Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Federation for FIRE Plus (Fed4FIREplus)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2021,

The Fed4FIRE+ project has the objective to run and further improve Fed4FIRE’s “best-in-town” federation of experimentation facilities for the Future Internet Research and Experimentation initiative. Federating a heterogeneous set of facilities covering technologies ranging from wireless, wired, cloud services and open flow, and making them accessible through common frameworks and tools suddenly op ...
Voir le projet

 24

 TERMINÉ 

RECAP: Research on European Children and Adults born Preterm (RECAP)

Date du début: 1 janv. 2017, Date de fin: 31 mars 2021,

...tion) or very low birth weight (VLBW, < 1500g) – approximately 50 000 births each year in Europe – by establishing an ICT platform to integrate, harmonise and exploit the wealth of data from 20 European cohorts of VPT/VLBW children and adults and their families constituted from the early 1980s to the present, together with data from national registries. VPT/VLBW births have higher risks of cerebra ...
Voir le projet

 21

 TERMINÉ 

Advanced Radio Astronomy in Europe (RadioNet)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

RadioNet is a consortium of 28 institutions in Europe, Republic of Korea and South Africa, integrating at European level world-class infrastructures for research in radio astronomy. These include radio telescopes, telescope arrays, data archives and the globally operating European Network for Very Long Baseline Interferometry (EVN). RadioNet is de facto widely regarded to represent the interests o ...
Voir le projet

 29

 TERMINÉ 
...ls predictive of immunogenicity and of correlates of protection at early stage of vaccine development to mitigate the risks of failure. To address these complex and challenging scientific issues, the European HIV Vaccine Alliance (EHVA) program will develop a Multidisciplinary Vaccine Platform (MVP) in the fields of prophylactic and therapeutic HIV vaccines. The Specific Objectives of the MVP are ...
Voir le projet

 43

 TERMINÉ 
HarmonicSS vision is to create an International Network and Alliance of partners and cohorts, entrusted with the mission of addressing the unmet needs in primary Sjogren Syndrome; working together to create and maintain a platform with open standards and tools, designed to enable secure storage, governance, analytics, access control and controlled sharing of information at multiple levels along wi ...
Voir le projet

 39

 TERMINÉ 
...ndly solution. To demonstrate feasibility, pilot studies will focus on diabetes, heart failure, renal failure, depression in different comorbidity combinations. Pilots will operate for 15 months in 3 European regions with diverse health and social care systems and ICT landscape, which will allow for strengthening the evidence base on health outcomes and efficiency gains. C3-Cloud adaptive patient ...
Voir le projet

 12

 TERMINÉ 

Advanced European Network of E-infrastructuresfor Astronomy with the SKA (AENEAS)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The objective of the AENEAS project is to develop a concept and design for a distributed, federated European Science Data Centre (ESDC) to support the astronomical community in achieving the scientific goals of the Square Kilometre Array (SKA). The scientific potential of the SKA radio telescope is unprecedented and represents one of the highest priorities for the international scientific communit ...
Voir le projet

 31

 TERMINÉ 
The project 'STI International Cooperation Network for EaP Countries Plus (EaP PLUS)' aims to stimulate cooperation between researchers from the EaP countries and EU MS and enhance the active participation of the Eastern Partnership countries in Horizon 2020 Framework Programme.Building on the results of the predecessor FP7 project 'IncoNet EaP', the project will eliminate remaining obstacles to E ...
Voir le projet

 18

 TERMINÉ 
...ing a transformation. Modern experimental tools study the molecules, reactions, and organisation of life in unprecedented detail. The precipitous drop in costs for high-throughput biology has enabled European research laboratories to produce an ever-increasing amount of data. Life scientists are rapidly generating the most complex and heterogeneous datasets that science can currently imagine, with ...
Voir le projet

 47

 TERMINÉ 
Trillium-II steps forward with an outstanding consortium to further advance global Electronic Health Record (EHR) interoperability. Activities surrounding the International Patient Summary (IPS) standards can nurture digital health innovation, lower trade barriers, and advance patient safety & trust, bridging the gap between strategic intent and capability for action by Standards Development Organ ...
Voir le projet

