Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

SYNERGY, Quality and respect for environment (SINERGIA)

Date du début: 1 sept. 2003, Date de fin: 1 juin 2006,

...gions of the EU. Valuable methodology has been designed and validated and quality tools have been produced. The dissemination and educational activities have been successful. The environmental and economic benefits of the project are potentially high in the medium to long term. The project has been cost-effective, 92% of the budget was spent. The main results were as follows: - Definition of ...
Voir le projet

 4

 TERMINÉ 
In Europe, the hydrotherapy sector has an important role to play both socially and economically. Bulgaria andRomania are facing the challenges raised by the transition from a planned economy to a market economy and theirintegration in Europe. The development of tourism, and of seaside tourism in particular, is of strategic significance forthese two countries. France, a major tourist destination, h ...
Voir le projet

 1

 TERMINÉ 

Un-Label - New Grounds for inclusive Performing Arts

Date du début: 1 mai 2015, Date de fin: 31 oct. 2017,

One of the major challenges of the large European society is the understanding and the acceptance of otherness. Our civilisation claims to give equal chances to everybody, no matter the gender, the skin colour, the physical or mental dissimilarities, the sexual orientations etc, but it deliberately promotes standards that are common to nobody, keeping the “uncommon” in the vestibule.Un-Label is an ...
Voir le projet

 5

 TERMINÉ 

Support Tourism And Reduction Strategy (+20) : STARS (+20) (LIFE STARS (+20))

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

...lion jobs (12% of the EU workforce) and more than 10% of the EU’s total GPD. It supports around 1.8 million enterprises, most of which are SMEs and micro-enterprises. The EU is the world’s no.1 tourist destination, with more than 500 million international tourist arrivals every year (40% of the global figure). Moreover, sustained growth of over 5% per year is forecast by the WTO for the rest ...
Voir le projet

 4

 TERMINÉ 

Development of an urban green infrastructure in the Chanteloup loop (SeineCityPark)

Date du début: 1 août 2012, Date de fin: 31 juil. 2017,

...as biodiversity. As ways are sought to address these problems, the use of natural areas in urban settings is becoming a key element in land development policy. The Chanteloup loop is located in the north-west of the departement of Yvelines in the Ile-de-France region. It is defined by a large U-shaped meander of the Seine which leaves an area of 2 384 ha of land surrounded on three sides by rive ...
Voir le projet

 4

 TERMINÉ 
Background The household appliance sector accounted for around 28% of EU electricity consumption in 2007. In the European economic area, household electricity consumption is some 4 100 kilowatt hours (KWh) per year, of which 100-200 KWh is consumed by electric ovens. Electric ovens are among the least energy-efficient household appliances, with an efficie ...
Voir le projet

 4

 TERMINÉ 

Use of poultry dejection for the bating phase in the tanning cycle (PODEBA)

Date du début: 1 janv. 2012, Date de fin: 30 juin 2014,

... processes the negative impacts of waste materials (hides and skins). The raw materials required for tannery processes generate waste that currently has a significant negative environmental and economic impact. However, tannery by-products could be reused/recycled or converted into higher value secondary raw materials for other industries and the agricultural sector. Accordingly, EU tanners are ad ...
Voir le projet

 4

 TERMINÉ 
Background Spain is an important wine making country in the EU (in terms of area cultivated, the quantity of wine produced, and the sector’s economical significance). In spite of significant efforts in the past, negative environmental impacts of the overall wine production process had remained notable and further work towards improved sustainability of ...
Voir le projet

 6

 TERMINÉ 
Background In France, populations of Orisini’s Viper (Vipera ursinii) are known to exist in just 12 locations (with unconfirmed sightings in three other places). Its range covers around 9000 ha, of which 5750 ha (more than 60%) are part of the Natura 2000 network. The French populations are highly isolated from other European populations (the closest of ...
Voir le projet

 6

 TERMINÉ 

Capacity building for sustainable tourism development (CBSTD)

Date du début: 22 janv. 2007, Date de fin: 21 déc. 2009,

Background Tourism is an important growing activity with a high impact on the economical and social development of Albania. This sector of the economy accounts for 4.1 % of national GDP and 160 thousand jobs. However, the sector is linked to the use of numerous natural resources and its recent development has been rather uncontrolled. There are no approp ...
Voir le projet

