Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Internet of Food and Farm 2020 (IoF2020)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Voir le projet

 72

 TERMINÉ 
The objective of the proposed CSA is to support and complement R&I activities in Smart Systems Integration (SSI) by structuring industrial cooperation and facilitating end-user adoption for the next generations of miniaturised smart objects and systems.Previous CSAs have revealed the immense breadth of SSI in its technology demands, its application sectors, its business ramifications, its provider ...
Voir le projet

 18

 TERMINÉ 

YOUNG EUROLAB II

Date du début: 1 sept. 2016, Date de fin: 31 déc. 2017,

1.- BACKGROUND: The Erasmus+ “YOUNG EUROLAB II” Project, is promoted by the Consortium of Mobility that consists of the next entities:- Municipal Institute for Employment and Bussiness Training (IMEFE). Coordinator and Sending organisation- Virgen del Carmen, VET school. Sending Organisation, Jaén- Santa María de los Apóstoles. VET school. Sending Organisation, Jaén- San Juan Bosco. VET school. Se ...
Voir le projet

 17

 TERMINÉ 

LET´S IMPROVE IN EUROPE III

Date du début: 1 sept. 2016, Date de fin: 31 déc. 2017,

The Project promoter is the Consortium LOS VIVEROS, composed of:- “San José de la Rinconada” VET School, Coordinator and Sending Organisation (San José de La Rinconada, Sevilla) - “Los Viveros” VET School, Sending Organisation (Sevilla)- “Antonio Ulloa” VET School, Sending Organisation (La Rinconada, Sevilla)- “Juan de Mairena” VET School, Sending organisation (Mairena del Aljarafe, Sevilla)- “Cam ...
Voir le projet

 18

 TERMINÉ 
Rapidly developing markets such as green construction, energy harvesting and storage, advanced materials for aerospace, electronics, medical implants and environmental remediation are potential key application targets for nanomaterials. There, nanotechnology has the potential to make qualitative improvements or indeed even to enable the technology. Impacts range from increased efficiency of energy ...
Voir le projet

 26

 TERMINÉ 

LEACHE – Europa más cerca

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

The Department for Education of the Government of Navarra is responsible for establishing the general conditions and developing general aspects of education in this Spanish autonomous region. In this context, a new structure has been created in the Vocational Training Service in order to provide assistance for the internationalization of VET institutions. These measures try to reach the following ...
Voir le projet

 91

 TERMINÉ 
Background The manufacturing of non-ferrous metals – such as aluminium (Al) - is an important part of the European industrial value chain. Current production of extruded Al in Europe is about 3 Mt/year. About one third of this production capacity is established in Italy, which is – after Germany – the second largest European market of extruded Al pr ...
Voir le projet

 4

 TERMINÉ 
The proposed EXPRESS CA responds to ICT-2013.3.3-b (iv) 'Supporting the development of an ecosystem for smart systems integration in Europe'. In this context, ecosystem is defined as a sustaining environment to promote economic growth, skills growth, and growth in industrial capability and global competitiveness, fuelled by the extension of knowledge, the ambitions of innovators and the business a ...
Voir le projet

 11

 TERMINÉ 

Colloidal Silica Medium, to Obtain Safe inert, from RICE husk ash (COSMOS-RICE)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

Background In municipal waste incinerators, the main waste product is bottom ash, which is equivalent to some 10% by volume of the solid waste input. Fly ash, or the finest, lightest residue, is collected in many plants using a filtration system. Fly ash contains heavy metals (including zinc, lead, cadmium and chromium) and is therefore classified as toxi ...
Voir le projet

 4

 TERMINÉ 

Textiles for Ageing Society (TAGS)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

The elderly have specific needs for clothing and other textile products, for personal hygiene or medical reasons. Improvements in these products will significantly increase their quality of life and improve the effectiveness of medical and social care services. The optimum way to achieve significant advances is through a concerted and coordinated effort by innovators, manufacturers and end-users t ...
Voir le projet

 12

 TERMINÉ 
The project aims at developing new technology routes to integrate waste materials in the production cycle of concrete, for both ready-mixed and pre-cast applications, resulting in an innovative light-weight, eco-compatible and cost-effective construction material, made by all-waste raw materials and characterized by low embodied energy and CO2 and by improved ductility and thermal insulation perfo ...
Voir le projet

 16

 TERMINÉ 

Informatic as Development of Economics Activities

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2015,

IDEA originates from a study on the relationships between job and school education, carried out by the Italian Industrial Union, data by EUROSTAT concerning young unemployment in the UE, a McKinsey's report on the italian economic situation and studies of the School of Management of Milan. Collectively these informations indicate the presence in Italy of a gap between jobs and school education, a ...
Voir le projet

 55

 TERMINÉ 

Social Inclusion for Youth With Migrant Background

Date du début: 1 oct. 2014, Date de fin: 31 oct. 2015,

Context of the Project The Social Inclusion for Youth with Migrant Background (SI4YMB) has been a youth exchange project implemented from the 5th of July to the 25th of July that targeted 30 participants (23 young people and 7 group leaders) coming from four countries: Belgium, Italy, Bulgaria, and Portugal and it took place in Molenbeek-Saint Jean (Brussels). The question of youth with migrant ba ...
Voir le projet