 21

 TERMINÉ 

Integrated Technology Ecosystem for ProACTive Patient Centred Care (ProACT)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2019,

...e pulmonary disease (COPD). Tools to support mild cognitive impairment and detect early onset dementia are included. Commercial potential will be validated during the project supported by a European feasibility study to assess the cultural and political determinants for adoption and scalability of the ecosystem. ProACT engages a multidisciplinary EU consortium of 3 public and 9 private organizatio ...
Voir le projet

 14

 TERMINÉ 

Optimizing and Enhancing the Integrated Atlantic Ocean Observing System (AtlantOS)

Date du début: 1 avr. 2015, Date de fin: 30 juin 2019,

... will demonstrate the utility of integrating in-situ and Earth observing satellite based observations towards informing a wide range of sectors using the Copernicus Marine Monitoring Services and the European Marine Observation and Data Network and connect them with similar activities around the Atlantic. AtlantOS will support activities to share, integrate and standardize in-situ observations, re ...
Voir le projet

 63

 TERMINÉ 
The EU and Turkey face mounting challenges both in relation to one another and internationally. The EU is confronted with an economic crisis which is likely to make differentiation a growing phenomenon. Turkey faces polarisation between different political forces, the state and civil society. The neighbourhood is unravelling to the east and south and a power shift is under way at global level. Thi ...
Voir le projet

 15

 TERMINÉ 

Future Sky Safety

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

...search Programme (JRP) on Aviation Safety, aiming for Coordinated Safety Research as well as Safety Research Coordination. The proposed JRP Safety, established under coordination of EREA, is built on European safety priorities, around four main themes with each theme consisting of a small set of projects. Theme 1 (New solutions for today’s accidents) aims for breakthrough research with the purpos ...
Voir le projet

 32

 TERMINÉ 

Alpine Ecosystem Services – mapping, maintenance and management (AlpES)

Date du début: 16 déc. 2015, Date de fin: 15 déc. 2018,

Description (EN): Ecosystems and their services go beyond national borders and need a transnational approach for their dynamic protection, sustainable use, management and risk prevention. As a basis for joint action, public authorities, policy makers, NGOs, researchers and economic actors – the AlpES target groups – need a common understanding of ecosystem services, comparable infor ...
Voir le projet

 10

 TERMINÉ 
Young migrants and refugees have entered European countries but they haven’t entered the public sphere. When they do, it is as characters in other people’s stories - desperate faces, surging hoards and floating bodies - something ‘other’. We rarely hear from young refugees as experts or legitimate voices - even when the news agenda concerns their country of origin. Migrants, it seems are only allo ...
Voir le projet

 9

 TERMINÉ 

Development of two cycle innovative curricula in microelectronic engineering

Date du début: 15 oct. 2015, Date de fin: 14 oct. 2018,

The project consist of 16 universities: four from program countries PL, DE, BG and IT; four from KZ, four from AM, four from IL; two stakeholders of related field: 1-from KZ and 1-from IL and spin-off company- ECM from DE. The overall objectives of the proposal are: To support the modernisation of the higher education (HE) in microelectronics in the targeted Universities in AM, KG and IL through ...
Voir le projet

 17

 TERMINÉ 

TRA VISIONS 2018

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

The concept of this project is to organise two competitions for transport research awards to be announced at the TRA conference in 2018- A Young researchers' competition with the goal of stimulating the interest among young researchers/students in the field of sustainable surface transport.- A competition for senior researchers in the field of innovative surface transport concepts based on results ...
Voir le projet

 8

 TERMINÉ 
One of the greatest challenges facing regulators in the ever changing landscape of novel nano-materials is how to design and implement a regulatory process which is robust enough to deal with a rapidly diversifying system of manufactured nanomaterials (MNM) over time. Not only does the complexity of the MNM present a problem for regulators, the validity of data decreases with time, so that the wel ...
Voir le projet

 46

 TERMINÉ 
GEO-CRADLE brings together key players representing the whole (Balkans, N. Africa and M. East) region and the complete EO value chain with the overarching objective of establishing a multi-regional coordination network that will (i) support the effective integration of existing EO capacities (space/air-borne/in-situ monitoring networks, modelling and data exploitation skills, and past project expe ...
Voir le projet

