Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
... political science and sociology and combines macro-scale econometric analysis and the generation and analysis of new quantitative survey data with regionally-focused qualitative empirical case study research in 11 EU member states; delivered by a multi-disciplinary and multi-national consortium. As such the research builds on the conceptual and methodological state of the art in several disciplin ...
Voir le projet

 16

 TERMINÉ 
WiseGRID has two intertwined and equally important strategic goals: on the one hand, it aims at successfully putting in the market, within a horizon of 24 months after project completion, a set of solutions and technologies which increase the smartness, stability and security of an open, consumer-centric European energy grid, with an enhanced use of storage technologies and a highly increased shar ...
Voir le projet

 21

 TERMINÉ 
...s of IoT, multi-sector IT services, API co-evolution, software analytics, software quality assurance, and OSS forges), along with R&D partners that have a long track-record in conducting cutting-edge research on large-scale software analytics, natural language processing, reverse engineering of software components, model-driven engineering, and delivering results in the form of widely-used, sustai ...
Voir le projet

 12

 TERMINÉ 

Research Network on EU-UN Relations

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

The proposal brings together established academics with a proven record of research and teaching excellence in the field of EU-UN relations. The aim is to promote research on and studying of the EU-UN interactions by encouraging exchange of academic best-practice and creating a thematic trans-national research group. At the same time, we aim to forge a broader common public space for informed anal ...
Voir le projet

 1

 TERMINÉ 
"Industry 4.0 is the next developmental stage in the organisation of the manufacturing value chain. ICT-based systems will play a major role, mainly by creating a virtual copy of the physical world and facilitating decentralised structures through Cyber-Physical Systems (CPS). Over the IoT, CPS cooperate with each other and humans in real-time. Via the Internet-of-Services, internal and cross-orga ...
Voir le projet

 9

 TERMINÉ 

Transforming Transport (TT)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Voir le projet

 48

 TERMINÉ 

CleAnweb Gamified Energy Disaggregation (ChArGED)

Date du début: 1 mars 2016, Date de fin: 28 févr. 2019,

ChArGED addresses the energy consumption in public buildings and proposes a framework that aims to facilitate achieving greater energy efficiency and reductions of wasted energy in public buildings. The framework leverages IoT enabled, low-cost devices (NFC or iBeacons) to improve energy disaggregation mechanisms that provide energy use and (consequently) wastages at the device, area and end user ...
Voir le projet

 9

 TERMINÉ 

Software ENgineering in Enterprise Cloud Applications systems (SENECA)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

... cloud-based systems, including a disciplined approach to their development and operation. The project partners have pooled their considerable knowledge and experience to identify areas where applied research, industrial tests, as well as graduate-level training can deliver the most promising results.The main challenge associated with cloud-based systems is their quality, as characterized (followi ...
Voir le projet

 6

 TERMINÉ 

network infrastructure as commons (netCommons)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Communication and information distribution are key components of a modern society. The advent of the Internet has been often invoked as a remedy for their democratization. The truth shows a different picture: the digital divide is widening the gap between those who can access and take advantage of the new systems, and those who remain disconnected.The Internet’s unsustainability, coupled with the ...
Voir le projet

 6

 TERMINÉ 

Jean Monnet Chair of EU as a Diplomatic and Security Actor

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

... rounded overviews of particular aspects of EU international engagements in a coherent and systematic way. A collective volume that will include contributions from top experts constitutes the major research output of this proposal.The Chair will also take advantage of the technological infrastructure of AUEB. AUEB has already set an open educational resources service providing a technological plat ...
Voir le projet

 1

 TERMINÉ 
Taking into account the fact that buildings constitute the largest end-use energy consuming sector, the design and development of solutions targeted at reducing their energy consumption based on the adoption of energy efficient techniques and the active engagement of citizens/occupants is considered crucial. Innovative solutions have to be implemented upon properly understanding the main energy co ...
Voir le projet

 9

 TERMINÉ 

New Cost Efficient Business Models for Flexible Smart Grids (NOBEL GRID)

Date du début: 1 janv. 2015, Date de fin: 30 juin 2018,

NOBEL GRID will develop, deploy and evaluate advanced tools and ICT services for energy DSOs cooperatives and medium-size retailers, enabling active consumers involvement –i.e. new demand response schemas – and flexibility of the market – i.e. new business models for aggregators and ESCOs.Through the dual-use of telecommunication networks, and validating the integration of renewable generation pre ...
Voir le projet

 24

 TERMINÉ 
"The U-TURN project aims at addressing freight urban distribution, focusing on food logistics. The project will contribute to our understanding of freight distribution in urban areas, especially addressing the special requirements and needs of food transportation, and will suggest innovative collaboration practices and tools towards achieving more efficient operations from both an environmental an ...
Voir le projet

