Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

European innovative programme for VET of nurses - "Moving and Handling"

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2017,

...n and training in the field of M&H is of enormous importance for daily work life of nurses. The project aims to transfer an innovative M&H educational programme developed in the UK by the Birmingham City University into 4 European countries (Czech Republic, Poland, Estonia and Lithuania). The main project activities are: - Analysis of the state of the art - Transfer and adjustment of the innovat ...
Voir le projet

 7

 TERMINÉ 

Corporate Social and Environmental Responsibility through Public Policy (COGITA)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...to improve public policy promoting CSR solutions, which combine social and environmental responsibility. Within this integrated concept, COGITA considers 5 sub-themes: raising CSR awareness and capacity; CSR in public procurement; CSR criteria in public funding; inter-firm collaboration / local supply chains; communication / branding.All PP have CSRexperience, though activities and levels of inten ...
Voir le projet

 13

 TERMINÉ 

Atelier European Fortresses - Powering Local Sustainable Development (AT FORT)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...1 partners, representing 7 old and 4 new MS. Partners are local and regional authorities, public bodies and knowledge institutes with experience in the field of cultural heritage and with capacity to ensure direct continuity of the project results.Roles and task are distributed between the partners in a balan+A3155ced way, building on their existing experience and transferable know how, and exploi ...
Voir le projet

 11

 TERMINÉ 
Project “E-Utilities” aims to improve quality of municipal utilities services by using ICT tools and creating new electronic services for consumers in water and heating supply, sewerage collection and street lighting systems.Project unites 16 partners in Latvia and Lithuania who will also engage in joint experience exchange, training and communication activities.
Voir le projet

 16

 TERMINÉ 

Regional Strategies for Energy Conscious Communities (RENERGY)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

RENERGY should be seen in a context of the EU Strategy for Competitive, Effective and Secure Energy (2020) setting out objectives and main line of action to address urgent global energy concerns: excessive reliance on non-renewable fossil fuels, dependency on energy imports from certain countries, safety issues (e.g. nuclear) and the significant CO2 contribution of transport sector and fossile ene ...
Voir le projet

 12

 TERMINÉ 
Use of biogas for city buses will lower emissions and substitute fossil fuels. It will strengthen the role of public transport as an efficient strategy to limit the impact from traffic on climate change. Biogas can be produced from biodegradable materials (waste, manure, sewage sludge and landfill gas) thereby creating energy autonomy and jobs. Through purification it reaches the same quality and ...
Voir le projet

 10

 TERMINÉ 
BERAS Implementation offers a response to the challenges to achieve a good environmental status in the Baltic Sea, reinforce sustainable agriculture and enhance rural development in the region.Objectives:Contribute to solving the problem of excessive nutrient losses from agricultural through introduction of conversion to Ecological Recycling Agriculture (ERA) in all countries of the BSRDevelop a s ...
Voir le projet

 25

 TERMINÉ 

Rail Baltica Growth Corridor (RBGC)

Date du début: 10 juin 2010, Date de fin: 9 sept. 2013,

The RBGC is led by the City of Helsinki and coordinated by the Aalto University Small Business Center. The project has in total of 21 partners from 6 BSR countries. Target groups of the RBGC are City and regional authorities, Transport service providers, Logistics centers, Intermodal terminals, Public transport authorities, Universities and other research centers. RBGC's partner composition is bas ...
Voir le projet

 21

 TERMINÉ 

n reduction of the eutrophication of the Baltic Sea today (PRESTO)

Date du début: 8 juin 2011, Date de fin: 7 mars 2013,

...asurement technology to improve their WWT processes.The project partners and associated partners are have up-to-date skills on modern wastewater treatment (nutrient removal) through a series of capacity building workshops and site visits. Results of the workshops have been also introduced into the academic education in Belarus.A framework paper for development of the education on waste water treat ...
Voir le projet

 12

 TERMINÉ 
Business ineptness and poorly equipped life-long learning centres are the main cause for dissatisfaction among region’s entrepreneurs. The aim of the project is to enhance the competitiveness of Latvia–Lithuania border regions by eliminating the obstacles to its development. Therefore, business and education support centres will be created by renovating premises of life-long learning institutions ...
Voir le projet

