Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The vision of EU-ToxRisk is to drive a paradigm shift in toxicology towards an animal-free, mechanism-based integrated approach to chemical safety assessment. The project will unite all relevant disciplines and stakeholders to establish: i) pragmatic, solid read-across procedures incorporating mechanistic and toxicokinetic knowledge; and ii) ab initio hazard and risk assessment strategies of chemi ...
Voir le projet

 43

 TERMINÉ 
EmERGE will develop a mHealth platform to enable self-management of HIV in patients with stable disease. The platform will build upon and integrate the existing mHealth solutions operated by pioneering healthcare providers in the UK and Spain and apply a rigorous co-design approach to ensure patient and clinician input to the solution. The platform will provide users with web based and mobile devi ...
Voir le projet

 13

 TERMINÉ 
The present situation of nuclear energy in Europe asks for a continuing effort in the field of Education and Training aimed to assure a qualified workforce in the next decades. In this scenario, the present proposal is aimed at enhancing and networking the Europe-wide efforts initiated in the past decades by different organisations belonging to academia, research centres and industry to maintain a ...
Voir le projet

 25

 TERMINÉ 

GrowSmarter

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2019,

GrowSmarter aims to:• Improve the quality of life for European citizens by better mobility, housing and the quality of urban infrastructure while improving the citizens economy by lower energy costs and creating as much as 1500 new jobs (on the demonstration level).• Reduce the environmental impact by lower energy needs by 60 % and increased use of renewable energy thus reducing GHG emissions eve ...
Voir le projet

 41

 TERMINÉ 

Architecture for EurOpean Logistics Information eXchange (AEOLIX)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Supply chain visibility supported by easy access to, and exchange and use of relevant and abundant logistics-related information is an important prerequisite for the deployment of pan-European logistics solutions that are needed to increase efficiency and productivity, and to reduce environmental impact. Although there is a proliferative development of logistics-related data stores, information ch ...
Voir le projet

 34

 TERMINÉ 

Future Sky Safety

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Voir le projet

 32

 TERMINÉ 
The goal of the TRUST Project is to catalyse a global collaborative effort to improve adherence to high ethical standards around the world. Achieving equity in international research is one of the pressing concerns of the 21st century. Many international groups and organisations are working on governance frameworks and standards to guide research activities after progressive globalization. Howeve ...
Voir le projet

 13

 TERMINÉ 

Enhancing ecoSysteM sERvices mApping for poLicy and Decision mAking (ESMERALDA)

Date du début: 1 févr. 2015, Date de fin: 31 juil. 2018,

Mapping and assessment of ecosystems and their services (ES) are core to the EU Biodiversity (BD) Strategy. They are essential if we are to make informed decisions. Action 5 sets the requirement for an EU-wide knowledge base designed to be: a primary data source for developing Europe’s green infrastructure; resource to identify areas for ecosystem restoration; and, a baseline against which the goa ...
Voir le projet

 25

 TERMINÉ 
The aim of the proposed action is to foster the development of the bioenergy sector in the Danube Region, and of the Bioeconomy at large, through the strengthening of local supply chains that will be supported through specific analytics (economics, sustainability and land use models), and targeted capacity building to foster the generation of innovative solutions in a participatory, cross-sector p ...
Voir le projet

 6

 TERMINÉ 

ONLINE Platform for Smart Specialisation Policy Advice (ONLINE-S3)

Date du début: 1 mai 2016, Date de fin: 30 avr. 2018,

This project aims to develop an e-policy platform augmented with a toolbox of applications and online services, which will assist national and regional authorities in the EU in elaborating or revising their smart specialisation agenda, in terms of policies and strategy. The platform will leverage existing methodologies, initiatives and tools developed by the EC for the RIS3 strategy, but it will a ...
Voir le projet

 12

 TERMINÉ 
The proposal is aimed at contribution to current reform of Ukrainian system of QA in higher education. The consortium plans to solve the following problems and needs that are crucial for the partner country both at national and institutional levels:-Need in tools ensuring effective functioning of internal and external QA systems-Need in capacity building of HEIs and national QA body through traini ...
Voir le projet

