Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

STEP-UP - Strategies Towards Energy Performance and Urban Planning (STEP-UP)

Date du début: 1 nov. 2012, Date de fin: 30 avr. 2015,

STEP-UP - brings together excellence on energy planning from Glasgow; Ghent; Riga; and Gothenburg – 4 ambitious, northern European, historic, port cities together with their industrial and research partners.The initiative is supported at the highest political level in all 4 cities – and city leaders will be active in the project throughout its life, ensuring it delivers its objectives, and has cl ...
Voir le projet

 12

 TERMINÉ 

Step Up - Cross Border City in Action

Date du début: 20 mai 2011, Date de fin: 19 mai 2014,

The overall objective of the project is to unit the existing institutions and organizations in the 4 fields (sport, youth policy, education and culture) to build a stable background for future cooperation. Specific objectives: To improve long established cooperation of the territories by using each others experiences and by building network, consolidating new links between local communities by, - ...
Voir le projet

 8

 TERMINÉ 

The Ireland/Wales Step Up Programme

Date du début: 9 janv. 2006, Date de fin: 29 juin 2008,

The project will develop a cross border initiative to test new ways of engaging employed individuals in training and learning activities, particularly those who traditionally are less likely to participate in such activity.
Voir le projet

 2

 TERMINÉ 

Step by Step up the Languages Ladder

Date du début: 5 sept. 2016, Date de fin: 4 sept. 2018,

Charles Saer Community Primary School is situation in Fleetwood, an area with significant social and economic deprivation. The 83.1% of pupils live within wards where the overall multiple deprivation index shows E (LSIP). 67.9% of the pupils are eligible for free school meals, compared to the Lancashire average of 15.2%. Family aspirations are low and there is a lack of opportunities provided by f ...
Voir le projet

 1

 TERMINÉ 

Step up, be the change

Date du début: 1 janv. 2016, Date de fin: 30 nov. 2017,

‘Step up, be the change’ is an EVS project. It is designed and built upon the idea of creating a project initiated from youth who are facing employability challenge in their lives. Thus, this project contributes to the growth and improvement of employability of young people who want to become creators of their future communities and employment opportunities. This project is designed to give opport ...
Voir le projet

 4

 TERMINÉ 

STEP UP IN POLYMER BASED RM PROCESSES (STEPUP)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2012,

...(at nanoscale) with different polymers to tune mechanical properties; 3.Nanocharging of polymers (development of nanocomposites). Moving from this background, the project will make a real, LARGE, step up in polymers and composites properties by including nano features into the base materials and the final products. The final products will benefit from radically extended performances (i.e. operatin ...
Voir le projet

 7

 TERMINÉ 

Learn for Work and Life! One Step Up.

Date du début: 1 déc. 2011,

The LeWeL Up project (Learn for Work and Life! One Step Up) seeks to tackle the question of how education and training can facilitate work migration for disadvantaged individuals and motivate them to embark on novel learning opportunities. In theory, new job opportunities may be appealing, but the process can be confusing or intimidating. “Learning is learnable” must become a reality for these les ...
Voir le projet

 7

 TERMINÉ 

Step Up To Change 2015

Date du début: 1 avr. 2015, Date de fin: 31 mars 2016,

The aim of the project was to support young people with fewer opportunities to participate in short-term volunteering activities in other European countries. The project was structured in a way that would provide achievable challenges to young people who could gain the most from them. The project worked with a group of nine young people from South & West Wales and all with fewer opportunities, to ...
Voir le projet

 17

 TERMINÉ 

Step up to serve

Date du début: 1 janv. 2015, Date de fin: 31 oct. 2015,

We have involved 3 volunteers in the project, 2 volunteers from the Ukraine and 1 volunteer from the Netherlands. The sending organisation couldn?t send a volunteer for the 4th place. During the everyday task they will learn the following aspects as well: - To increase awareness among young people from a minority background on European citizenship. - To empower youth to take an active role in loc ...
Voir le projet

 7

 TERMINÉ 

STEP UP

Date du début: 1 mai 2016, Date de fin: 30 avr. 2018,

STEP UP is an European Voluntary Service project organised by two Slovak Host organisations YMCA na Slovensku and MZ YMCA Revuca together with ten partners from Programme EU countries (Italy, Austria, Germany, Spain, France,Portugal, Romania, Czech republic, Poland ). Volunteers will be working mainly with children and young people attending activities in community centres in Liptovsky Mikulas a ...
Voir le projet

