Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The OLEUM project will generate innovative, more effective and harmonized analytical solutions to detect and fight the most common and emerging frauds and to verify the overall quality of olive oils (OOs). By a core group of 20 partners from 15 countries OLEUM will undertake RESEARCH ACTIVITIES based on the development of IMPROVED and NEW ANALYTICAL METHODS by targeted and omics approaches with th ...
Voir le projet

 24

 TERMINÉ 
According to European Commission, 13.1 million tons of poultry meat was produced only in the European Union (EU-28) in 2014 with an estimated generation of 3.1 million tons feather waste. At present the majority of poultry feathers are converted into low nutritional value animal food or disposed in landfills, causing environmental and health hazards. In this context, the overall objective of KaRMA ...
Voir le projet

 19

 TERMINÉ 

REsources from URban BIo-waSte (RES URBIS)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

RES URBIS aims at making it possible to convert several types of urban bio-waste into valuable bio-based products, in an integrated single biowaste biorefinery and by using one main technology chain. This goal will be pursued through: - collection and analysis of data on urban bio-waste production and present management systems in four territorial clusters that have been selected in different cou ...
Voir le projet

 22

 TERMINÉ 
The overall aim of Real-Time-Mining is to develop a real-time framework to decrease environmental impact and increase resource efficiency in the European raw material extraction industry. The key concept of the proposed research promotes the change in paradigm from discontinuous intermittent process monitoring to a continuous process and quality management system in highly selective mining operati ...
Voir le projet

 14

 TERMINÉ 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Voir le projet

 41

 TERMINÉ 

Innovative Intelligent Rail (IN2RAIL)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Voir le projet

 56

 TERMINÉ 
The European paper industry is at the core of the bioeconomy, using wood, a renewable material, and Paper for Recycling (PfR) as its main raw materials for producing paper products. This industry is a strategic sector in the EU economy, actively contributing to the re-industrialisation of Europe. Currently, the production of paper and board in the EU is 91 tonnes per year, while PfR represents 63% ...
Voir le projet

 19

 TERMINÉ 

TRAINING EXPERIENCIE IN EUROPE ALHAMBRA II

Date du début: 1 sept. 2016, Date de fin: 31 déc. 2017,

The “TRAINING EXPERIENCE IN EUROPE ALHAMBRA II” Project is promoted by the Consortium of the following VET Schools (sending organisations).- “Virgen de las Nieves” VET School Consortium Coordinator (Granada)- “Moraima” (Loja, Granada) VET School.- “Pedro Jiménez de Montoya” VET School (Baza, Granada)- “La Zafra” VET School (Motril, Granada)- “Albayzín” VET School (Granada)- “Padre Poveda” VET Sc ...
Voir le projet

 20

 TERMINÉ 

YOUNG EUROLAB II

Date du début: 1 sept. 2016, Date de fin: 31 déc. 2017,

1.- BACKGROUND: The Erasmus+ “YOUNG EUROLAB II” Project, is promoted by the Consortium of Mobility that consists of the next entities:- Municipal Institute for Employment and Bussiness Training (IMEFE). Coordinator and Sending organisation- Virgen del Carmen, VET school. Sending Organisation, Jaén- Santa María de los Apóstoles. VET school. Sending Organisation, Jaén- San Juan Bosco. VET school. Se ...
Voir le projet

 17

 TERMINÉ 
Nanotechnology is a key enabling technology. Still existing uncertainties concerning EHS need to be addressed to explore the full potential of this new technology. One challenge consists in the development of methods that reliably identify, characterize and quantify nanomaterials (NM) both as substance and in various products and matrices. The European Commission has recently recommended a definit ...
Voir le projet

 30

 TERMINÉ 

TRAINING EXPERIENCIE IN EUROPE ALHAMBRA

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

The Project "TRAINING EXPERIENCE IN EUROPE" is promoted by the Consortium composed of the following VET Schools: - IES Virgen de las Nieves, sending organisation and coordinator (Granada). - IES Moraima (Loja, Granada) - IES Albayzín (Granada) - IES Alfonso XI (Alcalá la Real, Jaén) - IES Pedro Jiménez de Montoya (Baza, Granada) The develop of the European dimension is the joint point that origins ...
Voir le projet

