Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

ACTivating InnoVative IoT smart living environments for AGEing well (ACTIVAGE)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2020,

ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Voir le projet

 50

 TERMINÉ 
Multi-cloud applications refer to applications that dynamically can distribute their components over heterogeneous cloud resources and still hold the functional, business and non-functional properties (NFP) declared in their SLAs. The main objective of the DECIDE action is to provide a new generation of multi-cloud service-based software framework, enabling techniques and mechanisms to design, dev ...
Voir le projet

 8

 TERMINÉ 
SynchroniCity represents the first attempt to deliver a Single Digital City Market for Europe by piloting its foundations at scale in 11 reference zones - 8 European cities & 3 more worldwide cities - connecting 34 partners from 11 countries over 4 continents. Building upon a mature European knowledge base derived from initiatives such as OASC, FIWARE, FIRE, EIP-SCC, and including partners with le ...
Voir le projet

 35

 TERMINÉ 

SMART RENEWABLE HUBS FOR FLEXIBLE GENERATION: SOLAR GRID STABILITY (GRIDSOL)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

Fight against climate change has its main battlefield at the energy sector. Electricity and transport are the largest contributors to GHG emissions; the trend in transport toward electric vehicle will increase pressure on the electricity system and fundamentally change its dynamics. With producers focused on their legitimate business targets, and consumers focused on security of supply and low pri ...
Voir le projet

 10

 TERMINÉ 
"Advanced Manufacturing has been highlighted by the EU as one of the key enablers to support and promotion of business research and innovation in key enabling technologies. Therefore, a number of objectives, aligned with pursuing the large scale targets, have been set for advanced manufacturing through four pillars: technology, economic, social and environment. Thus, HINDCON project aims to adapt ...
Voir le projet

 12

 TERMINÉ 

Transforming Transport (TT)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Voir le projet

 48

 TERMINÉ 
A major obstacle to increase the efficiency, effectiveness and quality of education in Europe is the lack of widely available, accessible, multilingual, timely, engaging and high-quality educational material (i.e. OpenCourseWare). The creation of comprehensive OpenCourseWare (OCW) is tedious, time-consuming and expensive, with the effect, that often courseware employed by teachers, instructors and ...
Voir le projet

 17

 TERMINÉ 

TURISTI non PER CASO

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2018,

A. CONTEXT The Italian accommodation offer is leader in Europe for quality and dimension. Tourism sector has always been and it is still a solid engine for economic recovery of European Union. It is important, in period of economic crisis, to invest in the education and training of young people who want to work in tourism sector. In order to increase sector competitiveness, is it essential to ensu ...
Voir le projet

 26

 TERMINÉ 

Forming and Modular Integration of Thermoplastics (FORMIT)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2017,

The main objective of FORMIT is to develop a modular tooling to integrate a wing upper skin and an external wing leading edge with several T-Shape and omega stringers. Skins will be laminated on the integration tool by Topic Manager with Automated Fiber Placement technology and stringer will be produced with an innovative continuous forming process patented by Applus. Both structures will be made ...
Voir le projet

 2

 TERMINÉ 
Industrial robots have demonstrated their capacity to answer the needs of many industrial applications, offering a high degree of dexterity, accuracy and efficiency.However, when the application requires the collaboration between the robot and the worker, including workspace sharing, it is not feasible to use standard industrial robots due to safety being compromised Recently, new robotic products ...
Voir le projet

 16

 TERMINÉ 

European mobility: from learning to employment

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

The goal of ADICE, and of this project, is to ensure the social and professional development of the learners (including those with fewer opportunities), by participating in a valuable mobility experience. ADICE considers the mobility as a tool allowing the development of technical, transverse and social skills favoring the access to the labour market. Furthermore, the labor pool of the Lille metro ...
Voir le projet

 24

 TERMINÉ 

First Step In Europe

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

Title: First Step in Europe Theme: Reception issues for Customers’ Care and Logistic Transport students. Direct and indirect actors: - 5 training institutions or placement companies, - 30 young people preparing vocational high school diplomas in Customers’ Care and Logistic Transport (level IV, from 17 to 20 years old), - The EFP staffs who will go on training period abroad, - Teachers / Student ...
Voir le projet

