Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
...border tourist products and common promotion of Lviv oblast, Podkarpackie and Lublin voivodships (implemented by Department for International Cooperation and Tourism of Lviv Regional State Administration and Gmina Medyka). Micro-project 3. The joint presentation of tourist, ethnic and cultural peculiarities of the city of Ugniv (Ukraine) and Gmina Werbkowice (Poland) on the international tourism ...
Voir le projet

 12

 TERMINÉ 
To improve the economic performance of the border area through diversification and modernisation in a sustainable manner of cross-border tourism in the Lower Danube region of Ukraine, Romania and Republic of Moldova. Expected Results: ...
Voir le projet

 9

 TERMINÉ 

Safer Roads for Users

Date du début: 22 mai 2013, Date de fin: 21 juil. 2015,

The main objective of the Project is to eliminate border effect expressed with difference in road accident risks for road users in EU and RF sides of Barents Region. Harmonisation of principles and instruments to manage accident risk for users, caused by factor "Road and its surrounding" is expected to be able harmonise road conditions both sides of the border, improve fluency of road transport fl ...
Voir le projet

 8

 TERMINÉ 

The model of cross-border cooperation (AgroPark Alakurtti)

Date du début: 19 déc. 2012, Date de fin: 18 juil. 2015,

Promotion of sustainable social and economic development of Alakurtti achieved through cross-border cooperation with Finland (Lapland) and Sweden (Norrbotten) with the long-term goal to make the whole project area (Lapland, Norrbotten and Murmansk region) attractive for international tourists, business people and investors.
Voir le projet

 10

 TERMINÉ 

Sustainable Mobility Information Network for the Alpine Space (AlpInfoNet)

Date du début: 30 juin 2012, Date de fin: 29 juin 2015,

Lacking information about public transport is often an obstacle for travellers to use public transport at all. This is an even bigger challenge when travelling by sustainable transport modes to and within destinations of the Alpine Space, where often cross-border information is needed. This project aims to provide travellers with comprehensive information about sustainable transport modes beyond r ...
Voir le projet

 13

 TERMINÉ 

Early warning system UA SK 2 (EWS UA SR 2) (HUSKROUA/1101/229)

Date du début: 31 déc. 2013, Date de fin: 29 juin 2015,

The overall objective: Based on the successful project Early warning system UA SK (EWS UA SR), to intensify and deepen the cross border cooperation of two regions: Zakarpatska region in UA and Košický kraj in SK in the field of emergency preparedness for floods, fire, and other natural disasters incidents. ...
Voir le projet

 3

 TERMINÉ 

The use of European experience in the fight against soil erosion

Date du début: 23 déc. 2013, Date de fin: 22 juin 2015,

To create pre-conditions for effective soil preservation in the cross-border area of Bukovyna and Moldova. Expected Results: Experimental farm with system against soil erosion; The map with exact situation and factors regardin ...
Voir le projet

 3

 TERMINÉ 

The Barents Freeway

Date du début: 3 sept. 2012, Date de fin: 30 mai 2015,

...region. The fact that south-north routes dominate in the northern areas, because of the long history of transport system development, was known at the beginning of the project. All the Barents region states have traditionally had their own national strategies within the confines of the borders. These strategies still rely on the inertia of south-north thinking. The Barents Freeway project has set ...
Voir le projet

 10

 TERMINÉ 
About 70 percent of central Europeans live in urban regions. Here, local and regional authorities are increasingly challenged by a steady growth of population and an increasing request for space for both economic activities and housing. Actions are therefore needed against urban sprawl that threatens to lead to a reduction of natural and open areas used for recreational purposes. Furthermore, the ...
Voir le projet

 10

 TERMINÉ 

Capitalising Climate Change Knowledge for Adaptation in the Alpine Space (C3-Alps)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...ransfer and implement in policy and practice results of previous Alpine Space projects on climate change adaptation. The capitalisation approach aims at a) generating new and directly usable forms of state-of-the-art synthesis adaptation knowledge in the Alps, harmonised across sectors and useful to adaptation decision-makers, b) its effective and tailor-made communication and transfer to target g ...
Voir le projet

 17

 TERMINÉ 
...n• Map of currently used meteorological indices with respect to climate change• Proposed set of indicators to harmonise climate change monitoring• Reports pilots forestry and agriculture• State of play adaptation policies and sectorial actionFor more information see:http://www.southeast-europe.net/en/projects/approved_projects/?id=163
Voir le projet

