Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

SUpport to SAfety ANalysis of Hydrogen and Fuel Cell Technologies (SUSANA)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

...emia and industry. The expert group is a powerful project instrument with open membership to maximise the outreach of the project outcomes and involve stakeholders in the protocol use at as early stages as possible. Experts will be invited to participate in online forum, benchmarking, attend events organised by the project. Dissemination activities will include workshops and seminars with invitati ...
Voir le projet

 7

 TERMINÉ 

Globalisering-Forlagt Undervisning og Praktik

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

...s responsible for grant application, the completion of the project, budget planning and the project report.SOH is in charge of securing the quality by being represented in all stages of the project, including project design, preparation of students to the study visit/work placement and participation in the study visit/work placement.According to our Letter of Intent, SOH is responsible for transpo ...
Voir le projet

 3

 TERMINÉ 
...eded to ensure cost-effectiveness, in planning, delivery, operation and maintenance of large infrastructures or infrastructures network. Infrastructure asset management generally focuses on the later stages of a facility’s life cycle, specifically maintenance, rehabilitation, and replacement. However, a process of efficient asset management must define methods and tools for asset tracking, managem ...
Voir le projet

 14

 TERMINÉ 
... role for research in the pharmaceutical industry, oils & plastic, and materials development. Simulation and high-throughput screening can be orders of magnitude cheaper than experiments in the early stages of drug design. The ERC project preceding this application has developed several new techniques that make it orders-of-magnitude more efficient to calculate free energies from simulations rathe ...
Voir le projet

 2

 TERMINÉ 

EU-FP: Formación en centros de trabajo europeos

Date du début: 1 juil. 2015, Date de fin: 30 juin 2016,

...ive academic, social and labor implications that these limitations implies. Tres Olivos School offers to students with hearing impairment the opportunity to do, not only the compulsory education stages; primary and Secondary education, but also to continue their education on high school or Vocational Training, thereby providing better opportunities to integrate in the university or working world. ...
Voir le projet

 4

 TERMINÉ 

Aprender hoje para melhorar amanhã

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

...have presented the project in a teachers meeting. They invited all school teachers to get involved. The Entry and selection Form for this KA1 was presented. The Erasmus+ Team will monitor all stages, ensuring the preparation of participants, with regard to performing the tasks requested by the host institutions. As for the linguistic preparation of participants, language courses will be provided t ...
Voir le projet

 1

 TERMINÉ 
... efficiency. Manufacturing challenges that arise from incorporating such self-healing thermosetting systems into fibrous composites (pre-preg, infusion/RTM) shall be closely investigated at the early stages of development to ensure the effective transfer of the desired properties to the large scale as required by the industry.
Voir le projet

 11

 TERMINÉ 

RENewable AdvancEd GAsification FeedstockS (RENEGAS)

Date du début: 1 août 2015, Date de fin: 31 déc. 2015,

...g biomass and other feedstocks into valuable synthesis gas (syngas), capable of directly fuelling standard engines to generate heat and power (CHP). Refgas’ clever patented processes includes 7 stages of syngas cleaning and cooling which ensures that its product gas is ultra clean and of the highest quality possible. The final ambition of Refgas team is to have proven solution with oil industry qu ...
Voir le projet

 1

 TERMINÉ 
...than others with the school system. 2- The place of ICT in school and indeed in life-long learning. We will look at the ways which business makes use of technology and see how this is used at all stages of production. Our children will compare the ideal with the realistic and will consider how to make an action plan to move their school gradually towards the next stage technologically. 3- Aspirati ...
Voir le projet

 7

 TERMINÉ 

Blackburn Primary School 1+2 Languages Development Project

Date du début: 1 juin 2016, Date de fin: 31 mai 2017,

...heir learning, new methodology and resources and share these within their own school, their cluster and the authority through meetings and online forums. Blackburn Primary School is at the very early stages in developing their policy on the 1+2 Approach. They have identified a member of staff who has an interest and natural competence in this area and have identified a suitable training opportunit ...
Voir le projet

 1

 TERMINÉ 

EFFECTOMICS- elucidating the toolbox of biotrophic pathogens (EFFECTOMICS)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2019,

