Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Green Belt of Bay of Santander: connecting nature and city (Life Anillo Verde)

Date du début: 1 oct. 2015, Date de fin: 30 sept. 2019,

Background The Bay of Santander is the largest estuary on the north coast of Spain extending over 41 675 ha. Due to the influence of the city of Santander and its metropolitan area, nearly half the region’s population is situated around the bay area. Despite its relative shallowness, the bay serves as the city’s main seaport and has consequently under ...
Voir le projet

 2

 TERMINÉ 

Biodiversity conservation in river Miera (LIFE Miera)

Date du début: 1 juil. 2014, Date de fin: 31 déc. 2018,

Background The Miera River is located in northern Spain, flowing 41 km from the Cantabrian Mountains into the Bay of Biscay. It has a significant role as an ecological corridor in the region. Natura 2000 sites are located all along its course. The EU Water Framework Directive has established that a river basin perspective should be applied to sectoral p ...
Voir le projet

 3

 TERMINÉ 

Landowners Club for the conservation of Western Spain (LIFE "Oeste Ibérico")

Date du début: 1 juil. 2013, Date de fin: 30 oct. 2018,

Background This LIFE project could be considered as a continuation of the LIFE project, ‘Campanarios de Azaba’ (LIFE07 NAT/E/000762), which carried out a series of actions aimed at improving the populations of the black vulture and black stork, and their habitats – temporary ponds, the dehesas with evergreen Quercus spp., gallery forests, etc. This ...
Voir le projet

 3

 TERMINÉ 

European Clearing House for Open Robotics Development Plus Plus (ECHORD Plus Plus)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2018,

Description ECHORD++ will create new opportunities for European robotics researchers to work directly with SME/start-ups and new users/customers to create innovative products. ECHORD++ will continue ECHORD’s two pillars, “experiments” and “structured dialogue”, taking advantage of experience and investment in the infrastructure. In addition, ...
Voir le projet

 68

 TERMINÉ 

Innovation and Commercialisation in the NMP thematic area (INCOMERA)

Date du début: 15 janv. 2014, Date de fin: 14 janv. 2018,

Towards Europe 2020, European Commission adopted a comprehensive innovation strategy to enhance Europe's capacity to deliver smart, sustainable and inclusive growth. This strategy concerns the so called concept of Smart Specialization Strategy.By itself, sounds a challenging task, but it is of crucial importance, especially for less advanced regions. According to this concept, each region must set ...
Voir le projet

 23

 TERMINÉ 
17 partners from11 countries covering all building life cycle will develop an innovative Integrated Evolutionary Design Methodology that can allow the stakeholders to predict the current and future energy efficiency of buildings (both at individual level and neighbourhood level) and make better informed decision in optimising the energy performance at building life cycle level, including operati ...
Voir le projet

 19

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 
Prospective global supply and demand for gallium, indium and other key metals show an increasing discrepancy, amongst others due to the explosive growth of green technologies such as photovoltaics (PV) and solid-state lighting (SSL). While their primary production is highly controlled by a few countries, recycling systems to reclaim these materials from discarded products are not yet in place. Thi ...
Voir le projet

 12

 TERMINÉ 
MobilePass will focus on research and development towards technologically advanced mobile equipment at land border crossing points. This will allow border control authorities to check European, visa-holding and frequent third country travellers in a comfortable, fast and secure way. The mobile solution incorporates new technologies needed in mobile scenarios and embeds them in the actual border cr ...
Voir le projet

 12

 TERMINÉ 
REEcover aims to:A) Improve European supply of the critical Rare Earth Elements Y, Nd, Tb and DyB) Strengthen SME positions in REE production and recovery value chainC) Innovate and research two different routes for hydro/pyro metallurgical recovery of REEs: as Rare Earth Oxides (REO) or Rare Earth Oxy-Carbides (REOC) in electrolytic reductionD) Demonstrate and compare viability and potential for ...
Voir le projet