 15

 TERMINÉ 
The social capacity, knowledge and acceptance to utilise eHealth technologies of citizens and medical professionals is a basic condition for the implementation and further generation of innovative technologies for the health sector. However, the absorption of new knowledge and acceptance to use eHealth technologies is varying remarkably among citizens and medical professionals and needs to be stre ...
Voir le projet

 19

 TERMINÉ 
Extended use of biogas for city buses will lower emissions, improve inner city air quality and strengthen the role of public transport in an efficient strategy to limit the impact from traffic on climate change. This three year project will stimulate cities and regions around the Baltic Sea to use biogas driven buses. The project will generate strategies and policies to introduce biogas as well as ...
Voir le projet

 12

 TERMINÉ 
...population segments and stakeholder groups in urban-rural areas and compare them to the existing policies and practices. Based on these results project defines and implements pilot actions in partner city-regions. Project develops new planning tools and introduces an integrated management approach to urban-rural interactions. To benefit also other city-regions, project produces a training package ...
Voir le projet

 12

 TERMINÉ 

The Baltic 21 Eco Region Project (Eco-Region)

Date du début: 31 déc. 2008, Date de fin: 23 janv. 2012,

...lical, integrated, regional sustainable development management is new and complex, with only little practical experience available. Thus, all 10 model EcoRegions participated in a capacity building programme designed to strengthen their sustainable development management on a regional level. In a sequential series of joint transnational workshops participants were introduced to the “Integrated Sus ...
Voir le projet

 22

 TERMINÉ 
The objective of CIVITAS CATALIST is to ensure that the experiences of the CIVITAS Initiative are exploited up to a maximum level. This means deploying actions aiming to:- consolidate, validate and deepen the knowledge of the wider impacts of CIVITAS through an integrated assessment of the CIVITAS measures;- promote the results of CIVITAS through a continuing knowledge transfer process;- increase ...
Voir le projet

 23

 TERMINÉ 
Regeneration of abandoned military sites (socio-economic regeneration of abandoned military heritage sites as a driver for sustainable urban development) Achievements: Documents/reports:Signature Sheet: Network Mtg - Rostock 29 May 0820/02/2015Signature Sheet: Partner m ...
Voir le projet

 11

 TERMINÉ 

Female Entrepreneurs´Meetings in the Baltic Sea Region (FEM)

Date du début: 14 août 2004, Date de fin: 13 août 2008,

FEM has promoted womens access to labour markets and entrepreneurship and strengthened the role of women in local and regional development by e.g. training, mentoring, networking and creating meeting-places. Gender sensitivity and gender mainstreaming have been key issues in the project. The aim has been to produce sustainable positive changes in the attitudes, processes and methods of economic an ...
Voir le projet

 41

 TERMINÉ 
...elopment models) in the post-soviet military residential areas and to develop and to evaluate possible development strategies;4) to develop specialized spatial planning tools;5) to increase the capacity of institutions involved in the development process of post-soviet military residential territories;6) to analyze challenges and opportunities for post-soviet military residential settlement develo ...
Voir le projet

 18

 TERMINÉ 

Regional Cooperation in Waste Management (RECO)

Date du début: 12 janv. 2005, Date de fin: 11 janv. 2008,

...ed by:Institution building thru the development of Regional Waste Management Institutions (RWMIs)Supporting of cross-border and cross-sectoral cooperation in waste management and Spatial Planning.Capacity building thru development of Waste management handbooks and other information material, educational seminars, training and study visits.Raising the level of participation and knowledge in waste m ...
Voir le projet

 58

 TERMINÉ 

Baltic Urban Sustainable Transport Implementation and Planning (BUSTRIP)

Date du début: 30 juin 2005, Date de fin: 30 déc. 2007,

...ed at: (1) developing and implementing Peer Review method in the process of SUTP development, (2) developing SUTPs and implementing pilot actions in 12 BSR cities, and (3) improving BSR cities’ capacity base and promoting transnational co-operation on sustainable urban transport planning and implementation. The development of the plans and methods has been supported by cross-sectoral implementatio ...
Voir le projet

 17

 TERMINÉ 

Baltic Culture and Tourism Route Fortresses (BalticFortRoute)

Date du début: 18 janv. 2005, Date de fin: 30 déc. 2007,

After the end of Cold War, military fortresses lost their function. Some of them have been designated as World Cultural Heritage sites.Fortresses have a significant economic and tourist potential for regional development. In transnational cooperation of 17 fortresses (“Fort-Pool”) and 8 scientific institutions (“Brain-Pool”) a high-quality tourist product is developed to be a model for a European ...
Voir le projet

