Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Renewables in a Stable Electric Grid (RE-SERVE)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

Future energy systems will use renewable energy sources to minimise CO2 emissions. Currently large generators powered by fossil fuel turbines maintain the stability and quality of energy supplies through their inertia. The inertia of these generator-turbine groups gives providers a significant time window in which to react to network events. We urgently need to find ways to stabilise energy sys ...
Voir le projet

 11

 TERMINÉ 
Living in a safe and secure society is a fundamental human need. The security of critical infrastructures must be maintained so that supplies of power, water or other resources are secured. Modern critical infrastructures are increasingly complex and they are turning into Cyber-Physical Infrastructures because ICT is growing in importance in infrastructure management.The SUCCESS project will dev ...
Voir le projet

 19

 TERMINÉ 

5G Exchange (5GEx)

Date du début: 1 oct. 2015, Date de fin: 31 mars 2018,

The goal of the 5G Exchange (5GEx) project is to enable cross-domain orchestration of services over multiple administrations or over multi-domain single administrations. This will allow end-to-end network and service elements to mix in multi-vendor, heterogeneous technology and resource environments. Market fragmentation has resulted in a multitude of network operators each focused on different co ...
Voir le projet

 20

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

THINGS2DO (THINGS2D0)

Date du début: 1 janv. 2014, Date de fin: 1 janv. 2018,

Develop the FDSOI ecosystem in Europe, beyond the PLACES2BE Pilot Line, in order to increase the impact of this European technology. At the time of set up of the first KET pilot line the proof of FDSOI was mainly technological. In between then and now, the first realization of a complex silicon chip in FDSOI has shown to the worldwide microelectronics community the capabilities of this technology. ...
Voir le projet

 44

 TERMINÉ 

5G-Crosshaul: The 5G Integrated fronthaul/backhaul (5G-Crosshaul)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

Mobile data traffic is forecasted to increase 11-fold between 2013 and 2018. 5G networks serving this mobile data tsunami will require fronthaul and backhaul solutions between the RAN and the packet core capable of dealing with this increased traffic load while fulfilling new stringent 5G service requirements in a cost-efficient manner.The 5G-Crosshaul project aims at developing a 5G integrated ba ...
Voir le projet

 21

 TERMINÉ 
...bile broadband services for mobile users, supporting UHD/3D streaming, immersive applications and ultra-responsive cloud services.The consortium brings together major infrastructure vendors (Samsung, Ericsson, Alcatel-Lucent, Huawei, Intel, Nokia), major European operators (Orange, Telefonica), leading research institutes and universities (Fraunhofer HHI Institute, CEA-LETI, IMDEA Networks, Univer ...
Voir le projet

 19

 TERMINÉ 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Voir le projet

 24

 TERMINÉ 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Voir le projet

 19

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 
...seen. The thermal energy (waste heat) of the system can be applied for heating purposes as well as for cooling applying, e.g. an absorption cooling system. The system demonstration will take place at Ericsson as a real TLC site
Voir le projet

 8

 TERMINÉ 
Description The Challenge:The advent of cloud applications and the proliferation of mobile devices have imposed a dramatic increase of the IP traffic. The emerging ZetaByte Era forces operators to seek a cost-efficient way of upgrading their network in order to accommodate the vast amount of data without compromising QoS and wasting bandwidt ...
Voir le projet

 7

 TERMINÉ 

Scaffolding Scalable Software Services (S-CASE)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

The goal of S-CASE is to accelerate the software development lifecycle for cloud services by introducing a new agile prototyping paradigm that automates the process of mapping user requirements to concrete software specifications and generates operational code (RESTful services). S-CASE aspires to support software developers in identifying software requirements and business processes in various fo ...
Voir le projet

 9

 TERMINÉ 

eWall for Active Long Living (eWALL)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

Description eWALL will be an affordable, easy-to-install prefabricated wall that can be mounted on an existing wall and includes all the ICT needed to enable a number of services for the senior citizen to cover major challenges in Active and Healthy Ageing. The project will carry out high-risk and multi-disciplinary research and will have a ...
Voir le projet

 14

 TERMINÉ 

COnvergence of fixed and Mobile BrOadband access/aggregation networks (COMBO)

Date du début: 1 janv. 2013, Date de fin: 30 sept. 2016,

Fixed and mobile networks have been subjects to significant technological and architectural evolutions in the past years, with e.g. deployments of 4G mobile networks and FTTH fixed networks, as well as significant increase in traffic demand and access bandwidth both in fixed and mobile access networks. All these network evolutions lead to enormous investments in independent network infrastructures ...
Voir le projet

 20

 TERMINÉ 

A BLUEPRINT of Haematopoietic Epigenomes (BLUEPRINT)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2016,

