Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Hydrogen Mobility Europe 2 (H2ME 2)

Date du début: 1 mai 2016, Date de fin: 30 juin 2022,

Hydrogen Mobility Europe 2 (H2ME 2) brings together action in 8 European countries to address the innovations required to make the hydrogen mobility sector truly ready for market. The project will perform a large-scale market test of hydrogen refuelling infrastructure, passenger and commercial fuel cell electric vehicles operated in real-world customer applications and demonstrate the system bene ...
Voir le projet

 37

 TERMINÉ 

Hydrogen Mobility Europe (H2ME)

Date du début: 1 juin 2015, Date de fin: 31 mai 2020,

Hydrogen Mobility Europe (H2ME) brings together Europe’s 4 most ambitious national initiatives on hydrogen mobility (Germany, Scandinavia, France and the UK). The project will expand their developing networks of HRS and the fleets of fuel cell vehicles (FCEVs) operating on Europe’s roads, to significantly expand the activities in each country and start the creation of a pan-European hydrogen fuell ...
Voir le projet

 27

 TERMINÉ 

Short supply chain Knowledge and Innovation Network (SKIN)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

...nputs to policymaking through links to the EIP-AGRI. SKIN will build and animate a community of about 500 stakeholders, with the strategic objective of setting up, at the conclusion of the project, a European association permanently working for the improvement of SFSCs efficiency and for the benefit of stakeholders and growth in the sector. The community will be built and animated around the ident ...
Voir le projet

 20

 TERMINÉ 

Transforming Transport (TT)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

...l efficiency, deliver improved customer experience, and foster new business models. TransformingTransport will address seven pilot domains of major importance for the mobility and logistics sector in Europe: (1) Smart High-ways, (2) Sustainable Vehicle Fleets, (3) Proactive Rail Infrastructures, (4) Ports as Intelligent Logistics Hubs, (5) Efficient Air Transport, (6) Multi-modal Urban Mobility, ( ...
Voir le projet

 48

 TERMINÉ 

ERC = ScienceSquared (ScienceSquared)

Date du début: 1 oct. 2015, Date de fin: 31 mars 2019,

The ERC is a great success scientifically, and now wants to broaden its popular and political support. But it has a problem: Most EU citizens don’t care about some Brussels agency they never heard of. The solution is in the ERC’s mandate: frontier research. It has science – the cutting edge variety, that can capture the imagination, change the world and stimulate curiosity. We have seen the power ...
Voir le projet

 8

 TERMINÉ 

FOSTERING WATER-AGRICULTURE RESEARCH AND INNOVATION IN MALTA (FOWARIM)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

FOWARIM (Fostering Water-Agriculture Research and Innovation in Malta) objective is to strengthen the research capacity of the Malta College of Arts, Science & Technology (MCAST)’s Water Research and Training Centre in 4 crucial themes related to the field of water use in agriculture: (a) Decreasing Water Demand, (b) Making Use of Alternative Sources of Water (c) Renewable Desalinization, On-Farm ...
Voir le projet

 7

 TERMINÉ 
...ction engages major shippers as partners (Beiersdorf, Borealis, Colruyt, Delhaize, KC, Mondelez, Panasonic, Philips, Unilever) owning freight volumes well over 1.000.000 annual truck movements across Europe, plus SME shippers and LSPs with a track record in ICT innovation. The pilot cases cover the entire scope of the call and cover a broad cross section of entire supply chain (from raw material t ...
Voir le projet

 31

 TERMINÉ 

Guardian Angels of Accessible Travelers in Rural Areas

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

VET has a decisive role in the acquisition and certification of new competences in rural areas, which face multiple challenges and they are desperate for life saving solutions. AccessAngels teams up VET and sustainable tourism to entice the interest of the accessible tourism market. AccessAngels uses a package of personal assistance paid services (PAS), already offered to disabled tourists in maj ...
Voir le projet

 10

 TERMINÉ 

V.A.L.L.E.Y. - Vocational Alliance: from Learning to Labour for European Young

Date du début: 1 juil. 2016, Date de fin: 30 juin 2018,

“VALLEY - Vocational Alliance: from Learning to Labour for the European Young" is a mobility project aiming at promoting the employability of young people coming from Tourism and Agribusiness sector and at facilitating their entrance into the labour market. This should also have a positive effect in terms of the national economy revitalization, especially in the South of Italy. Tourism and Agrib ...
Voir le projet

 28

 TERMINÉ 

Middle East Research and Innovation Dialogue (MERID)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

