Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

solving CHAllenges in Nuclear DAta (CHANDA)

Date du début: 1 déc. 2013, Date de fin: 30 nov. 2017,

"The CHANDA project main objective is to address the challenges in the field of nuclear data for nuclear applications and its acronym stands for solving CHAllenges in Nuclear DAtaThe project will prepare a proposal for an organization that will coordinate the nuclear data research program, and the infrastructures and capabilities of the EU Member States in a stable structure, well integrated with ...
Voir le projet

 35

 TERMINÉ 

Engine Module Validators (ENOVAL)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Voir le projet

 37

 TERMINÉ 
The success of the European vision of a low carbon electricity grid that minimises greenhouse gas emissions; and enhances security, quality and reliability of supply depends on how smart infrastructures, combining energy and telecom, are developed and implemented for the wider integration of security-aware distributed energy resources into the increasingly decentralised grid. MAS2TERING, a 3-year ...
Voir le projet

 9

 TERMINÉ 

European-wide field trials for residential fuel cell micro-CHP (ENE.FIELD)

Date du début: 1 sept. 2012, Date de fin: 31 août 2017,

...clause 5.1 reserving funds originally intended as a pre-payment to Ceres Power• Allocation of additional pre-financing to Solid Power Spa• Change of project coordinator named by COGEN Europe to Roberto Francia.
Voir le projet

 29

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 
Description NUBOMEDIA is an elastically scalable cloud infrastructure specifically devoted to the provision of real-time multimedia services.The most remarkable problem developer's face when creating real-time multimedia services is complexity. NUBOMEDIA proposition is to minimize complexity by creating a specific purpose cloud platform b ...
Voir le projet

 11

 TERMINÉ 
Providing broadband wireless communications to a majority of European citizens is a major objective of the EC at the horizon of 2020. With a current annual growth rate in the range of 70%, the mobile data traffic of smartphones, tablets, machine-to-machine and other portable devices dramatically challenges the 4G wireless cellular network currently under deployment. To sustain this growth, high da ...
Voir le projet

 15

 TERMINÉ 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Voir le projet

 27

 TERMINÉ 
OPTICITIES’ vision is to help European cities tackle complex mobility challenges. OPTICITIES’ strategy focuses on the optimisation of transport networks through the development of public/private partnerships and the experimentation of innovative ITS services.OPTICITIES addresses both passenger and freight transport issues supporting a user-centred approach.OPTICITIES delivers significant innovatio ...
Voir le projet

 26

 TERMINÉ 

Scaffolding Scalable Software Services (S-CASE)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

The goal of S-CASE is to accelerate the software development lifecycle for cloud services by introducing a new agile prototyping paradigm that automates the process of mapping user requirements to concrete software specifications and generates operational code (RESTful services). S-CASE aspires to support software developers in identifying software requirements and business processes in various fo ...
Voir le projet

 9

 TERMINÉ 

Agile Service Engineering for the Future Internet (CloudWave)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

CloudWave will revolutionise modern cloud infrastructures and tools by enabling agile development and delivery of adaptive cloud services which dynamically adjust to changes in their environment so as to optimise service quality and resource utilization. In doing so, CloudWave will advance the competitiveness of the EU economy by providing a powerful foundation, based on open standards, for creati ...
Voir le projet

 15

 TERMINÉ 

BRIDGING THE GAP FOR ENHANCED BROADCAST (BRIDGET)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

Description BRIDGET is opening new dimensions for multimedia content creation and consumption by enhancing broadcast programmes with bridgets.  A bridget links from the programme you are watching to second screen, interactive media such as web pages, images, audio clips, different types of video (2D, multi-view, with depth information, free ...
Voir le projet

 9

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Voir le projet

 116

 TERMINÉ 

Future Internet - Core (FI-Core)

Date du début: 1 sept. 2014, Date de fin: 30 sept. 2016,

FI-WARE has started to materialize as a powerful foundation for the Future Internet. FI-WARE is an innovative, open cloud-based infrastructure for cost-effective creation and delivery of services, at a scale not seen before. FI-WARE is now well under way to successfully achieve its goals of boosting the effectiveness of creating new services of high economic and societal value, reinforcing EU comp ...
Voir le projet

 33

 TERMINÉ 

ALMANAC: Reliable Smart Secure Internet Of Things For Smart Cities (ALMANAC)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

ALMANAC will develop a service delivery platform with corresponding technologies that integrates Internet of Things (IoT) edge networks (termed capillary networks) with Telco's metro access networks thus enabling an integrated Smart City Information System for green and sustainable Smart City applications.The Smart City Platform (SCP) collects, aggregates, and analyses real-time or near real-time ...
Voir le projet

 7

 TERMINÉ 

Unifying Cloud and Carrier Networks (UNIFY)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2016,

