Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Background Freshwater habitats are among the most threatened habitat types globally. In the 2007-2012 conservation status assessment of the EU Habitats Directive (Article 17), none of the freshwater, coastal, and groundwater dependent wetland habitats in Europe fully met favourable conservation status, and most are in unfavourable conservation status. Alm ...
Voir le projet

 30

 TERMINÉ 
A study on fatal accidents of professional drivers in Finland (Laapotti & Peräaho 2011) has revealed that the risks in loading and securing of cargo comprised 12 % of all vehicular risk factors. This was more than the proportion of risks connected to tires and brakes together (10 %). Europe is an area where goods and products can move around freely, without any checks at the national borders. Thi ...
Voir le projet

 18

 TERMINÉ 

DIGITAL COOPERATIVES (E-COOP)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...bits. After a presentation of each partner, 3 public workshops took place during the kick-off meeting, on the following themes:- Participation of all citizens and stakeholders : University of Bratislava (SK) / Mazovian Agricultural Advisory Centre (PL) / ERNACT (IR) / City of Iasi (RO) ;- Missions, budgets and training for intermediaries to public e-services :Computer Technology Institute (GR) / C ...
Voir le projet

 12

 TERMINÉ 

Cross-Border Move for Health

Date du début: 4 févr. 2013, Date de fin: 4 déc. 2014,

Objective of the projectThe objective was to increase the knowledge of health and wellbeing of the children and the youth in North Karelia and in the Republic of Karelia and to increase the physical activity of adapted physical activity -groups in the area. Main activities1. Developing new practices for increasing overall physical activity.2. Producing education materials and reports of seminars.3 ...
Voir le projet

 14

 TERMINÉ 

Restoration of the freshwater pearl mussel population with new methods

Date du début: 31 mai 2011, Date de fin: 30 mai 2014,

The objective of the project is to: 1) Find new methods and solutions to stop decline of the sterile mussel population as well as test critical factors for its propagation. 2) Provide updated information about the preservation of the mussel population to both public and private sectors that through their decision-makers and through their activities can influence the situation of the fluvial enviro ...
Voir le projet

 5

 TERMINÉ 
Background A vast amount environmental data is currently collected across Europe, both at national and international level, generating valuable information for policy makers and citizens. However, much of this information is not readily comparable, posing a major obstacle to the development of well-informed environmental policies and strategies at Europea ...
Voir le projet

 17

 TERMINÉ 

HighBio2

Date du début: 31 mai 2011, Date de fin: 30 déc. 2013,

The project aims to • Contribute to the development of clean and efficient technologies for bio energy production • Contribute to the development of bio-based fuels and raw materials for chemical industry • Through research and development support small-scale heat and power at local level The goal of this project is to develop methods by which you can use biomass more versatile than before. The ai ...
Voir le projet

 4

 TERMINÉ 

Improved accessibility of the Baltic Sea Region by air transport (BALTIC BIRD)

Date du début: 8 juin 2011, Date de fin: 7 mars 2013,

Peripheral Baltic Sea regions have been characterized by depopulation and weak socio-economic conditions. These trends are contrary to the EU Strategy for the Baltic Sea Region (BSR), VASAB and the integrated territorial development of the EU (see Art. 3 (2c) of the Council Regulation (EC) No. 1083/2006 and Art. 6 (2) of Regulation (EC) No 1080/2006). Although train and ferry connections exist, on ...
Voir le projet

 21

 TERMINÉ 
The BIOCLUS objective is to boost the regional competitiveness and growth in five European cluster regions: Wielkopolska (Poland), Slovakia, Western Macedonia (Greece), Navarre (Spain) and Central Finland. The project promotes collaboration and integration and supports the sustainable development of research related communities by • Promoting expertise competence at the cluster and consortium leve ...
Voir le projet

 20

 TERMINÉ 

Airports as Drivers of Economic Success in Peripheral Regions (ADES)