 34

 TERMINÉ 

sharing methodologies on FINancial ENgineering for enterprises (FIN-EN)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...across Europe on the methodologies and instruments used for implementing Financial Engineering operations in the framework of EU Structural Funds. Financial Engineering is an option offered to member states to reviewing the ERDF/ESF disbursement procedures by using financial instruments (as opposite to traditional grants) able to provide EU funding even after the 2013 deadline.The aim is to maximi ...
Voir le projet

 13

 TERMINÉ 

Bringing closer ESPON evidence for decision making (ESPON on the Road)

Date du début: 23 déc. 2013, Date de fin: 30 déc. 2014,

AimThe ESPON 2013 Programme has produced a lot of results and the applied research, targeted analyses, scientific tools and publications provide a huge pool of knowledge that can be actively used in decision making. The project aims at strengthening the bridge between ESPON knowledge and local reality by bringing ESPON results closer to potential users. The project shall provide a platform for dis ...
Voir le projet

 19

 TERMINÉ 

moting nature education as efficient mean of awareness raising (People with nature)

Date du début: 31 mars 2012, Date de fin: 29 sept. 2014,

The main objective of the project is to unite ideas, capacity and tools for improvement of nature education situation and so awareness of the society on sustainable development and integrated nature conservation in the project region of territories of Estonia, Latvia and Russia. During the project it is foreseen to create cooperation network between public and non-governmental organisations in Est ...
Voir le projet

 11

 TERMINÉ 

ECOREGIONS

Date du début: 31 déc. 2011, Date de fin: 29 sept. 2014,

...Jämtland, Kainuu Regions, joined little by little by other public organizations: Picardie Region (Fr) -exporting partner in Rur@ct and today ECOREGIONS Lead Partner (LP)-, District of Forcheim (De), State Development Coporation of Thuringia (De), Regional Agency for Energy of Eszak Alfold (Hu), Chamber of commerce of Cremona (It), Malta intelligent energy management agency (Ma), County of Hordalan ...
Voir le projet

 10

 TERMINÉ 
The growth of the maritime economy throughout Europe results in increasing demands for maritime space coupled with the need to ensure a viable marine environment. This phenomenon has led to the integrated maritime policy (IMP) approach throughout Europe with Maritime Spatial Planning (MSP) being by now the widely acknowledged tool for co-ordinating spatial use and balancing of interests in the sea ...
Voir le projet

 10

 TERMINÉ 

Railway Hub Cities and TEN-T network (RAILHUC)

Date du début: 30 sept. 2011, Date de fin: 31 août 2014,

Central Europe cities are the "first/last legs" of transnational transport chains. These chains consist of local, regional and transnational transport systems. On the one hand high speed connections among rail hubs in central Europe are being upgraded, especially on TEN-T networks and along the main intercity lines. On the other hand rail and in general public transport feeder lines need an upgrad ...
Voir le projet

 13

 TERMINÉ 

LOC- CLIM-ACT: Local acting on climate change impacts (HUSKROUA/1001/079)

Date du début: 31 août 2012, Date de fin: 30 août 2014,

...d adaptation to the climate change impacts on the local level. 2. Establish mechanisms for stimulation and support of local actions on climate change impacts´ emergencies. Main activities 1. Current state mapping. 2. Elaboration of optimal state of local responses. 3. Capacity building of local public authorities. 4. Awareness raising campaign. 5. Local strategies development. 6. Establishment of ...
Voir le projet

 4

 TERMINÉ 

Increase of life activity safety in the valley of the river PRUT

Date du début: 27 août 2012, Date de fin: 27 août 2014,

... Expected Results: Water quality improvement; Reduction of the threat of damage to bridges and shores and state power; Improvement program of the torent control measures; Scheme of the cross-border information exchange and collaboration in the case of extraordinary situations in the River Prut' database, ...
Voir le projet

 8

 TERMINÉ 

Early warning system UA SK (HUSKROUA/0901/136)

Date du début: 23 mars 2011, Date de fin: 22 avr. 2014,

The overall objective is:▪ To intensify and deepen the cross border cooperation of two regions: Zakarpatska region in Ukraine and Košický kraj in Slovakia in the field of emergency preparedness for floods, fire, and other natural disasters incidentsSpecific objectives: ▪ To establish EWS UA SK - a joint early warning system in the floodplains of the rivers Uzh, Tisa, Latorica, and Bodrog in Zakarp ...
Voir le projet

 3

 TERMINÉ 

ESPON Evidence in a North European Context (ENECON)