Telecom providers struggle with low service flexibility, increasing complexity and related costs. Although cloud computing and networking have been two very active fields of research, there is currently little integration between the vast networking assets and data centres of telecom providers. UNIFY addresses this by considering the entire network, from home networks up to data centre, as a "unif ...
Voir le projet

 16

 TERMINÉ 

Adaptive Cooperative Control in Urban (sub) Systems (ACCUS)

Date du début: 1 juin 2013, Date de fin: 31 janv. 2016,

Urban systems like traffic, energy, and outdoor lighting are managed by self-contained embedded systems – though the managed processes are deeply interconnected. New applications and collective optimization require integration of these systems which represents a truly “systems of systems” integration problem: these urban systems evolve independently, have their own purpose and internal policies wh ...
Voir le projet

 28

 TERMINÉ 
The ubiquity of Internet access, and the wide variety of Internet-enabled devices and applications, have made the Internet a principal pillar of the Information Society. Decentralized and diverse, the Internet is resilient and universal. However, its distributed nature leads to operational brittleness and difficulty in identifying and tracking the root causes of performance and availability issues ...
Voir le projet

 17

 TERMINÉ 
Seven European cities (Bordeaux, Copenhagen, Eindhoven-Helmond, Newcastle, Thessaloniki, Verona & Vigo) have joined forces with the objectives of substantially improving road safety, increasing energy efficiency and reducing level of congestions for road transport.In order to address these topics the cities and industrial partners will jointly implement three cooperative services, Road Hazard Warn ...
Voir le projet

 34

 TERMINÉ 
DISCUS will analyse, design, and demonstrate a complete end-to-end architecture and technologies for an economically viable, energy efficient and environmentally sustainable future-proof optical network. It will provide a revolution in communications networks applicable across Europe and the wider world exploiting to the full the opportunity offered by LR-PONS and flat optical core networks to pro ...
Voir le projet

 12

 TERMINÉ 

CO2 REduction for long distance transport (CORE)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

"The project proposal CORE (CO2 REduction for long distance transport) is a collaborative large-scale integrating project for a call within FP7-SUSTAINABLE SURFACE TRANSPORT (SST)-2011-RTD-1. The project consortium consists of three truck manufactures in Europe, Volvo, Daimler and IVECO, together with 13 other partners in the automotive industry and universities.The objective is to demonstrate a s ...
Voir le projet

 16

 TERMINÉ 
The goal of NEMESYS is to research and develop novel security technologies for seamless service provisioning in the smart mobile ecosystem. Mobile and smartphone security is a fast moving field, where new vulnerabilities and resulting attacks need to be detected and analyzed as fast as possible. The attacker is always a step ahead, managing to obtain vast amounts of information by hacking computer ...
Voir le projet

 7

 TERMINÉ 
Description Versatile Easy installable Connector implementing new Technologies for accelerated fibre Optic network Roll-outs in EuropeVECTOR aims to develop and commercialize an innovative low-cost highly performing field installable connectivity system that will impact at a multi-million-euro scale the capital expenditure (CAPEX) and the ...
Voir le projet

 7

 TERMINÉ 

Leone: From global measurements to local management (LEONE)

Date du début: 1 sept. 2012, Date de fin: 30 avr. 2015,

The Leone project is a 30-month long STREP targeting "Future Networks" within the 7th Framework programme. The project addresses "Novel Internet architectures, management and operation frameworks".The goal of the Leone project is to research and develop an innovative network management framework that has two novelties:• It is focused on Quality of Experience: Probes sited alongside end use ...
Voir le projet

 10

 TERMINÉ 
Motivation. The last decades brought an exponential increase in mobile traffic volume. This will continue and a 1000-fold increase by 2020 has been forecasted. Small-cells promise to provide the required data rates through an increased spatial utilisation of the spectrum.Problem statement. Due to strong inter-cell interference, small-cell deployments will require a high degree of coordination as o ...
Voir le projet

 12

 TERMINÉ 

European CYber Security Protection Alliance (CYSPA)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2015,

The goal of CYSPA is to address trustworthy ICT through a European strategy to protect cyberspace, with target audiences ranging from research communities and industry to public authorities and infrastructure operators.This goal builds on the analysis that the entire cyberspace which embodies our connected society has been created by technology but evolving towards trustworthy ICT requires taking ...
Voir le projet

 21

 TERMINÉ 
MASELTOV recognises the major risks for social exclusion of immigrants from the European information society and identifies the huge potential of mobile services for promoting integration and cultural diversity in Europe. Mobile – everywhere/everytime - persuasive assistance is crucial for more efficient and sustainable support of immigrants. MASELTOV researches and develops novel ICT instruments ...
Voir le projet