Date du début: 31 janv. 2010, Date de fin: 30 sept. 2012,

Dynamic territorial development depends on an optimal combination of access to services and resources. Good accessibility and connectivity is one of the most crucial factors in deciding on a location for economic activities. This leads to the fact that fast, relatively cheap, reliable but also sustainable freight and passenger transport, has become one of the essential prerequisites for the compet ...
Voir le projet

 4

 TERMINÉ 

Scandinavian-Adriatic Corridor for Growth and Innovation (SCANDRIA)

Date du début: 31 août 2009, Date de fin: 8 sept. 2012,

Against the background of doubling freight transport volumes by 2050 in the Baltic Sea Region (BSR), capable transport infrastructures are required for efficient, integrated and sustainable freight and passenger traffic.The Scandinavian-Adriatic Development Corridor is the shortest geographical link between Baltic and Adriatic Sea. It provides freight transport capacities to relieve overloaded Wes ...
Voir le projet

 19

 TERMINÉ 
BACKGROUND and addressed PROBLEM: Climate change, with its manifold aspects, is one of the biggest global challenges we face currently and in the future. Guidelines for the general direction of action developed on the international or national level are a first step but do not equal implementation. Concrete action in dealing with climate change issues is required on the local and regional level, f ...
Voir le projet

 23

 TERMINÉ 
Background Climate change presents a major challenge for the sustainable management of key ecosystem goods and services, including biodiversity, forests, water and agricultural production. Despite increasing efforts to reduce the emission of greenhouse gases, results from global circulation models show that major changes in the current climate cannot be a ...
Voir le projet

 4

 TERMINÉ 

Highbio

Date du début: 30 juin 2008, Date de fin: 29 juin 2011,

The project aim at develop alternative for a high refinement of bio energy for local using of raw material through processing. Processing can partly be done through local entrepreneurs and energy cooperative that can develop and apply experiences from the project. In the project will different refinement processes and types of purification technique and can be followed and evaluate through techno ...
Voir le projet

 4

 TERMINÉ 

Sustainable Development in the Mid Nordic Region (ProMidNord)

Date du début: 5 août 2004, Date de fin: 4 oct. 2007,

County Councils from Norway, Sweden and Finland being the members of the 25 year old Mid Nordic Committee (MNC)-covering the Mid Nordic Region (MNR)-are facing great challenges such as an ongoing decrease of the population and a tendency towards centralization of the whole society. The cities in the MNR have difficulties in balancing the increasing impact from the big cities. The population densit ...
Voir le projet

 27

 TERMINÉ 

moting Spatial Development by Creating COMon MINdscapes (COMMIN)

Date du début: 31 août 2004, Date de fin: 30 août 2007,

Transnational and cross-border co-operation have a growing need (e.g. EU-enlargement) for a precise understanding of the partner’s concepts and the planning systems they are embedded in. The improvement of solving similar problems in different BSR countries and on transnational activities can best be achieved by exchange of experiences and ideas, mutual training and further education as well as pr ...
Voir le projet

 28

 TERMINÉ 
NorWat aims to discover and disseminate information on new ways to make the best use of watercourses for the benefit of local sustainable community development. Watercourses are important features in many northern periphery regions and this project will seek to improve the inter-relationship between environmental and socio-economic well being along them. ...
Voir le projet

 12

 TERMINÉ 

New Bioenergy Business During Emission Trading (ET-BIOENERGY)

Date du début: 6 janv. 2005, Date de fin: 5 janv. 2007,

The biomass resources are significant in the Baltic Sea Region. However, the utilisation rate as well as the price level differs a lot from country to country. Most of biomass based fuels are utilised locally within short transportation distances. There has already been some international wood fuel trade, mainly in refined form (e.g. wood pellets), but also as wood fuels like logs and chips. The m ...
Voir le projet

 32

 TERMINÉ 

A Conversion Training Programme on Russian culture and language

Date du début: 31 déc. 2001, Date de fin: 29 juin 2006,

The departments of the University of Oulu in Kajaani make up an important base with regard to know-how about Russia. Th e implementation of cooperative strategies devised with the Russian parties requires academically educated people with Russian language skills. Already some years ago, there was an initiative made to the University of Oulu about an education programme in relationships, know-how a ...
Voir le projet