 18

 TERMINÉ 

Sign Language Teachers in Europe: an Open Educational Resource

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

The SignTeach project will develop, implement and evaluate an Open Educational Resource (OER) for sign language teachers and their trainers in EU member states. The OER will include information for new and experienced sign language teachers about a.o. didactics, class management, the CEFR for sign languages, meta-linguistics, ICT and entrepreneurial skills, as well as interviews with beginning and ...
Voir le projet

 11

 TERMINÉ 
Despite dramatic advances in molecular and imaging technologies, there are currently no effective pharmacological treatments for the core symptoms of autism spectrum disorder (ASD). Major obstructions to this include a lack of aetiologically-driven or pathophysiologically-accurate animal models; an absence of tests that indicate efficacy; and reliance of clinical trials on DSM/ICD10 categories wh ...
Voir le projet

 29

 TERMINÉ 

Integrated Approaches to Food Allergen and Allergy Risk Management (IFAAM)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

Up to 20 million European citizens suffer from food allergy. However management of both food allergy (by patients and health practitioners) and allergens (by industry) is thwarted by lack of evidence to either prevent food allergy developing or protect adequately those who are already allergic. iFAAM will develop evidence-based approaches and tools for MANAGEMENT of ALLERGENS in FOOD and integrate ...
Voir le projet

 46

 TERMINÉ 

Western Balkans Excellence for a Biobased Economy (WeBE)

Date du début: 31 déc. 2014, Date de fin: 30 déc. 2016,

The aim of the proposed action is to increase research excellence, industrial utilisation and education in the field of advanced biorefinery technologies and the biobased economy in Western Balkans by establishing a Centre of Excellence within the University of Belgrade (in alliance with the University of Novi Sad and other universities/ institutes from the neighbouring countries ). The overall ob ...
Voir le projet

 4

 TERMINÉ 
Each year more than 63,000 new cases of kidney cancer are diagnosed in the European Union. Approx. 50% of all patients have metastasized renal cell cancer (mRCC) at presentation or develop metastases during follow-up. 5-year relative survival of mRCC has been extremely poor: between 5 and 10%. In the past few years, so-called targeted therapies that suppress angiogenesis have changed the clinical ...
Voir le projet

 15

 TERMINÉ 

Safety of ACtinide Separation proceSSes (SACSESS)

Date du début: 1 mars 2013, Date de fin: 30 juin 2016,

"Nuclear power plays a key role in limiting EU’s greenhouse gases emissions, and makes an important contribution to improve European Union’s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensur ...
Voir le projet

 26

 TERMINÉ 

PROmoting Global REsponsible research and Social and Scientific innovation (PROGRESS)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2016,

Delivering European Renewal relies heavily on the advancement of Responsible Research and Innovation (RRI) – that is, research and innovation which is:- is ethically acceptable,- is sustainable by avoiding significant adverse effects and- drives towards the common good, i.e. societal desirability.To achieve maximum impact where it is most needed, ProGReSS concentrates on the underexplored and leas ...
Voir le projet

 10

 TERMINÉ 
Seven European cities (Bordeaux, Copenhagen, Eindhoven-Helmond, Newcastle, Thessaloniki, Verona & Vigo) have joined forces with the objectives of substantially improving road safety, increasing energy efficiency and reducing level of congestions for road transport.In order to address these topics the cities and industrial partners will jointly implement three cooperative services, Road Hazard Warn ...
Voir le projet

 34

 TERMINÉ 
Currently, best flame retardant formulations are still often based on halogenated flame retardants (FR). Those halogneted FR are supsected to endcrine disrupters when leaching from the material and produce toxic fumes and acids (HBr, HCl, organoirritants, PCDD/Fs etc.).DEROCA project aims at (i) developing and introducing new safer and more eco-friendly FRs through exploiting the synergistic effe ...
Voir le projet

 9

 TERMINÉ 

Advertising monitoring system development for outdoor media analytics (ADMOS)

Date du début: 1 sept. 2013, Date de fin: 31 août 2015,

The aim of ADMOS aim is to develop a compact monitoring device that can be installed additionally on public media interfaces, which is able to provide information about the displayed advertisement, and to give feedback about the obtained contact number and the pattern attributes. The ADMOS system will consist of two cameras (one facing the board and the other facing the public) integrated together ...
Voir le projet

 7

 TERMINÉ 

Smart Intelligent Aircraft Structures (SARISTU)

Date du début: 1 sept. 2011, Date de fin: 31 août 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Voir le projet

