Rechercher des projets européens

37 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Leicester College Construction Project

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

This project will target learners from Leicester Colleges construction department, who are studying one of the following Level 3 qualifications:- Electrical Installation- Plumbing- Construction and the Built EnvironmentThe participants will complete a 4 week Mobility in Seville, Spain where they will work within several construction companies, improving their work based knowledge and skills and in ...
Voir le projet

 11

 TERMINÉ 

Culturefest 2015

Date du début: 1 août 2015, Date de fin: 31 mars 2016,

...quip them with transferable skills that will both enhance their employability and build their self-confidence and self-esteem. The project will take place, following an online APV, at a campsite near Leicester. The 56 young people (3 male and 4 female or vice versa) and 16 leaders will be accommodated in single-sex bunk houses in mixed international groups. Food will be provided by outside catere ...
Voir le projet

 8

 TERMINÉ 

Night of Festivals - a celebration of European freedom

Date du début: 1 avr. 2015, Date de fin: 30 nov. 2016,

...nstallations (The Plinth Programme) - for delivery in the UK, Germany and Bulgaria, all under the cohesive artistic umbrella of the Night of Festivals project. The outcomes include presentations in Leicester and London (UK), Hamburg (Germany), and Gabrovo (Bulgaria), reaching live audiences of 250,000 plus and stimulating engagement from many thousands more through live participation and on line a ...
Voir le projet

 3

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 mai 2016,

...re going for training make the project even more interesting.They are going to collaborate with other students in finding lodgement and new firms.As an example , the city of Rennes (France ) or Leicester ( England ) ,or Hamburg ( Germany ) where former students who enjoyed the experience of a Erasmus+project are working. Our plans are to extend the number of mobilities and above all the number of ...
Voir le projet

 1

 TERMINÉ 

OER uptake in adult education institutions

Date du début: 1 sept. 2014, Date de fin: 31 août 2016,

...ectives on the uptake of OER to the table. MFG, the Innovation Agency for IT and Media Baden-Württemberg, from Stuttgart (Germany), NIACE, the National Institute for Continuing Adult Education, from Leicester (United Kingdom), and IREA, the Romanian Institute for Adult Education, from Timisoara (Romania) who work closely with private and public adult education providers and their staff within thei ...
Voir le projet

 6

 TERMINÉ 

Electrical Maintenance Experience

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2016,

Leicester College is one of the largest in the UK with more than 27,400 learners studying with us on a wide range of courses, from many backgrounds and with different ambitions and aspirations. This project aims to address the labour market demands of the UK's expanding construction industry, specifically in relation to the sub-sector of electrical installation. The project will address the exis ...
Voir le projet

 3

 TERMINÉ 
...lopment of MOOCs and has recently run training courses on "DIY" MOOC production. Fachhochschule Bielefeld in Germany is active in the rapid low-cost development of e-learning content. University of Leicester, an institution with extensive experience in distance learning and e-learning research is carrying out evaluation on the cost effectiveness of the techniques identified as part of this proje ...
Voir le projet

 5

 TERMINÉ 

Integration Through Action

Date du début: 1 mai 2015, Date de fin: 31 déc. 2015,

... from local society. That is why we decided to show ? based on our project ? to show participants how important the real influence on local society is. In terms of having impact on the HOST CITY of Leicester, we met with local Institutions and NGO?s like the Racial Equality Centre, and a Sikh temple. During these meetings, the participants had the opportunities to take a closer examination of ex ...
Voir le projet

 12

 TERMINÉ 

Proyecto pedagógico europeo Escuela de Escritores 2015-2016

Date du début: 1 juin 2015, Date de fin: 31 mai 2016,

...also in Belgium. The activities and the profiles of the involved participants where: A1. COURSES AND TRAINING STAFF A1.1 – Course for Creative Writing teachers and tutors in Centre for New Writing, Leicester University (UK): one teacher member of the pedagogical comitee of Escuela de Escritores took part in this course to study the british methods of introducing Creative Writing teaching as part ...
Voir le projet