 7

 TERMINÉ 

Bioenergy Technology Transfer Network (BTN)

Date du début: 4 juin 2002, Date de fin: 3 sept. 2005,

...es. CEBra GmbH established the BDC Brandenburg (Wood Energy Centre Eberswalde) in August 2005. The BDC is located in the premises of the Brandenburg Forestry Authority at the wood campus of the University of Applied Sciences Eberswalde.International seminars have been organised. Seminar on Bioenergy Interacting between Rural and Urban Areas attracted participants from several countries. The keynot ...
Voir le projet

 7

 TERMINÉ 
...urope, Australia and the USA. Because of the success of the concept of the SIGNALL and its brand, the multiple transfers are proposed. What is proposed? - SIGNALL III proposes to transfer a current University course - Working with the Deaf community is offered as part of accredited courses at the Centre for Deaf Studies, Trinity College Dublin, that will carry 10 ECTS points and deliver it on-lin ...
Voir le projet

 6

 TERMINÉ 
The Quality Boost in Tourism -project is transferring innovations between providers of quality trainings and systems in tourism. There is a clear need to improve the current tourism service quality training, and with this project the development can take a step further to include European level common parts or tools in the tourism training. Each country already has its own training and material fo ...
Voir le projet

 9

 TERMINÉ 
The overall objective of the project was the transnational transfer, implementation and testing of a procedure for the description and comparative level assessment of units of learning outcomes in health care and nursing. The procedure in question, the Module Level Indicator (MLI), is designed in a way that makes it possible to apply the tool in different VET systems and to achieve comparable resu ...
Voir le projet

 8

 TERMINÉ 
...t results:• study of APL in VET teachers’ education systems in partner countries;• methodology for assessment of VET teachers’ prior learning, basing on “donor” – partner (Jyvaskyla University of Applied Sciences) experience;• study module for assessors of VET teachers’ prior learning developed and tested in partner countries;• trained groups of assessors of VET teachers’ prior learning in three p ...
Voir le projet

 4

 TERMINÉ 
The main topic of the project is the cross-national transfer and testing of instruments for the accreditation of vocational learning outcomes in accordance with the principles of the ECVET, the EQF and the forthcoming German Qualifications Framework. The plan is to apply and improve existing instruments for identifying the levels, contents and workloads of vocational learning outcomes in selected ...
Voir le projet

 17

 TERMINÉ 
A previous LEONARDO project (NetPro I) resulted in NBPL (network based project learning), a new pedagogical approach to the organisation of vocational and university learning in the engineering education sector. Feedback on that project indicated the need for additional training models based on modern work practices, reorganisation of working methods and processes. Learning of this kind is impossi ...
Voir le projet

 14

 TERMINÉ 
No substitute for practical experience : The principal resource produced has been a white book promoting the principal of work placements as a vital part of chemistry training and looking at how education can adapt to the labour market. A project website has been developed and links for practical exchanges established. This project started in 2001 and lasted 37 months.
Voir le projet

 30

 TERMINÉ 
The DEQU project aims at developing elements of quality assurance in selected “key processes” for practice and professional field oriented higher education under the outlines of the Bologna process as well as the Bruges-Copenhagen process.The focus is on practice oriented higher education institutions with an outlook to their integrative role between vocational education and training and higher ed ...
Voir le projet

 17

 TERMINÉ 
The CONGRAD project’s wider objective is to enable higher education institutions (HEIs) in Serbia, Montenegro and Bosnia and Herzegovina to continuously conduct graduate surveys for the purpose of enhancing study offerings and facilitating permanent modernisation processes. CONGRAD is expected to contribute to the improvement of institutional self-evaluation processes by collecting systematic and ...
Voir le projet

 15

 TERMINÉ 
The proposed project is the result of the activities of the Special Interest Group on 'Assessment and Multilingual Competence' established by the European Language Council in 2010, which aims to address the new challenges appearing in the European Higher Education Area through the internationalisation processes in higher education, society and economy. The project's principal objective is to integ ...
Voir le projet