...ed effectors, to overcome plant defence systems and to establish biotrophy. The rapid increase in available genome sequences of biotrophic pathogens and in transcriptomic datasets of their biotrophic stages allow us to identify putative secreted proteinaceous effectors by bioinformatic means. However, our insight into the functions of these effectors is still very limited. In this proposal, the PI ...
Voir le projet

 1

 TERMINÉ 
...tro while retaining ability to differentiate into neurons, astrocytes and oligodendrocytes. However, because of the nature of their developmental progression, NSCs isolated at different developmental stages or regions exhibit remarkable differences in their ability to yield specific neuron types. Specifically, NSCs grown in vitro rapidly lose access to the full neuronal spectrum. Limited NSC poten ...
Voir le projet

 1

 TERMINÉ 
...ins covered by our institution: Linguistics, Arts, Earth sciences, Maths, Technical disciplines. The main activities that will be carried out have to do with the successful completion of the course stages proposed by our partner institutions, International Training Centre and Quarter Mediation. Through the completion of these cpurses our institution will also be able to etablish bilateral agreemen ...
Voir le projet

 3

 TERMINÉ 

HOMER - Development of Home Rehabilitation system (Homer)

Date du début: 1 déc. 2016, Date de fin: 31 mai 2017,

...d of post stroke rehabilitation and home care. Stroke affects 15 million people around the world annually. More than 75% of stroke survivors are left without proper rehabilitation in the most crucial stages of the recovery. In EU alone, cost of stroke is estimated at €38 billion. HOMER project (HOME Rehabilitation) will be first-ever open-access rehabilitation system to integrate patented motion c ...
Voir le projet

 1

 TERMINÉ 
...her, but also led to better elaborated policies, as experience and expertise from the different actors - youth organisations, public authorities and researchers - could be taken into account at all stages of the policy cooperation. At the regional and European level, our partnership sees the development of Structured dialogue in gender equality and empowerment field as a way of bridging the gap be ...
Voir le projet

 6

 TERMINÉ 

MESLEK EĞİTİMİ İŞ GÜVENLİĞİNDE AVRUPA NORMLARINI İSTİYORUZ

Date du début: 31 déc. 2015, Date de fin: 30 déc. 2016,

...they will desire to learn Spanish and German languages.. With all this new skills and experience they will be mofe confident and sufficient. The execution phase of our project, will be held on four stages according to EQAVET European Quality Assurance Reference in Vocational Education Standarts. The first step is the planning. At this stage, all of the partners will plan the project together an ...
Voir le projet

 3

 TERMINÉ 

To volunteer - To learn and live!

Date du début: 1 mai 2015, Date de fin: 30 avr. 2017,

...ject, and other participants of the project who are involved in these activities and processes.The project will be realised using participative and qualitative methods during all three stages of the project. Results of the project and its impact will be in form of development of volunteers, HOs, their users, and close community.Volunteers will get to know themselves better, gain valuable experienc ...
Voir le projet

 14

 TERMINÉ 
...e instrumental in the development of efficient nematocyte (stinging-cells) based drug-delivery tools. Identifying variation in venom-composition and sites of expression across various developmental stages and between the sexes (gender-specific expression) is also an understudied topic. The former is particularly intriguing in sea anemones, as their larval stages do not feed and yet synthesize toxi ...
Voir le projet

 1

 TERMINÉ 

OYUNCU GENÇLER OYUNCU AİLELER/PLAYER YOUNGSTERS PLAYER PARENTS

Date du début: 3 mai 2016, Date de fin: 2 mars 2018,

...ct we have created for our young people who will be the parents of the future "game" we want to realize the impact and importance of development to transfer our children.Games, an event which has all stages of life. The shape of the game features, game supplies, also varies from culture to culture and from an age where the child is in the game anywhere and appear to have a universal constant featu ...
Voir le projet

 4

 TERMINÉ 

Direct Shift Gearbox Şanzıman Eğitimi Ve Stajı

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

... general and vocational foreign language proficiency of the participants The methodology to be used during the execution of the project will project management methodology. Thus, the stages of research, project identification, planning, addressing the potential risks, beginning and implementation of the project, evaluation of the project performance, impact and dissemination and completion of the ...
Voir le projet