 7

 TERMINÉ 

Water analytics and Intelligent Sensing for Demand Optimised Management (WISDOM)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2017,

Growing water demand caused by climate change, urbanization and population growth requires new business and technology platforms to manage the increased level of diversity and complexity of urban water resources management. The increasing variability of both supply and consumption will also require more sophisticated and optimized decision making.To achieve a step change in water and energy saving ...
Voir le projet

 13

 TERMINÉ 

WING STRUCTURAL TEST DEVELOPMENT METHOD (WISDOM)

Date du début: 14 janv. 2013, Date de fin: 13 déc. 2016,

The proposal approach innovative solutions for the design and manufacturing of the test rig and the definition of the method and prformance for the structural testing of two different kinds of configuration for the outer wings within a Smart Fixed Wing Aircraft.The WISDOM proposal, understand that the test philosophy is to demonstrate that major components tests can be performed on flight test air ...
Voir le projet

 3

 TERMINÉ 
More than 99% of European Food & Drink companies are small and medium enterprises. Industrial food production generates a lot of polluting wastewater. the Urban Waste Water Directive has set strict regulations to the quality of waste water discharged from these industries to the environment. But treating wastewater is expensive. The smaller the company is, the more expensive it is to treat 1m3 of ...
Voir le projet

 8

 TERMINÉ 
Integrated product-service solutions or Product-Service Systems promote a shift from value in exchange to value in use to satisfy customer needs. In this new landscape, manufacturers do not sell a physical product, but its usage (renting, pay-x-use) or its outcome (pay-x-performance). Companies and supply network should focus on reducing the Life Cycle Cost of the Product-Service Systems and exten ...
Voir le projet

 10

 TERMINÉ 

Ouvrir les portes de l'Europe aux jeunes dipômés

Date du début: 1 sept. 2014, Date de fin: 31 août 2016,

Convinced of the merits of mobility to promote language learning , discover other work environments and other European cultures , we wanted to put this project in place for young graduates. Indeed, recall that France , youth unemployment is important and even more so for those with a level of less than or equal to IV degree ( bachelor or maximum level ) . It is therefore to reduce this form of dis ...
Voir le projet

 7

 TERMINÉ 
The TEMGIR project is for the design and development of Thermal and Electrical Mock-ups for the validation of the thermal behaviour in the electrical air systems architecture at aircraft level.TEMGIR will provide a thermal model of an aircraft with both electrical and thermal behaviour, which will be able to develop any relevant condition and scenarios within the different flight phases. The TEMGI ...
Voir le projet

 4

 TERMINÉ 

INNOVATIVE CONFIGURATION FOR A FULLY RENEWABLE HYBRID CSP PLANT (HYSOL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

Renewable energies have often problems in order to provide a stable and reliable power supply, as they often depend on meteorological circumstances that have a variable or stochastic component. This fact is often used by their detractors to favour the use of other alternatives such as fossil fuels.The main added value of the hybridisation concept will be the achievement of the Europe Strategic Ene ...
Voir le projet

 8

 TERMINÉ 
Agricultural residues could represent a good source of biomass to convert into energy in particular wherever it is impractical to convert cropland to energy crop cultivation . According to FAO’s reportage (1997) , large quantities of ligneous biomass can be obtained from pruning operations carried out in Mediterranean fruit plantations. Agricultural residues therefore play an important role in any ...
Voir le projet

 19

 TERMINÉ 

European Mobility: Key Opportunity for a New Generation

Date du début: 1 juil. 2014, Date de fin: 30 juin 2016,

The goal of ADICE, and of this project, is to enable the social and professional development of learners and job seekers (including those with fewer opportunities) through a rewarding mobility experience, which is built according to their own ability and ambition. Indeed, ADICE considers the mobility experience as a tool which allows the development of technical, transverse and social skills, all ...
Voir le projet