 15

 TERMINÉ 

IES Almunia "Growing in Europe"

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

IES Almunia is a Secondary Education School offering curriculum diversification programmes, A levels on Science and Technology , initial VET in "Microcomputer and Network Systems", a VET higher degree in "Development of Multiplatform Applications" and Initial Vocational Training program (PCPI) in " Computer and communications". Since 2004 we are an ICT and DIG centre and we developed the project ...
Voir le projet

 5

 TERMINÉ 

LET´S IMPROVE IN EUROPE II

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

The "Let's Improve in Europe II" project is led by the Consortium formed by the following entities: - IES Los Viveros, sending organisation and coordinator of the consortium (Sevilla). - IES Antonio de Ulloa, sending organisation (La Rinconada, Sevilla). - IES Juan de Mairena, sending organisation (Mairena del Alcor, Sevilla). - IES San José de la Rinconada, sending organisation (San José de la Ri ...
Voir le projet

 14

 TERMINÉ 

ALJARAFE EN EUROPA

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

The Project "ALJARAFE IN EUROPE" is promoted by the Consortium which composition is as follows: - Association for the Promotion and Development of the Aljarafe (coordinator and sending organisation). - Municipal Center of Integral Training (Pilas City Hall) - Isla Mayor City Hall - Alixar VET School (Castilleja de la Cuesta) - El Majuelo VET School (Gines) - Heliche VET School (Olivares) - Lucus S ...
Voir le projet

 17

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 

Wind Blade Using Cost-Effective Advanced Composite Lightweight Design (WALID)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2017,

WALiD will combine design, material and process developments using thermoplastic materials to create cost-efficient, lightweight and recyclable blades which will be demonstrated by industrial end-users. The power generated by off-shore wind turbines is proportional to the rotor plane area of the blade. However, the weight of large blades puts the materials used under considerable strain, leading t ...
Voir le projet

 15

 TERMINÉ 

MechMob - Mechanical&Mechatronics Mobility

Date du début: 31 déc. 2015, Date de fin: 30 déc. 2016,

Mechanics in Arezzo and Reggio Emilia represents a cross sector for all other major regional production specializations. Its most significant scopes are: mechanical and plant engineering (gold sector and Textile Clothing Footwear sector in particular in AR), engine design in RE, oil hydraulics, food packaging, agricultural mechanics, precision mechanics. It is a concentrate of highly specialized t ...
Voir le projet

 32

 TERMINÉ 
To solve the energy dilemma, research effort was concentrated on stand-alone buildings weakly tight to their immediate environment. Specifically in each building only key sub-systems were considered individually. Such individual systems were made more effective by becoming pervasive into any building area (the reign of “boxes” and “controllers”). Importing parameters from other sub-systems allowed ...
Voir le projet

 18

 TERMINÉ 
"In order to reduce the sensor number, one has to be based on signals carrying information about the “global” structure state. The structure’s vibrational behavior is definitely a global characteristic. The idea is thus the development of a vibration based, in flight, SHM platform, which can be applied in aircraft structures in practice.The main practical problem for the application of vibration b ...
Voir le projet

 7

 TERMINÉ 

LOw COst Manufacturing and Assembly of Composite and Hybrid Structures (LOCOMACHS)

Date du début: 1 sept. 2012, Date de fin: 31 août 2016,

The continued use of composite materials in the aerospace industry has been addressed in several past research projects which have focused on new design solutions and composite manufacturing processes. However an area which has been given much less attention up until now is how to achieve a time and cost effective lean assembly production system. The current airframe assembly process of composite ...
Voir le projet

 33

 TERMINÉ 

CreAting NonconventionAl Laminates (CANAL)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