In response to the call for a high impact initiative on the human epigenome, the BLUEPRINT Consortium has been formed with the aim of generating at least 100 reference epigenomes and studying them to advance and exploit knowledge of the underlying biological processes and mechanisms in health and disease. BLUEPRINT will focus on distinct types of haematopoietic cells from healthy individuals and o ...
Voir le projet

 45

 TERMINÉ 

Programmability In RINA for European supremacy of virTualised NEtworks (PRISTINE)

Date du début: 1 janv. 2014, Date de fin: 30 juin 2016,

The Internet as the global communications infrastructure has been successful in shaping the modern world by the way we access and exchange information. The Internet architecture designed in the 1960's has been supporting a variety of applications and offering a number of services till now but emerging applications demand better quality, programmability, resilience and protection. Any alterations t ...
Voir le projet

 16

 TERMINÉ 

Unifying Cloud and Carrier Networks (UNIFY)

Date du début: 1 nov. 2013, Date de fin: 30 avr. 2016,

Telecom providers struggle with low service flexibility, increasing complexity and related costs. Although cloud computing and networking have been two very active fields of research, there is currently little integration between the vast networking assets and data centres of telecom providers. UNIFY addresses this by considering the entire network, from home networks up to data centre, as a "unif ...
Voir le projet

 16

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 
ASTRON aims at the development of high-capacity, energy-efficient and bit-rate flexible optical transceivers capable of supporting rates from 10Gb/s to beyond 1Tb/s. The ASTRON concept is based on developing multi-functional and agile devices so as to achieve Terabit capacities on a single photonic integrated chip. ASTRON's transceiver can realize different techniques of flexible super-channel ge ...
Voir le projet

 14

 TERMINÉ 

Pilot Lines for Advanced CMOS EmbodimentS in 2x nodes, Built in Europe (PLACES2BE)

Date du début: 3 déc. 2012, Date de fin: 31 déc. 2015,

...licy that is an integral part of the Horizon 2020 strategy.Consortium: PLACES2BE Pilot line gathers 27 experienced partners, including industry leaders such as GLOBALFOUNDRIES, ARM, STEricsson, SOITEC, MENTOR Graphics along the microelectronics value chain, SMEs such as Open Engineering, eSilicon, GSS, Axiom, IBS, RTOs such as the Fraunhoger Gesellschaft, IMEC, and LETI, and several academic teams ...
Voir le projet

 22

 TERMINÉ 
Traffic demand is increasing dramatically, year on year, with typical growth figures of up to 60% for Internet based traffic. Such traffic increase is impacting on both network costs and power consumption. Moreover, traffic is not only increasing but becoming much more dynamic, both in time and direction. For these reasons, transport network evolution from current DWDM systems towards elastic opti ...
Voir le projet

 16

 TERMINÉ 

Future INternEt Smart Utility ServiCEs (Finesce)

Date du début: 1 mars 2013, Date de fin: 30 sept. 2015,

Change is the name of the game in energy! The shift to sustainability is visible everywhere. It is now a European priority to combine solutions which utilise energy generation from renewable energy sources and optimize energy usage efficiency into a Smart Energy System based on the introduction of Future Internet technologies. At the same time, business innovation needs to be encouraged to ensure ...
Voir le projet

 34

 TERMINÉ 

Self-Management for Unified Heterogeneous Radio Access Networks (SEMAFOUR)

Date du début: 1 sept. 2012, Date de fin: 31 août 2015,

The SEMAFOUR project will design and develop a unified self-management system, which enables the network operators to holistically manage and operate their complex heterogeneous mobile networks. The ultimate goal is to create a management system that enables an enhanced quality of user experience, improved network performance, improved manageability, and reduced operational costs. SEMAFOUR aims at ...
Voir le projet

 9

 TERMINÉ 

Minerals Intelligence Network for Europe (MINERALS4EU)

Date du début: 1 sept. 2013, Date de fin: 31 août 2015,

The Minerals4EU project is designed to meet the recommendations of the Raw Materials Initiative and will develop an EU Mineral intelligence network structure delivering a web portal, a European Minerals Yearbook and foresight studies. The network will provide data, information and knowledge on mineral resources around Europe, based on an accepted business model, making a fundamental contribution t ...
Voir le projet

 32

 TERMINÉ 
In 2020, mobile and wireless traffic volume is expected to increase thousand-fold over 2010 figures. Moreover, an increase in the number of wirelessly-connected devices to counts in the tens of billions will have a profound impact on society. Massive machine communication, forming the basis for the Internet of Things, will make our everyday life more efficient, comfortable and safer, through a wid ...
Voir le projet

 24

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

Harmonised eCall European Pilot - Phase 2 (HeERO2)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

The overall objective of HeERO 2 is "To extend HeERO to new Member States or associated countries to demonstrate the scalability of the HeERO solution and to widen the acceptance of eCall."To support this objective there are three aims:(1) to prepare the necessary infrastructure to realize interoperability of "eCall" at European level, (2) to boost Member States investment in the PSAP infrastructu ...
Voir le projet