 16

 TERMINÉ 

Cold Spray Radical Solutions for Aeronautic Improved Repairs (CORSAIR) (CORSAIR)

Date du début: 1 juin 2013, Date de fin: 30 nov. 2016,

CORSAIR project is a wide investigation concerning the capabilities of Cold Spray Technology for maintenance and repair of aeronautic frames and components. Today, deep and systematic investigation in Cold Spray is required to better understand the capabilities and fully validate the technology in aeronautics. In this scenario, the activities planned in CORSAIR project are (1) Explore the real cap ...
Voir le projet

 13

 TERMINÉ 
HoliDes addresses development and qualification of Adaptive Cooperative Human-Machine Sys-tems (AdCoS) where many humans and many machines act together, cooperatively, in a highly adaptive way. They adapt to each other and to the context to guarantee fluent and cooperative task achievement. Such systems with higher levels of automation are urgently needed to enhance safety and to increase the conf ...
Voir le projet

 32

 TERMINÉ 

Reengineering and Enabling Performance And poweR of Applications (REPARA)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

In recent years, traditional processors have not been able to translate the advances of silicon fabrication technology into corresponding performance gains. This has been due to weaknesses inherent in the current sequential programming model, which has not changed significantly since the late 1940's, as well as due to physical constraints, such as practical limits on the energy consumption and the ...
Voir le projet

 9

 TERMINÉ 

Attitudinal change in troubled times: A triangulation strategy (TRIANGULATE)

Date du début: 1 janv. 2013, Date de fin: 1 juil. 2016,

"Comparative political behaviour research studies the impact of individual and contextual characteristics on citizens’ political attitudes and behaviour. Typically, researchers use cross-national survey data and country-level data to examine how economic, political, or institutional contexts affect the outcomes of interest. However, conventional identification strategies suffer from omitted variab ...
Voir le projet

 3

 TERMINÉ 
Description The DECIPHER project wants to enable secure cross-border mobile access to existing patient healthcare portals which are individually supported by national (governmental) bodies. DECIPHER will deploy Pre-commercial Procurement (PCP) to create step-change innovations in mobile patient ICTs. Using electronic patient records as the k ...
Voir le projet

 11

 TERMINÉ 

ETCS Advanced Testing and Smart Train Positioning System (EATS)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2016,

Currently European Train Control System (ETCS) rollout is a major concern for the railway sector. Equipment for ETCS level 1 and 2 typically follows a long process before being put into service due to interpretation variations in the specification and certification procedures requiring long and expensive field-testing. On the other hand, migration from ETCS level 2 to 3 has not been yet foreseen d ...
Voir le projet

 9

 TERMINÉ 
The CONECTA 2020 project embraces the collaboration between Europe and Latin American/Caribbean Countries around Information and Communication Technologies (ICT) and Horizon 2020. CONECTA 2020 proposes to create new mechanisms of collaboration and networking between Latin American Technology Platforms (LATPs) and ETPs in the form of innovative match-making tools around ICT and Future Internet area ...
Voir le projet

 9

 TERMINÉ 

Integrated Components for Assisted Rescue and Unmanned Search operations (ICARUS)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2016,

"Recent dramatic events such as the earthquakes in Haiti and L’Aquila or the flooding in Pakistan have shown that local civil authorities and emergency services have difficulties with adequately managing crises. The result is that these crises lead to major disruption of the whole local society. The goal of ICARUS is to decrease the total cost (both in human lives and in €) of a major crisis. In o ...
Voir le projet

 29

 TERMINÉ 

Developmental neurotoxicity assessment of mixtures in children (DENAMIC)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

Various recent epidemiological studies have indicated that exposure to low doses of environmental biologically active contaminants during human development can alter gene expression and have deleterious effects on cognitive development in childhood. The DENAMIC project is ultimately focused on reducing such effects of environmental contamination on learning and developmental disorders in children. ...
Voir le projet