The purpose of the CANAL project is to develop new Non-Conventional Laminate (NCL) configurations using Dry Fibre Placement (DFP) and the establishment of engineering tools to ensure implementation of the technology in the aerospace industry and other industries, such as automotive that can benefit from rapid and cost effective production of complex shaped and high-performance composite parts. Whe ...
Voir le projet

 10

 TERMINÉ 
Organized crime does an intensive use of non-cooperative vehicles (cars and motorboats mainly) for a variety of criminal activities, as they are transport of illegal immigrants or smuggling of goods (especially drugs). This generates a very large number of operations carried out by law enforcement agencies in order to intercept these vehicles. During the vehicle interception operations, non coope ...
Voir le projet

 15

 TERMINÉ 
The All-Electric Aircraft is a major target for the next generation of aircraft to lower consumption of non-propulsive power and thus fuel burn. To eliminate hydraulic circuits, pumps and reservoirs, Electro Mechanical Actuators (EMA) are mandatory but now need to meet cost, reliability and weight requirements from the airframers.ACTUATION2015 aims to develop and validate a common set of standard ...
Voir le projet

 56

 TERMINÉ 
Background Gypsum is widely used in construction, the biggest sectorial employer in EU. Gypsum is widely used in construction, the biggest sectorial employer in EU. The gypsum industry has a turnover of around 7.7 billion Euro. It operates 154 quarries and 160 factories, which generate employment directly for 28 000 and indirectly for 300 000 people. The ...
Voir le projet

 21

 TERMINÉ 

Smart Intelligent Aircraft Structures (SARISTU)

Date du début: 1 sept. 2011, Date de fin: 31 août 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Voir le projet

 68

 TERMINÉ 

ADVANCED TEXTILES FOR OPEN SEA BIOMASS CULTIVATION (AT~SEA)

Date du début: 1 avr. 2012, Date de fin: 31 juil. 2015,

AT~SEA is a 3-year European project within FP7 (NMP work programme). The project aims at the development of advanced technical textiles in order to demonstrate the technical and economical feasibility of open sea cultivation of macroalgae (seaweed).The project targets the development of novel textile materials for 3 different elements of the aquatic biomass cultivation farms:• Advanced 3D multilay ...
Voir le projet

 11

 TERMINÉ 

European Railway Electromagnetic Compatibility (EUREMCO)

Date du début: 1 oct. 2011, Date de fin: 31 déc. 2014,

The current authorisation process for placing into service rail vehicles according to Technical Specifications for Interoperability and national safety rules is a very long and costly process. The Technical Specifications for Interoperability (TSI) provide common regulations for the placing in service of rail vehicle, when such common understanding and harmonized rules exist. This is not the case ...
Voir le projet

 19

 TERMINÉ 

Sustainable Cleaning and Disinfection in Fresh-Cut Food Industries (SUSCLEAN)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2014,

SUSCLEAN will contribute to the development and implementation of a new generation of environment-friendly equipment sanitation and food product decontamination technologies ensuring food safety. Susclean is focused on minimally-processed vegetables (MPV) i.e. vegetables physically altered from their original form by slicing and cutting but remaining in a fresh state. We will develop knowledge, me ...
Voir le projet

 24

 TERMINÉ 

Electricity Demand and Supply Harmonizing for EVs (e-DASH)

Date du début: 1 sept. 2011, Date de fin: 30 nov. 2014,

The sustainable integration of the electric vehicles requires an intelligent charging system for the real-time\nexchange of charge related data between FEVs and the grid in order to allow the management of:\n• high-current fast-charging for large numbers of FEVs in a brand-independent way\n• price-adaptive charging/reverse-charging at optimum price for the customer\n• the real-time grid balancing ...
Voir le projet

 15

 TERMINÉ 

GREENHOUSE SOLUTION TO AVOID FILM COVER U.V. AND SULPHUR DEGRADATION (GREENAVOID)

Date du début: 1 déc. 2012, Date de fin: 30 nov. 2014,

"Greenhouse cultivation under plastic has allowed converting apparently unproductive lands in modern agriculture exploitations. Different types of plastic materials such as Poly Vinyl Chloride (PVC), Poly Carbonate (PC) and Low Density Polyethylene (LDPE) are commonly used for cladding of greenhouse structures. However, most of plastic polymer films are prone to photo-degradation when exposed to ...
Voir le projet