 19

 TERMINÉ 
...ransnational cooperation in innovation promotion and a joint development vision for 2017 were identified in the joint approach.2) Regional training events and study tours were organized to ensure capacity building of key innovation system actors and sustainability of the RIS analyses results.3) Key innovation actors skills and knowledge on concrete tools and best practises in developing the RIS we ...
Voir le projet

 18

 TERMINÉ 

Challenge of eCitizen - Promoting eGovernment Actions in European Cities (eCitizen)

Date du début: 31 déc. 2004, Date de fin: 30 déc. 2007,

... Achievements: Challenge of eCitizen project started its activities early 2005, and proceeded well towards the goals set in three subject categories: eManagement for city administrations as well eServices and eParticipation targeted at citizens, with awareness raising as a cross-cutting theme. Concrete results were achieved by all 11 partners from 10 partner citie ...
Voir le projet

 12

 TERMINÉ 

Mobility Culture in the Baltic Sea Area -MoCuBa- (MoCuBa)

Date du début: 9 déc. 2005, Date de fin: 8 déc. 2007,

... barriers and lack of information.In MoCuBa 16 partners from eight cities in six countries were involved: Sweden, Denmark, Finland, Poland, Lithuania and Germany. Many of the partners are part of city administrations but there are also Public Transport (PT) companies and authorities, a health insurance, a cycling association (NGO) and a foundation (NGO).Intermodal co-operation within environmental ...
Voir le projet

 18

 TERMINÉ 
...irrational human behaviour. The concepts of ES and CSR, promoted by the project, were widely discussed in mass media and Internet. The project also strengthened the managerial and technical capacity of all stakeholders. This was achieved through the exchange of best practices, training in energy audits, integrated energy planning, preparing and launching pilot ES projects. It is expected that all ...
Voir le projet

 11

 TERMINÉ 
River basin planning has a long tradition in water protection terminology, but new whole Europe approach has been adopted when Water framework directive (WFD) come into force. According to WFD all European river basins should be covered by river basin plans with ultimate goal to reach good ecological status or potential in all waterbodies. Baltic Sea is one of the most fragile marine areas in Euro ...
Voir le projet

 16

 TERMINÉ 
The project “e-Health for Regions“ aimed to create modern health care systems by building up modern structures and implementing e-Health solutions to make ‘health for all’ possible. Thereby the project partners contributed to optimise the cross-border medical care and to improve the quality of medical care.The European healthcare systems have to deal with the rising demand for services in addition ...
Voir le projet

 18

 TERMINÉ 

Baltic Tangent

Date du début: 3 janv. 2005, Date de fin: 2 mai 2007,

...perspective.The project has concluded that measures for improvements primarily should be carried out in five bottleneck areas. The border crossings between Russia and Latvia and Estonia, rail capacity in the Baltic States, Riga traffic congestion, port and ferry capacities and the rail/road standard in the Swedish BT parts. Measures to eliminate or improve the situation concerning these bottleneck ...
Voir le projet

 34

 TERMINÉ 

Network for Future Regional Health Care (Future Health)

Date du début: 31 déc. 2003, Date de fin: 30 déc. 2006,

The main objective of this cooperation is to create an effective platform for sharing cross-professional experience on developmental health care issues amongst the participating EU countries. This platform will develop new approaches for resolving health care management problems for the participating organisations. The objective will be pursued by analysing existing treatment processes, developing ...
Voir le projet

 19

 TERMINÉ 

art II: Development of a Conversion Network in the Baltic Sea Region (Convernet II)

Date du début: 16 mars 2005, Date de fin: 15 juil. 2006,

...ure and Tourism Route Fortresses”, meanwhile approved by the INTERREG IIIB BSR Steering Committee and to close contacts to other actors in the BSR confronted with conversion issues (e.g. City of Hamburg, Latvian Housing Agency)- activation of ministries interested in conversion from Russia, BelarusOther project results put the conversion process a step forward in concrete cases:- the marketing of ...
Voir le projet

 21

 TERMINÉ 
...g committee consised of members from the Baltic University Programme, BUP; the Union of Baltic Cities, UBC; the Division of Urban Studies at the Royal Institute of Technology, KTH, Stockholm, and the city of Nacka.2. Conferences. 10 best practice conferences on the ten key theme areas in urban management were organised in 2003-04, and 10 conferences on integration and application of management dur ...
Voir le projet