 9

 TERMINÉ 

LORCA - Camino de Europa

Date du début: 15 août 2014, Date de fin: 14 août 2015,

This Project involving students and staff mobility is promoted and managed by the Department of Education - Government of Navarra- within the Erasmus Plus framework and is developed in the Public VET schools. The number of candidates is 79 VET 18 or over 18–year-old students and 9 VET school teachers The fact that we establish a comprehensive information, a follow-up and an assessment plan from ...
Voir le projet

 72

 TERMINÉ 

Product Remanufacturing Service System (PREMANUS)

Date du début: 1 sept. 2011, Date de fin: 30 juin 2015,

For centuries mankind has attempted to exploit the resources available to it through the reuse of objects and artifacts. However, as wealth of modern man has grown, the financial necessity to utilize the lifetime of these objects has dramatically declined, especially in developed countries with high focus on manufacturing. The demand for new products also placed undue pressure on the world's res ...
Voir le projet

 13

 TERMINÉ 
Background One of the negative impacts of climate change in Mediterranean countries is water shortages. While only a minor reduction in the total amount of water that reaches the ground from the atmosphere has been recorded in the past few decades, significant hydrological changes are occurring. For example, weather events (such as rainstorms) have shorte ...
Voir le projet

 7

 TERMINÉ 
ICT-EMISSIONS aims at developing a novel methodology to evaluate the impact of ICT-related measures on mobility, vehicle energy consumption and CO2 emissions of vehicle fleets at the local scale, in order to promote the wider application of the most appropriate ICT measures. The proposed methodology combines traffic and emission modelling at micro and macro scales. These will be linked with interf ...
Voir le projet

 11

 TERMINÉ 
SaveMe project will address current urgent needs for pancreatic cancer diagnosis and treatment by exploiting partners’ expertise and most recent research achievements for the design and development of novel modular nanosystems platform integrating new functionalized nano-core particles and active agents. The modular platform will enable the design of diverse active nanosystems per diagnostic or th ...
Voir le projet

 23

 TERMINÉ 
HoverSpill driving force is based on the concept that the greatest part of oil spills has a strong impact on coasts, beaches and shoals. Even if the pollution takes place at open sea, vessels usually don’t reach the location in short time to contain the spot, which rapidly expands. Moreover the oil hits those areas which can not be easily reached by traditional vehicles/vessels, nor by land nor by ...
Voir le projet

 9

 TERMINÉ 
SafeLand will develop generic quantitative risk assessment and management tools and strategies for landslides at local, regional, European and societal scales and establish the baseline for the risk associated with landslides in Europe, to improve our ability to forecast landslide hazard and detect hazard and risk zones. The scientific work packages in SafeLand are organised in five Areas: Area 1 ...
Voir le projet

 27

 TERMINÉ 
Serious adverse effects resulting from the treatment with thalidomide prompted modern drug legislation more than 40 years ago. Post-marketing spontaneous reporting systems for suspected adverse drug reactions (ADRs) have been a cornerstone to detect safety signals in pharmacovigilance. It has become evident that adverse effects of drugs may be detected too late, when millions of persons have alrea ...
Voir le projet

 15

 TERMINÉ 

Sustainable highway development in rural areas (S.HI.D.R.A.)

Date du début: 15 sept. 2004, Date de fin: 14 sept. 2007,

Background Pollutants produced by highway traffic cause significant environmental damage, both in terms of air quality and on use of rural land through which highways run. Dust from highway traffic causes contamination of agricultural produce, and the construction of roads also contribute to territorial fragmentation, with consequent loss of continuity wi ...
Voir le projet

 3

 TERMINÉ 

Women Engendering the Finance Network (WEFneT) (WEFneT)

Date du début: 31 déc. 2003, Date de fin: 30 déc. 2006,

The WEFneT project is based on Women's Resource Centres as an instrument for local development with a gender perspective. The main objective of the project is to achieve local development through an increased participation of women in economic, political and social life - both in quantity and in quality. The Women's Resource Centres are a co-ordination service of territorial actions and actors eng ...
Voir le projet

 19

 TERMINÉ 
The project RES deals with resilience, the ability to bounce back adversities in life. Resilience can be trained and resilient people are more successful in education & jobs and are less prone to depression.The project's main products:An easy to use online database-toolbox containing methods and exercises based on resilience studies for trainers and multipliers working in the field of qualificatio ...
Voir le projet

 8

 TERMINÉ 
The RATIONALE of the proposal was based on the need of enterprises with high presence of multiethnic workers for an employee(s) who facilitates multiethnic relationships and acquires a key role within the process of socialization in the workplace (towards workers of his own ethnic network and the enterprise itself). MAIN AIM was to transfer (it was a geographic, linguistic/cultural and functional ...
Voir le projet