 17

 TERMINÉ 
The introduction of new technologies in the fabrication of light-weight high-performance materials for civil-engineering applications opens many new possibilities for the design of extremely lightweight structures. In particular, the inclusion of photo-voltaic cells together with the use of carbon-fiber cables will allow new design concepts combining an extreme lightness with an excellent structur ...
Voir le projet

 7

 TERMINÉ 
The main goal of MyWave is to lay the foundation for a future Marine Core Service that includes ocean waves. The proposal has identified four target areas where concerted research is needed to establish a high quality GMES Marine Core Service for ocean waves:1. increase the use of earth observations by improving data processing algorithms and data assimilation systems,2. improve the physics in cur ...
Voir le projet

 13

 TERMINÉ 

Manufacturing Error-free Goods at First Time (MEGAFIT)

Date du début: 1 déc. 2011, Date de fin: 30 nov. 2014,

Today, Europe’s leading position in manufacturing of high-precision metal parts is being threatened by developed non-EU countries that catch up quickly on product quality at low cost. If no further action is taken, loss of jobs and GDP are at risk.To face global competition, a breakthrough is needed in tackling the following 4 challenges:1) High number of defects2) Many costly, energy consuming fi ...
Voir le projet

 17

 TERMINÉ 

The Foundation for the Smart Factory of the Future (FoFdation)

Date du début: 1 juin 2010, Date de fin: 31 oct. 2014,

Today's major challenges for manufacturing companies, operating under productivity pressures, greater product variability and environmental constraints, are clearly identified as global cooperation with multiple supply chain partners, production optimization, and tracking and management of information to meet new requirements like traceability, security, sustainability. These requirements lead to ...
Voir le projet

 19

 TERMINÉ 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

The iCore initiative addresses two key issues in the context of the Internet of Things (IoT), namely: (a) how to abstract the technological heterogeneity that derives from the vast amounts of heterogeneous objects, while enhancing context-awareness, reliability and energy-efficiency. (b) to consider the views of different users/stakeholders (owners of objects & communication means) for ensuring pr ...
Voir le projet

 28

 TERMINÉ 

uBiquitous, secUre inTernet-of-things with Location and contExt-awaReness (BUTLER)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an ...
Voir le projet

 23

 TERMINÉ 
Description 3D cameras, based on the measurement of the Time-of-Flight of single photons by means of Single-Photon Avalanche Diode imagers, for automotive safety driving and security surveillance application MiSPIA will develop beyond state-of-the-art photonics technology for array imagers of smar ...
Voir le projet

 7

 TERMINÉ 
VERITAS aims to develop, validate and assess an open framework for built-in accessibility support at all stages of ICT and non-ICT product development, including specification, design, development and testing. The goal is to introduce simulation-based and VR testing at all stages of product design and development into the automotive, smart living spaces, workplace, infotainment and personal health ...
Voir le projet

 33

 TERMINÉ 

UniverSelf

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

The internet of today is fragmented into loosely interacting domains. Future Networks will be pervasive: people, machines and the surrounding spaces will form decentralized and dynamic networks of networks of as-yet unseen scales. Future Networks will challenge Service and Network Operators to find the right ways to embed intelligence into networks in order to ensure their autonomic management an ...
Voir le projet

 22

 TERMINÉ 
Making efficient use of energy in buildings is a paramount challenge to conserve energy and reduce greenhouse effects. GreenerBuildings will investigate how buildings can dynamically adapt their operations according to actual use, aiming at substantial energy savings.People spend a great deal of time in buildings, may these be offices, hospitals or commercial buildings. While active indoor, people ...
Voir le projet

 8

 TERMINÉ 

Building the PaaS Cloud of the Future (4CaaST)

Date du début: 1 juin 2010, Date de fin: 31 août 2013,

To survive in today's economy; short time-to-market and efficiency are paramount for the creation of innovative products and to survive in the current economic climate. This is especially true for IT services which will dominate the way people work and live in the future.Cloud computing is essentially changing the way services are built, provided and consumed. Despite simple access to Clouds, buil ...
Voir le projet

 18

 TERMINÉ 
Internet traffic has been growing quickly for many years, despite adverse economic conditions and this growth will continue in the future. To cope with this evolution, the cost of today's network solutions is still too high.In addition, in line with the EC goal of reducing the overall emissions, energy efficiency should be widely improved, using whenever possible optics instead of electronics wher ...
Voir le projet

 19

 TERMINÉ 

QUIetening the Environment for a Sustainable Surface Transport (QUIESST)

Date du début: 1 nov. 2009, Date de fin: 31 déc. 2012,

"Noise Reducing Devices (barriers, claddings, covers and added devices following EN14388) play an important role in noise reduction: optimizing their global performance is of major concern towards Sustainable Surface Transport. QUIESST will merge, for the very first time and within a true holistic approach, “true” intrinsic products characteristics, whatever their materials and shapes, together wi ...
Voir le projet

 14