 42

 TERMINÉ 

uBiquitous, secUre inTernet-of-things with Location and contExt-awaReness (BUTLER)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an ...
Voir le projet

 23

 TERMINÉ 

immersiVe ENhancemenT of User-woRld Interactions (VENTURI)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2014,

Augmented Reality (AR) is a concept and a vision that has been with us, and will be with us, for the foreseeable future. We're already augmented today using mobile devices with a connection to the Internet allowing us to almost instantly gain access to the collective global human knowledge. We're starting to add visual augmentation into some devices, but we are only tapping into a small part of th ...
Voir le projet

 9

 TERMINÉ 

Networked Society (NetSoc)

Date du début: 1 juil. 2012, Date de fin: 30 juin 2014,

The strategic objective of the Networked Society project is to define the requirements for future networks that can seamlessly support the Networked Society of 2020. This will be achieved by enabling an informed dialogue and policy debate between the terrestrial, satellite and content delivery communities and the industrial and social application sectors. This project will create new and lasting r ...
Voir le projet

 10

 TERMINÉ 
"The activity is focused on the design and development of a ""ready-to-market"" single chip GNSS mass marketreceiver for GPS, EGNOS and GALILEO signals.Based on the wide expertise of STM in building high performance, ultra low power consumption receivers for the mass market and on the large experience and involvement of the consortium partners in the different domains (mass market AGNSS leading ro ...
Voir le projet

 11

 TERMINÉ 

Harmonised eCall European Pilot (HeERO)

Date du début: 1 janv. 2011, Date de fin: 30 juin 2014,

The HeERO project will prepare, carry-out and coordinate eCall pre-deployment pilots at European level taking into account the approved standards. The overall project objective is to prepare for the deployment of the necessary infrastructure in Europe with the aim of making the Pan-European in-vehicle emergency call service eCall a reality.In order to address the eCall interoperability which would ...
Voir le projet

 39

 TERMINÉ 
FLEXWIN proposes a significant advance towards smart RF microsystems by combining 1.) an RFMEMS switch process monolithically integrated with a Si/SiGe BiCMOS process, 2.) highly reconfigurable mm-wave building blocks, able to be used over a broad frequency range and for different applications, 3.) a new RF-system design paradigm built around the concepts of reusability, multifunctionality and re ...
Voir le projet

 8

 TERMINÉ 
The INFINITY Support Action will have a positive impact on the success of the FI-PPP programme. Through collaboration with organisations across Europe, INFINITY will capture and communicate information about available infrastructures and any interoperability requirements and issues. INFINITY will document any usage-related operational constraints and seek to identify and foster federation opportun ...
Voir le projet

 14

 TERMINÉ 
This project aims at developing architecture and technologies for implementing agile radio frequency (RF) transceiver capacities in future radio communication products. These new architecture and technologies will be able to manage multi-standard (multi-band, multi-data-rate, and multi-waveform) operation with high modularity, low-power consumption, high reliability, high integration, low costs, l ...
Voir le projet

 41

 TERMINÉ 
Description The main goal of the universAAL project is to make it easier for the ICT industry in Europe to develop and successfully deploy AAL solutions. To achieve this, the project is developing an open standardized platform/specification on which the AAL service providers can quickly and cheaply build AAL services. The project also assist ...
Voir le projet

 21

 TERMINÉ 

low Energy COnsumption NETworks (ECONET)

Date du début: 1 oct. 2010, Date de fin: 31 déc. 2013,

Nowadays, it is widely recognised that the sole introduction of low consumption silicon elements will not be sufficient to effectively curb tomorrow's network energy requirements. Based on this assumption, the ECONET project will investigate, develop and test new capabilities for the Future Internet devices enabling the efficient management of power consumption so to strongly reduce the current en ...
Voir le projet

 15

 TERMINÉ 

Cooperative Systems for Sustainable Mobility and Energy Efficiency (COSMO)

Date du début: 1 nov. 2010, Date de fin: 30 juin 2013,

Energy efficiency is strictly related to CO2 emissions and by its nature is a global issue.Traffic and transport have the potential of producing savings in energy consumptions that are potentially estimated in 26%. Looking at the traffic and transport system as a whole, energy is addressed in the traffic environment through different angles:•\tVehicle fuel consumption: Savings can be achieved by a ...
Voir le projet

 13

 TERMINÉ 

Design methods for Radio Architectures GOing Nanoscale (DRAGON)

Date du début: 1 févr. 2010, Date de fin: 31 mai 2013,

Description DRAGON develops a design platform and novel flexible RF architectures for SoC( Systems on Chip) and SiP (Systems in Package).The DRAGON project seeks to achieve distinct reductions in cost, size and energy consumption for multi-standard cellular handsets, and other products employing similar technology, while meeting higher de ...
Voir le projet

 8