Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Internet of Food and Farm 2020 (IoF2020)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Voir le projet

 72

 TERMINÉ 

CPSwarm

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

Cyber-Physical Systems (CPS) find applications in a number of large-scale, safety-critical domains e.g. transportation, smart cities, etc. While the increased CPS adoption has resulted in the maturation of solutions for CPS development, a single consistent science of system integration for CPS has not yet been consolidated. Therefore CPS development remains a complex and error-prone task, often re ...
Voir le projet

 9

 TERMINÉ 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Voir le projet

 43

 TERMINÉ 
The SoundCity Project MONICA aims to provide a very large scale demonstration of multiple existing and new Internet of Things technologies for Smarter Living. The solution will be deployed in 6 major cities in Europe.MONICA demonstrates a large scale IoT ecosystem that uses innovative wearable and portable IoT sensors and actuators with closed-loop back-end services integrated into an interoperab ...
Voir le projet

 28

 TERMINÉ 
CREATE-IoT’s aim is to stimulate collaboration between IoT initiatives, foster the take up of IoT in Europe and support the development and growth of IoT ecosystems based on open technologies and platforms. This requires synchronisation and alignment on strategic and operational terms through frequent, multi-directional exchanges between the various activities under the IoT Focus Areas (FAs). It a ...
Voir le projet

 20

 TERMINÉ 

My Active and Healthy Aging (my-AHA)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

BackgroundWe propose a holistic view of interrelated frailties: cognitive decline, physical frailty, depression and anxiety, social isolation and poor sleep quality, which are a major burden to older adults and social and health care systems. Early detection and intervention are crucial in sustaining active and healthy ageing (AHA) and slowing or reversing further decline.Aims and RelevanceThe mai ...
Voir le projet

 16

 TERMINÉ 

Storage4Grid

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2019,

Future energy systems will be characterized by growing shares of intermittent power generation from Renewable Energy Sources (RES) while facing increasing diffusion of Electrical Vehicles (EVs). Such scenarios are creating new challenges for efficient management and grid stability. Energy Storage Systems (ESS) will provide a valuable solutions to such challenges. The Storage4Grid (S4G) vision i ...
Voir le projet

 8

 TERMINÉ 
The MONSOON vision is to provide Process Industries with dependable tools to help achieving improvements in the efficient use and re-use of raw resources and energy.MONSOON aims at establishing a data-driven methodology supporting the exploitation of optimization potentials by applying multi-scale model based predictive controls in production processes.MONSOON features harmonized site-wide dynamic ...
Voir le projet

 11

 TERMINÉ 
Data and services have become the key factor in manufacturing processes. The need to react on dynamically changing market demands is dramatically rising. One of the most imperative problems so far is to connect supply chain data and services between enterprises and to connect value chain data within a factory, so that it can meaningfully support decision-making. COMPOSITION will create a digital a ...
Voir le projet

 12

 TERMINÉ 
The automotive industry has made a substantial effort in recent years in developing powertrain technologies to improve fuel efficiency on Heavy-Duty Vehicles (HDVs). Due to increasing road freight traffic, however, projections indicate that total HDV energy use and CO2 emissions are expected to remain stable at the current level over the long term, if no policy action is taken. This is clearly inc ...
Voir le projet

 11

 TERMINÉ 
The MAESTRI project aims to advance the sustainability of European manufacturing and process industries. This is done by providing a management system in the form of a flexible and scalable platform, and to guide and simplify the implementation of an innovative approach, the Total Efficiency Framework. The overall aim of this framework is to encourage a culture of improvement within process indust ...
Voir le projet

 15

 TERMINÉ 
TCBL uses Europe’s Textiles & Clothing (T&C) industry as test beds for evolutionary-driven co-design, dynamic optimisation and deployment of business models. It aims to increase the performance of a sector that, over the past two decades, upheld three main strategies to handle global competitive pressure: cost-oriented, product/service-oriented and productivity-oriented. TCBL provides a business e ...
Voir le projet

 19

 TERMINÉ 

BigDataOcean - Exploiting Ocean's of Data for Maritime Applications (BigDataOcean)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

The main objective of BigDataOcean is to enable maritime big data scenarios for EU-based companies, organisations and scientists, through a multi-segment platform that will combine data of different velocity, variety and volume under an inter-linked, trusted, multilingual engine to produce a big-data repository of value and veracity back to the participants and local communities.BigDataOcean aims ...
Voir le projet

 10

 TERMINÉ 
Society as a whole is increasingly exposed and vulnerable to natural disasters because extreme weather events, exacerbated by climate change, are becoming more frequent and longer. To increase the resilience of European citizens and assets to natural disaster we propose I-REACT: Improving Resilience to Emergencies through Advanced Cyber Technologies. The proposed system targets public administrati ...
Voir le projet

 20

 TERMINÉ 
The improvement of energy efficiency across European industry is crucial for competitiveness. So far, the measures for improvement of energy efficiency have been directed at primary production processes. In this project, we will address the improvement of energy efficiency in industrial water circuits: auxiliary electric motor driven systems with high optimisation potential. The European manufactu ...
Voir le projet