 6

 TERMINÉ 

Integrated Product Policy in the Telecommunication Sector (IPP TEL)

Date du début: 1 oct. 2004, Date de fin: 30 sept. 2007,

...reuse and their awareness of eco-design. The survey revealed that consumers were generally willing to buy eco-designed products if they were available on the market, provided their price was no higher than that of other conventional devices. A technical/economic study of different end-of-life management options was carried out (covering reuse of devices, disassembly and reuse of components, and ma ...
Voir le projet

 8

 TERMINÉ 
... Domestic cooling appliances (refrigerators and freezers) have increased in energy efficiency by more than 40% in the last decade, thanks also to the introduction of the EU Energy Label. No such energy optimisation has occurred for commercially used appliances, however, which are also characterised by a significant environmental impact due to the use of hydrofluorocarbons (HFCs) as re ...
Voir le projet

 4

 TERMINÉ 
...s the integration in the professional world (nursing homes, hospitals, small shops, supermarkets, etc..). A number of students, however, are designed to carry out studies in first year Bac Pro. The knowledge of a foreign language is therefore one of the success factors. The school has chosen to send all students abroad. However, the frames of references plan to learn only one foreign language in ...
Voir le projet

 4

 TERMINÉ 
...rope there are several international, national and regional monitoring and benchmarking initiatives for accommodation: ECOMMT, IHEI benchmark hotel, GG21, SHR accounting and reporting system, Groenne Noegle service, and the Ecocamping monitoring system in Baden-Wurttemberg. Although, each of these systems have some strengths, there are also considerable weaknesses with many: e.g. too expensive, to ...
Voir le projet

 2

 TERMINÉ 
Background For over half a century growers/farmers have been using plastic materials in agriculture, also known as agro-films. Current existing semi-intensive and intensive farming practices require the use of large quantities of mulching film and fruit protection bags (and clips to close them) since they help prevent the growth of weeds, protect crops fr ...
Voir le projet

 7

 TERMINÉ 
Background The Bottlenose dolphin (Tursiops truncatus) has a very large distribution range and is found everywhere around European coasts, from the Mediterranean to the North sea. However, few population estimates have been made and the UICN has classified the species as “data deficient”. In Corsica, three Bottlenose dolphin censuses, taken by the GEC ...
Voir le projet

 1

 TERMINÉ 

Ecolabelling of retail trade (Ecotrade)

Date du début: 1 sept. 2001, Date de fin: 31 août 2004,

... of retail trade chains is complementary to the product-oriented eco-labelling mainly because it promotes sales of eco-labelled products through active marketing but also because it guarantees that not only the products but also the services attached are marked by an eco-label. Objectives The project aims at impro ...
Voir le projet

 5

 TERMINÉ 
...ous tourism development may result in irreversible changes to landscape, and historical and cultural heritage. However, tourism is an attractive source of income and new jobs. Whilst Latvia has no history of mass tourism, it is a sector that needs to be facilitated and developed as a catalyst for development of the rural economy. In order to stimulate rural tourism and to support a high stan ...
Voir le projet

 2

 TERMINÉ 
The Baltic fashion sector is mainly composed of SMEs, with large share of females not only in services & administration but also production (80% in new member states). Despite dramatic changes within the last decade resulting in a loss of a third of its volume and jobs textile, clothing and leather industries still highly contribute to employment esp in the E-BSR, where the sector counts for appro ...
Voir le projet

 14

 TERMINÉ 

Coastal Practice Network (CoPraNet)

Date du début: 31 déc. 2003, Date de fin: 30 déc. 2006,

...ility are key objectives for tourism development in coastal areas. This means that a sectoral approach to coastal development, including tourism, beach management, erosion and nature conservation, is no longer sufficient. In Europe, many coastal regions are working towards an integrated, multi-sectoral planning approach (Integrated Coastal Zone Management) for sustainable economic growth. As a res ...
Voir le projet

 21

 TERMINÉ 

Greenbox

Date du début: 31 déc. 2005, Date de fin: 30 déc. 2008,

The Greenbox is a defined area in the North West of Ireland and is regarded as Ireland’s only developing Eco Tourism Destination. During the lifetime of this 3 year cross-border project the project has been able to promote the establishment of the target area as an ecotourism destination, a conceptual and spatial ‘Green Box’ containing environmentally sustainable products, accommodation and attrac ...
Voir le projet