 68

 TERMINÉ 

Self-Printing Advertisement Board with Reusable Ink (SPABRINK)

Date du début: 1 sept. 2013, Date de fin: 31 août 2015,

"Outdoor advertising can be split into two main categories, static and dynamic. The static types are much cheaper but apart from producing a lot of waste (paper, glue, ink) they are also limited as they are not capable of real time advertising. In addition, human resources are required for changing images, generating additional costs for the board owners. Dynamic (digital) advertising is becoming ...
Voir le projet

 8

 TERMINÉ 

Capitalizing Alpine Building Evaluation Experiences (CABEE)

Date du début: 30 juin 2012, Date de fin: 29 juin 2015,

CABEE is a transnational Alpine project that aims to create and implement an Alpine-wide guideline for definition, procurement, production, assessment and promotion as well as learning about new and refurbished Nearly-Zero-Emission-Buildings (NZEB) and their neighbourhoods. CABEE capitalizes wisdom from finished and on-going EU-projects but also projects from the Alpine Space program. It focuses o ...
Voir le projet

 12

 TERMINÉ 

Accessibility and development for the re-launch of the Adriatic internal (ADRIA A)

Date du début: 30 déc. 2013, Date de fin: 29 avr. 2015,

The project ADRIA A, funded in range of the Cross-border Cooperation Programme Italy-Slovenia 2007-2013, aims to reorganize the accessibility and the transport of the entire cross-border Italy and Slovenia area and establish an integrated metropolitan area. Achievements: ...
Voir le projet

 28

 TERMINÉ 
Major objective: It is our aim to develop a lipid based diet that is able to delay or prevent onset of Alzheimer’s disease and related diseases and has a stabilizing effect on cognitive performance in aging. Multiple lines of evidence suggest that there is a large overlap between risk factor of these three diseases. Importantly, there is equally strong evidence that prevention and treatment of the ...
Voir le projet

 19

 TERMINÉ 

Territorial Scenarios and Visions for Europe (ET2050)

Date du début: 31 mai 2011, Date de fin: 28 févr. 2015,

Policymakers in the field of territorial development and cohesion are in need of a future oriented and integrated vision on the development of the European territory. Therefore the ESPON Programme started a territorial vision-building process following a participatory process and involving relevant stakeholders at European, national and regional level. This vision has a strategic character that al ...
Voir le projet

 13

 TERMINÉ 

Harmonised eCall European Pilot - Phase 2 (HeERO2)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

The overall objective of HeERO 2 is "To extend HeERO to new Member States or associated countries to demonstrate the scalability of the HeERO solution and to widen the acceptance of eCall."To support this objective there are three aims:(1) to prepare the necessary infrastructure to realize interoperability of "eCall" at European level, (2) to boost Member States investment in the PSAP infrastructu ...
Voir le projet

 42

 TERMINÉ 
The EC has recently published the Proposal for a Regulation on Union guidelines for the development of the trans - European transport network -COM (2011) 650/2, that defines the long term strategy for the Ten-T policy up to 2030/2050 and proposes Corridors relevant for the SEE area. By creating a multilevel formed by Transport Ministries, Regions, Universities, Chambers of Commerce, transport stak ...
Voir le projet

 18

 TERMINÉ 
The OrientGate project will foster concerted and coordinated climate adaptation actions across the SEE region. The project will explore climate risks faced by coastal, rural and urban communities; contribute to a better understanding of the impact of climate variability and change on water regimes, forests and agro-ecosystems; and analyse specific adaptation needs in the hydroelectricity, agro-ali ...
Voir le projet

 34

 TERMINÉ 

Venture Initiative in the Balkan Europe  (VIBE)

Date du début: 31 déc. 2012, Date de fin: 30 déc. 2014,

The VIBE project addresses the challenge of developing the innovation and entrepreneurship system across the SEE by enabling private investment into innovative entrepreneurial companies in partnership with smart public initiatives and investment. VIBE offers a transnational integrated approach by avoiding unnecessary duplication, mobilizing a critical mass of the regional investment, innovation ag ...
Voir le projet

 11

 TERMINÉ 

Managing Migration and its Effects in SEE - Transnational Actions Towards (SEEMIG)

