Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
"The International Post-Doc Initiative of the Technische Universität Berlin (IPODI) aims to promote the career development of experienced female researchers within ERA. IPODI offers in total 21 fellowship positions which will be allocated in three internationally open selection rounds with international peer review. A 24 months employment contract including social security insurance, pension cover ...
Voir le projet

 1

 TERMINÉ 
"GREEN SURGE will identify, develop and test ways of connecting green spaces, biodiversity, people and the green economy, in order to meet the major urban challenges related to land use conflicts, climate change adaptation, demographic changes, and human health and wellbeing. It will provide a sound evidence base for green infrastructure planning and implementation, exploring the innovation potent ...
Voir le projet

 28

 TERMINÉ 

LArge Scale Information Exploitation of Forensic Data (LASIE)

Date du début: 1 mai 2014, Date de fin: 31 oct. 2017,

The LASIE project will design and develop a novel framework to assist forensic analysts in their investigations. The envisaged framework will be based on automated technology for advanced data processing supported by an important human component in critical decision making stages, as well as, legal and ethical aspects. The framework will consist of tools to automatically manipulate, analyse and fu ...
Voir le projet

 18

 TERMINÉ 

Synthetic Biology for the production of functional peptides (SYNPEPTIDE)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

"Peptides are among the most versatile natural products that nature provides to cater for a broad set of biotechnological applications ranging from antibiotics to personal hygiene. Their diversity comes from a broad variety of posttranslational modifications that is used to provide additional functionality beyond to what is possible with the classic proteinogenic set of 20 amino acids. In SYNPEPTI ...
Voir le projet

 7

 TERMINÉ 

Position and Personalize Advanced Human Body Models for Injury Prediction (PIPER)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2017,

"In passive safety, human variability is currently difficult to account for using crash test dummies and regulatory procedures. However, vulnerable populations such as children and elderly need to be considered in the design of safety systems in order to further reduce the fatalities by protecting all users and not only so called averages.Based on the finite element method, advanced Human Body Mod ...
Voir le projet

 14

 TERMINÉ 

Foresight Tools for Responding to cascading effects in a crisis (FORTRESS)

Date du début: 1 avr. 2014, Date de fin: 31 mars 2017,

FORTRESS will identify and understand cascading effects by using evidence-based information from a range of previous crisis situations, as well as an in-depth analysis of systems and their mutual interconnectivity and (inter-)dependency. FORTRESS will seek to intervene in current crisis response practices by bridging the gap between the over-reliance on unstructured information collection on one s ...
Voir le projet

 17

 TERMINÉ 
CRISP aims at facilitating a harmonised playing field for the European security industry by developing a robust methodology for security product certification. CRISP will enhance existing security evaluation and certification schemes by offering an innovative evaluation methodology that integrates the security, trust, efficiency and freedom infringement assessment dimensions. The proposed scheme w ...
Voir le projet

 9

 TERMINÉ 
The proposed research responds to the call for research into the ‘Quality, Efficiency and Solidarity of Health Systems’. European countries are reforming their health systems to improve health care delivery. One of the ways they are doing this is by changing skill mix within teams delivering health services: extending the roles of existing health professions and introducing new ones. This project ...
Voir le projet

 9

 TERMINÉ 

Organic Zeolites (ORGZEO)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2016,

"This ERC-StG proposal, OrgZeo, outlines a strategy for the synthesis, processing and application of charged, porous, covalent organic net- or frameworks, denoted “organic zeolites”. In analogy to their inorganic counterparts, organic zeolites should fulfil the following criteria: a) the material will possess small (nm-range) and accessible pores and consequently very high surface areas and pore v ...
Voir le projet

 1

 TERMINÉ 
A network combining 9 academic research groups and 4 collaborating industrial companies is proposed to train the next generation of PhD students and post-doctoral researchers, in developing and applying novel experimental and theoretical methods in the NMR spectroscopy of systems containing paramagnetic metals. The assembled team, with researchers distributed throughout the EU, will investigate a ...
Voir le projet