 20

 TERMINÉ 

Open Access Infrastructure for Research in Europe 2020 (OpenAIRE2020)

Date du début: 1 janv. 2015, Date de fin: 30 juin 2018,

OpenAIRE2020 represents a pivotal phase in the long-term effort to implement and strengthen the impact of the Open Access (OA) policies of the European Commission (EC), building on the achievements of the OpenAIRE projects. OpenAIRE2020 will expand and leverage its focus from (1) the agents and resources of scholarly communication to workflows and processes, (2) from publications to data, software ...
Voir le projet

 50

 TERMINÉ 

Negotiating early job-insecurity and labour market exclusion in Europe (NEGOTIATE)

Date du début: 1 mars 2015, Date de fin: 28 févr. 2018,

...s. NEGOTIATE’s core question is how young people’s scope for agency interacts with different layers of structural conditions in a multi-level governance system. By actively involving national and European stakeholders – including young people – NEGOTIATE will contribute to policies that promote the employability of young Europeans, thus maximising societal and scientific impact. We will observe th ...
Voir le projet

 10

 TERMINÉ 

European Medical Information Framework (EMIF)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2017,

In response to the need to tackle increasingly complex medical research questions, a growing amount of human health data is being collected, either in routine Electronic Healthcare Record (EHR) databases, through research-driven cohort studies, in biobanks or related efforts. However, data sources are typically fragmented and contain information gaps which prevent their full exploitation. EMIF aim ...
Voir le projet

 64

 TERMINÉ 

Digital Ecosystem for E-Participation linking Youth

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2017,

The overall aim of the DEEP-linking Youth project is to test a digital ecosystem for youth engagement by bridging technology (digital entry points) and young citizens (collaboration of a large number of people) for a common task with the aim of providing quality inputs for decision-making in view of producing a sustainable impact. The approach used by the project team is based on the assumption th ...
Voir le projet

 7

 TERMINÉ 

MObility for Vocational and Educational Training 2.0

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

...io Emilia, 9 technical and professional high schools of the province, the Emilia-Romagna Region, the Chamber of Commerce, the main local trade associations, in addition to receiving partners and many European SMEs interested in a transnational dimension of business and labor market. The project develops mobility experiences for 90 students and 36 newly graduated/qualified.The level of territorial ...
Voir le projet

 30

 TERMINÉ 
The INNOVER-EAST project targets five countries of the Eastern Partnership (in short, EPCs: Armenia, Azerbaijan, Belarus, Georgia and Ukraine) to overcome the bottlenecks of innovation and intensify the level of cooperation between research and business in the target countries. The project aims, on the one hand, to develop new skills and competences in innovation services at relevant organisations ...
Voir le projet

 15

 TERMINÉ 
Developing robust, reproducible, interoperable and collaborative hyper-models of diseases and normal physiology is a sine qua non necessity if rational, coherent and comprehensive exploitation of the invaluable information hidden within human multiscale biological data is envisaged. Responding to this imperative in the context of both the broad Virtual Physiological Human (VPH) initiative and the ...
Voir le projet

 17

 TERMINÉ 

em4em - Empowerment for Employment - Contact Making Event

Date du début: 2 mai 2016, Date de fin: 1 mars 2017,

BASIC INFORMATION:The proposed project is a KA1 Youth Workers mobility - Contact Making Event which is due to take place in Wisla in Poland on 4 - 11 September 2016. The mobility will gather 28 partners from the following countries: Bulgaria, United Kingdom, Romania, Macedonia, Slovakia, Turkey, Italy, Lithuania, Czech Republic, Greece, the Netherlands and Poland. CONTEXT:As keen advocates of the ...
Voir le projet

 16

 TERMINÉ 
...rticipants from anthropology, criminology, economics, gender studies, history, legal studies, political science, public policy and administration and sociology at twenty-one units in sixteen European countries. Research will be conduced using a various set of methods including historical case-studies, large-scale surveys and ethnographical approaches. The project will strive to ensure that the re ...
Voir le projet