 18

 TERMINÉ 
The stringent Solvent Emission Directive (1999/13/EC), fully transposed in 2007, imposes limitations of emissions of volatile organic compounds (VOC) due to the use of organic solvents in paints and varnishes. The most economical way of limiting VOC emission is using water-based coating formulas in which water replaces a substantial amount of the organic solvents traditionally used. Unfortunately, ...
Voir le projet

 15

 TERMINÉ 
Seven European cities (Bordeaux, Copenhagen, Eindhoven-Helmond, Newcastle, Thessaloniki, Verona & Vigo) have joined forces with the objectives of substantially improving road safety, increasing energy efficiency and reducing level of congestions for road transport.In order to address these topics the cities and industrial partners will jointly implement three cooperative services, Road Hazard Warn ...
Voir le projet

 34

 TERMINÉ 
GreenGELAIR aims at developing a two component sol-gel product to be applied on spray or stick/brush device to improve paint adhesion on large surface for OEM or MRO situations.It will be done through:• Development of a new and competitive formulation of sol gel product based on hybrid organic-inorganic system. It will be competitive compared to commercial products regarding induction time, pot li ...
Voir le projet

 3

 TERMINÉ 

Human Factors in Risk-Based Ship Design Methodology (FAROS)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

Up to 96% of maritime accidents (collision, grounding, fire, occupational accidents) are routinely attributed to human error. However, rather than assessing the ship performance in terms of global design factors such as ship motions and noise, the human element studies have primarily focused on local design features (e.g., bridge design) that are relatively easy to fix and tune towards required ef ...
Voir le projet

 15

 TERMINÉ 

Rehabilitative Wayout In Responsive home Environments (REWIRE)

Date du début: 1 oct. 2011, Date de fin: 31 déc. 2014,

Description The REWIRE project develops, integrates and field tests an innovative rehabilitation platform based on virtual reality. The platform allows patients, discharged by the hospital, to continue their intensive rehabilitation at home under remote monitoring by the hospital itself. The patient sees on the display himself or an avatar m ...
Voir le projet

 13

 TERMINÉ 

Pro-active decision support for data-intensive environments (ASTUTE)

Date du début: 1 mars 2011, Date de fin: 31 mai 2014,

"ASTUTE aims at defining reference architecture for the development of HMIs, targeting proactive information retrieval and delivery based on situational context, as well influenced by information content and services, and user state information. This architecture will support the user intentions, optimizing the choices available to the user, while keeping the user in control of the situation. Veri ...
Voir le projet

 22

 TERMINÉ 
"Congenital and acquired diseases of the heart are the leading causes of morbidity and mortality in the world today; 7.2 million people die each year due to coronary heart disease, being the first cause of mortality in population above 60 years old, and the second cause after HIV in world wide young population. There is an urgent demand for new methods to repair and replace damaged cardiovascular ...
Voir le projet

 19

 TERMINÉ 

Jatropha curcas Applied and Technological Research on Plant Traits (JATROPT)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

Jatropha curcas shows a big promise towards sustainable and affordable biofuels. Several groups are working independently towards development of both agrosystems and high quality germplasm of Jatropha, and downstream processing and biodiesel markets. The challenges are to make the big promises come true: high oil yield, low competition with food crops, use in various agrosystems from monoculture p ...
Voir le projet

 12

 TERMINÉ 

How will life be in 2020? (Future2020)

Date du début: 1 mai 2013, Date de fin: 30 nov. 2013,

This proposal aims to raise awareness of the prominent role researchers and how their work plays in our currently every day and for the future. Bearing in mind Horizon 2020 Societal Challenges, the ERN2013 will promote and disseminate what in terms of science and innovation is being done in Portugal.The extensive and nationwide range of activities already planned and being prepared have one major ...
Voir le projet

 10

 TERMINÉ 
This project is aiming at the scaling-up of one of the most promising concepts for CO2 capture from coal power plants: postcombustion carbonate looping systems. This project focuses on the experimental pilot testing and scaling up of the process at scales in the 1 MW range. The 1 Mw carbonate looping pilot will be built in the Hunosa 50 Mwe CFB coal power plant of “La Pereda”, using a side stream ...
Voir le projet