 6

 TERMINÉ 
The lack of experienced practitioners having proper competence of applying the international internal audit standards for European specific requirements in European funding structures is the target problem of the project. Formal and sectoral education has been concentrating on general accounting and financial audit policies or on high level certification requirements of internal audit, which are l ...
Voir le projet

 8

 TERMINÉ 
Many different EU Recommendations highlight that, VET Systems are called to enhance the employability and adaptability of people, and to increase the mobility of learners and periods of learning abroad. At present, the lack of shared methods for the assessment, transfer, validation and recognition of learning outcomes, and the lack of flexibility of training solutions, are delaying the full integr ...
Voir le projet

 18

 TERMINÉ 
Employment opportunities for VET students and jobseekers are presently at a premium in most EU states. As competition for contracts is fierce, the student or jobseeker has to demonstrate excellence not only in their technical field but also in key interpersonal and work related skills. Given the current economic situation, VET graduates and skilled jobseekers have two positive options. They urge ...
Voir le projet

 8

 TERMINÉ 
FOR WHOM: For teachers, trainers, tutors working as internationalactivities developers, EU project managers, international coordinatorsand in similar professionals in VET schools/institutes or in working lifeinstitutes WHY: To find a European-wide solution for the followingproblems: Role of VET teachers, trainers and tutors is changing: newskills are demanded because of the internationalisation of ...
Voir le projet

 10

 TERMINÉ 
The project intends to offer models and strategic tools that are intended as localadministrative support to tackle the problems related to education and training policiesfor adults. The project aims to transfer know-how and methodologies to publicadministration staff to implement concrete actions for senior citizens living in areas thatare peripheral, rural or subject to depopulation and may not o ...
Voir le projet

 10

 TERMINÉ 
The partnership applied for the project ICT Skills 2 in order to develop new contentsbased on the theoretical and methodological assumptions of the associated project ICTSkills for Guidance Counsellors project (www.ictskills.org), financed by the Leonardo daVinci programme - Reference materials - and included by the European Commissionwithin the 50 best practices of the same programme. Those outpu ...
Voir le projet

 8

 TERMINÉ 
Das Ziel des Projektes ist die Entwicklung eines modular aufgebauten und medial unterstützten Qualifizierungskonzeptes. Dies soll in Kombination aus 7 Qualifizierungsmodulen und einer Materialien-CD Auszubildende und Facharbeiter zur Durchführung unternehmensinterner Analysen (Prozessanalysen) hinsichtlich der Ermittlung und Umsetzung von Optimierungspotentialen befähigen. Dabei findet unter ander ...
Voir le projet

 27

 TERMINÉ 
This projects aims at introducing innovation and improvement of the quality of the teaching and learning processes. More specifically, this project aims to plan, test out, approve and disseminate a course in acquisition of basic computer literacy skills as well as vocational know-how for employees in the metal engineering sector. The course will use blended training methodologies and an open-sourc ...
Voir le projet

 11

 TERMINÉ 
The project, in partnership with D and I, will focus on providing access to vocational training to blind people in HU in all age categories, but in particular blind young people. Over a period of 30 months the existing education materials, including CD-Roms and books, are to be reworked to meet the needs of the blind , they are to be didactically modified and adapted to the needs of blind pupils a ...
Voir le projet

 4

 TERMINÉ 
The project will establish a cooperation network to address mobility, vocational training and lifelong learning problems in the cement industry. The groups targeted comprise employees, new entrants, graduates, employers and instructors. The products include a lifelong learning paper, operational guidelines, common professional qualifications in 5 specific areas, common training programmes and mat ...
Voir le projet

 8

 TERMINÉ 
TIPEIL is based on the outcomes achieved by the implementation of the “INTRA and EGEIS” transnational projects that ontributed to the development of a specific tool – the digital portfolio – and a methodology, with the aim of supporting the identification and valorisation of informal and non formal learning.Though the portfolio in itself has ancient roots, its most recent use (as a methodology for ...
Voir le projet

 7

 TERMINÉ 
The Form@tic project involves providing trainers with training and professional qualifications in the information and communication technologies. The project entails developing and implementing a structured European approach. The first stage of the project will involve analysing the situation of open and distance learning in each of the partner countries and examining the needs of trainers in the ...
Voir le projet

 7

 TERMINÉ 
The EURORUBIK project aims at improving the quality and access to continuous vocational training (CVT) with a view to improving the adaptability of minimally qualified workers with particular regard to technological and organisational innovation. The project will establish local networks, responsible for the analysis and ongoing development of existing experience towards the creation of new, indiv ...
Voir le projet

 12

 TERMINÉ 
The design of the project Informedu was formulated based on the observation that the Italian school system as a whole reflects a low rate of adult participation in formal education. The evaluation and recognition of non-formal and informal learning achievements could improve adults professionalism as well as their re-entry into the educational system, also through a customization and a reduction o ...
Voir le projet

 9

 TERMINÉ 
A step forward for the footwear industry : A variety of analyses have been carried out concerning areas such as training needs in the shoe industry, with the aim of defining professional profiles for the industry in order to raise the quality of products and improve economic competitiveness. This project started in 2003 and lasted 24 months.
Voir le projet

 19