 5

 TERMINÉ 

Sustainable Tourism and Sports Work Placement

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

Leicester College is one of the largest public further education colleges in the United Kingdom, with a student body of approximately 27400, offering a comprehensive range of technical, vocational and higher education qualifications across a broad range of programme areas from entry-level up to bachelor's degree level. Leicester College is committed to enriching the lives of all members of our com ...
Voir le projet

 2

 TERMINÉ 

Extending Spanish Teaching and Widening Participation at St Pauls

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

St Paul's recently introduced Spanish to the curriculum and is now offering an A Level course. Only one other school in the City of Leicester does so at the moment. The objective of the project is to train staff to teach the language better and be confident to run the course. None of the members of staff have studied the language at university level and they have been refreshing their knowledge as ...
Voir le projet

 1

 TERMINÉ 

Charnwood Riders Academy Enhancement & Exit and Progression Opportunities

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

CONTEXTThe Leicester Riders is a British professional basketball team that play in the British Basketball League (BBL). In 2010, the Riders formed a partnership with Charnwood Community College to provide the Charnwood Riders Academy, and became one of the first institutions in the UK to deliver the Advanced Apprenticeship in Sporting Excellence (AASE) framework on behalf of Basketball England. AA ...
Voir le projet

 2

 TERMINÉ 
...ology in Europe (VTT Finland, IPHT Germany), and represent the highest international level of scientific expertise in astrophysics research and instrument development (SRON Netherlands, University of Leicester United Kingdom, Max-Planck Institute for Radio Astronomy Germany, and University of Helsinki Finland). Also two SME partners are involved in minor supporting work packages."
Voir le projet

 9

 TERMINÉ 

Youth Mela: Becoming Global Citizens

Date du début: 15 janv. 2016, Date de fin: 14 janv. 2017,

...se countries across Europe, seeking an educational experience which caters for their moral, spiritual and emotional wellbeing, and an enjoyable experience.The transnational meeting will take place in Leicester, UK, from arrival date of 31st of August till the departure date of 6th of September 2016. It will last for 5 days, during which young people will be together in discussions, brainstormings, ...
Voir le projet

 5

 TERMINÉ 

Work placements for students in England

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

...lsace region of France, which offers training in retail, administration and management. Our aim is to give our students the opportunity to spend their last work placement in England in the cities of Leicester and Loughborough. These cities are located in the East-Midlands, partner of the Academy of Strasbourg. These work placements take place in partner companies for over twenty years.Our students ...
Voir le projet

 2

 TERMINÉ 

Developing and implementing European Public Sector Accounting modules

Date du début: 1 oct. 2016, Date de fin: 31 août 2019,

... Public Sector Accounting modules) is a cooperation between the Johannes Kepler University Linz (Austria), the University of Tampere (Finland), the University of Rostock (Germany), the University of Leicester (UK) and the University of Coimbra (Portugal). Each key personen of the strategic partners has significant expertise in the field of public sector accounting, thereby complementing each othe ...
Voir le projet

 5

 TERMINÉ 
...SS responsible for the needs analysis in the field of the identifications of key competences. A qualified evaluation and validation of the project results will be done by University of Leicester.The tangible outcomes are listed under “objectives of the project”. The main impact of the project is to contribute to the easier entrance of the unemployed into the labour market and to improve the capaci ...
Voir le projet

 9

 TERMINÉ 

Political and sOcial awareness on Water EnviRonmental challenges (POWER)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2019,

...lity 3. Extreme weather events (surface water flood risk) 4. Variables related to water conservationIt will develop a common DSP system prototype to be demonstrated in Milton Keynes, Sabadell, Leicester and Jerusalem. It will combine the experience of these Key Demonstration Cities with follower Cities. The followers are members of EIP Water Action Group City Blueprints, NetwercH2O and citi ...
Voir le projet

 12

 TERMINÉ 
...deal ‘test-bed’ for the study given the results of new fieldwork, an availability of relevant sites (urban/rural), and recent published outputs. The applicant and the proposed Host (University of Leicester) and Partner Organizations (the CSIC-National Research Council of Spain and CINECA of Italy) can draw upon a rich vein of expertise, specialists, research, publications, equipment and infrastruc ...
Voir le projet