 12

 TERMINÉ 

Step Up! Inovácia a obohatenie vyučovania anglického jazyka

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

The project is focused on the professional growth of the participants and its aim is to update knowledge of current trends in the use of contemporary English, enhance creativity in the teaching process and be more innovate in the approach to CLIL. The participants will acquire practical techniques and innovative teaching methods, which will afterwards be applied to the teaching plans and process. ...
Voir le projet

 2

 TERMINÉ 

Step OUT - Step UP

Date du début: 4 mai 2015, Date de fin: 3 janv. 2016,

Step Out - Step Up is a training course that aimed to support the professional development of young leaders/trainers and to raise the quality of their projects concerning outdoor activities with learning methodologies. We approached the idea of leadership and outdoors activities on different levels: group dynamics, learning outcomes and intercultural context. The training course used methods of e ...
Voir le projet

 14

 TERMINÉ 
...sue a major opportunity by bringing its innovative hybrid concept – an offshore-proven, floating, wind and wave power plant – to commercial maturity. Specifically, with POSEIDON, FPP aims to go a step further in its business strategy by overcoming the key barriers that may hinder the successful market uptake of its commercial-scale device – the P80.The innovation project activities will be focused ...
Voir le projet

 1

 TERMINÉ 
...ts of the multibarriers have been evaluated on a laboratory scale. Such evaluation in the field are rare, and thus the onsite demonstrations of multibarriers represents a great innovative step forward. Furthermore, many of the processes demonstrated in the multibarriers designed in this project are innovative, including: Classical biological nitrification/denitrification under in situ conditions ...
Voir le projet

 8

 TERMINÉ 

Mitigating Spatial Relevant Risks in European Regions and Towns (MiSRaR)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

...al authorities start to design and implement strategies to minimize the impact of such extreme events. These strategies are called Spatial Mitigation strategies and are the first, and very important, step in a disaster management strategy. The ambition of this project is to exchange experiences and best practices with partners from around Europe that have incorporated the corner stones of mitigati ...
Voir le projet

 7

 TERMINÉ 

Job OpportuNEETy

Date du début: 1 mars 2016, Date de fin: 30 sept. 2016,

... this we can reach a high number of y.p. (around 1000 a year/partner organization) and help to solve a big European challenge. The dissemination of our project is just a small step, but in case the public is receptive and we see we can create change, we will prepare a follow up, maybe in the form of a K2 project.
Voir le projet

 6

 TERMINÉ 

MEMbrane based Purification of HYdrogen System (MEMPHYS)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

...s that result from recent design improvements and market introductions of various electrochemical conversion systems such as hydrogen fuel cells. In detail, the purification process will be a two-step process. A catalyst-coated proton exchange membrane will be assisted by one selectively permeable polymer membrane. Standard catalysts are sensitive to impurities in the gas. Therefore, alternative a ...
Voir le projet

 6

 TERMINÉ 

Smart Multifunctional silica-based Nanoparticles for Targeted Therapy (NanoSil4Cancer)

Date du début: 1 sept. 2016, Date de fin: 28 févr. 2017,

...e project. We will buy sectorial report, we will use patent search such as EPO and Thomson, we will acquire missing competence in marketing and communication. The approach will represent a strong step forward in chemotherapy, improving the efficacy, lowering drug dosage (thus minimizing side effects for cancer patients and environmental impact), other than dramatically lowering EU Healthcare costs ...
Voir le projet

 1

 TERMINÉ 
...mans up to 10 days.Two complementary approaches for biofilm prophylaxis will be developed:A. Ultrasonic coating of Inorganic antibiofouling agents (process developed by partner BIU) based on a single step sonochemical process to: a) Produce metal fluorides or metal oxides (e.g. MgF2, ZnO) nanoparticles (NPs) and simultaneously b) Impregnate them as antibacterial factors on the catheters. c) Co-coa ...
Voir le projet

 12

 TERMINÉ 

Innovative Technology for District Heating and Cooling (InDeal)

Date du début: 1 juin 2016, Date de fin: 28 févr. 2019,

...antee the increase of the overall energy efficiency of the system accomplishing a fairly distribution of heating and cooling energy demands. In light of this, InDeal will make a significant step forward contributing to wider use of intelligent district heating and cooling systems and integration of renewables, waste and storage.
Voir le projet