 1

 TERMINÉ 

The Art and Crafts Kingdom (Konst- och hantverksriket)

Date du début: 31 déc. 2004, Date de fin: 30 déc. 2006,

... the artisans are gathered under one brand, Destination 60º12º, says Swedish project leader Mikael Engstig. The existence of one giant on each side of the border, Klässbols Linneväveri and Magnor Glassverk respectively, means no threat to the minor businesses since the project functions as an umbrella. Instead, the minor companies can benefit from the well-established companies flow of customers b ...
Voir le projet

 1

 TERMINÉ 

Maritime Tourism Marketing in the Baltic Sea Region (MARITOUR)

Date du début: 31 déc. 2005, Date de fin: 30 déc. 2007,

Apart from the natural diversity the Baltic Sea Region has everything a boating tourism region needs: festival highlights such as the Hanse Sail and the Kieler Woche, numerous smaller but no less attractive maritime events, about 1,500 marinas and some 500 traditional vessels sailing the Baltic Sea.What is missing is a cooperative marketing platform. Many maritime suppliers conduct their own marke ...
Voir le projet

 22

 TERMINÉ 

I-STEP

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

...nhancing entrepreneurial skills of VET teachers/managers/board by: • Development and implementation of a comprehensive programme creating an international dimension to entrepreneurship;• Sharing knowledge, experiences and practises in the field of (international) entrepreneurship;• Ensuring cooperation between VET, regional business, government and research institutes (quadriple helix network) thu ...
Voir le projet

 7

 TERMINÉ 

Label Free Nanoscopy Using Infra Red (LANIR)

Date du début: 1 avr. 2012, Date de fin: 30 sept. 2015,

Every year, Alzheimer's disease (AD) affects about 800,000 new patients in Europe and directly causes 50% of dependency of aged persons. Currently there is no test to diagnose this disease. There is a great need to improve outcomes for patients with lung cancer which causes between 15-28% of all cancer deaths in Europe.Chemical and structural imaging with nanoresolution under ambient conditions ca ...
Voir le projet

 11

 TERMINÉ 

Plasma And Nano for New Age “soft” conservation (PANNA)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2014,

The main objective is to develop a novel atmospheric plasma technique for surface cleaning and coating deposition as well as two innovative coatings: a self-diagnostic protective coating and a coating provided with identification marker.The project aims at integrating the new plasma cleaning/deposition technique and the new coatings in a “full-life” protocol spanning surface cleaning and pre-treat ...
Voir le projet

 10

 TERMINÉ 
By integrating and interfacing multiple core technologies and related materials from fluidics and photonics technology to porous silicon (porSi) and polymers, Positive will target the implementation of a microsystem tailored to a specific application with a key societal and economic need. The very high surface to volume ratio of porSi permits very high surface densities of bound antibody-antigen c ...
Voir le projet

 8

 TERMINÉ 
"The Turks of Cyprus constitute the biggest non-migrant Muslim community in the EU. So far no systematic research on their religious identity has been carried out. The religious attitudes of the Cypriot Turks are usually labeled with epithets such as “halfhearted” or “lax”. The deconstruction of this label would be one of the aims of the research.The main target of the proposed project is to ident ...
Voir le projet

 1

 TERMINÉ 
...tions (PTMs) of histones play a crucial role in gene expression and to the field of epigenetics, and that aberrant histone modification contributes to different diseases such as cancer. Recently, two novel types of histone PTMs called lysine malonylation (Kmal) and succinylation (Ksucc) have been identified. KMal and Ksucc induce more substantial chemical changes to the chemical properties of the ...
Voir le projet

 2

 TERMINÉ 

Machine-readable and interoperable age classification labels in Europe (MIRACLE)

Date du début: 1 févr. 2014, Date de fin: 31 juil. 2016,

...access this content with electronic end devices. Where retail boxes traditionally came with visual age labels, the digitalisation of age labels is stuck in a very early stage of development. There is no extensive use of digital age labels yet, especially on the open internet. One of the main reasons for this is the high fragmentation of classification systems and labelling approaches among Europea ...
Voir le projet