 22

 TERMINÉ 

A common European approach to the regulatory testing of nanomaterials (NANOREG)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

The innovative and economic potential of Manufactured Nano Materials (MNMs) is threatened by a limited understanding of the related EHS issues. While toxicity data is continuously becoming available, the relevance to regulators is often unclear or unproven. The shrinking time to market of new MNM drives the need for urgent action by regulators. NANoREG is the first FP7 project to deliver the answe ...
Voir le projet

 73

 TERMINÉ 

Inclusive Growth Research Infrastructure Diffusion (INGRID)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2017,

Referring to the increasingly challenging EU2020-ambition of Inclusive Growth, the objectives of the InGRID project are to integrate and to innovate existing, but distributed European social sciences research infrastructures on ‘poverty and living conditions’ and ‘working conditions and vulnerability’ by improving the transnational data access, organising mutual knowledge exchange and improving me ...
Voir le projet

 17

 TERMINÉ 
"INFOCORE focuses on the conditions that bring about different media roles in the cycle of conflict and peace building. It generates knowledge on (1) the social processes underlying the production of conflict news, and (2) the inherent dynamics of conflict news contents, (3) in a systematically comparative fashion. Based on this perspective, we identify the conditions under which media play specif ...
Voir le projet

 9

 TERMINÉ 
...e accession of Russia to the World Trade Organisation in 2012 and the establishment of a Customs Union between Russia, Belarus and Kazakhstan in 2011 are expected to boost trade relations between the European Union and its Eastern Neighbours. The aim of AGRICISTRADE is to accompany these developments by analysing the potential impact of these trade agreements and by delivering insights on the pote ...
Voir le projet

 17

 TERMINÉ 

A European Platform for Translational Cancer Research (EUROCANPLATFORM)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2016,

Europe has a number of advantages as regards developing translational cancer research, yet there is no clear European strategy to meet the increasing burden posed by cancer. The FP6 Eurocan+Plus project analysed the barriers underlying the increasing fragmentation of cancer research and stressed the need to improve collaboration between basic/preclinical and comprehensive cancer centres (CCCs), in ...
Voir le projet

 29

 TERMINÉ 

The European network of Women web Entrepreneurs Hubs (WeHubs)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2016,

...epreneurship sector can contribute significantly to the competiveness and economic growth of countries and regions. However, Europe is clearly lagging behind given that even though there are lots of European web start-ups, most of them rarely grow up to become global leaders. In this context, the position of women seems particularly weak given that only a very small percentage of them are web ent ...
Voir le projet

 9

 TERMINÉ 
...ners, the improvement and the widening of the foreign partnership, in terms of territories and competencies; the opportunity to finalize exchange and cooperation projects within different other European Programmes (e.g. Progress, EaSI, others); the opportunity to become (as a Consortium) an important partner in the management of mobility and in the adoption of EQAVET and ECVET systems.
Voir le projet

 27

 TERMINÉ 
EU-SOLARIS aims to create a new legal entity to explore and implement new and improved rules and procedures for reserach infrastructures (RI) for Solar Thermal Electricity (STE) technology, in order to optimise RI development and RTD coordination. According to what was communicated by ESFRI, EU-SOLARIS is expected to be the first of its kind, where Industrial needs and private funding will play a ...
Voir le projet

 15

 TERMINÉ 

“Introducing Online collaboration methods and tools in education”

Date du début: 1 oct. 2014, Date de fin: 1 oct. 2016,

...s working at telecentres, libraries and adult education centers. The project will design, develop and implement an up-to-date curriculum, training materials, blended learning environment, and Pan–European certification system „Online collaboration methods and tools”. There are 2 kind of results expected within the Project: Intellectual and dissemination outputs. The main intellectual outputs are ...
Voir le projet

 5

 TERMINÉ 
... biological effects data will be extended and developed as a sustainable tool with various training materials. All outcomes will be disseminated broadly by direct engagement with SMEs via an existing European SME association, with stakeholders via seminars, newsletters and press releases, as well as through traditional scientific routes (high quality publications, and conference presentations)."
Voir le projet

 28

 TERMINÉ 

Federation for FIRE (Fed4FIRE)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Voir le projet

 43