Rechercher des projets européens

28 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

solving CHAllenges in Nuclear DAta (CHANDA)

Date du début: 1 déc. 2013, Date de fin: 30 nov. 2017,

"The CHANDA project main objective is to address the challenges in the field of nuclear data for nuclear applications and its acronym stands for solving CHAllenges in Nuclear DAtaThe project will prepare a proposal for an organization that will coordinate the nuclear data research program, and the infrastructures and capabilities of the EU Member States in a stable structure, well integrated with ...
Voir le projet

 35

 TERMINÉ 

Engine Module Validators (ENOVAL)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Voir le projet

 37

 TERMINÉ 

European-wide field trials for residential fuel cell micro-CHP (ENE.FIELD)

Date du début: 1 sept. 2012, Date de fin: 31 août 2017,

...clause 5.1 reserving funds originally intended as a pre-payment to Ceres Power• Allocation of additional pre-financing to Solid Power Spa• Change of project coordinator named by COGEN Europe to Roberto Francia.
Voir le projet

 29

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 
OPTICITIES’ vision is to help European cities tackle complex mobility challenges. OPTICITIES’ strategy focuses on the optimisation of transport networks through the development of public/private partnerships and the experimentation of innovative ITS services.OPTICITIES addresses both passenger and freight transport issues supporting a user-centred approach.OPTICITIES delivers significant innovatio ...
Voir le projet

 26

 TERMINÉ 

Tomorrow's Elastic, Adaptive Mobility (TEAM)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2016,

TEAM aims at developing systems for participants in transportation networks, which help them to behave better – by explicitly taking into account the needs and constraints of other participants and the network itself. Focus will be placed upon decision-making in a time interval, above what is commonly associated with reactive safety (typically less than 5 seconds) and below long-term planning appl ...
Voir le projet

 27

 TERMINÉ 

Agile Service Engineering for the Future Internet (CloudWave)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

CloudWave will revolutionise modern cloud infrastructures and tools by enabling agile development and delivery of adaptive cloud services which dynamically adjust to changes in their environment so as to optimise service quality and resource utilization. In doing so, CloudWave will advance the competitiveness of the EU economy by providing a powerful foundation, based on open standards, for creati ...
Voir le projet

 15

 TERMINÉ 

BRIDGING THE GAP FOR ENHANCED BROADCAST (BRIDGET)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

Description BRIDGET is opening new dimensions for multimedia content creation and consumption by enhancing broadcast programmes with bridgets.  A bridget links from the programme you are watching to second screen, interactive media such as web pages, images, audio clips, different types of video (2D, multi-view, with depth information, free ...
Voir le projet

 9

 TERMINÉ 

Future Internet - Core (FI-Core)

Date du début: 1 sept. 2014, Date de fin: 30 sept. 2016,

FI-WARE has started to materialize as a powerful foundation for the Future Internet. FI-WARE is an innovative, open cloud-based infrastructure for cost-effective creation and delivery of services, at a scale not seen before. FI-WARE is now well under way to successfully achieve its goals of boosting the effectiveness of creating new services of high economic and societal value, reinforcing EU comp ...
Voir le projet

 33

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Voir le projet

 116

 TERMINÉ 

ALMANAC: Reliable Smart Secure Internet Of Things For Smart Cities (ALMANAC)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

ALMANAC will develop a service delivery platform with corresponding technologies that integrates Internet of Things (IoT) edge networks (termed capillary networks) with Telco's metro access networks thus enabling an integrated Smart City Information System for green and sustainable Smart City applications.The Smart City Platform (SCP) collects, aggregates, and analyses real-time or near real-time ...
Voir le projet

 7

 TERMINÉ 

Unifying Cloud and Carrier Networks (UNIFY)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2016,

Telecom providers struggle with low service flexibility, increasing complexity and related costs. Although cloud computing and networking have been two very active fields of research, there is currently little integration between the vast networking assets and data centres of telecom providers. UNIFY addresses this by considering the entire network, from home networks up to data centre, as a "unif ...
Voir le projet

 16

 TERMINÉ 

Adaptive Cooperative Control in Urban (sub) Systems (ACCUS)

Date du début: 1 juin 2013, Date de fin: 31 janv. 2016,

Urban systems like traffic, energy, and outdoor lighting are managed by self-contained embedded systems – though the managed processes are deeply interconnected. New applications and collective optimization require integration of these systems which represents a truly “systems of systems” integration problem: these urban systems evolve independently, have their own purpose and internal policies wh ...
Voir le projet

 28

 TERMINÉ 

CO2 REduction for long distance transport (CORE)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

"The project proposal CORE (CO2 REduction for long distance transport) is a collaborative large-scale integrating project for a call within FP7-SUSTAINABLE SURFACE TRANSPORT (SST)-2011-RTD-1. The project consortium consists of three truck manufactures in Europe, Volvo, Daimler and IVECO, together with 13 other partners in the automotive industry and universities.The objective is to demonstrate a s ...
Voir le projet