 6

 TERMINÉ 
OPERA project aims at supporting these ambitious challenges with technological innovation on three main aspects: • Design next generation Low Power (LP) and Ultra-Low Power (ULP) systems, • improve energy efficiency in computing by means of heterogeneous architectures, • and provide smart and energy efficient solution for the interaction between embedded smart systems and remote small form-factor ...
Voir le projet

 11

 TERMINÉ 

Communication Systems for Next-generation Railways (MISTRAL)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2018,

MISTRAL will elaborate the Technical Specification of the future communication system for all railways in light of the migration from the current obsolete GSM-R.The new radio system will leverage the broadband capacity of IP-based wireless communication to enhance signaling but also to make possible innovative services for both users and train automation/control.To achieve the objective, MISTRAL w ...
Voir le projet

 4

 TERMINÉ 
Living in a safe and secure society is a fundamental human need. The security of critical infrastructures must be maintained so that supplies of power, water or other resources are secured. Modern critical infrastructures are increasingly complex and they are turning into Cyber-Physical Infrastructures because ICT is growing in importance in infrastructure management.The SUCCESS project will dev ...
Voir le projet

 19

 TERMINÉ 

Building European Links toward South East Asia in the field of GNSS (BELS)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

The project implements a set of coordinated actions to promote EGNSS technology in South East Asia (SEA), meanwhile supporting the competitiveness of EU enterprises facilitating their contacts with relevant GNSS stakeholders in SEA, a fast growing market of more than 600 million people. Exploiting the facilities offered in Hanoi by the NAVIS Centre - a strategic asset for Europe, setup with FP7 EU ...
Voir le projet

 13

 TERMINÉ 
"Known as either "Industrial Revolution 4.0" or as "Industrial Renaissance", the need for new manufacturing approaches is widely accepted in the EU. SatisFactory aims to contribute to the transformation of traditional industrial environments using cutting-edge technologies in ways that are both productive and appealing to youth.The fundamental component of the proposed system will be the assessmen ...
Voir le projet

 11

 TERMINÉ 

Automotive EGNSS Receiver for High Integrity Applications on the Drive (InDrive)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

The main objective of this project is to develop and demonstrate innovative close-to-market applications, which are heavily relying on accurate and high integrity satellite navigation. To achieve the full potential of advanced satellite positioning, an integrated solution starting from low-level signal processing to high-level data fusion will be proposed to get a continuous probabilistic position ...
Voir le projet

 7

 TERMINÉ 

Supporting Internet of Things Activities on Innovation Ecosystems (UNIFY-IoT)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

Coordination and Support Action to stimulate the collaboration between IoT projects, between the potential IoT platforms and support these in sustaining the IoT ecosystems developed by focusing on complementary actions, e.g., fostering and stimulating acceptance of IoT technology as well as the means to understand and overcome obstacles for deployment and value creation.
Voir le projet

 8

 TERMINÉ 

SOcietal Needs aNalysis and Emerging Technologies in the public Sector (SONNETS)

Date du début: 1 mars 2016, Date de fin: 31 août 2017,

It is a fact that technology in our age is offering countless solutions that could change the way we live and act and that innovation is lately directly linked with emerging technologies that are applied in various domains. However, despite the investments performed in the last decade the bitter truth is that “we are not there yet” when it comes to fully exploiting the benefits of ICT to help the ...
Voir le projet

 4

 TERMINÉ 
SnowBall is a €5M STREP R&D proposal of 36 months. Its overall objective is to increase preparedness and response capacities of decision-makers, emergency planners and first responders in respect to amplifying hazards in large disasters.SnowBall consists in a deep analysis of cascading effects and development of methods to anticipate them; and in a Decision Support System able to display current c ...
Voir le projet

 14

 TERMINÉ 
The aim of the FREME innovative action is to establish an “Open Framework of E-Services for Multilingual and Semantic Enrichment of Digital Content”. Six enrichment services will be designed, piloted, and validated during the action. Their innovation, usability, and robustness will be shaped by four real world business cases that will bring FREME data innovation and technology transfer directly to ...
Voir le projet

 10

 TERMINÉ 

Galileo EnHancement as BoOster of the Smart CiTies (GHOST)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2016,

With the increase of the density of people in urban areas, modern cities experience significant needs related to planning, maintenance and administration. As a result, many cities are engaged in massive investment for infrastructure development across many structural elements including water supply, lighting, maintenance, traffic and transportation systems, refuse disposal and all the factors whic ...
Voir le projet

 7

 TERMINÉ 

Joint EUropean Project for International ITS/EGNSS awareness Raising (JUPITER)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2016,

JUPITER aims at EGNSS awareness raising, capacity building and promotion activities for fostering business development of EGNSS based applications worldwide in response to the H2020 societal challenges at stake for mobility and transportation.In order to ensure that EGNSS comes to prominence in the ITS sector, the added value of EGNSS, compared to or in combination with GPS/Glonass/Beidou constell ...
Voir le projet

