Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Rail Infrastructure Systems Engineering Network (RISEN)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2020,

Social and economic growth, security and sustainability in Europe are at risk of being compromised due to aging and failing railway infrastructure systems. This partly reflects a recognised skill shortage in railway infrastructure engineering. This project, RISEN, aims to enhance knowledge creation and transfer using both international and intersectoral secondment mechanisms among European Advance ...
Voir le projet

 13

 TERMINÉ 

Network of European – Asian Rail Research capacities (NEAR2)

Date du début: 1 déc. 2012, Date de fin: 30 nov. 2014,

...ystems potential adaptation of new technologies, interoperability solutions and optimized operations should be considered. To support this objective, NEAR2 proposed the development of a Rail Research Network, drawing knowledge and expertise form leading institutions and researchers from both continents.The project capitalizes upon the existing structure and leverages the achievements of the existi ...
Voir le projet

 13

 TERMINÉ 
"SPIDER PLUS objective is to provide a new 2050 mobility VISION through a Strategic Design & Plan, and a Road Map delivering Sustainable Solutions by then. In such Plan the electrified Rail has a central role both for passengers and freight. The productivity of the available resources supported by ICT and other technologies, is maximized by the combination of infrastructural nodes with spatial and ...
Voir le projet

 14

 TERMINÉ 

Intermodal rail freight Twin hub Network Northwest Europe (ITN)

Date du début: 31 déc. 2009, Date de fin: 29 sept. 2015,

...he Belgian seaports and European inland terminals. in this way creating the conditions to shift flows from the road to the rail sector. providing in more sustainable and robust transport and a higher network connectivity and territorial cohesion within NWE. The central configuration to achieve this aim is the Twin hub network. a transnational rail service network. Its implementation to improve int ...
Voir le projet

 13

 TERMINÉ 
« Sistema de aportacion a la red ferroviaria de alta velocidad » sintéresse au réseau ferroviaire à grande vitesse en Méditerranée. Le projet a pour but de créer un système modal de fonctionnement en réseau intégré, pour transporter des voyageurs et des marchandises, et en liaison avec le réseau ferroviaire à grande vitesse dans les régions dAragon, de Catalogne et du Languedoc-Roussillon. Il sagi ...
Voir le projet

 3

 TERMINÉ 
...m would be based on joint planning activities as a result of closer cooperation of public transport operators and authorities responsible for transport provision on either side of the border. The new network will be supported by an electronic management, planning and information platform providing ITS based real-time information and coordinated planning.As a demonstration of the cross-border elect ...
Voir le projet

 2

 TERMINÉ 
...erability of the Committees and their link with the governance structure provided by the European Commission for a coordinated approach with regard to infrastructure use and investments of every Core Network Corridor: the Corridor Platform. WG Coordinator: Generalitat de Catalunya. Chronogram: 12 months (July 2014 - June 2015). ...
Voir le projet

 9

 TERMINÉ 
... on the Ipolytarnóc-Losonc line has recently been suspended. Demand for public transport of goods and passengers gives reason for renewal of the cross-border rail transport thus a regional railway network will be created adjusted to the demands. The feasibility study intends to examine and outline the possibility of this. ...
Voir le projet

 1

 TERMINÉ 

SOuth-NORth Axis (SoNorA)

Date du début: 31 oct. 2008, Date de fin: 27 févr. 2012,

...area, SONORA targets to incisively bring forward the state of the art on the deployment of primary transport infrastructure and services, through trans-national collaboration to prioritise: transport network development, removal of obstacles in the infrastructure realisation process, activation of services along itineraries. These activities will support the development of a primary central Europe ...
Voir le projet

 25

 TERMINÉ 

LIRA-II

Date du début: 31 août 2002, Date de fin: 30 déc. 2005,

Addressing similar concerns of mobility and accessibility but on a more local scale, the study project, The International Network of Light Rail Cities – From Vision to Action (LIRA-II), brings together 9 partners from the Netherlands, the UK and Belgium. Over 30 months the Dutch-led initiative will address accessibility in and around metropolitan areas by investigating strategies for the integrate ...
Voir le projet