 9

 TERMINÉ 

5G Exchange (5GEx)

Date du début: 1 oct. 2015, Date de fin: 31 mars 2018,

The goal of the 5G Exchange (5GEx) project is to enable cross-domain orchestration of services over multiple administrations or over multi-domain single administrations. This will allow end-to-end network and service elements to mix in multi-vendor, heterogeneous technology and resource environments. Market fragmentation has resulted in a multitude of network operators each focused on different co ...
Voir le projet

 20

 TERMINÉ 

Human Brain Project Specific Grant Agreement 1 (HBP SGA1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

...oal is to catalyze a global collaborative effort. During the HBP’s first Specific Grant Agreement (SGA1), the HBP Core Project will outline the basis for building and operating a tightly integrated Research Infrastructure, providing HBP researchers and the scientific Community with unique resources and capabilities. Partnering Projects will enable independent research groups to expand the capabili ...
Voir le projet

 126

 TERMINÉ 

NGHCS: Creating the Next-Generation Mobile Human-Centered Systems (NGHCS)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2018,

...tered systems. Our goal is to develop a comprehensive framework to simplify the development of mobile human-centered systems, as well as make them predictable and reliable. Our work has the following research thrusts: First, we develop techniques for dealing efficiently with dynamic unpredictable factors that such complex systems face, including dynamic workloads, unpredictable occurrence of event ...
Voir le projet

 1

 TERMINÉ 

Productivity, Non-Tariff Measures and Openness (PRONTO)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2018,

...y of forms and include safety regulations, environmental standards, and corporate tax incentives, all of which influence both trade and investment. This proposal brings together a team of world-class researchers from academia, policy organizations, and the private sector to offer a comprehensive and unified approach to describing and measuring these NTMs and their impact on a variety of social out ...
Voir le projet

 11

 TERMINÉ 

POINT: iP Over IcN - the betTer ip (POINT)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

...nd develop migration scenarios for operators wishing to deploy ICN in production networks. The consortium has all the experience and competencies needed to cover the entire chain from an idea and research prototype to a working platform ready for production use. In addition to academic partners, POINT includes a technology company, a telecom vendor, an ISP, a content provider, and a cooperative wh ...
Voir le projet

 9

 TERMINÉ 

OPTiOptimisation of District Heating Cooling systems (OPTi)

Date du début: 1 mars 2015, Date de fin: 31 oct. 2017,

“With a user-centric design, we will contribute to next-generation District Heating & Cooling systems” The OPTi project aspires to create a long-lasting impact by rethinking the way DHC systems are architected and controlled. The overarching goal is to create business benefit for the industry as well as to ensure optimal end-consumer satisfaction. OPTi will deliver methodologies and tools that wil ...
Voir le projet

 8

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 30 sept. 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2016, Date de fin: 30 sept. 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Social & Sustainable Fashion Entrepreneurs

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

... in Sustainability, to Business Schools, social entrepreneurs, fashion incubators, and fashion producers. The methodology of the project is firstly the conduct of an exploratory mixed methods research in all partners’ countries and through their networks, if possible, to the rest European countries. This will provide the framework based on which the content of the learning programme will be design ...
Voir le projet

 7

 TERMINÉ 

LEADER - LEarning And Decision making Resources

Date du début: 1 sept. 2014, Date de fin: 31 août 2017,

...gies. More then 300 users and 200 guidance practitioners from education, high adult edueducation, adult education and Employment services will be directly involved in a wide participatory action-research process for develop this new CME framework. The needs of students are at the base of the process, taking into account the specific conditions and cultural backgrounds of each region involved in t ...
Voir le projet

 9

 TERMINÉ 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Sensor-Enabled Real-World Awareness for Management Information Systems (SERAMIS)

Date du début: 1 oct. 2013, Date de fin: 30 avr. 2017,

The objective of the SERAMIS project is to push the boundaries of current RFID implementations, thus turning them into powerful tools for intelligent information management. For this purpose, SERAMIS develops models, procedures, and tools for the handling of massive RFID data sets. The project aims at covering the entire causal chain from the initial investment in an RFID data collection infrastru ...
Voir le projet

 8

 TERMINÉ 

Accelerating Entrepreneurial Learning across European Regions (EU-XCEL)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2016,

...objectives, which is the core outcomes required from the Horizon 2020 ICT 35 call. Specifically this programme sets out to train ICT entrepreneurs to be ‘incubator ready’ and this is informed by research into current practice in incubators across Europe. The Horizon 2020 is an ideal opportunity for Europe to enable a different breed of European ICT entrepreneurs. Some of the characteristics of ac ...
Voir le projet