 8

 TERMINÉ 
...ported by a European programme to promote development. […]”.These territories have been labelled regarding their geological, cultural and ecological heritage - since the early 2000s this Label knows a growing success among European countries, particularly in the West (France, Germany, Italy, Spain). In 2013, 54 European Geoparks received the precious label. This international recognition by UNESCO ...
Voir le projet

 3

 TERMINÉ 

Networks of Trade and Religion in Richard Hakluyt's 'Principal Navigations' (RHAK)

Date du début: 4 août 2014, Date de fin: 3 août 2016,

...e project will introduce a more sophisticated understanding of religious identity into the discussion of Hakluyt and his sources. In light of recent research on religious identity formation, we can no longer label Hakluyt as simply a staunch Protestant when he featured material from those of other faiths and his anti-Catholic rhetoric simply reflected state policy. The second objective is to re-es ...
Voir le projet

 1

 TERMINÉ 

Smart electroactive 3D models of osteoregeneration (SMART-BONE)

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

In the European Union alone, the annual number of bone fractures is projected to reach 4.5 million in 2025. Despite the advances in implant technology, grafts prepared using bone extracted from the patient to fill the bone defect are the only material reported so far to retain any significant efficacy in sustaining new bone formation. However, the aging worldwide population and increased life expe ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

International Mobility in IPT - Quality, Innovation, Employability Currently the Polytechnic Institute of Tomar (IPT) holds agreements with almost all European countries. Its network of partners comprises the oldest and most renowned institutions that ensure accreditation and recognition and more recent ones that confer an innovative and less bureaucratic dimension. In either case academic quality ...
Voir le projet

 1

 TERMINÉ 

Evropská škola - program dalšího vzdělávání pedagogických pracovníků

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

Project European School is a part of professional development strategy of Gymnazium Hladnov a Jazyková škola s právem státní jazykové zkoušky Ostrava. Our school attaches great importance to preparing students to become democratic and socially conscious citizens with global outlook and abilities for independent reflection and problem analysis. Since the essence of our school is to educate young pe ...
Voir le projet

 2

 TERMINÉ 
InTopSens is a multidisciplinary project involving the emerging fields of photonics structures, electronics, fluidics and bio-chemistry, to contribute to the development of high value sensor technology. This objective will be addressed through the demonstration of a compact polymer and silicon-based CMOS-compatible photonics sensor system. It integrates two label-free biomolecular recognition phot ...
Voir le projet

 7

 TERMINÉ 

Collective Awareness Platforms for Quality Internships

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

...nships play a key role for young people’s integration into the labour market. They are essential in bridging the skills gap between education and work. However, the great majority of internships do not fulfil their purpose. According to a Eurobarometer study, out of 4,5 million students and graduates doing an internship each year in Europe, 59% are unpaid, 40% work without a contract and 30% have ...
Voir le projet

 7

 TERMINÉ 

FLORNETs mobility for florists and gardeners 2016

Date du début: 1 août 2016, Date de fin: 31 juil. 2018,

Who:A) 34 students of Vea and BLOK (www.vea-fs.no) B) 36 staff members of the college and from BLOKC) Host partners: FLORNET as a cooperation between more then 30 partner colleges in floristry/horticulture in AT, CZ, DE, EE, ES, FI, FR, GB, HU, IT, LU, NL, NO, SE, SI, SK, EL and their regional network (www.flornet.eu)Students:• Individual aims: following a part of their curriculum abroad /carrying ...
Voir le projet

 12

 TERMINÉ 
...at low prices, steadily gaining ground against small bakeries. A similar picture appears in the Greek market, where the “traditional” bakeries hold an ever smaller market share, with a fall in turnover, reduced profitability and a consequent rise in unemployment.In this context, the small business members of the Ag. Grigorios Bakers’ Association in the Euboia prefecture need to “innovate” in order ...
Voir le projet

 2

 TERMINÉ 

Uşak Toplumunda Atık Ayırışımı Bilincinin Oluşturulması

Date du début: 31 déc. 2015, Date de fin: 30 déc. 2016,

...on working in the, of adult education staff of the waste separation in Germany to describe the importance of separating waste to the public taking training on the process. Project waste separation; Innovative Waste Sorting, Eco-Label Applications, Waste Decomposition Process of participants with training on the implementation of the European Consumer Habits CHANGING involves increasing competence ...
Voir le projet

 2