 30

 TERMINÉ 
The IERF, founded in 1995, an organisation providing training, career guidance and mobility accompaniment, proposes for consideration the CEDRES.S project – “European Careers for Recent Graduates of Secondary and Higher Education” – whose goal is to offer 100 participants from the Ile de France region a mobility road-map enabling them to acquire professional skills and improve their employability. ...
Voir le projet

 10

 TERMINÉ 

Environmentally sustainable data centres for Smart Cities (DC4Cities)

Date du début: 1 sept. 2013, Date de fin: 29 févr. 2016,

Data centres are involved play two different and complementary roles in Smart Cities' energy policies with two roles: as ICT infrastructures supporting Smart City resource optimization systems - and more in general, delivering for ICT services to the citizens - and as large energy consumers. Therefore there are huge expectations on data centres being able to run at the highest levels of renewable ...
Voir le projet

 14

 TERMINÉ 
The project aims on the one hand the development of new biobased materials specially adapted to the development of a wide range of containers or packages (films made by extrusion laminating, trays or lids developed by injection moulding and bottles performed through extrusion blow moulding technologies) and the improvement of thermal, mechanical and barrier properties of these packages through nan ...
Voir le projet

 22

 TERMINÉ 

PRECISSION OUTER WING ASSEMBLY DEVICES (PROUD)

Date du début: 4 sept. 2011, Date de fin: 3 févr. 2016,

The proposal approach innovative solutions for the design and manufacturing of the tooling needed for the assembly of two different kinds of configuration for the outer wings within a Smart Fixed Wing Aircraft. The PROUD proposal, understand that the main requirement for this wing structural part is based on their high dimensional stability and tight geometrical tolerances to compliance with surfa ...
Voir le projet

 1

 TERMINÉ 

Zero-impact innovative technology in forest plant production (ZEPHYR)

Date du début: 1 oct. 2012, Date de fin: 30 nov. 2015,

The UN General Assembly has proclaimed 2011 as the International Year of Forests, since they play a crucial role in regulating the global climate and are also a vital resource for many countriesBy the European side, the Commission Green Paper “On forest protection and information in the EU: preparing forests for climate change” [COM(2010)66] underlines that forests serve multiple and interrelated ...
Voir le projet

 14

 TERMINÉ 

INTelligent systems for Energy Prosumer buildIngs at District level (INTrEPID)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

The INTrEPID project aims to develop technologies that will enable energy optimization of residential buildings, both performing an optimal control of internal sub-systems within the Home Area Network and also providing advanced mechanisms for effective interaction with external world, including other buildings, local producers, electricity distributors, and enabling energy exchange capabilities a ...
Voir le projet

 8

 TERMINÉ 

A Novel Decision Support System for Intelligent Maintenance (IMAIN)

Date du début: 1 sept. 2012, Date de fin: 31 août 2015,

“iMain” is an European level research project aiming to develop a novel decision support system for predictive maintenance. To that end, a multi-layer solution integrating embedded information devices and artificial intelligence techniques for knowledge extraction and novel reliability & maintainability practices will be developed. The resulting solution will provide extended capabilities compared ...
Voir le projet

 9

 TERMINÉ 
VERTIGEEN addresses a need identified by olive sector SME-Associations for the rapid and reliable on-site detection and quantification of the Verticillium dahliae fungus in soil and plant samples. The increasing frequency and severity of this pathogen in most EU olive growing areas has made it the most serious problem of commercial olive plantations.For an estimated commercial price of €1,000/devi ...
Voir le projet

 11

 TERMINÉ 
The ENCOURAGE project aims to develop embedded intelligence and integration technologies that will directly optimize energy use in buildings and enable active participation in the future smart grid environment. The desired energy savings will be achieved in three complementary ways. Firstly, by developing supervisory control strategies that will be able to coordinate larger subsystems (HVAC,lighti ...
Voir le projet

 12

 TERMINÉ 
New building strategies addressing climate change effects and reduction of heating/cooling energy are two fundamental issues at EU level. Figures as the 35,000 excess deaths attributed to the last heat wave in the continent in 2003, or 10% of the world’s energy being used just for heating of buildings support European citizen’s concerns and new EU legislation. New national and communitarian string ...
Voir le projet