 12

 TERMINÉ 
NIOPLEX will contribute to the development of non-intrusive experimental flow diagnostics to improve the aerodynamic analysis capabilities in wind tunnels. The particular objective of the project is to develop an unprecedented comprehensive diagnostic approach, achieved by a simultaneous measurement of the surface pressure distribution on a model and the velocity and pressure field around it. Curr ...
Voir le projet

 9

 TERMINÉ 

Opening bio-based markets via standards, labelling and procurement (OPEN-BIO)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

"Application of standards, certification schemes and labels has positive long-term effects on the overall development of the European bio-based product market. Good product information that presents correct claims to industry and public procurers is vital for the usage of these new products. Ensuring the sustainable sourcing of raw materials and the effective bio-content are important additional s ...
Voir le projet

 15

 TERMINÉ 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Voir le projet

 27

 TERMINÉ 
NEWLED will develop high efficiency and high brightness monolithic and hybrid all-semiconductor WHITE light-emitting GaN-based diodes. Power losses due to phosphor conversion and the problem of different ageing rates of the GaN LED pump will be eliminated by the development of phosphor free structures with increased brightness (power emitted per surface per angle). NEWLED will enhance the efficien ...
Voir le projet

 15

 TERMINÉ 

Energy Efficient Safe SHip OPERAtion (SHOPERA)

Date du début: 1 oct. 2013, Date de fin: 31 oct. 2016,

The 2012 guidelines on the attained Energy Efficiency Design Index (EEDI) for new ships (MEPC.212(63)) represent a major step forward in implementing the REGULATIONS ON ENERGY EFFICIENCY OF SHIPS (resolution MEPC.203(62)). There are, however, serious concerns regarding the sufficiency of propulsion power and of steering devices to maintain the manoeuvrability of ships in adverse conditions, hence ...
Voir le projet

 23

 TERMINÉ 
Millions of people find the digital media that they want and need via social networks, and rely on recommendations to sort a flood of posts, friends, multimedia and promoted content. Today's users, however, need a new generation of smart recommendations that are able to keep pace with their moment-to-moment needs in their fast-moving, dynamically developing, mobile worlds. Achieving such social sm ...
Voir le projet

 10

 TERMINÉ 

Symbiotic Mind Computer Interaction for Information Seeking (MindSee)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

While real time analysis of user states based on signals from the brain and peripheral physiology have made progress (as separate branches of research), the possibility to predict intentions and infer implicit user variables is still a grand challenge in real-world applications. As a novel approach, MindSee proposes to fuse EEG as a main sensor with peripheral physiological sensors (EDR, fEMG, eye ...
Voir le projet

 5

 TERMINÉ 

"Rough path theory, differential equations and stochastic analysis" (RPT)

Date du début: 1 sept. 2010, Date de fin: 31 août 2016,

"We propose to study stochastic (classical and partial) differential equations and various topics of stochastic analysis, with particular focus on the interplay with T. Lyons' rough path theory:1) There is deep link, due to P. Malliavin, between the theory of hypoelliptic second order partial differential operators and certain smoothness properties of diffusion processes, constructed via stochasti ...
Voir le projet

 2

 TERMINÉ 

Critical System Engineering Acceleration (CRYSTAL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Voir le projet

 70

 TERMINÉ 
"Global energy consumption is continuously increasing, leading to an increased world wide demand for new power generation installations in the near future. In order to protect the earth s climate, energy conversion efficiency and the use of sustainable resources have to be improved significantly to reduce the emission of the greenhouse gas CO2. To maintain our high standard of living and to enhanc ...
Voir le projet

 1

 TERMINÉ 

FOResight Coordination for Europe (FORCE)

Date du début: 1 avr. 2014, Date de fin: 31 mars 2016,

FORCE will examine previous Security foresight studies and horizon-scanning activities in FP7 and elsewhere in Europe and produce, based on this work, a corresponding Intelligent Decision Support System (IDSS), evolvable and scalable with future Foresight research activities conducted in Europe in order to assist policy makers and stakeholders in the Security domain determine expectations about sh ...
Voir le projet

 6

 TERMINÉ 

"Modeling, Simulation and Control of Multi-Physics Systems" (MODSIMCONMP)

