Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

Context and project background The Ministry of Education, Culture and Sports of the Government of Cantabria has been promoting the international dimension of education through the participation of its educational centers in different international mobility programs over time. Decree 4/2010 of 28 January, the general organization of vocational training in the education system of the Autonomous Comm ...
Voir le projet

 1

 TERMINÉ 
...NAP) – including the potentially harmful health problems resulting from improper management of manure. An extensive information and communications campaign was planned by the beneficiary, the Ministry for Sustainable Development, the Environment and Climate Change (MSDEC; formerly the Ministry for Resources and Rural Affairs), along with training sessions for the country’s 850-plus full-time f ...
Voir le projet

 1

 TERMINÉ 
...ities (27 events were organised) led to the participation of a much larger number of private landowners than expected. The experiences gained from this action were then used by the regional ministry of rural affairs to develop a funding scheme for the whole state of Baden-Württemberg. As a direct result of this project a region-wide programme for the restoration of traditional orchards was establ ...
Voir le projet

 8

 TERMINÉ 

Legislation and policy options for reduction of traffic emission in Cyprus

Date du début: 1 févr. 2002, Date de fin: 31 juil. 2004,

... concerning road traffic emission in Cyprus and proposed a number of reforms, which have been approved by the relevant authorities. It was decided to form a separate unit within the Ministry of Communications and Works. This constitutes a significant institutional strengthening which is expected to lead to more efficient management of road traffic emission in Cyprus. In addition to these objec ...
Voir le projet

 1

 TERMINÉ 
...[(Law of the European Community L84/1/23.02.2004 and Law 1547/1985 (Government Gazette 94/Α/22.05.1985)]. In addition, the General Directorate of Customs and Special Consumer Taxes of the Greek Ministry of Economy and Finance cooperates closely with the General Directorate of Customs Administration of the Ministry of Finance of the Former Yugoslav Republic of Macedonia.Expected beneficiaries : 1. ...
Voir le projet

 1

 TERMINÉ 

Main road 866 Jussinpuro–Pahalampi

Date du début: 31 déc. 2002, Date de fin: 30 déc. 2004,

...s to the alignment and structure of a road section with demanding soil composition. 50 percent of the projects funding was received from the European Regional Development Fund, 40 percent from the Ministry of Employments administrative branch and 10 percent from the Oulu Road Region and Ministry of Transport and Communications Finland. ...
Voir le projet

 1

 TERMINÉ 
...ussia. The financial resources of the organisations that have maintained the support system will not suffice for maintaining the system in 2002 if outside assistance with costs is not obtained. The Ministry of Transport and Communications and the Finnish Embassy in Moscow consider it necessary for the project to be continued.
Voir le projet

 1

 TERMINÉ 
The GeoERA proposal is put forward by the national and regional Geological Survey Organisations (GSO) of Europe. Its overall goal is to integrate the GSO’s information and knowledge on subsurface energy, water and raw material resources, to support sustainable use of the subsurface in addressing Europe’s grand challenges. The GeoERA consortium will organise and co-fund together with the EC a joint ...
Voir le projet

 45

 TERMINÉ 

Via Baltica linking Poland, Lithuania, Latvia and Estonia (Via Baltica)

Date du début: 31 déc. 2008, Date de fin: 30 déc. 2020,

The project for the construction of section Bialystok – Augustow – Budzisko of the Via Baltica express road was placed on the indicative list of major projects of Operational Programme Infrastructure & Environment 2007- 2013.Key Natura 2000 sites in North-East Poland have been under threat from damage by a series of road projects on the so called Via Baltica international road corridor, which woul ...
Voir le projet

 1

 TERMINÉ 

IST-Africa (2016 - 2018) (IST-Africa 2016-2018)

Date du début: 1 oct. 2016, Date de fin: 31 déc. 2018,

IST-Africa (2016 - 2018) has 4 complimentary objectives focused on strengthening ICT-related research and innovation cooperation between Europe and Africa: 1) Foster greater coordination of research and innovation activities; 2) Strengthen research and innovation linkages, increase awareness of research and innovation capacity and cooperation opportunities, and support mutually beneficial collabor ...
Voir le projet

 18

 TERMINÉ 

Promoting EGNSS Operational Adoption in BLUEMED FAB (BLUEGNSS)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2018,