 9

 TERMINÉ 

Avrupa'da Alimünotermit Ray Kaynağı İşlemleri Eğitimi

Date du début: 5 sept. 2014, Date de fin: 5 sept. 2015,

In our country, railway networks and the development of high-speed train network day by day is accelerated. In this context, many new high-speed rails are put into operation year after year. In addition inter-city rail journey works, also metro and commuter lines in developing cities of our country are gradually increasing. The rapid development of our railways has created the need the intermediar ...
Voir le projet

 2

 TERMINÉ 

Needs Tailored Interoperable Railway (NeTIRail-INFRA)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

...ng a lean design process for new installation and retro-fit. Accompanying economic and social impact research is packaged as decision support tools to implement the findings in management of the rail network. Holistic treatment of the economy of operation will be developed, including societal impacts of rail investment decisions, to increase attractiveness of rail for all passenger categories. Thi ...
Voir le projet

 13

 TERMINÉ 
...tiveness of businesses – this project has led to increased cross border and regional mobility. Creating and sustaining employment – the main effects of investment in the rail network are in respect of jobs created in the construction industry – this project has contributed to this by creating approximately 120 Construction jobs on site with many more jobs created within the region via the project ...
Voir le projet

 1

 TERMINÉ 
...and far eastern markets for NWE products are growing rapidly. The project treats logistics in this global context. It also uses best practices from other densely populated areas via its observer network of other European and Global ports e.g. Zeebrugge. Shanghai. It focuses on the East West sustainable freight corridor across NWE. with underused port and sea transport capacity at the same tim ...
Voir le projet

 22

 TERMINÉ 

Eddy CUrrent Brake Compatibility (ECUC)

Date du début: 1 sept. 2012, Date de fin: 31 août 2015,

...economy, and is addressed to the main stakeholders in the European railway industry. The medium-sized ECUC consortium is formed by CEIT (S), KNORR-BREMSE (D), ALSTOM (F), SNCF (F), DEUTSCHE BAHN (D), NETWORK RAIL (UK), UNIFE (B) and FRAUSCHER (AUT). The proposal describes the consortium's strategy in order to guarantee highly efficient coordination. This alliance offers unique advantages in terms ...
Voir le projet

 9

 TERMINÉ 

Two-way railway traffic via Imatra/Svetogorsk border-crossing point

Date du début: 16 mars 2011, Date de fin: 15 mars 2013,

To investigate possibility to open two-way railway cargo traffic via Imatra/Svetogorsk border crossing point. To network companies and authorities across the border and to benchmark most suitable management model for business/industrial parks on both sides of the border in order to facilitate networking and the use of rail connection. The project purpose is: To promote cross-border co-operation ai ...
Voir le projet

 2

 TERMINÉ 

Regions of Connected Knowledge (RoCK)

Date du début: 30 juin 2007, Date de fin: 29 juin 2015,

...large impact on connectivity. RoCK will deal with technical barriers for quality improvement. and with barriers resulting from the different institutional contexts. International accessibility of the network for the end-users is addressed as well. To achieve RoCKs aims. cooperation between stakeholders is a must. Within RoCK. stakeholders (including operators) will jointly work on concrete (cross- ...
Voir le projet

 13

 TERMINÉ 

Transalpine Transport Architects (TRANSITECTS)

Date du début: 30 juin 2009, Date de fin: 29 juin 2012,

...pace. In the partnership different interests (economy, environment and transport) are integrated which is of crucial importance for a sustainable solution. Main aim of the project is to make the rail network more attractive and hence to foster its accessibility and functionality for the logistic market. The focus lies on developing innovative transnational rail services, on optimizing the use of e ...
Voir le projet

 16

 TERMINÉ 
... the European level. The concept relies on two chemical pathways, CO2 to CH4 and CH4 to CH3OH with the intermediate carbon vector: methane. Methane benefits from the extended and existing natural gas network infrastructure. Its distribution will prevent additional CO2 emissions (rail & road transportation). This approach will favour the emergence of small and flexible production units of fine chem ...
Voir le projet

 10

 TERMINÉ 

Quiet Tracks for Sustainable Railway Infrastructures (QUIET-TRACK)