...he experience carried out in countries of the region that have already participated in the previous framework programmes, and therefore are at a relatively advanced stage of research cooperation with Europe, like Egypt and Jordan. Attention is paid to calibrating in the most appropriate way the intervention logic of the project, adapting actions to the specific needs of the target countries and th ...
Voir le projet

 13

 TERMINÉ 

POINT: iP Over IcN - the betTer ip (POINT)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The goal of POINT is to develop technology, innovations, and business value chains for commercially viable IP-over-ICN deployment, based on the hypothesis that many current IP-based applications can run ‘better’ on an ICN-based network than on current IP networks.To achieve this, we will first define a set of Key Performance Indicators (KPIs) to specify what exactly 'better' means. Then, we will s ...
Voir le projet

 9

 TERMINÉ 

A World of Opportunities II

Date du début: 1 août 2016, Date de fin: 30 sept. 2017,

...e professional and personal development of its students and employees, and to improve the competitiveness of companies and therefore to improve the economic situation of the region and the country”.European activities will involve the mobility of secondary vocational education, and are:• Internships in hosting companies (92 days / France and the UK) • 6 students of the 12th year and 6 recent gradu ...
Voir le projet

 12

 TERMINÉ 
Since its inception the IMI has funded over 30 public-private partnership projects. Many of these projects are centered upon data intensive translational research and are employing integrative analysis approaches to achieve their goals. Although a common KM platform for IMI projects was envisioned in the original IMI Strategic Research Agenda it has not yet been implemented. The lack of a common p ...
Voir le projet

 17

 TERMINÉ 
Sustainable water management under climate change is an urgent challenge for the Euro-Mediterranean region. Future climate change projections estimate an increase in water scarcity and droughts in the region, causing substantial socioeconomic losses and environmental impacts.In this context, efforts are needed to strengthen public participation and embed a sense of responsibility within the societ ...
Voir le projet

 14

 TERMINÉ 

Future European Tunisian Research Innovation Cooperation (FETRIC)

Date du début: 2 sept. 2013, Date de fin: 1 mars 2017,

... improving knowledge and skills on scientific and technological matters so as to improve the quality and number of partnerships involving both researchers and entrepreneurs from Tunisia and Europe. This will mainly be done through the building and improvement of technical and management skills in the Liaison Office and the Tunisian networks of multipliers it coordinates.- WP4 is dedicated to devel ...
Voir le projet

 7

 TERMINÉ 

Clean Hydrogen in European Cities (CHIC)

Date du début: 1 avr. 2010, Date de fin: 31 déc. 2016,

The Clean Hydrogen in European Cities (CHIC) Project is the essential next step to full commercialisation of hydrogen powered fuel cell (H2FC) buses. CHIC will reduce the ‘time to market’ for the technology and support ‘market lift off’ – 2 central objectives of the Joint Undertaking.CHIC will:- Intensively test the technology to generate learning for the final steps towards commercialisation by o ...
Voir le projet

 26

 TERMINÉ 

The European Location Framework (E.L.F.)

Date du début: 1 mars 2013, Date de fin: 31 oct. 2016,

E.L.F. project will foster the wider use of geo-information and enable the creation of innovative value-added services. The purpose of this project is to deliver the European Location Framework (E.L.F.) required to provide up-to-date, authoritative, interoperable, cross-border, reference geo-information for use by the European public and private sectors. Our versatile cloud and cascade supporting ...
Voir le projet

 41

 TERMINÉ 

Drug Disease Model Resources (DDMORE)

Date du début: 1 mars 2011, Date de fin: 31 août 2016,

Model based-drug development (MBDD) is accepted as a vital approach in understanding patient risk/benefit and attrition. At the core of MBDD lies Modelling and Simulation (M&S), a technology providing the basis for informed, quantitative decision-making.M&S facilitates the continuous integration of available information related to a drug or disease into constantly-evolving mathematical models capa ...
Voir le projet

 28

 TERMINÉ 

MOVIL'APP mobilité européenne et apprentissage

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

Apprenticeships A European priority... To combat youth unemployment and to increase the quality and supply of apprenticeships opportunities across Europe, the European Commission launched in July 2013 the "European Alliance for Apprenticeships". The goal is to secure commitment of stakeholders (public authorities, companies, CCIs and social partners) through concrete pledges to achieving the goals ...
Voir le projet