Date du début: 31 mai 2012, Date de fin: 29 nov. 2014,

The SEE region faces a complex, nationally and regionally diverse set of demographic, migratory and labour market challenges (low or declining fertility, large scale out-migration, brain and care drain, ageing, low labour force participation rate). Together with further aspects like gender, age and the given territorial heterogeneity of the programme area, they are creating a complex challenge to ...
Voir le projet

 28

 TERMINÉ 

motion of Resource Efficiency in SMEs in Central Europe (PRESOURCE)

Date du début: 31 mai 2012, Date de fin: 29 nov. 2014,

...hile minimising impacts on the environment. The European Union must use natural resources in a more convincing manner and the answers must go beyond existing policy actions. The situation within the central Europe area is even more alarming, since productivity in most of the countries joining the EU after 2004 has remained static or even decreased. Two major barriers for exploiting the potential ...
Voir le projet

 8

 TERMINÉ 

Smarter Cluster Policies for South East Europe (ClusterPoliSEE)

Date du début: 30 avr. 2012, Date de fin: 30 oct. 2014,

ClusterPoliSEE main objective is to enhance the capacity of regional policy makers to confront, prevent and anticipate change, developing smart specialization strategies for cluster improvement, thus accelerating differentiation and structural change towards a knowledge-based economy in which there is a place for all SEE regions to position themselves. 25 members partnership covers 11 different SE ...
Voir le projet

 25

 TERMINÉ 

Low Carbon South East Europe  (LOCSEE)

Date du début: 30 sept. 2012, Date de fin: 29 sept. 2014,

Combating climate change and reducing greenhouse gas emissions is one of the biggest challenges of the European Union which is addressed also in the Europe 2020 Strategy with the objective to reduce greenhouse gas emissions by 20% by year 2020 compared to year 1990. Because of its diversity and extreme weather events it is expected that South East Europe region will be impacted by climate change m ...
Voir le projet

 9

 TERMINÉ 

Action to Support Photonic Innovation Clusters in Europe (ASPICE)

Date du début: 1 sept. 2011, Date de fin: 31 août 2014,

The enabling technology of photonics has grown dramatically worldwide over the last 20 years and has now become a key emerging technology in a modern industrial economy. Europe has benefited disproportionately from this growth having increased its photonic revenues by 30% in the period 2005 – 2008. In parallel with this expansion, photonic clusters have emerged so that today we have in excess of 4 ...
Voir le projet

 7

 TERMINÉ 

Furthering Strategic Urban Research (URBAN-NEXUS)

Date du début: 1 sept. 2011, Date de fin: 31 août 2014,

European cities face many significant challenges, including the current economic crisis, urban sprawl, and the longer-term implications of climate change and resource scarcity. To face up to and overcome these challenges, it has become urgent for all concerned stakeholders to collaborate.URBAN-NEXUS, a coordination action, will develop and use structured dialogues to encourage communication, exch ...
Voir le projet

 14

 TERMINÉ 

Green Intermodal Freight Transport (GIFT)

Date du début: 29 févr. 2012, Date de fin: 30 août 2014,

The main aim of the current project is to map, analyze, and evaluate the status of the transport sector in the GIFT transport network and propose new policies and strategies in infrastructure, processes, assets, ICT, legislation, norms and harmonization/ standardization issues, in order to promote innovative green intermodal freight transport corridors. GIFT project will drill down in three Pan-Eu ...
Voir le projet

 27

 TERMINÉ 

Forecasting Financial Crises (FOC-II)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2014,

In this project we set up an interdisciplinary consortium of computer scientists, physicists, economists and policy makers to deal with the problem of understanding and forecasting systemic risk and global financial instabilities. By leveraging on expertise in the various disciplines, we want to provide a novel integrated and network-oriented approach to the issue. On one hand, we will offer a the ...
Voir le projet

 14

 TERMINÉ 

Welfare Innovations at the Local level In favour of Cohesion (WILCO)

Date du début: 1 déc. 2010, Date de fin: 31 janv. 2014,

The effort to strengthen social cohesion and lower social inequalities is among Europe’s main policy challenges. It means that local welfare systems are at the forefront of the struggle to address this challenge – and they are far from winning. While the statistics show some positive signs, the overall picture still shows sharp and sometimes rising inequalities, a loss of social cohesion and faili ...
Voir le projet

 14