Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Background Traditional semi-natural biotopes are particularly species-rich natural habitat types and are important features of the landscape. They are the result of traditional land use procedures such as mowing, grazing and leaf fodder collection, so that the upkeep of such biotopes requires constant work. Over the years the traditional land use prac ...
Voir le projet

 2

 TERMINÉ 
Background The Monticchie nature reserve is a proposed site of community interest in a network of protected areas close to the Po river, in northern Italy (Lombardy). The area, originally marsh but reclaimed over the centuries, is now characterised by riparian vegetation, including 19 ha of the priority habitat, and the common alder (Alnus glutinosa incan ...
Voir le projet

 2

 TERMINÉ 
...ld.Schon jetzt lädt das Storchenhaus in Marchegg zum Besuch ein: Vor der Kulisse des romantischen Schlosses – nahe dem Storchenreservat des WWF mit über 300 gezählten Brutpaaren – gibt es neben vielfältigen Informationsangeboten auch die Möglichkeit, an Exkursionen in der Umgebung teilzunehmen. Weiter nördlich an der March entsteht im Dorf Malé Levare ein Naturlehrpfad, der zweisprachige Informati ...
Voir le projet

 4

 TERMINÉ 
...site, Nagykőrösi pusztai tölgyesek’. This would be achieved through the cooperation between the Duna-Ipoly National Park Directorate, the local government of Nagykőrös and the WWF Hungary. Foreseen measures included: Suppression of invasive trees and herbs in the area using appropriate mechanical and chemical methods. Fencing off the forest compartments and their monitoring. Guarantee o ...
Voir le projet

 3

 TERMINÉ 
... and French have attracted lots of interest as they are an innovative and practically unique tool and will be disseminated by many international organisations dealing with tourism (UNEP, UNWTO and WWF in first place). In Algeria, Morocco and Tunisia pilot projects for the introduction of environmental management tools in hotels have been set up. These hotels serve as demonstration projects to fa ...
Voir le projet

 4

 TERMINÉ 

Conservation of Anser erythropus on European migration route (Anser-Eur)

Date du début: 1 avr. 2005, Date de fin: 31 mars 2009,

Background The lesser white-fronted goose (Anser erythropus) is a goose species breeding in the tundra zone (low-arctic and forest) from northern Fennoscandia to eastern Siberia. Its historical range covers the whole subarctic Eurasia, but nowadays the distribution is patchy. The recent estimate of its world population is 22 000-27 000 individuals. Presen ...
Voir le projet

 10

 TERMINÉ 

Urgent conservation actions for Fortore River pSCI (Fortore 2005)

Date du début: 1 oct. 2005, Date de fin: 30 mars 2010,

...ooperative of 13 trained environmental educators and nature guides. The regionally funded cooperative operates in across the Capitanata area in collaboration with NGOs such as WWF and LIPU.
Voir le projet

 4

 TERMINÉ 
... The ecological importance of the park is recognised nationally and internationally. For example, it is included in the Lower Danube Green Corridor programme, which was developed with the support of WWF and signed by representatives of Romania, Bulgaria, Moldavia and Ukraine in 2000. In 1999-2000 a PHARE scheme project to rehabilitate nature and manage international wetlands was implemented in th ...
Voir le projet

 4

 TERMINÉ 

Eco-Efficient Mass Event EMS manual (ECOMASS)

Date du début: 1 août 2004, Date de fin: 31 juil. 2006,

...ased ‘climate calculator’ with an integrated user’s guide. This CO2 management module has proved useful in reducing CO2 emissions including in the beneficiaries’ offices. WWF Finland - which still maintains this free-to-use web tool - has adopted it as part of its Green Office campaign and such uses guarantee the sustainability of this tool, which can be easily used by organisations in dif ...
Voir le projet

 12

 TERMINÉ 

Freshwater Pearl Mussel and its habitats in Sweden (Fpmswe)

Date du début: 1 nov. 2004, Date de fin: 1 nov. 2009,

Background The freshwater pearl mussel (Margaritifera margaritifera) is generally restricted to nutrient-poor freshwater streams. It has a widespread but fragmented and declining distribution across Europe. In Sweden, the mussel has disappeared from around 40% of the rivers and streams in which it was found 100 years ago. Reproduction levels are low or fa ...
Voir le projet

 8

 TERMINÉ 

The creation of a Transboundary UNESCO Biosphere (Protecting Europe's Lifeline)

Date du début: 31 déc. 2010, Date de fin: 30 mars 2016,

...l and cultural heritage of five countries: Austria, Croatia, Hungary, Serbia and Slovenia. The rivers are rich in biological values and natural resources. In order to preserve this European Lifeline, WWF and his partner organisations pushes for a Trans-Boundary UNESCO Biosphere Reserve; this would bring benefit for both, nature and people in the region. Once established it will be Europes largest ...
Voir le projet

 2

 TERMINÉ 
...e risk of collision is not non-negligible, particularly when they have young. Whale watching has a negative effect if there is too much of it and essential rules are not respected. Since 1999, WWF-France has worked for the conservation of marine mammals in the Mediterranean. The Cap Ligure programme, which ran for 4 years, supported the creation of the PELAGOS Sanctuary in Corsica and the improve ...
Voir le projet