 10

 TERMINÉ 
...ub-supplements, with which the national networks are equipped and are ready to work with; all countries have agreed to these common instruments and the principles stated therein. Again, Elos needs to step up to the next level of a solid quality review to guarantee further development of Elos into a quality label which is recognized and validated at policy level and that offers an added value for s ...
Voir le projet

 22

 TERMINÉ 

Pump And Leakage Management (PALM)

Date du début: 1 sept. 2010, Date de fin: 31 août 2013,

...utlines actions that concentrate on better implementation of current water legislation, integration of water policy objectives into other policies, the results of the project are certainly a step in this direction. Sustainability in the long term resides in the ability of the project tool to counter environmental and economic concerns. Further information on the project can be found in the proje ...
Voir le projet

 4

 TERMINÉ 

Development of an urban green infrastructure in the Chanteloup loop (SeineCityPark)

Date du début: 1 août 2012, Date de fin: 31 juil. 2017,

...lopment of an urbanised territory of 1 700 ha can be combined with the improvement of local environmental conditions through the creation of green urban infrastructure. It hopes to be the first step of an ambitious programme of sustainable economic development in the area known as the Chanteloup loop, approved by the French label "Eco-quartier" rewarding sustainable development of urban areas. Th ...
Voir le projet

 4

 TERMINÉ 

"Učíme se v Evropě, držíme krok"

Date du début: 1 juil. 2016, Date de fin: 30 sept. 2017,

'By learning in Europe, we step ahead' is the follow up project to 'Keramka learns in Europe', which has been prepared by the implementation team and school staff . Its main aim is to increase teachers' language, pedagogical and professional skills and competences. The organisation has very limited experiences with EU grants funded by Erasmus + (previous LLP) , we are at the first fase; planning ...
Voir le projet

 3

 TERMINÉ 
... Development Plan has been developed based on the needs of the school staff and following the objectives of the Erasmus+ programme and also taking into account the European 2020 strategy. The first step is a project covered by the Key Action 1, where 20 teachers are supposed to do mobilities to get training in two basic lines: 1. The CLIL methodology is a daily necessity due to the amount of subj ...
Voir le projet

 1

 TERMINÉ 

Future IMPACT...

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

... will be achieved by ensuring opportunities for the success of all students by providing a high-quality and comprehensive instructional program and effective leadership. Therefore, the most important step on this layered strategy is to expand and improve the integration of in-service training that will lead to support curriculum implementation, instructional innovation and so to improve student a ...
Voir le projet

 1

 TERMINÉ 

A Small Step For Our Future - Geleceğimiz için küçük bir adım

Date du début: 1 mai 2016, Date de fin: 31 août 2017,

Researches prove that %80s of mental improvement happens until the age of 6. The age between 0 – 6 (pre school) are acknowledged as critical time because it is the time to create charectheristic skills. Pre school education is increasing significantly but the rate of pre schol education in Turkey is still nowhere near the EU. In Turkey, schooling rate of pre school education is approximately %15. ...
Voir le projet

 6

 TERMINÉ 

Une expérience maltaise pour une ouverture à l'Europe

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

...MFR training centre will take the opportunity of implementing a new project approved in 2014, and offer a professional training period in Europe to each student in each training programme. The first step will involve sending the students from the technical Baccalaureate (equivalent to high school diploma) to Malta for a two week internship and cultural immersion. The MFR members responsible for t ...
Voir le projet

 2

 TERMINÉ 
...aste streams include cullet from end-of-life-vehicle (ELV) sources, television screens, lighting products and building scrap. In addition, the proposed process was to remove an intermediary step between processing cullet and glass fibre manufacturing, thereby reducing transport requirements. The applied system was expected to surpass current EU best available techniques (BATs), aiming to incre ...
Voir le projet

 4

 TERMINÉ 
...ed at the end of the ash treatment chain, before the bottom-ash is used as construction material. Because ECR treats the bottom-ash using a wet process, potentially the ageing step in the bottom-ash processing chain could be shortened or omitted in future. Lab tests with the ECR process have shown a copper recovery rate up to 90%, leaving little to no copper in the WtE bottom-ash. Besides, the p ...
Voir le projet