 11

 TERMINÉ 
Speaking is one of the most difficult skills to put into practice when learning a foreign language. Formal second or foreign language acquisition settings do not provide enough room for everyone in the classroom to practice the language. If the learning is done through an online course, speaking is mostly put aside in favour of writing, reading and listening. SpeakApps aims to fill this and other ...
Voir le projet

 5

 TERMINÉ 

Lingu@net World Wide

Date du début: 1 déc. 2009,

Lnet EU was developed over the last 12 years with support from the EU (in 1998-2001, and 2003-2006). In 2007 it was awarded the MERLOT prize for being ‘exemplary on-line learning material for all disciplines’ (www.merlot.org) and in 2008 L’net EU was awarded the European Commission’s Gold prize in the "European Lifelong Learning Awards for quality in mobility" (http://ec.europa.eu/education/langua ...
Voir le projet

 22

 TERMINÉ 
The term Content and Language Integrated Learning (CLIL) was launched in 1994following some 10 years of European dialogue (supported by the European Commissionand the Council of Europe), and national actions, on the benefits for additional languagelearning of variants of what had been widely termed "bilingual education" or"immersion". CLIL is a dual-focussed educational approach in which an additi ...
Voir le projet

 21

 TERMINÉ 
This proposal will contribute to the professional development of early educators (approximately 120) from 6 countries (Greece, Finland, Denmark, Portugal, Romania, Cyprus) who will be trained in using the Early Childhood Environmental Rating Scale-R (ECERS-R) that evaluates the quality of early childhood environment. These educators will acquire the skills to work as assessors in using ECERS-R and ...
Voir le projet

 19

 TERMINÉ 
The ISIT project addresses two of the crucial needs defined by the Education and Training Benchmarks for 2020 and by the High Level Group of Experts on Literacy (HLGEL 2012):a) the problem of low literacy skills in many European countries b) the unsatisfying status of teachers' continuous professional development (CPD) in the EU.Thus ISIT pursues two goals:a) a specific goal: training 30 teacher e ...
Voir le projet

 11

 TERMINÉ 

Master in Educational Leadership

Date du début: 1 déc. 2013,

In order to improve student learning in Serbia, competencies of principals and other education leaders – vice-principals and school team leaders, school board members, employees in education sectors of municipalities, regional school authorities and national education institutions, and also in the education NGO sector - need to be improved. In order to achieve this wider objective, and also as a r ...
Voir le projet

 13

 TERMINÉ 
EUSA_ID offers study, training and research periods in Europe for South African Master and PhD candidates and staff and provides European PhD candidates the opportunity to spend a research period in South Africa. 84 mobilities (18 European, 66 South African) cover Master students (40,5%), PhD candidates (38,1%) and staff (21,4%) of TG I (76%) and II (24%). The partnership consists of 6 South Afric ...
Voir le projet

 16

 TERMINÉ 

Digital Literacy Instructor

Date du début: 1 janv. 2013,

The number of non-literate and low-literate adults in European countries varies from 10-15% of the population. Many of them, esp. immigrants, have to learn to read for the first time in a second language (L2) (i.e. not their mother tongue). Poor oral and written proficiency often leads to social exclusion and prohibits social and economic integration. Adequate literacy training is thus a key facto ...
Voir le projet

 5

 TERMINÉ 
...licies on financing and equity in higher education; (d) development of a policy framework for an efficient, effective and equitable higher education systems in the three countries; (e) development of university financing models based on sensible diversification of income streams and strengthen universities' capacities to implement these models; and (d) the establishment of Regional Resource Point ...
Voir le projet

 17

 TERMINÉ 
The wider objective of the Project is to develop an inclusive concept at the university level: by developing a new master study program, sensitizing university staff for the full affirmation of the inclusive paradigm in higher education and the entire educational system for both, the core team focused on the work under the new program and wider, from the other study programs of UoM.Specific objec ...
Voir le projet

 9