 8

 TERMINÉ 
Cardiovascular disease (CVD) has a significant impact on the European society in terms of mortality, morbidity and allied healthcare costs. The opportunity of multi-scale modelling spanning, sub-cellular level up to whole heart is to improve CVD outcomes by providing a consistent, biophysically-based framework for the integration of the huge amount of fragmented and inhomogeneous data currently av ...
Voir le projet

 21

 TERMINÉ 
MyUI will foster the mainstreaming of accessible and highly individualized ICT products – a major issue for e-Inclusion. The project addresses important barriers which include developers' lack of awareness and expertise, time and cost requirements of incorporating accessibility and missing validated approaches and infrastructures.The project's approach goes beyond the notion of Universal Design by ...
Voir le projet

 11

 TERMINÉ 

Biodiversity conservation in western Iberia (Campanarios de Azaba)

Date du début: 1 janv. 2009, Date de fin: 1 oct. 2012,

Background The project site is located in a biodiversity hotspot in the Iberian Peninsula, which represents one of the best examples of Mediterranean ranges and foothills to be found in Spain and Portugal. The site includes well-preserved forests of holm oak, cork oak and Mediterranean scrub with a low density of human presence. It is home to important po ...
Voir le projet

 3

 TERMINÉ 

Business Models for User Centred Products (MADE4U)

Date du début: 1 juil. 2008, Date de fin: 30 juin 2012,

Recent research results by one of the partners have shown that human beings display unique behaviour (visual strategy), in the way they look at objects. Thus it has been (2006) possible to create spectacles with Progressive Addition lenses which were personalized to a subject’s visual strategy, finding that they dimensionally improved overall user experience, practically eliminating the spectacle- ...
Voir le projet

 15

 TERMINÉ 

Biometric European Stakeholders Network (BEST NETWORK)

Date du début: 1 oct. 2009, Date de fin: 31 mars 2012,

The main objective of BEST NETWORK is to bring together knowledge and hands-on experience with biometric deployments, addressing gaps in the gathering and dissemination of best practices, lessons learned in the scope of studies, pilots and deployments on European and Member States level.Recent experiences with biometrics-enabled systems and services have revealed issues beyond accuracy of identifi ...
Voir le projet

 24

 TERMINÉ 

Fusion Energy Materials Science – Coordination Action (FEMaS-CA)

Date du début: 1 oct. 2008, Date de fin: 30 sept. 2011,

The timely availability of qualified materials for use in fusion power reactors is a necessity for the fast deployment of fusion power. 27 European institutions have joined together in the FEMaS-CA to advance fusion materials science in Europe and in close cooperation with EFDA, the European Fusion Development Agreement. The overarching objective of this Coordination Action is: The FEMaS-CA w ...
Voir le projet

 31

 TERMINÉ 
FRESHFILM will create a highly-functional film food packaging, that will strongly serve two main end-user communities: Food Processing Industry & Plastic Packaging Industry (meat processing vs. fresh food processing). These are mature sectors which create annual revenues in Europe in €147 billion and €12 billion respectively and require continues innovation to differentiate in a strong-competition ...
Voir le projet

 10

 TERMINÉ 
The overall technological aim is to develop a mould-brick acoustic solution based on noise absorption and insulation due material density and porosity that will at least increase levels in 6 dB in performance but at a 20% lower weight and will avoid or minimize noise flanking. The acoustic insulation and absorption of the brick will be achieved by developing the concept of layers oand forms in the ...
Voir le projet

 9

 TERMINÉ 
CoopAIR is an ambitious and innovative action supporting Latin American (LA) cooperation. It aims at deepening strategic RTD cooperation between Europe and LA by building, starting from what already exist a multinational and multistakeholder community that will involve a significant representation of the relevant RTD European and LA actors (researchers, companies, policy makers, users) and by iden ...
Voir le projet

 9