 11

 TERMINÉ 

Integrated air quality sensor for energy efficient environment control (INTASENSE)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2014,

"Space heating accounts for more than 50% of the energy consumption of public & residential buildings, and reduction of this energy demand is a key strategy in the move to low energy/low carbon buildings. The careful management of air flow within a building forms part of this strategy through the control of inlet fresh air and exhaust air, maximising air re-circulation, and minimising the amount o ...
Voir le projet

 9

 TERMINÉ 

New Designs of Ecological Furnaces (EDEFU)

Date du début: 1 juin 2010, Date de fin: 31 mai 2014,

...nmental footprint.In addition these new technologies will allow reaching efficient operating conditions: reduction of times of fusion, minor power consumption in zones of maintenance and energy storage.On th emonger term, the project will grealty contribute to increase the competitiveness of the Foundry, Glass, Cement and Ceramic industries often economically unfavoured by new environmental regul ...
Voir le projet

 20

 TERMINÉ 

Sharing AudioVisual language resources for Automatic Subtitling (SAVAS)

Date du début: 1 mai 2012, Date de fin: 30 avr. 2014,

Due to recently approved European and National directives and laws, the subtitling demand has grown fast in the past few years throughout Europe. The path of manual subtitling is no longer feasible, due to the quantity of the demand and the cost of the process, both in terms of time and personnel. As a result, broadcasters and subtitling companies are seeking for subtitling alternatives more produ ...
Voir le projet

 8

 TERMINÉ 
The goal of OUTSMART is to contribute to the Future Internet (FI) by aiming at the development of five innovation eco-systems. These eco-systems facilitate the creation of a large variety of pilot services and technologies that contribute to optimised supply and access to services and resources in urban areas. This will contribute to more sustainable utility provision and, through increased effici ...
Voir le projet

 29

 TERMINÉ 
The SmartAgriFood project addresses the food and agribusiness as a use case for the Future Internet. The intelligence, efficiency, sustainability and performance of the agri-food sector can be radically enhanced by using information & decision support systems that are tightly integrated with advanced internet-based networks & services. Concurrently, the sector provides extremely demanding use case ...
Voir le projet

 23

 TERMINÉ 

Optimization of Bandwidth for IPTV video streaming (OptiBand)

Date du début: 1 janv. 2010, Date de fin: 31 oct. 2012,

IPTV provides telecommunication operators the opportunity to better serve the video market and better compete with the industry transition to HD (High Definition) and unicast video (e.g. Video on Demand), both creating challenges to the existing CATV (Cable TV) and SAT (Satellite) providers. One of the main challenges in IPTV is the line rate of the access lines, which is predominantly ADSL.OptiBa ...
Voir le projet

 15

 TERMINÉ 

SELF OPTIMISING MEASURING MACHINE TOOLS (SOMMACT)

Date du début: 1 sept. 2009, Date de fin: 31 août 2012,

SOMMACT develops and validates an innovative production hardware and control system founded on understanding, evaluating and controlling production system performances. This approach is based on detection (in-process traceable measurement embedded capabilities) and compensation (adaptive control and self-learning capabilities) of geometrical effects of varying external and internal quantities, suc ...
Voir le projet

 12

 TERMINÉ 

Services and Applications For Emergency Response (SAFER)

Date du début: 1 janv. 2009, Date de fin: 31 mars 2012,

"SAFER aims at implementing preoperational versions of the Emergency Response Core Service. SAFER will reinforce European capacity to respond to emergency situations: fires, floods, earthquakes, volcanic eruptions, landslides, humanitarian crisis. The main goal is the upgrade of the core service and the validation of its performance with 2 priorities: First priority is the short term improvement o ...
Voir le projet

 57

 TERMINÉ 
There is a need to mange Europe’s finite water resources. Water discharged from industrial processes needs to be returned into our environment in a safe and clean state. This is reflected by the Water Framework Directive (EC 2455/2001/EC) and other legislation. Over 7,000 million cubic metres of heavily polluted water are discharged by our targeted industries every year in Europe, existing technol ...
Voir le projet

 10