Date du début: 1 juin 2013, Date de fin: 31 mai 2016,

...edded track systems, will be developed which to yield a noise reduction performance of at least 6 dB(A) in comparison with the global rolling noise measured on a well maintained standard track in the network of the participating infra managers. The solutions will be applicable to tram, LRT and metro tracks as well as to conventional tracks in the whole European Union. The developed solutions shoul ...
Voir le projet

 12

 TERMINÉ 

The 8 Million City (COINCO North II)

Date du début: 31 oct. 2011, Date de fin: 30 oct. 2014,

... a precedent project, hence the name COINCO (Corridor of innovation and cooperation) North II.As economic activity increasingly takes place on a global scale, the emergence of new strategic areas and networks becomes apparent, resulting in the development of new organizational structures and cross border regions. City regions have become the engines in developing the knowledge and information base ...
Voir le projet

 1

 TERMINÉ 
...dly transportation policies is expected to further underline the economic and societal role of rail transport in achieving sustainable mobility across Europe in the years to follow. The European rail network is continuously getting busier with trains travelling at higher speeds and carrying more passengers and heavier axle loads than ever before. The combination of these factors has put considerab ...
Voir le projet

 13

 TERMINÉ 
... designed for the actual traffic volume. The "alpine" policy of traffic has abandoned the scope of single nationalities and reached European dimensions. The new focus for the solution is "thinking in network and systems, not in axes”. The project will:- create a sustainable mobility concept and masters the transalpine freight traffic by using existing (railway) infrastructure- install a prototype ...
Voir le projet

 17

 TERMINÉ 

FINESSE (Freight Intermodality and Exchange on Sea and Straits in Europe) (FINESSE)

Date du début: 31 août 2002, Date de fin: 30 janv. 2006,

...gether port authorities, regional authorities and chambers of commerce, and is a highly innovative attempt to co-ordinate strategies across the English Channel/La Manche region and between its port network, the benefits of which could extend far beyond port hinterlands, as far as Eastern Europe and the Mediterranean.
Voir le projet

 10

 TERMINÉ 
...tries is worth approximately €40 billion. [Ref. 1] . Based on the extrapolation of data relating to the UK, French and German railways [Ref 1], the 500,000 kms of rail [Ref. 2] on the European rail network has an average estimated 5000 rail breaks annually with about 1500 due to weld failure. Although the number of weld failures is relatively small compared to the estimated 11 million alumino-ther ...
Voir le projet

 10

 TERMINÉ 
...e tram-train concept among national policymakers, and provided evidence of how investment can help urban regeneration and translate into jobs. The project has also participated in the consultation on Network Rails (national Rail authority) Route Utilisation Strategy, designed to influence future innovation in technological planning.Also in the project SINTROPHER, the West Flanders partners in Belg ...
Voir le projet

 14

 TERMINÉ 
... using the TSI route to consolidate the methodologies allowing the free exchange of certification data.The project is part of the TRIO-TRAIN cluster (Total Regulatory Acceptance for the Interoperable Network) which comprises 3 related projects dealing with key railway interoperability issues: Aerodynamics (AEROTRAIN), Railway Dynamics and Track Interaction (DYNOTRAIN) and Pantograph/Catenary Inter ...
Voir le projet

 18

 TERMINÉ 

Greater RAIL Safety using the Smart Washer Ecosystem (GRAILS-SWE)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2017,

9% of all EU freight (280 billion tonne-kilos) & 381 billion passenger km were travelled on EU rail networks in 2014. A railroad switch & crossing (point) is a mechanical installation enabling trains to be guided from one track to another. Point integrity is vital; there are on average 31 critical fastenings at each switch. Across the EU, SCF was responsible for 21 derailments between 2005-2010. G ...
Voir le projet

 1

 TERMINÉ 
... Achievements: LO-PINOD (Logistics Optimisation for Ports Intermodality: Network, Opportunities, Development) challenged traditional practices of freight distribution and offered a more sustainable alternative.Through improvements to short sea routes, multi-modal connectivity between region ...
Voir le projet

 17

 TERMINÉ 

Connected Cities (CC)

Date du début: 30 juin 2005, Date de fin: 30 déc. 2007,

...ollution, holding back efforts to achieve sustainable development. Public transport can form the basis of more sustainable approaches to mobility. However, the mismatch between older public transport networks and much more modern patterns of city development make trains, trams and buses impractical for many commuters. Decision-makers must integrate transport policy and urban planning into comprehe ...
Voir le projet