 11

 TERMINÉ 

District Information Modeling and Management for Energy Reduction (DIMMER)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

ICT is recognized as being a key player against climate change: pervasive sensors and actuators can efficiently control the whole energy chain (Smart Thermal/Electricity Grid). On the other side, advances on 3D modeling, visualization and interaction technologies enable user profiling and real-time feedback to promote energy efficient behaviors. To unlock the potentiality of these technologies, th ...
Voir le projet

 15

 TERMINÉ 

ALMANAC: Reliable Smart Secure Internet Of Things For Smart Cities (ALMANAC)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

ALMANAC will develop a service delivery platform with corresponding technologies that integrates Internet of Things (IoT) edge networks (termed capillary networks) with Telco's metro access networks thus enabling an integrated Smart City Information System for green and sustainable Smart City applications.The Smart City Platform (SCP) collects, aggregates, and analyses real-time or near real-time ...
Voir le projet

 7

 TERMINÉ 
Description A flexible architecture compatible with current infrastructures and low cost components based on silicon photonics: the keys for mass Fiber-To-The-Home ultra-broadband deployment FABULOUS will design, develop and characterize new Silicon Photonics components for application in next-gen ...
Voir le projet

 8

 TERMINÉ 
One promising answer leveraging the time frame of investment in changes of power supply and demand is to optimize the grid capacity with Smart Grids. However, a managed customer demand with intensive grid monitoring, automation and reliable customer flexibility is needed to allow for a real and secure reduction in residual capacity.The aim of GreenCom is to utilise the flexibility and intelligence ...
Voir le projet

 7

 TERMINÉ 
The aim of the IMPRESS project is to provide a Systems Development Platform which enables rapid and cost effective development of mixed criticality complex systems involving Internet of Things and Services (IoTS) and at the same time facilitates the interplay with users and external systems. The IMPRESS development platform will be usable for any system intended to embrace a smarter society. The d ...
Voir le projet

 6

 TERMINÉ 

Trusted Vessel Information from Trusted On-board Instrumentation (TRITON)

Date du début: 1 déc. 2013, Date de fin: 31 mars 2016,

A new consciousness has arisen in the scenario of civilian and commercial maritime control: surveillance and safety systems may be under the attack of intentional or unintentional or malevolent players, whose aim (or effect) is to bypass or mystify the control system to obtain economic gain. The advances of mass-price technology, easily sold over the Internet, make this kind of potential events a ...
Voir le projet

 6

 TERMINÉ 
FLOODIS will provide accurate location based application for portable devices. The proposed solution closes a critical gap for disaster management teams, civil protection, field/emergency response units to better address and mitigate crisis situations arising before, during, and after heavy flooding. The project will provide an open-source, location based smart phone application for the general pu ...
Voir le projet

 7

 TERMINÉ 
Security and quality of life in industrialized countries depend on continuous and coordinate performance of a set of infrastructures (energy systems, ICT systems, transportation etc) which can be therefore defined “critical infrastructures” (CI).“STRUCTURES - Strategies for The impRovement of critical infrastrUCTUre Resilience to Electromagnetic attackS” aims at analyzing possible effects of elect ...
Voir le projet

 13

 TERMINÉ 

Future INternEt Smart Utility ServiCEs (Finesce)

Date du début: 1 mars 2013, Date de fin: 30 sept. 2015,

Change is the name of the game in energy! The shift to sustainability is visible everywhere. It is now a European priority to combine solutions which utilise energy generation from renewable energy sources and optimize energy usage efficiency into a Smart Energy System based on the introduction of Future Internet technologies. At the same time, business innovation needs to be encouraged to ensure ...
Voir le projet

 34

 TERMINÉ 

REal and Virtual Engagement in Realistic Immersive Environments (REVERIE)

Date du début: 1 sept. 2011, Date de fin: 31 mai 2015,

Description REVERIE is a revolution in online social networking. It is safe, collaborative, online environment which brings together realistic inter-personal communication and interaction.REVERIE will bring online social networking into the real-world with interaction and communication based on what people do and say and how they act. In ...
Voir le projet

 17

 TERMINÉ 
The ebbits project aims to develop architecture, technologies and processes, which allow businesses to semantically integrate the Internet of Things into mainstream enterprise systems and support interoperable real-world, on-line end-to-end business applications. It will provide semantic resolution to the IoT and hence present a bridge between enterprise applications, people, services and the phys ...
Voir le projet

 9

 TERMINÉ 

Harmonised eCall European Pilot - Phase 2 (HeERO2)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

The overall objective of HeERO 2 is "To extend HeERO to new Member States or associated countries to demonstrate the scalability of the HeERO solution and to widen the acceptance of eCall."To support this objective there are three aims:(1) to prepare the necessary infrastructure to realize interoperability of "eCall" at European level, (2) to boost Member States investment in the PSAP infrastructu ...
Voir le projet

 42

 TERMINÉ 

uBiquitous, secUre inTernet-of-things with Location and contExt-awaReness (BUTLER)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an ...
Voir le projet

 23