 6

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2015, Date de fin: 30 sept. 2016,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Voir le projet

 1

 TERMINÉ 

Adapting Service lifeCycle towards EfficienT Clouds (ASCETiC)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Adapting Service lifeCycle towards EfficienT (ASCETiC) is focused on providing novel methods and tools to support software developers aiming to optimise energy efficiency and minimise the carbon footprint resulting from designing, developing, deploying, and running software in Clouds. At the same time, quality of service, experience and perception will still be takenInto account, so energy efficie ...
Voir le projet

 9

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

...ersions of six ICT platforms dedicated to Neuroinformatics, Brain Simulation, High Performance Computing, Medical Informatics, Neuromorphic Computing and Neurorobotics, and create a user community of research groups from within and outside the HBP, set up a European Institute for Theoretical Neuroscience, complete a set of pilot projects providing a first demonstration of the scientific value of t ...
Voir le projet

 116

 TERMINÉ 
"The Edusafe project is a 4-year ITN with 10 ESR and 2 ER researchers, which focuses on research into the use of Virtual Reality (VR) and Augmented Reality (AR) during planned and emergency maintenance in extreme environments (nuclear installations, space, deep sea etc). The scientific objective of this project is research into advanced VR and AR technologies for a personnel safety system platform ...
Voir le projet

 9

 TERMINÉ 

Poverty Reduction in Europe: Social policy and innovation (ImPRovE)

Date du début: 1 mars 2012, Date de fin: 29 févr. 2016,

This research proposal takes as its starting points: (a) the long standstill in poverty reduction, especially for people of working age, (b) the complementarity between employment, economic growth and social inclusion that is focal in the EU 2020 strategy, and, (c) the emergence of socially innovative policies and actions in the margins of the European welfare states. It aims at the evaluation of ...
Voir le projet

 9

 TERMINÉ 
During the second half of 2011 sovereign and banking risks increased in the Eurozone in an environment of weakening macroeconomic growth prospects. Contagion effects have become substantial also accelerated by the interplay between vulnerability of public finances and financial sector. Furthermore, bank funding pressures increased markedly thus feeding the fear of the Euro crash.The SYRTO project ...
Voir le projet

 5

 TERMINÉ 

Responsible ICT Network (R-ICT)

Date du début: 1 mars 2014, Date de fin: 29 févr. 2016,

R-ICT aims to: Ensure coherent and consistent coordination of CSR issues in the ICT sector, in order to encourage and enable enterprises across the EU to apply and promote CSR, through strategic partnerships with relevant stakeholders, based on good practices that show the societal benefits that can be delivered by ICT.R-ICT is relevant to ICT-PSP as it is in line with and contributes to the DAE, ...
Voir le projet

 10

 TERMINÉ 
"European oceans will be subject to massive development of marine infrastructure in the near future. The most obvious is the energy facilities e.g. offshore wind farms, exploitation of wave energy, expansion of electricity connections, and also further development and implementation of marine aquaculture. This will also lead to an increased need for marine infrastructure to support installation an ...
Voir le projet

 29

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

... of Erasmus+ Programme initiatives and rules, l) the continuation of implementation of Quality assurance systems including internal and external evaluation, m) the continuation of its extensive research activities and contribution in science aiming at excellence. In the framework of Erasmus, AUEB cooperates with more than 220 universities of EU. During 28 years of implementation of the Programme a ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

The Programme ?AUEB Consortium for Student Placement & Staff Mobility? is addressed to undergraduate and postgraduate students interested in carrying out a placement in companies and organizations of the European Union and to teaching & administrative staff wishing to participate in teaching & training activities. The Programme takes place with the support of the Greek National Agency and the fund ...
Voir le projet

 1

 TERMINÉ 
...employed. A flurry of interest in econometric modelling based on spectral methods is observed mostly during the last decade. Until recently multiscale spectral analysis (MSA) represented an important research area only in engineering & natural sciences, wherein the utilization of timescales in the analysis of different modes of behavior isvery common. The use of MSA in economic sciences is in its ...
Voir le projet

 1

 TERMINÉ 

Modelling and Analysing Demand Response Systems (WATTALYST)

Date du début: 1 oct. 2011, Date de fin: 31 déc. 2014,

...he emergence of technology to support DR are known to offer a high potential for energy consumption reduction. However, the process of designing effective DR programs is not yet very well understood. Research related to demand response and demand side management has addressed a suite of issues including differential pricing, incentive schemes, consumption profiling, and eco-feedback. Despite these ...
Voir le projet

 7