 68

 TERMINÉ 

Periplus 2.0

Date du début: 1 août 2015, Date de fin: 29 févr. 2016,

...workers planned in the frame of the KA1 of the Erasmus Plus Programme and to be hosted by the Italian network SEYF. The project is coordinated from SEYF's network and foresees the participation of 13 European Organizations from 13 EU countries from South Europe (Italy, Spain, Portugal, Bulgaria, Malta and France) and North Europe (Germany, Czech Republic, United Kingdom, Ireland, Findalnd, Sweden ...
Voir le projet

 13

 TERMINÉ 

ONLINE ANALYSIS TOOL FOR THE OPTIMIZATION OF SOCIAL MEDIA CAMPAIGNS (OPTIMIZR)

Date du début: 1 sept. 2013, Date de fin: 31 août 2015,

For the first time in history, spending on Internet advertising surpassed newspaper spending, a trend that will increase in the future. The large bulk of this spending was invested in non-traditional social media marketing programmes, involving multiple channels such as Twitter, social networks, blogs and more. Alongside the growth of social networks the birth of a new methodology of analysis: Soc ...
Voir le projet

 8

 TERMINÉ 

Maintaining all Green and Ecoinnovation Results in a Living Portal (GREENXPO)

Date du début: 1 juin 2013, Date de fin: 31 mai 2015,

...ledge to policy makers, enterprises and society at large. To ensure synergies and a speedy implementation, greenXpo will build on the state-of-the-art INNOVATIONSEEDS portal that already features 100 European environmental R&D results.The general objective is broken down into six ambitious, specific objectives: 1) to develop a web-based tool for eco-innovation knowledge; 2) to present 190 new eco- ...
Voir le projet

 10

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

...ty guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI-WARE unites major European industrial actors. The key deliverables of FI-WARE will be an open architecture and a reference implementation of a novel service infrastructure, building upon generic and reusable building b ...
Voir le projet

 92

 TERMINÉ 

Smart Connected Electro Mobility (smartCEM)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2014,

Four European cities/regions (Barcelona, Gipuzkoa-San Sebastian, Newcastle and Reggio Emilia) have come together to demonstrate the role of ICT solutions for cities and citizens in addressing shortcomings of electro mobility. Electric power solutions have proven to offer a potentially ground-breaking solution for more energy-efficient and less petrol-dependent vehicles and transport systems. The ...
Voir le projet

 31

 TERMINÉ 

Theodor Bilharz into the European Research Area (THEBERA)

Date du début: 1 nov. 2010, Date de fin: 30 avr. 2014,

...international excellence and reference centre for liver diseases and Hepatic surgery excellence by defining liver research priorities to respond to socio-economic needs, facilitating participation in European liver research initiatives and inclusion in Euro-Mediterranean Research and Innovation Area.The specific objectives of THEBERA project are:- TBRI’s Cooperation Capacities Reinforcement- Liver ...
Voir le projet

 4

 TERMINÉ 
...blicationsPublic project deliverablesThis folder collects the project deliverablesSEE_INNOVA EOI KPsThis folder collects the documents produced by each partner for the Expression of Interest.act 3.4: European Active Ageing perspective and strategiesDocuments can be found under: http://www.seeinnova.eu/documents
Voir le projet

 11

 TERMINÉ 

Assistive Technologies and Inclusive Solutions for All (ATIS4all)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2013,

... the first human rights treaty that the EC as a whole has ratified. It aims to ensure that people with disabilities enjoy human rights on an equal basis with other people.People with special needs in Europe continue to be confronted with a number of barriers to usage of everyday ICT products and services. Inclusive ICT and Assistive Technologies (ATs) are essential for enabling full participation ...
Voir le projet

 20

 TERMINÉ 

Palestine for European Research Area (PERA)

Date du début: 1 avr. 2011, Date de fin: 30 sept. 2013,

...ion capacities and research activities in Palestinian’s water and energy sectors by defining water and energy research priorities to respond to socio-economic needs, facilitating participation in European water and energy research initiatives and inclusion in European Research Area.The specific objectives of PERA project are:-Better Coordination Between Policy, Research and Business in Palestine-E ...
Voir le projet

 4

 TERMINÉ 
...on an accessible and attractive place, and to improve internal and external transport links (p 49). Transport issues are especially important for BSR since the distances internally and to the rest of Europe are very long and the conditions for traffic are difficult. In the times of economic slowdown, the pace of change in the transport sector is increasing.Project addresses to:1) Structural challe ...
Voir le projet

 14

 TERMINÉ 

Capacity Building for Direct Water Reuse in the Mediterranean Area (CB-WR-MED)