 4

 TERMINÉ 

Camelina Oil for Sustainable Salmon Aquafeed (CORE)

Date du début: 1 mai 2015, Date de fin: 31 oct. 2015,

...ant role in human health. Fish oil is a vital strategic ingredient for farmed fish and crustaceans, since it provides the required quantities of Omega 3 fatty acids, especially at the critical growth stages.The prospects for increasing the production of fish oil are very limited, since most of the fisheries for fish oil production are now tightly monitored to not exceed the established fishing quo ...
Voir le projet

 1

 TERMINÉ 

Erken Okul Terklerinin Azaltılması

Date du début: 1 août 2014, Date de fin: 31 juil. 2015,

...ho do not go to school regularly is significant. This fact means the individuals, who could not complete even compulsory education, do not have adequate opportunities to make use of learning at later stages of their lives, do have limited opportunities to develop their skills for employment, therefore deprivation and poverty. The students who leave school at early stages need social programs and s ...
Voir le projet

 1

 TERMINÉ 

Equality in practice and work

Date du début: 3 juil. 2016, Date de fin: 2 nov. 2017,

...ts that can be accepted on the basis of previous experience. V. Preparation activities for the third stage of mobility and activities to disseminate the results obtained in the first two mobility stages. VI. July 2017 will be held the third mobility activity in Lithuania with the same structure as those conducted in previous mobilities stages. VII. Dissemination of mobility and integration of resu ...
Voir le projet

 4

 TERMINÉ 
... solutions to reduce the generation of defects as well as new on-line defect management and improved production traceability solutions to mitigate the propagation of defects along the production line stages. This will be achieved through the proper integration of innovative enabling technologies, such as cyber-physical systems, selective inspection, advanced analytics and integrated process and pa ...
Voir le projet

 13

 TERMINÉ 
..., C14 analysis and palaeobotany. The project will document from a chronological perspective climatic and environmental change in the study area, defining their parameters and reconstructing the stages of colonisation by human settlement and its decline in individual ecological enclaves; a phenomenon which is observed in Andean valley areas also in modern times.
Voir le projet

 1

 TERMINÉ 
... of this seven day seminar are but not limited to; • explore the concept of citizenship in general and European citizenship in particular• discuss, debate and share their views on different stages of European cooperation• reflect on the role of the young people and the youth work in the processes to understand weather the youth engagement was provided enough or if there is a room for improvement• ...
Voir le projet

 11

 TERMINÉ 
...utionary classification, traditionally based on the SED alone, by means of diagnostic emission lines and the mass accretion rates. This will also allow us to derive the YSO lifetime in the various stages.Additionally, the proposed survey will provide the largest available catalogue of SEDs and spectra from YSOs, which will be fundamental for the selection of promising targets to be observed by hig ...
Voir le projet

 1

 TERMINÉ 
...roughput procedures for finding new markers and discovering which markers complement each other into effective diagnostic panels. Better capabilities to diagnose cancer at the early and most curable stages will greatly improve human health and reduce health care costs. Patient stratification is also in need of better diagnostics to facilitate the selection of appropriate patient care. Many clinic ...
Voir le projet

 6

 TERMINÉ 

Bulaşıcı Hastalıklara Yönelik Koruyucu Yaklaşımlar

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

...s. Our project is dedicated to our teachers, sophomores and seniors who are studying in our school of nursing and emergency medical technician department. Our movement will be carried out with in two stages with the participation of 30 students and 10 teachers. The aim of the project is to improve the knowledge and skills of both our students and teachers within the help of our internship partners ...
Voir le projet

 3

 TERMINÉ 
...aries along coast of Uruguay. Specific objectives are: 1) To analyse the evolution of the retinal tissue structure in larvae of P. platessa (in laboratory) and P. orbignyanus (in situ) at different stages of development subject to diets of differing HUFA contents. 2) To characterise the HUFA profiles in the retina of P. platessa and P. orbignyanus larvae at different stages of development and subj ...
Voir le projet