Date du début: 31 janv. 2012, Date de fin: 30 mars 2014,

ENECON addresses challenges and opportunities facing territorial development and spatial planning policies and practices, particular to the vast territory of the northern part of Europe. By facilitating the use and capitalization of ESPON evidence, the overall aim is to contribute to make clear the significance of the European perspective on territorial development and cohesion, and especially the ...
Voir le projet

 8

 TERMINÉ 
...ion (the European XFEL in Hamburg, ESS and Max IV in Lund, Solaris in Krakow). In the Science Link project, structures for cooperation were established in order to allow companies from all Baltic Sea States access to the research infrastructures. As well supporting structures had to be built up as SME do not have their own research departments or measurement experts. Almost no sufficient and tailo ...
Voir le projet

 19

 TERMINÉ 
BIOREGIO Carpathians is aimed at enhancing the integrated management of the Carpathians protected areas and natural assets in a transnational context and thereby increase the attractiveness of the region. The Carpathians, the largest mountain range of Europe, harbour a unique natural heritage and act as a major ecological link within Europe. Experiences e.g. from the Alpine Space demonstrate that ...
Voir le projet

 24

 TERMINÉ 

South East Transport Axis (SETA)

Date du début: 31 déc. 2010, Date de fin: 30 déc. 2013,

Together with the projects SoNorA, BATCo, SCANDRIA North and SEETAC (Central Europe, Baltic Sea, SEE Programme), SETA is aiming on the analysis and development of the transport corridors from Scandinavia to South-East Europe. Competitive Accessibility of regions is one of the most important preconditions for their economic growth and development (as the project SIC! has shown). Fluent transport of ...
Voir le projet

 25

 TERMINÉ 

Single CBR Home market (Home market)

Date du début: 31 juil. 2011, Date de fin: 30 nov. 2013,

In order to increase regional competitiveness, CBR needs innovative, born-global SMEs who develop their ideas not only on a local but also on international level. Home market project aims to enlarge the market where SMEs operate from the local country level to whole CBR market so that the region is viewed as one single market. Currently each country individually tries to increase its competitivene ...
Voir le projet

 9

 TERMINÉ 

Science and expirience for business (IPBU.01.01.00-18-151/10)

Date du début: 29 févr. 2012, Date de fin: 30 août 2013,

Differing level of economic transformations in Poland Belarus and Ukraine define varying economic potential of these countries. The regions ultimately need support and tighter cooperation to carry out innovative solutions to facilitate promotion of the region, establish tighter cooperation among the SME sector entrepreneurs, foster promotion, etc.The main goal of the project is improving condition ...
Voir le projet

 4

 TERMINÉ 

Barents Low Volume Road Management

Date du début: 4 janv. 2011, Date de fin: 4 juil. 2013,

The overall objective is in the project: harmonisation of regional practices on the voluntary basis rather than by directives. Developing the economy of Kolarctic core regions through improving of their currently non-adequately managed low volume road networks resulting in better economic activity and improved access to their regional, national and international markets. The specific objectives ar ...
Voir le projet

 4

 TERMINÉ 

Baltic-Adriatic Transport Cooperation (BATCo)

Date du début: 28 févr. 2010, Date de fin: 27 févr. 2013,

...na with branches to Poznan and Breclav/Brno and its South-Western extension to Bratislava/Vienna, Graz, Klagenfurt, Udine, Trieste/Venice and Bologna.The favourable economic development of the Baltic States and the central and eastern European countries has resulted that the Danzig–Warsaw–Vienna section has been declared a Priority Project (PP23) within the TEN-T policy. The states bordering are e ...
Voir le projet

 18

 TERMINÉ 

Capitalisation and Dissemination of ESPON Concepts (CADEC)

Date du début: 29 oct. 2010, Date de fin: 30 déc. 2012,

The main aim of the project is to capitalise on and disseminate ESPON results and activities using concepts included in ESPON Priority 1 projects as a gateway to ESPON reports. To realise this, the project follows a three-pronged implementation strategy: 1.The construction of an information network between Project Partners, and at a national level between Project Partners and members of the nation ...
Voir le projet

 9

 TERMINÉ 

Nordic-Baltic Dialogues on transnational perspectives in spatial planning (NORBA)

Date du début: 15 févr. 2010, Date de fin: 30 déc. 2012,

The aim of this project is to facilitate transnational dialogues on spatial planning between policy makers and practitioners, scientists and young academics and students in the Nordic-Baltic countries. Cooperation with Nordic and Baltic organizations dealing with spatial planning issues and territorial cohesion, Vision and Strategies in the Baltic Sea Region (VASAB) and the Nordic Section of the R ...
Voir le projet