Date du début: 1 nov. 2010, Date de fin: 30 avr. 2013,

...ional and international impact with the ultimate goal that R&D activities lead to a fruitful cooperation with the UE for sustainable water management in accordance with the national and European strategies.There is much effort needed to build cooperation to develop appropriate sustainable water management. Still, high attention is given to capacity building on EC cooperation and scientific researc ...
Voir le projet

 6

 TERMINÉ 

Integrating Jordan into the European Research Area (IJERA)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2012,

..., and reinforcing the cooperation capacities and research activities in Jordan’s water sector by defining water research priorities to respond to socio-economic needs, facilitating participation in European water research initiatives and inclusion in Euro-Mediterranean Research and Innovation Area. The specific objectives of IJERA project are:EMARCU’s Cooperation Capacities Reinforcement,  Water ...
Voir le projet

 4

 TERMINÉ 

Sustainable Technologies and Research for European Aquatic Management (STREAM)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2012,

...ication actions tailored to the needs of the different categories of stakeholders. These include Policy Seminars to be held in 3 different countries and also streamed online, a Final Symposium at the European Parliament in Brussels, 2 Summer Schools, e-learning courses, audiovisual materials, including videos and interviews, webinars for research events and participation in sectorial events. A web ...
Voir le projet

 4

 TERMINÉ 

Sustainable energy for the rural village environment (SERVE)

Date du début: 1 nov. 2007, Date de fin: 31 oct. 2012,

The SERVE project demonstrates sustainable energy use in rural communities. Retrofit work is led by the Local Authority (NTCC) and new build by a not-for-profit co-operative (SPIL). SPIL is selling serviced sites in an Eco-Village to members, who will then build under the control and guidance of SPIL. This 132-home project is already under way. Thus, it will act as a flagship for Concerto from the ...
Voir le projet

 12

 TERMINÉ 
The RACE networkRFID initiative has been developed to raise awareness of Radio Frequency Identification across Europe through the establishment of a federating platform for all key European stakeholders in the development and use of RFID technology and applications.The European Union (EU), through the Commission, has made a substantial investment in research, standards and regulatory developments ...
Voir le projet

 25

 TERMINÉ 

Fostering the Research Dimension of Science and Technology Agreements (FORESTA)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2011,

...o start discussions on an S&T Agreement. The project is structured in two main blocks of activities: one looking at immediate opportunities for cooperation between researchers of the two communities (Europe and Latin America) via the organisation and follow up of conferences in the five target countries, the other one looking at long-term perspectives. This latter evolves around two sets of activi ...
Voir le projet

 9

 TERMINÉ 
SKEMA aims to establish a Sustainable Knowledge Platform to be used by policy makers and stakeholder groups in the European Maritime and Logistics Industry. The SKEMA Knowledge Platform will contain a Knowledge Base that will be populated by Consolidation Studies and associated Periodic Studies and outputs from Thematic Activities addressing key challenges for the European maritime transport and l ...
Voir le projet

 14

 TERMINÉ 
This Trilogy proposal is for a 3-year Integrated Project targeting Challenge 1 of the 7th Framework Programme: "Pervasive and Trusted Network and Service Infrastructures". The project scope lies entirely within Objective 1.1, "The Network of the Future".The aim of the project is to develop new solutions for the control architecture of the Internet that remove the known and emerging technical defic ...
Voir le projet

 12

 TERMINÉ 

Western Balkan Countries Inco-Net Support in the field of ICT (WINS-ICT)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2010,

WINS-ICT aims to strengthen S&T cooperation between the EU and the Western Balkan countries by deepening the bi-regional strategic relations in the field of ICT and promoting the participation of WB ICT research actors in FP 7.The objectives of the WINS-ICT project are to- Provide comprehensive understanding of the current framework of EU-WBC ICT RTD policies and RTD collaboration- Optimize the cu ...
Voir le projet

 15

 TERMINÉ 

Enabling Grids for E-sciencE III (EGEE-III)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2010,

...ry, earth and life sciences, fusion and particle physics. Strong quality assurance, training and outreach programmes contribute to the success of this production Grid infrastructure. Built on the pan-European network GÉANT2, EGEE has become a unique and powerful resource for European science, allowing researchers in all regions to collaborate on common challenges. Worldwide collaborations have ext ...
Voir le projet

 167

 TERMINÉ 
The basis for the project is a detected need of people with intellectual disabilities for respectful life and treatment; legislation in most European countries has developed towards social inclusion and improvement of the quality of life of disabled persons. The project will develop training packages for trainers of people with intellectual disabilities, based on the values of social inclusion, em ...
Voir le projet

 31