 25

 TERMINÉ 

Vision for Innovative Transport (VIT)

Date du début: 1 juin 2008, Date de fin: 30 nov. 2009,

... and the brakes checked. These operations are time consuming and costly. Metrocargo loads and unloads trains horizontally on the regular railway track in less than on hour. In the Metrocargo vision a network of terminals, connected by scheduled freight trains, will be set up all over the European territory. Containers will be transferred from one train to another, as it happens to passengers, and ...
Voir le projet

 9

 TERMINÉ 

Supporting intermodal transport solutions in the Adriatic area (INTERMODADRIA)

Date du début: 30 sept. 2012, Date de fin: 27 févr. 2015,

...nd transport infrastructures: even if the ports and the national governments have undertaken significant investments to increase the railways accessibility and the connection to the national railways network, not all the ports will be served in the present and medium term by railways services and infrastructures. Therefore, a clear picture on the available infrastructures and policy framework for ...
Voir le projet

 11

 TERMINÉ 

LAnners NETwork for CENtral and South East Europe (PLANET CENSE)

Date du début: 31 oct. 2003, Date de fin: 17 févr. 2007,

PLANET CENSE is a network of national spatial planning institutions and experts established as a consequence of the VISION PLANET project. It aims at pursuing and developing further the policy options laid down in the VISION PLANET project documents. The network will foster spatial integration and a cross-sector dialogue with: - The European Spatial Planning Gateway (ESP GATEWAY): an expert dialog ...
Voir le projet

 25

 TERMINÉ 
The Northern Axis is one of the five Trans-European transport axes defined by the High Level Group in 2005 and presented in the report Network for Peace and Development. The Northern axis connects the northern EU with Norway to the north and with Belarus and Russia and beyond to the east and consists of the following road and rail corridors which are directly linked to the TEN-T networks:1. Narvik ...
Voir le projet

 1

 TERMINÉ 
... low resistence to track lateral displacement, high noise and low anti-vibration properties, high manteinance costs, lack of a piezoelectric system that generates electricity). Our users are: railway network operators; energy operators/managers in trafficked railways areas/underground/urban railway network operators. Their needs are: a railroad sleeper that ensures longer lifespan, lower maintenan ...
Voir le projet

 1

 TERMINÉ 

IPPN - InterPortsPromotioNet (IPPN)

Date du début: 6 janv. 2003, Date de fin: 30 déc. 2006,

...ment measures for their removal, working with logistics partners to design improved inter-modal transport arrangements. Knowledge gathered on potential transport flows will be fed into an information network, available over the internet both to partners and interested parties, particularly logistics providers. Initially, the network will contain information on transport and available sites in harb ...
Voir le projet

 14

 TERMINÉ 
...ector. It will bring together inter-disciplinary experts from Risk based asset assessment of infrastructure, Artificial Intelligence (AI), object detection and data management sectors with leaders in network micro-simulation modelling to deliver a Decision Support Tool that will allow a step change for infrastructure safety. The involvement of Infrastructure Managers and Railway Undertakings will ...
Voir le projet

 10

 TERMINÉ 
...anslating the original DVD. EWF will act as Project Coordinator, since it has considerable experience in managing this sort of action but, most importantly, its Training and Qualification network covering 29 member countries will be essential in the implementation and dissemination of DISTOOLWELD results.This project aims at supporting the translation and implementation of training material for di ...
Voir le projet

 6

 TERMINÉ 

Cave del Predil international geomineral park 

Date du début: 30 juin 2004, Date de fin: 30 août 2006,

...ant Museums present in Slovenia (Idrija and Mezica) and in Carinthia (Beliberg), in order to extend and intensity cross-border cooperation in the cultural and tourist fields through the creation of a network connecting local authorities and associations active in the interested areas.
Voir le projet

 1

 TERMINÉ 
The objective of the project is to upgrade and further develop the current TRANSTOOLS model, here referred to as TT2, to a new and improved European transport demand and network model (TT3).The project will improve the methodological basis of TRANSTOOLS, improve and validate its data foundation, deal with known deficiencies of the existing model, make the software faster and more efficient, and fo ...
Voir le projet

 15