 1

 TERMINÉ 
...use of the material, the project assessed that the plant could be successfully scaled-up and applied in other European contexts. The project constructed a prototype plant integrating three treatment stages: 1. Soil washing – decontamination techniques for contaminated soils and sediments, after which the latter are separated and classified according to different grain-size classes - gravel, sa ...
Voir le projet

 8

 TERMINÉ 

Embryonic Stem cell-based Novel Alternative Testing Strategies (ESNATS)

Date du début: 1 avr. 2008, Date de fin: 30 sept. 2013,

...iological situation ESNATS will develop a battery of toxicity tests using hESC lines subjected to different standardised culture protocols. Tests will cover embryoid bodies in different developmental stages and differentiated derivatives including gamete and neuronal lineages, complemented with test systems for hepatic metabolism. Predictive toxicogenomics and proteomics markers will be identified ...
Voir le projet

 34

 TERMINÉ 
...rt an increase in biogas production and consumption, BIOGASSYS will demonstrate a sustainable system for biogas production and provide solutions and best practices that can be used to combat critical stages of the biogas lifecycle. Specific objectives include: To demonstrate methods to incorporate by-products, waste and other biomass into biogas production; To demonstrate innovative application ...
Voir le projet

 7

 TERMINÉ 

Entrepreneurial Diversity (ENTREDI)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2011,

...l start-up support infrastructure in their regions and for development of the RAP the partners have agreed on a common structure following Kompass’ 4+1 process oriented model according to the stages of entrepreneurship and applying the socio-economic approach. Based on the training sessions all partners have pre-selected those Good Practices from the ENTREDI Good Practice Pool which they consider ...
Voir le projet

 7

 TERMINÉ 
... design criteria of water vapour and gas barrier properties, ensuring safety of the produce while maintaining the original quality, firmness and colour of the fresh produce is still at the very early stages of research and development. The proposed project aims at developing innovative and safe biodegradable Equilibrium Modified Atmosphere Packaging film systems based mainly on the use of environm ...
Voir le projet

 10

 TERMINÉ 
...tation with “real size” batches of ELV parts in France. Emphasis was put on the need to create processes that can be easily duplicated at a large scale in other European countries. All the stages of the end-of-life of a vehicle were explored. Firstly, the dismantling of vehicles utilised the knowledge and experience of new practices and tools of project partner INDRA, which has spread best pr ...
Voir le projet

 5

 TERMINÉ 

Cryogenic Electronics for Space Applications and Research (CESAR)

Date du début: 1 déc. 2010, Date de fin: 31 mars 2014,

...odiacal light.The development of large format array detectors in these three fields is today constrained by the amount of signal channels that can be extracted in parallel from the power limited cold stages.The goal of this network is to provide the community with cryogenic electronic elements performing all the essential functions to preserve the signal quality of a large amount of sensors (pixel ...
Voir le projet

 7

 TERMINÉ 

Les Pionniers du Savoir Vert

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

...g in the context of the project, either by participating in job-shadowing situations or by taking courses in their specific domain of teaching. The teachers in charge of the LTA’s Office des Stages as well as the students’ mentors will make sure that all problems likely to arise in the context of producing applications and CVs, of finding ideal training places and accommodation will be dealt with ...
Voir le projet

 2

 TERMINÉ 

Radial cOmpresSor Surge INception Investigation (ROSSINI)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2020,

Centrifugal compressor stages using vaneless diffusers are known to have a wide operating range. However, when operated outside of this range, instabilities have been reported to commonly develop in the impeller (rotor) or diffuser or both. The unsteady flow phenomena are believed to start from a localized flow separation (stall) that frequently will orbit within the stage at sub-harmonic rotation ...
Voir le projet

 2

 TERMINÉ 
... rTMS on each group of participants, which will provide correlates and biomarkers of brain plasticity related with age and AD. These biomarkers will allow the identification of individuals at early stages of AD and evaluating efficacy of novel TMS treatments. Importantly, identification of rTMS parameters responsible to induce neural plasticity and improve cognitive functions will contribute to de ...
Voir le projet

 2