines and the surrounding spaces will form decentralized and dynamic networks of networks of as-yet unseen scales. Future Networks will challenge Service and Network Operators to find the right ways to embed intelligence into networks in order to ensure their autonomic management an ...
Voir le projet

 22

 TERMINÉ 

4 Dimension Contracts - Guidance and Control (4DCO-GC)

Date du début: 1 nov. 2010, Date de fin: 31 oct. 2013,

"The 4DCo-GC project aims at exploring the concept of ""4D Contract guidance and control of the aircraft"" as a step change in air transport operations by providing a more radical and environmentally efficient solution for the management of the airspace. Scientific objectives of 4DCo-GC are to:- model 4D contract concepts (strategic, tactical and emergency levels)- develop algorithms (strategic, t ...
Voir le projet

 13

 TERMINÉ 

Large Scale Choreographies for the Future Internet (CHOReOS)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

The CHOReOS project positions itself in the context of the Ultra-Large-Scale (ULS) Future Internet of software services. To address the challenges inherent of ULS as well as other key requirements of the Future Internet, such as fusion of the user/developer/system roles, adaptability and QoS-awareness, to name a few, CHOReOS revisits the concept of choreography-based service composition in service ...
Voir le projet

 17

 TERMINÉ 

HIRF Synthetic Environment (HIRF SE)

Date du début: 1 déc. 2008, Date de fin: 31 mai 2013,

"The HIRF SE research project has the goal of providing the aeronautics industry with a framework which can be used during the development phase to mitigate the EM aspects. In addition it will provide a considerable reduction in the certification/qualification tests required on air vehicle. The HIRF SE main objectives can be summarized by the two followings items: • Full validated and integrated s ...
Voir le projet

 45

 TERMINÉ 
The main objective of the COMPLEX project is to increase the competitiveness of the European semiconductor, system integrator and EDA industry by addressing the problem of platform-based design space exploration under consideration of power and performance constraints early in the design process. High performance usually causes high power consumption. A main challenge in today's embedded system de ...
Voir le projet

 15

 TERMINÉ 

Future Internet Applied to Public Safety in Smart Cities (SafeCity)

Date du début: 1 avr. 2011, Date de fin: 31 mars 2013,

Safecity deals with smart Public safety and security in cities. The main objective is to enhance the role of Future Internet in ensuring people feel safe in their surroundings at time that their surroundings are protected.Safecity is the result of the elaboration of a vertical Use Case Scenario based on Public Safety in European cities. The main goal of this project is to collect specific require ...
Voir le projet

 15

 TERMINÉ 

Integrated Mobile Security Kit (IMSK)

Date du début: 1 mars 2009, Date de fin: 28 févr. 2013,

"The Integrated Mobile Security Kit (IMSK) project will combine technologies for area surveillance; checkpoint control; CBRNE detection and support for VIP protection into a mobile system for rapid deployment at venues and sites (hotels, sport/festival arenas, etc) which temporarily need enhanced security. The IMSK accepts input from a wide range of sensor modules, either legacy systems or new dev ...
Voir le projet

 29

 TERMINÉ 
The complete transition from analogue to the digital TV is planned in Europe for 2012. This will release significant amount of valuable spectrum in VHF/UHF bands. In fact, the Digital TV Switchover provides a "once in a lifetime" opportunity for the development of innovative services and the introduction sophisticated new technologies into the VHF/UHF bands.However, despite the grand words about o ...
Voir le projet

 10

 TERMINÉ 

Cost-Efficient Methods and Processes for Safety Relevant Embedded Systems (CESAR)

Date du début: 1 mars 2009, Date de fin: 30 juin 2012,

"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Voir le projet

 54

 TERMINÉ 

Beyond Next Generation Mobile Broadband (BuNGee)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

An IMT-Advanced key requirement for next generation systems is the support for unprecedentedly high throughputs per user.This implies an infrastructure –composed of access and backhaul network–capable of supporting the resulting high capacity densities.The current next-generation technologies LTE and WiMAX support a mere 100Mbps/Km2 in ordinary cellular deployment.This is insufficient, in particul ...
Voir le projet

 9

 TERMINÉ 
"The goal of this project is to elaborate an open architecture for the operation of unmanned air-to-ground wide area land and sea border surveillance platforms in Europe. This architecture is based on analysis of concepts and scenarios for UAV-based aerial surveillance of European borders. It takes into account the emerging legislation for insertion of UAS into controlled civil airspace. The techn ...
Voir le projet

 14

 TERMINÉ 

EUropean software defined radio for WireLEss in joint secuRity operations (EULER)

Date du début: 1 mars 2009, Date de fin: 30 avr. 2012,

The EULER project proposal gathers major players in Europe in the field of wireless systems communication integration and software defined radio (SDR), is supported by a strong group of end-users, and aims to define and actually demonstrate how the benefits of SDR can be leveraged in order to drastically enhance interoperability and fast deployment in case of crisis needed to be jointly resolved. ...
Voir le projet

 19

 TERMINÉ 
Description EUWB – Coexisting Short Range Radio by Advanced Ultra-Wideband Radio TechnologyMain ObjectivesEUWB is an industry-led initiative of 21 major industrial and excellent academic organisations all around Europe and Israel. Its key objective is to explore the enormous economic potential of innovative and disruptive radio technology ...
Voir le projet

 28