Rechercher des projets européens

25 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Graduate and Executive Nuclear Training and Lifelong Education (GENTLE)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2016,

The GENTLE project is a pan-European effort in the field of education and training (E&T) on Nuclear Energy. It brings together leading European academic and research institutions with the goal to set up a life-long learning programme, strongly supported by stakeholders from industry. GENTLE focuses on two E&T domains: (a) the education of students by means of student research experiences in the nu ...
Voir le projet

 12

 TERMINÉ 

Federation for FIRE (Fed4FIRE)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Voir le projet

 43

 TERMINÉ 

Future Internet - Core (FI-Core)

Date du début: 1 sept. 2014, Date de fin: 30 sept. 2016,

FI-WARE has started to materialize as a powerful foundation for the Future Internet. FI-WARE is an innovative, open cloud-based infrastructure for cost-effective creation and delivery of services, at a scale not seen before. FI-WARE is now well under way to successfully achieve its goals of boosting the effectiveness of creating new services of high economic and societal value, reinforcing EU comp ...
Voir le projet

 33

 TERMINÉ 

Fast Reactor Experiments for hYbrid Applications (FREYA)

Date du début: 1 mars 2011, Date de fin: 29 févr. 2016,

"Building up on the former activities accomplished in the previous FPs, namely MUSE in FP5 and EUROTRANS in FP6, it is proposed in the FREYA project to extend the investigations of the subcritical configurations for validation of the methodology for on-line reactivity monitoring of ADS systems. The investigations will be related to the different subcriticality levels for the nominal operation mode ...
Voir le projet

 17

 TERMINÉ 

Hard Material Small-Batch Industrial Machining Robot (Hephestos)

Date du début: 1 sept. 2012, Date de fin: 31 oct. 2015,

Description Hard materials machining has recently attracted great attentions from the European automotive, the aerospace and the biomedical industries. However, the existing technology failed to cope efficiently with small-batch production of large and complex-shaped products. The project Hephestos shall give rise to a cost-efficient solutio ...
Voir le projet

 10

 TERMINÉ 

eXperimental Infrastructures for the Future Internet (XIFI)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Voir le projet

 38

 TERMINÉ 

Optimization of Perennial Grasses for Biomass Production (OPTIMA)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2015,

OPTIMA will integrate an ambitious biology system approach for perennial grasses such as switchgrass, miscanthus and giant reed in the Mediterranean environment. Moreover the perennial species cardoon, which has been proven to be particularly adapted to the Mediterranean climate, will be used as a control species.The main objective of the OPTIMA project is to identify high-yielding perennial grass ...
Voir le projet

 21

 TERMINÉ 
ÉCLAIRE investigates the ways in which climate change alters the threat of air pollution on European land ecosystems including soils. Based on field observations, experimental data and models, it establishes new flux, concentration and dose-response relationships, as a basis to inform future European policies.Starting with biosphere-atmosphere exchange measurements, ÉCLAIRE quantifies how global w ...
Voir le projet

 41

 TERMINÉ 
Large scale societal challenges require large scale monitoring and control solutions. Technological developments will make it possible to design and build these large systems. A major obstacle in realizing these systems is the lack of a versatile methodology to design and implement adaptive monitoring and control systems taking into account intrinsic properties of system of systems (decentralizati ...
Voir le projet

 26

 TERMINÉ 

European CYber Security Protection Alliance (CYSPA)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2015,

The goal of CYSPA is to address trustworthy ICT through a European strategy to protect cyberspace, with target audiences ranging from research communities and industry to public authorities and infrastructure operators.This goal builds on the analysis that the entire cyberspace which embodies our connected society has been created by technology but evolving towards trustworthy ICT requires taking ...
Voir le projet

 21

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

Data Science for Simulating the Era of Electric Vehicles (DATA SIM)

Date du début: 1 sept. 2011, Date de fin: 31 août 2014,

DATA SIM aims at providing an entirely new and highly detailed spatio-temporal microsimulation methodology for human mobility, grounded on massive amounts of big data of various types and from various sources, with the goal to forecast the nation-wide consequences of a massive switch to electric vehicles, given the intertwined nature of mobility and power distribution networks.While the increasing ...
Voir le projet

 9

 TERMINÉ 

OpenLab: extending FIRE testbeds and tools (OpenLab)

Date du début: 1 sept. 2011, Date de fin: 30 juin 2014,

Experimentally-driven research is key to success in exploring the possible futures of the Internet. An open, general-purpose, shared experimental facility, both large-scale and sustainable, is essential for European industry and academia to innovate today and assess the performance of their solutions. OpenLab brings together the essential ingredients for such a facility. We extend early prototypes ...
Voir le projet

 31

 TERMINÉ 
Description DON'T WALK ALONE, JOIN THE GLOBAL SCIENCE EXCURSION!Scientists Meet TeachersIt is the vision of the GLOBAL excursion project that students and teachers can explore science in innovative, virtual excursions to science labs where they interact with scientific infrastructure, material and data as well as the scientists themselves ...
Voir le projet