Promoting EGNSS Operational Adoption in BLUEMED FABBLUEGNSS proposal aims at promote innovation technologies to maximise the potential of the European GNSS and its adoption. The Consortium, led by ENAV, Italian Air Navigation Service Provider, sees the participation of the other BLUE MED FAB ANSPS partners, such as DCAC – Cyprus, HCAA – Greece, MATS – Malta and is complemented by an industrial p ...
Voir le projet

 5

 TERMINÉ 
Maritime disasters in recent years are a stark reminder of the imperative need for timely and effective evacuation of large passenger ships during emergency. The Lynceus2Market project addresses this challenge through delivering a revolutionary operational system for safe evacuation based on innovative people localisation technologies.The system consists of: 1) Localisable life jackets that can pr ...
Voir le projet

 16

 TERMINÉ 
EU CISE 2020 is an important step towards the accomplishment of the European roadmap for CISE; the project attains the widest possible experimental environment of innovative and collaborative processes between European maritime institutions.EU CISE 2020 takes as reference a broad spectrum of factors in the field of European Integrated Maritime Surveillance, arising from the European legal framewor ...
Voir le projet

 38

 TERMINÉ 

Building EGNSS capacitY On EU Neighbouring multimodal Domains. (BEYOND)

Date du début: 1 avr. 2015, Date de fin: 31 mars 2017,

The overall project concept consists of building capacity in the field of multi-modal applications, focussed mainly on aviation using EGNSS in different Eastern European and Mediterranean countries. These countries are located at boundaries of the EGNOS SOL coverage area with limited EGNSS experience; the projects will promote the development of multi-modal applications, building on the lessons le ...
Voir le projet

 19

 TERMINÉ 

Era-net Transport III (ENTIII)

Date du début: 1 nov. 2012, Date de fin: 30 avr. 2016,

Era-net Transport (ENT) has evolved since 2004 into a service platform for Programme Owners and Managers, providing the required framework for initiating and implementing transnational research and innovation funding collaborations ENTIII will further strengthen the foundation of the ERA, engaging 20 partner countries and regions, represented by Europe’s most relevant national transport research a ...
Voir le projet

 26

 TERMINÉ 

Broadband in EU Regions via satellite (BRESAT)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2016,

Project BRESAT will define guidelines for the successful deployment of high speed broadband via satellite across regions of Europe to assist with the objective of 100% EU broadband coverage. It will support the objectives of the EU Digital Agenda and assist national regional initiatives. Project BRESAT will include following objectives:1.\tLeveraging previous experience, it will identify the cond ...
Voir le projet

 16

 TERMINÉ 

IST-Africa Initiative 2014 - 2015 (IST-Africa 2014-2015)

Date du début: 1 oct. 2013, Date de fin: 31 janv. 2016,

The main objectives of IST-Africa (2014 – 2015) are to· Support implementation of Information Society, ICT and Innovation related aspects of the Africa – EU Strategic Partnership and associated dialogues between the European Commission (EC) and EU Member States with the African Union Commission (AUC), African Member States and other Key Regional Organisations· Foster partnerships between EU and Af ...
Voir le projet

 20

 TERMINÉ 
Increasing cooperation capacity of the information exchange on the public authorities of Romania and Republic of Moldova cross border area, through the implementation of an integrated communication system. Expected Results: Te ...
Voir le projet

 4

 TERMINÉ 

The Barents Freeway

Date du début: 3 sept. 2012, Date de fin: 30 mai 2015,

Economic and social development of local communities in the Kolarctic area through optimization of transport infrastructure development on a base of the common Barents Region Transport Strategy responding to new challenges arising in the Arctic and Northern periphery. Achievements: ...
Voir le projet

 10

 TERMINÉ 

Improvement of Express Passenger Train "Vilnius-Minsk" (PT VM)

Date du début: 30 nov. 2013, Date de fin: 29 avr. 2015,

PROBLEM: Every month about 7000 passengers are going to both directions Belarus and Lithuania. Traveling time from Vilnius to Minsk (or vice versa) by train is 4 to 5 hours. This is caused by inconvenient and long lasting customs control procedures. To overcome this lack of competitiveness there is a need for improvement, interoperability and integration of transport systems of both Lithuania and ...
Voir le projet