 16

 TERMINÉ 
The ubiquity of Internet access, and the wide variety of Internet-enabled devices and applications, have made the Internet a principal pillar of the Information Society. Decentralized and diverse, the Internet is resilient and universal. However, its distributed nature leads to operational brittleness and difficulty in identifying and tracking the root causes of performance and availability issues ...
Voir le projet

 17

 TERMINÉ 
Seven European cities (Bordeaux, Copenhagen, Eindhoven-Helmond, Newcastle, Thessaloniki, Verona & Vigo) have joined forces with the objectives of substantially improving road safety, increasing energy efficiency and reducing level of congestions for road transport.In order to address these topics the cities and industrial partners will jointly implement three cooperative services, Road Hazard Warn ...
Voir le projet

 34

 TERMINÉ 

European CYber Security Protection Alliance (CYSPA)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2015,

The goal of CYSPA is to address trustworthy ICT through a European strategy to protect cyberspace, with target audiences ranging from research communities and industry to public authorities and infrastructure operators.This goal builds on the analysis that the entire cyberspace which embodies our connected society has been created by technology but evolving towards trustworthy ICT requires taking ...
Voir le projet

 21

 TERMINÉ 
The introduction of new technologies in the fabrication of light-weight high-performance materials for civil-engineering applications opens many new possibilities for the design of extremely lightweight structures. In particular, the inclusion of photo-voltaic cells together with the use of carbon-fiber cables will allow new design concepts combining an extreme lightness with an excellent structur ...
Voir le projet

 7

 TERMINÉ 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

The iCore initiative addresses two key issues in the context of the Internet of Things (IoT), namely: (a) how to abstract the technological heterogeneity that derives from the vast amounts of heterogeneous objects, while enhancing context-awareness, reliability and energy-efficiency. (b) to consider the views of different users/stakeholders (owners of objects & communication means) for ensuring pr ...
Voir le projet

 28

 TERMINÉ 
VERITAS aims to develop, validate and assess an open framework for built-in accessibility support at all stages of ICT and non-ICT product development, including specification, design, development and testing. The goal is to introduce simulation-based and VR testing at all stages of product design and development into the automotive, smart living spaces, workplace, infotainment and personal health ...
Voir le projet

 33

 TERMINÉ 
Description 3D cameras, based on the measurement of the Time-of-Flight of single photons by means of Single-Photon Avalanche Diode imagers, for automotive safety driving and security surveillance application MiSPIA will develop beyond state-of-the-art photonics technology for array imagers of smar ...
Voir le projet

 7

 TERMINÉ 
Making efficient use of energy in buildings is a paramount challenge to conserve energy and reduce greenhouse effects. GreenerBuildings will investigate how buildings can dynamically adapt their operations according to actual use, aiming at substantial energy savings.People spend a great deal of time in buildings, may these be offices, hospitals or commercial buildings. While active indoor, people ...
Voir le projet

 8

 TERMINÉ 

QUIetening the Environment for a Sustainable Surface Transport (QUIESST)

Date du début: 1 nov. 2009, Date de fin: 31 déc. 2012,

"Noise Reducing Devices (barriers, claddings, covers and added devices following EN14388) play an important role in noise reduction: optimizing their global performance is of major concern towards Sustainable Surface Transport. QUIESST will merge, for the very first time and within a true holistic approach, “true” intrinsic products characteristics, whatever their materials and shapes, together wi ...
Voir le projet

 14

 TERMINÉ 
Internet traffic has been growing quickly for many years, despite adverse economic conditions and this growth will continue in the future. To cope with this evolution, the cost of today's network solutions is still too high.In addition, in line with the EC goal of reducing the overall emissions, energy efficiency should be widely improved, using whenever possible optics instead of electronics wher ...
Voir le projet

 19

 TERMINÉ 
"The IMG4 project CRESCENDO addresses the Vision 2020 objectives for the aeronautical industry by contributing significantly to the fulfilment of three specific targets of the aeronautical industry’s Strategic Research Agenda. CRESCENDO will develop the foundations for the Behavioural Digital Aircraft (BDA), taking experience and results from VIVACE, and integrating these into a federative system ...
Voir le projet

 59

 TERMINÉ 
The Intelligent Car Initiative has identified road safety, energy efficiency, and traffic congestion as the main challenges currently being faced by European transportation. Despite their severity, these issues may be improved with the use of new in-vehicle technologies currently not available in the market. However, implementing new technologies implies a risk to manufacturers. Factors such as di ...
Voir le projet

 35

 TERMINÉ 
"ACCENT addresses the relevance to the call 7.1: “Aeronautics and Air Transport” by “Improving Cost efficiency” and quality of safety critical aircraft engine components. The manufacture of safety critical rotating components in modern aero engines is by nature very conservative. In order to achieve the required engine performance, thermal and mechanical stresses are pushed to the maximum, which i ...
Voir le projet

 14

 TERMINÉ 
"Analytical methods based on fluorescence measurements are widely employed for investigating biological process at cellular level. A modern technique is fluorescence-lifetime imaging microscopy (FLIM), where a map is obtained of the fluorescent emission lifetime versus position in a cell. The objective of project PARAFLUO is an innovative instrumentation system that will enhance and extend the use ...
Voir le projet

 9