 6

 TERMINÉ 

Interregional Partnership Platform (IPP)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

The innovation capacity of regions and firms depends on their ability to create, diffuse and exploit knowledge from outside the region through the regional innovation system. This regional innovation system is determined by policies, funding instruments, companies and technology providers. Public innovation intermediaries play a crucial role in providing innovation support measures, creating partn ...
Voir le projet

 5

 TERMINÉ 

Sustainable Hydro Assessment and Groundwater Recharge Projects (SHARP)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

Over 95% of the worlds freshwater, excluding glaciers and ice caps, is found underground. Groundwater provides the steady, base flow of rivers and wetlands, maintaining this flow and keeping it free from pollution is vital for surface water ecosystems. Groundwater is also a crucial source of drinking water, supplying the water systems for three out of four EU citizens. In some countries groundwate ...
Voir le projet

 9

 TERMINÉ 

Renewable Energy Regions Network (RENREN)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

...nal communication & dissemination events.Outputs & results: a. Policy recommendations to aid all partners and other EU regions to optimise their policy frameworks to achieve or go beyond their stated renewable energy targets, thus contributing to EU climate change action. b. database of best practices and activity plan for future exchangeIn particular, the policy recommendations will be drawn up o ...
Voir le projet

 13

 TERMINÉ 

Declining, Ageing and Regional Transformation (DART)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

Declining, Ageing and Regional Transformation (DART), demographic and economic change is a great challenge for about 30% of EU regions and this amount will increase up to 50% in 2030. Until 2030 every 3rd person in the EU will be 60+. Together with the low fertility rate and the outflow of human capital the regional effects are a declining population density with great difficulties in ensuring the ...
Voir le projet

 14

 TERMINÉ 

Heritage Tourism for increased BSR Identity (AGORA 2.0)

Date du début: 30 nov. 2009, Date de fin: 15 déc. 2012,

Countries in the Baltic Sea Region have a long common history throughout the centuries and a great variety of natural and cultural resources. However, the area is still not well recognised as one common region, even by its own residents.AGORA 2.0 aims at strengthening the common identity of the Baltic Sea Region, based on its rich natural and cultural heritage. Substitutional for numerous assets, ...
Voir le projet

 24

 TERMINÉ 
The EWTC II project started in 2009 and was a follow up of the EWTC project completed in 2007, with the overall aim to highlight the development of a ”Green Corridor Concept” as a best practise case in the European context. Green transport corridors are defined as a concentration of freight traffic between major hubs and by relatively long distances where short sea shipping, rail, inland waterways ...
Voir le projet

 29

 TERMINÉ 

Transalpine Transport Architects (TRANSITECTS)

Date du début: 30 juin 2009, Date de fin: 29 juin 2012,

In TRANSITECTS public institutions design common transnational intermodal solutions for freight transport in the Alpine Space. In the partnership different interests (economy, environment and transport) are integrated which is of crucial importance for a sustainable solution. Main aim of the project is to make the rail network more attractive and hence to foster its accessibility and functionality ...
Voir le projet

 16

 TERMINÉ 

actical Use of MONITORing in Natural Disaster Management (MONITOR II)

Date du début: 31 mai 2009, Date de fin: 29 mai 2012,

Management of natural hazards constitutes a common challenge in the SEES. Until now, neither hazard mapping nor contingency planning have been transnationally coordinated and defined in a sufficient manner. These gaps will be tackled in MONITOR II with the development of a common methodology and a CSA ("Continuous Situation Awareness") system. The integration of monitoring systems facilitates peri ...
Voir le projet

 13

 TERMINÉ 
(1) The project origin arises from the ARGE DONAULANDER - Working Group of spatial planning (ARGE) where since 1993 the idea of the Concept of the cooperation of the Danube regions, cities and ports was permanently developed. Up to now the common methodological model was elaborated and approved by the ARGE members. (2) The model consist of Three phases. Each phase is divided into four sectoral gen ...
Voir le projet

 19

 TERMINÉ 

Climate Change and Impacts on Water Supply (CC-WaterS)

Date du début: 30 avr. 2009, Date de fin: 29 avr. 2012,

Climate change (CC) affects fresh water resources and may have significant influence on public drinking water supply. Land use activities exert pressure on water resources and will change according to CC. It is crucial for safeguarding future water supply to anticipate these climate and land use changes and to assess their impacts on water resources. Transnational action is needed to prepare SEE f ...
Voir le projet

 18