Date du début: 1 avr. 2011, Date de fin: 31 mars 2016,

"This proposal is aimed at developing and analyzing a fundamentally new interdisciplinary approach for the modeling, simulation, control and optimization of multi-physics, multi-scale dynamical systems. The new innovative feature is to generate models via a network of modularized uni-physics components, where each component incorporates a mathematical model for the dynamical behavior as well as a ...
Voir le projet

 1

 TERMINÉ 
The RESPONSIBILITY project aims to create a network of stakeholders that would adopt and diffuse a common understanding in Responsible Research and Innovation between different actors in Europe and around the globe. In doing so it will develop a model and provide a tool for international cooperation, the RESPONSIBILITY Observatory, involving the societal, policy and research stakeholders to these ...
Voir le projet

 13

 TERMINÉ 

Modular Logistics Units in Shared Co-modal Networks (MODULUSHCA)

Date du début: 1 oct. 2012, Date de fin: 31 janv. 2016,

The objective of Modulushca is to achieve the first genuine contribution to the development of interconnected logistics at the European level, in close coordination with North American partners and the international Physical Internet Initiative. The goal of the project is to enable operating with developed iso-modular logistics units of sizes adequate for real modal and co-modal flows of fast-movi ...
Voir le projet

 16

 TERMINÉ 
"The use of HTA has increased recently in Europe and more widely (e.g. Americas) to enable evidence-based coverage decisions and improve efficiency in resource allocation.HTA has often resulted in different coverage decisions across settings despite the same evidence being used for this purpose. This may reflect in part societal preferences about value, priorities or risk perceptions, suggesting a ...
Voir le projet

 13

 TERMINÉ 

Testbeds for Reliable Smart City Machine-to-Machine Communication (TRESCIMO)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2015,

Smarter and greener cities are essential to address economic, social, and environmental challenges due to the increase in urbanization, requiring informed decisions based on Internet of Things generated data. A particular challenge is the unstable power supply of cities in underdeveloped countries (e.g. South Africa), thus requiring smart energy management. Future handling of grid overload in Sout ...
Voir le projet

 8

 TERMINÉ 
"MAPPING_NCD moves beyond the state of the art in the research area via three distinct means: by providing accurate mapping of research funding activities at Member State (MS) and European Union (EU) level; by providing bibliometric mapping and analysis of the volume of research outputs in the EU and MSs relevant to chronic non-communicable diseases (NCDs), and, by using input from both the above ...
Voir le projet

 8

 TERMINÉ 

Characterizing and Controlling Carbon Nanomaterials (CCCAN)

Date du début: 1 déc. 2010, Date de fin: 30 nov. 2015,

The aim of this project is to understand and control the fundamental physical properties of novel carbon nanomaterials:carbon nanotubes and graphene. By a combination of complementary methods, i.e. vibrational spectroscopy, scanning probe microscopy, and theoretical modelling, a comprehensive understanding of the electronic, vibrational, optical properties, and their connection with the material’s ...
Voir le projet

 1

 TERMINÉ 

Viable Wagonload production Schemes (VIWAS)

Date du début: 1 sept. 2012, Date de fin: 30 nov. 2015,

Single wagonload (SWL) transport is still a major component in numerous European states transport systems and in the logistics of different economic sectors such as steel, chemical industry and automotive. However changing framework conditions and increasingly demanding market requirements have led to dramatic market losses and even to complete shutdown of SWL business in some countries. As this b ...
Voir le projet

 10

 TERMINÉ 
The concept of METACODE is to preform genetic code engineering in microbial strains with parallel recruitment of novel bio-orthogonal chemistries for mass production of desired protein/peptide based products. In combination with computational and classical chemical synthetic approaches as well as chemo-informatics, enzyme guided evolution, synthetic metabolism, and directed evolution of microbial ...
Voir le projet

 8

 TERMINÉ 

Big Data Analytics of Digital Footprints (BigFoot)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

The amount of digital information in our world has been exploding and new technologies and services will continue to fuel exponential growth of large pools of data that can be captured, stored, and analyzed. Nowadays, however, tools and services to store, process and interact with data are still in their infancy, represented by scattered solutions that fall short in having a unified vision, that l ...
Voir le projet