 38

 TERMINÉ 

South East Baltic Transport Link (SEBTrans-Link )

Date du début: 28 août 2002, Date de fin: 27 nov. 2005,

SEBTrans-Link is a direct continuation of the former Interreg II C project SEBTrans. This SEBTrans project identified strong demand for improved infrastructure in the SEBTrans corridors. In the North-South Corridor, building the A1 motorway (Gdynia – Lodz) in Poland is a first priority together with improving the section within Sweden (Gothenburg – Borås – Växjö – Karlskrona). Road improvements pr ...
Voir le projet

 24

 TERMINÉ 

Connect Baltic Sea Region (CBSR )

Date du début: 31 mai 2005, Date de fin: 30 août 2005,

The overall objective of CBSR project was to stimulate creation of new firms and jobs in knowledge intensive sectors by linking entrepreneurs and innovators with R&D, service providers and venture capitalists. A short term goal was to establish Connect organisations or networks in all the countries participating in the project (Norway, Sweden, Denmark, Finland, Estonia, Latvia, Lithuania, Germany) ...
Voir le projet

 26

 TERMINÉ 

Via Baltica Nordica Development Zone (VBNDZ )

Date du début: 31 juil. 2002, Date de fin: 30 juil. 2005,

The Via Baltica Nordica is a coherent development corridor stretching from Berlin to Mo i Rana in Norway. The idea is not to construct or develop the Via Baltica road connection as such, but to develop the regions located along the corridor by means of transnational co-operation. More than 40 cities, municipalities, regions and other development organisations from Finland, Sweden, Germany, Estonia ...
Voir le projet

 45

 TERMINÉ 
The project was aiming at the improvement of planning processes by improving the transregional communication and decision structures. The outcome of the project is a thematic network and a centre of excellence for improving the political (e.g. spatial planning authorities, municipalities, ministries, Governmental and Non-Governmental-Organisations) and entrepreneurial policy-making-processes in th ...
Voir le projet

 14

 TERMINÉ 

Development of a Conversion Network in the Baltic Sea Region (CONVERNET )

Date du début: 16 avr. 2003, Date de fin: 15 mars 2005,

...ure and Tourism Route Fortresses”, meanwhile approved by the INTERREG IIIB BSR Steering Committee and to close contacts to other actors in the BSR confronted with conversion issues (e.g. City of Hamburg, Latvian Housing Agency)- activation of ministries interested in conversion from Russia, BelarusOther project results put the conversion process a step forward in concrete cases:- the marketing of ...
Voir le projet

 21

 TERMINÉ 

Eco Forum Baltica (Eco Forum Baltica )

Date du début: 31 mai 2002, Date de fin: 30 déc. 2004,

Eco Forum Baltica has two main objectives; to promote the development and knowledge on Environmental Management Systems (EMS) in companies (mainly SMEs) and authorities in Estonia, Latvia, Lithuania and Poland and to develop the Spatial planning process (starting in the Harju region) and integrating Waste management/EMS perspectives in this process. The project is based on Eco Forum St Petersburg, ...
Voir le projet

 22

 TERMINÉ 

Networking Logistics Centres in the Baltic Sea Region (NeLoC )

Date du début: 17 déc. 2001, Date de fin: 16 févr. 2004,

The NeLoC project provided a networking forum for existing and planned logistics centres in the Baltic Sea Region and it has enabled the exchange of experiences in planning and operating logistics centres.The project promoted the role of logistics centres in regional development as well as national and international logistics chains with emphasis laid on intermodal solutions. Further, the project ...
Voir le projet

 24

 TERMINÉ 
The Baltic University Urban Forum (BUUF) is a cooperation between cities/towns and universities in the Baltic Sea region to promote sustainable development. The BUUF project aims to develop strategies for sustainable development for cities and towns. 20 cities and towns, and 15 universities in 9 countries take part in the project. Through the Union of Baltic Cities the results will be available fo ...
Voir le projet

 38

 TERMINÉ 
The nursing experts from two European Union (EU) institutions and two United States (US) institutions and associated networks will reassess traditional approaches to the self-management of chronic ill-health, including palliative care, education and practice standards, across the continuum of patient care, in the age range aged 40 through 100. Research and key policy documents will be examined fo ...
Voir le projet

 4