 3

 TERMINÉ 
The overall objective of the project is to contribute to improvement of traffic conditions of the IA Pan-European Transport Corridor by improving the conditions for transit and long distance traffic and reducing the problems caused by the traffic with which inhabitants of Panemune settlement (Lithuania) and Sovetsk town (Russia) are encountering. ...
Voir le projet

 2

 TERMINÉ 

Harmonised eCall European Pilot - Phase 2 (HeERO2)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

The overall objective of HeERO 2 is "To extend HeERO to new Member States or associated countries to demonstrate the scalability of the HeERO solution and to widen the acceptance of eCall."To support this objective there are three aims:(1) to prepare the necessary infrastructure to realize interoperability of "eCall" at European level, (2) to boost Member States investment in the PSAP infrastructu ...
Voir le projet

 42

 TERMINÉ 
This axis, an extension of the Øresund fixed link (PP11) and the Nordic Triangle road and rail links (PP12), is a key component in the main north-south route between central Europe and the Nordic countries. It involves the construction of a bridge or a tunnel in order to form a fixed road and rail link, spanning the 19 km wide Fehmarn Strait between Germany and Denmark. It also includes improvemen ...
Voir le projet

 1

 TERMINÉ 

Harmonised eCall European Pilot (HeERO)

Date du début: 1 janv. 2011, Date de fin: 30 juin 2014,

The HeERO project will prepare, carry-out and coordinate eCall pre-deployment pilots at European level taking into account the approved standards. The overall project objective is to prepare for the deployment of the necessary infrastructure in Europe with the aim of making the Pan-European in-vehicle emergency call service eCall a reality.In order to address the eCall interoperability which would ...
Voir le projet

 39

 TERMINÉ 
IST-Africa (2012 - 2013) is a strategic collaboration between 1 European partner and 18 African Ministries and National Councils responsible for ICT /STI adoption, policy and research representing North Africa (Egypt, Tunisia), Southern Africa (South Africa, Namibia, Lesotho, Mauritius, Mozambique, Botswana, Swaziland, Malawi), East Africa (Tanzania, Uganda, Kenya, Burundi, Ethiopia), West Africa ...
Voir le projet

 22

 TERMINÉ 

Air Transport Net (AirTN) (AirTN)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

The AirTN ERA-Net was established under FP6 as a network of Member States whose ministries and agencies manage public funded national research activities and programmes in Aeronautics and Air Transport. The results from AirTN in FP6 are prerequisites for the implementation of joint activities to enhance co-operation and coordination of national and regional research programmes. AirTN in FP7 will s ...
Voir le projet

 25

 TERMINÉ 

Improving Road Infrastructure Safety in the Baltic Sea Region (BALTRIS)

Date du début: 10 juin 2010, Date de fin: 9 sept. 2013,

Safe transportation is an element in the overall objective of the BSR programme – to make the BSR an attractive place to work and live in. However increasing road traffic volumes in the BSR come at a price of accidents during which lives are lost and injuries caused. There are large differences among BSR countries in road safety performance. Transportation in the south-eastern part of the region i ...
Voir le projet

 7

 TERMINÉ 
Πολλές περιοχές της Ελλάδας και της Κύπρου αντιμετωπίζουν σημαντικά προβλήματα λόγω της έντονης εποχικότητας που χαρακτηρίζει τη ζήτηση των μεταφορών στις περιοχές αυτές.Σκοπός του έργου αποτελεί η δημιουργία και αξιολόγηση ενιαίας μεθοδολογίας σχεδιασμού και ανάπτυξης συστημάτων ευφυών μεταφορών (ΣΕΜ) για νησιωτικές πόλεις μεσαίου μεγέθους με πιλοτικές εφαρμογές στη Λευκωσία, στον Άγιο Νικόλαο κ ...
Voir le projet

 3

 TERMINÉ 
The main objective of the project is to improve the safety of local inhabitants and environment protection in the cross-border area of Poland and Lithuania, as well as to establish innovative practices concerning the cross-border cooperation. In order to achieve the goal of the project, partners foresee joint actions such as a working team meeting, practical trainings, and a conference. ...
Voir le projet

 3

 TERMINÉ 

Bothnian Green Logistic Corridor (BGLC)

Date du début: 8 juin 2011, Date de fin: 7 mars 2013,

The railway infrastructure of the Bothnian Corridor is of great importance for transnational cargo flows within EU and to the rest of the world and it is listed in the Baltic Sea Strategy action plan as an optional flagship project. The corridor is of great importance for all the states in the Baltic Sea Region and central Europe, for transports of cargo as well as for sustainable passenger transp ...
Voir le projet