 1

 TERMINÉ 
...iences specialism. Traditionally, bridging this divide between the social, legal, and physical sciences has not been possible for prospective PhD students. The United Kingdom, and the University of Leicester in particular, has a strong history of world class forensic research and innovation and this proposed innovative doctoral programme would attract high quality early career researchers to inv ...
Voir le projet

 1

 TERMINÉ 

Incorporating in Numerical Schemes Transition On Curved Surfaces (INSTOCS)

Date du début: 1 mars 2011, Date de fin: 28 févr. 2014,

...ransition database with surface curvature under different level of free-stream turbulence level of flows of engineering interests will be generated using the existing wind tunnel at the University of Leicester with different measurements techniques. Transition model and their correlation will be modified by the addition of specific curvature terms, the forms of which will be driven by the physics ...
Voir le projet

 1

 TERMINÉ 

Building planetary systems: linking architectures with formation (BuildingPlanS)

Date du début: 1 juin 2016, Date de fin: 31 mai 2021,

The last few years have seen an explosion in our knowledge of extra-solar planetary systems. However, most exoplanetary systems look nothing like our own: we see “hot Jupiters” which take just days to orbit their parent stars, planets which meander across entire solar systems on highly eccentric orbits, and even planets orbiting twin, binary suns. These planets formed in relatively homogenous disc ...
Voir le projet

 1

 TERMINÉ 

RECAP: Research on European Children and Adults born Preterm (RECAP)

Date du début: 1 janv. 2017, Date de fin: 31 mars 2021,

The project’s overall aim is to improve the health, development and quality of life of children and adults born very preterm (VPT, < 32 weeks of gestation) or very low birth weight (VLBW, < 1500g) – approximately 50 000 births each year in Europe – by establishing an ICT platform to integrate, harmonise and exploit the wealth of data from 20 European cohorts of VPT/VLBW children and adults and the ...
Voir le projet

 21

 TERMINÉ 

Boost Brittle Bones Before Birth (BOOSTB4)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2020,

Osteogenesis imperfecta (OI) is, in its severe forms, a devastating inherited disorder characterised by brittle bones. A person with severe OI is affected throughout their lifetime with repeated, multiple fractures, considerable pain and handicap. There is no curative or effective treatment for OI. Our preclinical studies and initial clinical cases have demonstrated that transplantation of fetal m ...
Voir le projet

 13

 TERMINÉ 

Liaison in Scientific Training for European auditory Neuroscience (LISTEN)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2020,

This ITN will train 10 ESRs to meet the urgent need for translation of Auditory Neuroscience into commercial and pharmaceutical products to treat hearing disorders including tinnitus. Tinnitus is the debilitating perception of imaginary sound that is often associated with hearing loss. This Liaison in Scientific Training for European auditory Neuroscience (LISTEN) is a consortium of top hearing sc ...
Voir le projet

 9

 TERMINÉ 
Unlike China, Russia or South Africa, the EU-28 Member States are not in the fortunate position of having vast, easily accessible ore deposits containing valuable metals. However, Europe does have large quantities of secondary industrial residues (tailings, sludges, slags and ashes) that contain sig¬nificant concentrations of both critical and economically important metals. The Euro¬pean Training ...
Voir le projet

 8

 TERMINÉ 
There is an intense interest in the function of human Myc proteins that stems from their pervasive role in the genesis of human tumors. A large body of evidence has established that expression levels of one of three closely related Myc proteins are enhanced in the majority of all human tumors and that multiple tumor entities depend on elevated Myc function, arguing that targeting Myc will have sig ...
Voir le projet

 3

 TERMINÉ 
Next-Lab intends to change the educational landscape of science and technology education in Europe on a very large scale. The project offers a unique and extensive collection of interactive online (virtual and remote) laboratories that, through a process of mixing and re-use, can be straightforwardly and efficiently combined with dedicated support tools (learning apps) and multimedia material to t ...
Voir le projet