 8

 TERMINÉ 

Secured Urban Transportation - European Demonstration (SECUR-ED)

Date du début: 1 avr. 2011, Date de fin: 30 sept. 2014,

"SECUR-ED Project federates, with a delegated management and in a balanced manner, major operators and top industrial integrators to enhance the security of urban public transportation in medium and large cities, through live demonstrations.Based on the best practices, in a very diverse societal and legacy environment, SECUR-ED will aggregate a consistent and interoperable mix of technologies and ...
Voir le projet

 44

 TERMINÉ 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Date du début: 1 sept. 2009, Date de fin: 31 août 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Voir le projet

 42

 TERMINÉ 
Facing the problem of enhancing the railway security with a systematic top-down approach (i.e. to search for an all-inclusive solution valid for all the conceivable threat scenarios) is judged by PROTECTRAIL members too ambitious even if it could generate potential economies of scale and effort rationalisation. The proposed PROTECTRAIL approach is therefore to split the problem of making the railw ...
Voir le projet

 31

 TERMINÉ 

High-protective clothing for complex emergency operations (SAFEPROTEX)

Date du début: 1 avr. 2010, Date de fin: 30 sept. 2013,

The idea that constitutes the basis of the proposed project is to address the main issues that currently limit the wide acceptance of protective garments, i.e. protection against multiple hazards, extension of the life-cycle of protective garments, physiological comfort and mechanical parameters. Overall, the proposed research activities aim at addressing the complex risky conditions met in variou ...
Voir le projet

 19

 TERMINÉ 
"Fresh Cut Products category refers to fresh vegetables, fruit and market garden products without thermal treatment, prepared, washed and packaged without the incorporation of additives or preservatives and, as an essential requirement, demands the maintenance of the cold chain for its perfect conservation and has a shelf life of approximately 7 days. PLA4FOOD proposal deals with the development o ...
Voir le projet

 10

 TERMINÉ 

HIRF Synthetic Environment (HIRF SE)

Date du début: 1 déc. 2008, Date de fin: 31 mai 2013,

"The HIRF SE research project has the goal of providing the aeronautics industry with a framework which can be used during the development phase to mitigate the EM aspects. In addition it will provide a considerable reduction in the certification/qualification tests required on air vehicle. The HIRF SE main objectives can be summarized by the two followings items: • Full validated and integrated s ...
Voir le projet

 45

 TERMINÉ 
"The polymer industry, including producers, converters and machine manufacturers employ 1.6 million people and generate annual sales worth over €300 billion. Europe is the world leader in plastics recycling and the second worldwide plastic producer, but competence by emerging industrialised nations, such as China, is growing bigger and represents a major thread for European interests in mid and lo ...
Voir le projet

 8

 TERMINÉ 
"The electric ship concept offers many benefits; among other aspects if offers flexibility of control and effectiveness of power transmission. But predominantly it enables higher energy conversion efficiency by ensuring that prime movers are effectively loaded at all times and across all operating conditions. This dominating advantage cannot be matched by mechanical transmission systems because ge ...
Voir le projet

 34

 TERMINÉ 
Main aim of the project is the development of a complete, integrated process chain for the cost effective serial production of various aerospace CFRP stiffener profiles. The production is foreseen in the two steps: Preform manufacturing and infiltration / curing. The project will focus on complex profile geometries with variable cross sections, single or multiple curvature and integrated load int ...
Voir le projet

 20

 TERMINÉ 
"The IMG4 project CRESCENDO addresses the Vision 2020 objectives for the aeronautical industry by contributing significantly to the fulfilment of three specific targets of the aeronautical industry’s Strategic Research Agenda. CRESCENDO will develop the foundations for the Behavioural Digital Aircraft (BDA), taking experience and results from VIVACE, and integrating these into a federative system ...
Voir le projet

 59