 7

 TERMINÉ 

Building the PaaS Cloud of the Future (4CaaST)

Date du début: 1 juin 2010, Date de fin: 31 août 2013,

To survive in today's economy; short time-to-market and efficiency are paramount for the creation of innovative products and to survive in the current economic climate. This is especially true for IT services which will dominate the way people work and live in the future.Cloud computing is essentially changing the way services are built, provided and consumed. Despite simple access to Clouds, buil ...
Voir le projet

 18

 TERMINÉ 

Europen Nuclear Education Network Training Schemes (ENEN-III)

Date du début: 1 mai 2009, Date de fin: 30 avr. 2013,

The project covers the structuring, organisation, coordination and implementation of training schemes in cooperation with local, national and international training organisations, to provide training to professionals active in nuclear organisations or their contractors and subcontractors. The training schemes provide a portfolio of courses, training sessions, seminars and workshops for continuous ...
Voir le projet

 20

 TERMINÉ 

Coordinating the Antenna Research in Europe (CARE)

Date du début: 1 janv. 2010, Date de fin: 30 avr. 2012,

The European antenna research received great benefits from the structuring efforts provided by the Network of Excellence ACE (2004-2007). The ACE NoE produced a long list of outstanding results, such as the Antenna Expert Groups (AEG), the European School of Antennas (ESoA), the European Conferences on Antennas and Propagation (EuCAP), the Antenna Virtual Centre of Excellence (VCE) and the Europea ...
Voir le projet

 15

 TERMINÉ 

Software Services and Systems Network (S-Cube) (S-Cube)

Date du début: 1 mars 2008, Date de fin: 29 févr. 2012,

Description S-Cube, the Software Services and Systems Network, will establish an integrated, multidisciplinary, vibrant research community that will enable Europe to lead the software-services revolution...S-Cube, the Software Services and Systems Network will establish a unified, multidisciplinary, vibrant research community which will e ...
Voir le projet

 21

 TERMINÉ 

Building the Future Optical Network in Europe: The e-Photon/ONe Network (BONE)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

Description Building the Future Optical NetworkMain ObjectivesThe BONE-network brings together 49 laboratories and research institutes from al over Europe in a close networking infrastructure, built on the foundations laid down by the FP6 ePhoton/ONe Network and represents the research activities within Europe in the field of Optical Netw ...
Voir le projet

 53

 TERMINÉ 

Extreme Light Infrastructure Preparatory Phase (ELI-PP)

Date du début: 1 nov. 2007, Date de fin: 31 déc. 2010,

"Among the most significant scientific inquiries defined by Science (July 2005) was whether or not scientists will be able to build a laser of intensity sufficient to “rip photons into electron-positron pairs.” ELI will be the first infrastructure to approach this limit. It represents the consensual effort of 13 European countries, more than 50 laboratories and numerous international collaborator ...
Voir le projet

 17

 TERMINÉ 

Enabling Grids for E-sciencE III (EGEE-III)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2010,

A globally distributed computing Grid now plays an essential role for large-scale, data intensive science in many fields of research. The concept has been proven viable through the Enabling Grids for E-sciencE project (EGEE and EGEE-II, 2004-2008) and its related projects. EGEE-II is consolidating the operations and middleware of this Grid for use by a wide range of scientific communities, such as ...
Voir le projet

 167

 TERMINÉ 

E-SCIENCE GRID FACILITY FOR EUROPE AND LATIN AMERICA (EELA-2)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2010,

EELA-2 aims to build, on the current EELA e-Infrastructure, a high capacity, production-quality, scalable Grid Facility providing round-the-clock, worldwide access to distributed computing, storage and network resources for a wide spectrum of applications from European and Latin American scientific communities. The project will provide an empowered Grid Facility with versatile services fulfilling ...
Voir le projet

 56

 TERMINÉ 

Generic Embedded System Platform (GENESYS)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2009,

The objective of the GENESYS project is to develop a cross-domain reference architecture for embedded systems that can be instantiated for different application domains to meet the requirements and constraints documented in the ARTEMIS strategic research agenda. These requirements are composability, networking, security, robustness, diagnosis, integrated resource management and evolvability. The r ...
Voir le projet

 25

 TERMINÉ 
This TN project brings together within a single network all actors in HE in chemistry and chemical engineering in Europe. There are schools, universities, industries, national chemical societies, and accreditation bodies. The project brings all these actors together to collaborate in the development of a knowledge based economy, specifically in chemistry and chemical engineering. The project:- wil ...
Voir le projet

 118

 TERMINÉ 
Lingu@net Europa provides support and resources for language learning. It helps learners understand their strengths and weaknesses, and points them towards ways to learn. It guides learners in a choice of over 3700 on-line learning resources, gives advice on overcoming common problems, and provides motivational tips. Those who want to practise the language they are learning can find key pals for e ...
Voir le projet

 25