 12

 TERMINÉ 

European Prevention of Alzheimer’s Dementia Consortium (EPAD)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2019,

Background:The secondary prevention of Alzheimer’s dementia (AD) is achievable if we can identify individuals at risk of disease progression defined by biomarker evidence of AD pathology and no or only minimal clinical symptoms and engage them in a standing adaptive clinical trial, of the highest quality, testing multiple interventions. To achieve this, EPAD will also provide the analytical infras ...
Voir le projet

 40

 TERMINÉ 

DC-based immunotherapy to treat Malignant Mesothelioma (H2020MM04)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

Asbestos is one of the major occupational carcinogens. The European Union has an extensive history of protecting workers and consumers against asbestos and even adopted a resolution 2012/2065(INI) ‘on asbestos related occupational health threats and prospects for abolishing all existing asbestos’ last year. Although asbestos is banned, it is still massively present in the built environment. Millio ...
Voir le projet

 8

 TERMINÉ 

Combating Fiscal Fraud and Empowering Regulators (COFFERS)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

Since 2008 'fiscal leaks' have become an immediate policy challenge for EU governments, partly as a result of tax abuse. The COFFERS project unfolds as EU tax authorities transition to a new era in tackling tax abuse based upon policy innovation at the OECD, EU and national levels. COFFERS recognizes this creates a state of flux where much tax authority expertise regarding past regulations, system ...
Voir le projet

 9

 TERMINÉ 
The Energy Data Innovation Network (EDI-Net) will use smart energy and water meter data to accelerate the implementation of sustainable energy policy. It will do this by increasing the capacity of EU public authorities to act quickly and decisively. The capacity will be increased by the provision of just the right amount of intelligible information, by training and exchange of experiences of Publ ...
Voir le projet

 7

 TERMINÉ 

Integrated Activities for the High Energy Astrophysics Domain (AHEAD)

Date du début: 1 sept. 2015, Date de fin: 28 févr. 2019,

We propose a set of integrated Activities in the High Energy Astrophysics Domain (AHEAD) in response to the INFRAIA-2014-2015 call Research Infrastructures for High EnergyAstrophysics.The overall objective of AHEAD is to integrate national efforts in high-energy Astrophysics and to promote the domain at the European level, to keep its community at the cutting edge of science and technology in this ...
Voir le projet

 26

 TERMINÉ 
Attention deficit/hyperactivity disorder (ADHD) and autism spectrum disorders (ASD) are frequent, chronic and highly heritable neurodevelopmental disorders. Despite their societal importance, progress in understanding disease biology has been slow and no curative treatment options are available.The pan-European training network MiND aims to educate a new generation of researchers in the field of n ...
Voir le projet

 12

 TERMINÉ 
Aggression is a basic physiological trait with important roles throughout evolution, both in defence and predation. When expressed in humans in the wrong context, aggression leads to maladjustment, social impairment and crime. Despite this, knowledge about aggression aetiology is limited and current treatment strategies are insufficient. Contingent to a subdivision into impulsive and instrumental ...
Voir le projet

 27

 TERMINÉ 

Post-ingestive effects on mesolimbic circuitry (POST-INGEST MESOLIMB)

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2018,

Recent decades have seen a rapid rise in the prevalence of obesity across the globe. This rise can be attributed, at least in part, to overconsumption of so-called junk foods, which are highly palatable and densely caloric. These foods, in particular, drive activity in the brain's mesolimbic circuitry. The mesolimbic system - primarily comprising dopamine cells in the ventral tegmental area and nu ...
Voir le projet

 1

 TERMINÉ 
Long-term side-effects of radiotherapy impact on the quality-of-life (QoL) of cancer survivors. These side-effects could be reduced if predicted in advance. Previous work identified clinical and biological predictors but a major, coordinated approach is needed to validate them so they can be used clinically. The EU has ~17.8 million people living with a prior diagnosis of cancer of whom ~7 million ...
Voir le projet

 15