 2

 TERMINÉ 

Mobiilne Teko

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

...er in English addressed to specific vocational head teacher. Motivation letters will be read by head teacher and project manager as well as teachers responsible for applicants. Next step is face to face interview, which carried out partially in English. Final decision is made by head teacher and the teacher responsible for applicant. Mission to international practice will be finally confirmed with ...
Voir le projet

 10

 TERMINÉ 
...d life cycle assessment of the resulting gains in energy efficiency and conversion of renewable carbon, together with an implementation strategy based on a product mix with optimal value, will inform step changes that contribute to achieving more secure and sustainable sludge treatment and management practices in Europe while reducing pressure on natural resources and reliance on manufactured fert ...
Voir le projet

 14

 TERMINÉ 
...types to create complex hierarchical, biomimetic, hybrid structures that exhibit remarkable properties such as self-healing and the capacity to undergo morphogenesis. The work would represent a major step-change by developing a dynamic strategy based on emerging physico-chemical mechanisms that generate and dissipate stresses, and maintain a controlled non-equilibrium state that together is remini ...
Voir le projet

 1

 TERMINÉ 
...her, more advanced, professional development abroad in order to reflect and support our teaching and learning objectives and to help the school meet its goals. Thus our project involves three major steps: Step 1: Staff mobility: In order to develop their language and teaching skills and to gain intercultural experience, three teachers, which have been chosen by a selection committee in the individ ...
Voir le projet

 1

 TERMINÉ 

"Regards croisés sur la planète skate"

Date du début: 1 août 2014, Date de fin: 30 sept. 2015,

...minant to convince them! EVS' impact on young participants of the project "Shared views on the skate planet" EVS commitment on this project is a plus. Indeed, skateboard and photography are a first step to developp youth exchanges in France and abroad. It also helps to open young people to european citizenship, tolerance and friendhsip. It fits into a global process of cultural opening, fight agai ...
Voir le projet

 2

 TERMINÉ 

Ecosystem-based Responsive Fisheries Management in Europe (EcoFishMan)

Date du début: 1 mars 2011, Date de fin: 28 févr. 2014,

...nomy, sociology and legal aspects of fisheries management. The work starts with a review on existing results-based management systems (RBMS), the CFP and tools that aid fisheries management. The next step is identification of outcome targets and development of relevant indicators, which are then visualised through development of a GIS based decision support tool. The RFMS will be designed, develop ...
Voir le projet

 16

 TERMINÉ 

New Opportunities in Terahertz Engineering and Science (NOTES)

Date du début: 1 nov. 2008, Date de fin: 31 oct. 2013,

...and dynamics of carriers in condensed matter systems, not obtainable by other techniques, can potentially be accessed though the dynamic (high frequency) electronic response. My vision is to create a step-change in the study of mesoscopic electronic systems by developing and exploiting THz frequency technology to probe the THz frequency/picosecond response of quantum-confined electronic systems. I ...
Voir le projet

 1

 TERMINÉ 

UP-grading of landfillgas for lowering CO2 emissions (UPGAS-LOWCO2)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

...ods. The first proposed method was based on the chemical absorption of CO2 with an alkaline aqueous solution that produces carbonate-rich solutions. This spent solution is fed to a regeneration step, where it is mixed with alkaline industrial residues (such as fly or bottom ashes, steel slag and cement wastes), producing a sludge rich in calcium or magnesium carbonate and a regenerated alkaline so ...
Voir le projet

 5

 TERMINÉ 
...ial scale, new job opportunities will be created in the plastic waste collection, management, and recycling sectors. The beneficiaries have drawn up a plan for exploiting the results. The next step could be to establish a larger plant, with 5 000 kg/hour capacity and a plastic waste collection plant in the facilities of the associated beneficiary SMSA in Carcar, Navarra. If this initiative succee ...
Voir le projet

 4

 TERMINÉ 

Digital Age in Rural and Remote Areas 1.12 (DARRA)

Date du début: 31 déc. 2007, Date de fin: 30 déc. 2010,

.... This vision will be a guide to developing ICT strategies in peripheral regions. The e-Ladder model which was developed in BIRRA will be used for this purpose by the partner regions, takeing one step forward in selected domains of the e-Ladder. This means very concrete steps in regional ICT development. The actions in this project will lead to raised awareness and ICT uptake among SMEs and the pu ...
Voir le projet

 12