 6

 TERMINÉ 

Future Internet Social and Technological Alignment Research (FI-STAR)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2015,

FI-STAR will establish early trials in the Health Care domain building on Future Internet (FI) technology leveraging on the outcomes of FI-PPP Phase 1. It will become self-sufficient after the end of the project and will continue on a sustainable business model by several partners. In order to meet the requirements of a global Health industry FI-STAR will use a fundamentally different, "reverse" c ...
Voir le projet

 44

 TERMINÉ 

Towards a Sustainable and Affordable Healthcare (WE-CARE)

Date du début: 1 sept. 2013, Date de fin: 31 août 2015,

The aim of this action is to prepare the future for health research and innovation to contribute significantly towards a sustainable and affordable healthcare.EU-wide there is a clear and present need to contain healthcare costs to keep the healthcare affordable to all EU citizens. In many EU member states healthcare budgets are overstretched and in some states the growth of these budgets seem eve ...
Voir le projet

 7

 TERMINÉ 

Stability and hyperbolicity of polynomials and entire functions (SHPEF)

Date du début: 1 août 2010, Date de fin: 31 juil. 2015,

The project is devoted to the theory, algorithms and applications of hyperbolic and stable multivariate polynomials. This line of research is meant to lead to new fundamental results in analysis, matrix and operator theory, combinatorics, and theoreticalcomputer science.The central goal of the project is to develop a comprehensive, seamless, theory of hyperbolic and stable multivariate polynomials ...
Voir le projet

 1

 TERMINÉ 
"Discrete structures appear throughout mathematics not only as approximations to continuous objects, but also as mathematical objects of their own right. The ""right"" discrete models should have analogous theory to the continuous limit, but often more transparent, more interesting structure, it ""tells you more"". The proposed project has the agenda to connect, and make substantial progress in, a ...
Voir le projet

 2

 TERMINÉ 
CI-FIRE will support a broader and deeper coordination and integration of Future Internet Research Experimentation (FIRE) activities on EU and Member State level in order to enable the sustainable use of FIRE facilities.To this purpose, CI-FIRE will analyse the sustainability potential of European FIRE facilities, develop an innovation business framework template, and perform an analysis of the us ...
Voir le projet

 6

 TERMINÉ 

The Future of Brain/Neural Computer Interaction: Horizon 2020 (BNCI Horizon 2020)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2015,

Brain-computer interfaces (BCIs) have become a popular topic for research in recent years. A BCI is a communication device which allows people to control applications through direct measures of their brain activity. A BNCI (brain/neuronal computer interaction) system extends a BCI by including other physiological measures such as muscle or eye movement signals.The number of BCI research groups aro ...
Voir le projet

 14

 TERMINÉ 

Dynamics in polymer brush-nanoparticle systems (POLYBRUSH)

Date du début: 2 avr. 2013, Date de fin: 1 avr. 2015,

"Polymer brushes are long polymer chains tethered to a surface by one end. They have applications in chemistry, engineering, medicine, microelectronics, etc. Many of these applications involve interactions between the brush and nanoparticles which are near or within the brush (for instance, when used to arrest toxic substances or to arrange nanoparticles in the patterned surface).Structure of thes ...
Voir le projet

 1

 TERMINÉ 
"The objective of the proposed project is the design of new approximation to the exchange-correlation energy of Kohn-Sham density functional theory (DFT). The work will be based on two different approaches to the exchange-correlation energy density. The so-called local hybrid approach relies on a position-dependent mixing of approximate DFT exchange and exactexchange. Alternatively, the exchange-e ...
Voir le projet

 1

 TERMINÉ 

Advanced Hybrid Engines for Aircraft Development (AHEAD)

Date du début: 1 oct. 2011, Date de fin: 31 déc. 2014,

"Future demands on the air transport systems dictate that aircraft should be less polluting, less noisy and more fuel efficient. Also, in the long term alternative fuels like biofuels and hydrogen will replace the traditional jet fuel. The ACARE in Europe has identified that CO2 emission and perceived noise levels should be reduced by half and NOx emission be reduced by 80% by 2020. However recent ...
Voir le projet

 6