 29

 TERMINÉ 
The CAAST-Net project will establish a platform to promote improved cooperation in science and technology between Europe and Sub-Saharan Africa. To achieve this objective, CAAST-Net will analyse the current European and African S&T cooperation landscape, and undertake S&T policy analyses. Informed by the outcomes of analyses, CAAST-Net will initiate and support European-African S&T policy dialogu ...
Voir le projet

 25

 TERMINÉ 

INFRASTRUCTURE ACCESS TO THE BRIDGE AT CALAFAT - VIDIN, OVER DANUBE

Date du début: 31 déc. 2008, Date de fin: 30 déc. 2012,

Aim:Construction of road infrastructure for the Clafat– Vidin Bridge over the Danube River.
Voir le projet

 1

 TERMINÉ 
Shorter Plane Routes were implemented through the establishment of Functional Airspace Blocks (FAB) in the Baltic Sea region (the North European FAB, Danish-Swedish FAB and the Baltic FAB (joint initiative between Poland and Lithuania). Achievements: By 4 December 2012 ...
Voir le projet

 1

 TERMINÉ 
The EWTC II project started in 2009 and was a follow up of the EWTC project completed in 2007, with the overall aim to highlight the development of a ”Green Corridor Concept” as a best practise case in the European context. Green transport corridors are defined as a concentration of freight traffic between major hubs and by relatively long distances where short sea shipping, rail, inland waterways ...
Voir le projet

 29

 TERMINÉ 
Transport security and accessibility are essential for a balanced and sustainable development of ASP. Due to current climatic trends, the vulnerability of transport infrastructure to natural hazards has increased. But the specific threats to transport infrastructure have not yet been tackled in a systematic joint effort. Therefore the goal of PARAmount is to improve risk management strategies for ...
Voir le projet

 13

 TERMINÉ 

ERA-NET TRANSPORT II (ENT II)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2012,

"ERA-NET TRANSPORT II (ENT II) brings together the owners of national transport re-search programmes from thirteen countries, representing an annual public funding volume in the access of € 300 Mio in total. The vision behind ENT is to supplement and enrich na-tional RTD programmes through trans-national cooperation where national programme representatives can see an added value. Since 2003 the EN ...
Voir le projet

 17

 TERMINÉ 

South East European Research Area for eInfrastructures (SEERA-EI)

Date du début: 1 avr. 2009, Date de fin: 31 mars 2012,

"The South-East European eInfrastructure initiatives aim to ensure equal participation of the region in European networking and Grid computing trends. SEEREN initiative has established regional network and SEE-GRID the regional Grid. SEE-LIGHT project is currently establishing dark-fibre backbone in the region, and SEE-GRID-SCI empowering strategic regional user communities in common use of the eI ...
Voir le projet

 19

 TERMINÉ 

South East European Transport Axis Cooperation (SEETAC)

Date du début: 31 mars 2009, Date de fin: 30 mars 2012,

The existing SEE transport framework & network are inadequate to actual requirements. For too long the relevant institutions were concentrating on national infrastructures where most of the investments have been made to the detriment of the trans-national implications. Current transport facilities, mostly in the non-EU countries are way beneath international standards mainly because of insufficien ...
Voir le projet

 21

 TERMINÉ 
IST-Africa (2010 – 2011) is a collaborative Initiative between 1 European and 13 African partners, 11 Ministries & 2 National Councils responsible for ICT adoption, Science, Technology; Innovation policy and research in North (Egypt), Southern (South Africa, Namibia, Lesotho, Mozambique, Botswana, Mauritius), East (Tanzania, Uganda, Kenya, Burundi), West (Senegal) & Central Africa (Cameroon).Main ...
Voir le projet

 14

 TERMINÉ 

ERA-NET ROAD II (ENR2)

Date du début: 1 mai 2009, Date de fin: 31 déc. 2011,

"ERA-NET ROAD II’s aim is to strengthen the European Research Area in road research by coordinating national and regional road research programmes and policies. The consortium comprises owners and managers of road research programmes in fifteen countries and two regions, i.e. the eleven National Road Administrations active in the first ERA-NET ROAD plus four more National Road Administrations and ...
Voir le projet

 21