 1

 TERMINÉ 
Background Flood prevention is not only a technical task; rather, it is a far reaching, multi- disciplinary and border-crossing undertaking. Floodwater provision is an important component of a flood protection concept and plan. According to the Flood Risk Management Guidelines of the EU, all floodplain areas with risk of flooding are required to have a fl ...
Voir le projet

 3

 TERMINÉ 

Conservation of birds of prey in the Dadia Forest Reserve, Greece (Dadia)

Date du début: 1 janv. 2002, Date de fin: 31 déc. 2005,

...ffon vulture and the Egyptian vulture. Dadia hosts the last breeding colony of the black vulture in the Balkans. The site was made a protected area in 1979 and became a Nature Reserve in 1981. WWF Greece established a permanent local unit to implement activities for the scientific monitoring and conservation management of the area in 1992. These efforts helped increase the black vulture popula ...
Voir le projet

 2

 TERMINÉ 

Water scarcity and droughts; coordinated actions in European regions (WATER CoRe)

Date du début: 31 déc. 2009, Date de fin: 29 avr. 2013,

...ctices have been finalized/updated and are available on our website. Furthermore, we actively presented our project results in EU fora, international fairs and conferences like the World Water Forum (WWF) in Marseille, the Water and Climate Change WG in Geneva or the Green Week in Brussels. The end of the project comes closer and most of the targeted project results and products have been finalize ...
Voir le projet

 14

 TERMINÉ 
...d ochrany přírody (WWF), jež se dlouhodobě věnuje ekologickému lesnímu managementu a stála u zrodu certifikace FSC. Partneři budou dále spolupracovat na vytvoření a rozvoji přeshraniční databáze certifikovaných podniků a výrobků. Cílem této aktivity je prohloubit propojení jihomoravského a rakouského trhu a přispět tak k trvale udržitelnému rozvoji regionu.
Voir le projet

 2

 TERMINÉ 
...ombining the three dimensions, the project co-organised three conferences under the label “A Greener Agriculture for a Bluer Baltic Sea” together with other BSR Programme projects and the WWF. The first conference was in Stockholm 2011, the second in Copenhagen in 2012, and the third conference in Helsinki in 2013 (with additional organisers: HELCOM, CIEC and NJF). The conference continues after t ...
Voir le projet

 18

 TERMINÉ 

utting best agricultural practises into work (Baltic Deal)

Date du début: 10 juin 2010, Date de fin: 9 sept. 2013,

...l amount of 11 conferences have been organized.Once a year (4 times) the conference A Greener Agriculture for Bluer Baltic Sea have been arranged together with Baltic Compass,BalticManure and WWF.Also 5 water forums have been organized.Two seminars have been held in Brussels,of which one has been in EU Parliament.Seen and heard about Baltic Deal:The project has co-produced 27 short movie clips,tha ...
Voir le projet

 7

 TERMINÉ 

Urgent actions for conservation of pSCI Orbetello Lagoon (Orbetello)

Date du début: 1 nov. 2000, Date de fin: 31 déc. 2003,

...g the lagoon constitutes one of the main threats in that it affects the hydrographical and ecological balances of the natural habitats of the core area, which is managed, for conservation purposes by WWF Italia. Objectives The main objective of the project was to put a stop to the impact of intensive farming on the ...
Voir le projet

 2

 TERMINÉ 

Bright Future for Black Vulture in Bulgaria (Vultures back to LIFE)

Date du début: 16 juil. 2015, Date de fin: 15 juil. 2022,

... The most serious problem for vultures in Bulgaria today is the critically low number of populations and their isolation. In spite of two decades of conservation efforts, the WWF Greece Dadia project showed that the number of breeding pairs is not increasing and remains around 20 pairs. Another threat is unsuitable livestock breeding practices resulting in inaccessible foo ...
Voir le projet

 5

 TERMINÉ 

DRAVA LIFE – Integrated River Management (DRAVA LIFE)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2020,

Background River ecosystems are extremely threatened in Europe. The Drava in the project area, along with the connected Mura and Danube reaches, is one of Europe's most important examples. The creation of a Transboundary UNESCO Biosphere Reserve "Mura-Drava-Danube" in Croatia, Austria, Hungary, Slovenia and Serbia is a central part of Europe's largest riv ...
Voir le projet

 6

 TERMINÉ 
...en, erlebnisintensiven Programmangeboten seit Jahren erfolgreich Bildungsarbeit betrieben. Auf österreichischer Seite zeichnet das Nationalpark-Informationszentrum Illmitz in Zusammenarbeit mit dem WWF Seewinkelhof verantwortlich, auf ungarischer Seite ist es das Informationszentrum Sarród. Trotz erster Ansätze für gemeinsame länderübergreifende Bildungsprojekte fehlt bislang eine institutionalisi ...
Voir le projet

 1

 TERMINÉ 

Pelobates project in the Ticino Valley Natural Park of Piedmont (Pelobates Ticino)

Date du début: 1 janv. 2001, Date de fin: 31 déc. 2003,

... Objectives With this initiative, the Ticino Park intended to pursue a programme already begun under a previous LIFE project, managed by WWF Italia. The project aimed at involving the owners of areas where the presence of the species had been verified, and particularly where breeding sites were present. The purchasing of important ...
Voir le projet

 1

 TERMINÉ 

Wetland Restoration in the Mura-Drava-Danube area

Date du début: 30 juin 2012, Date de fin: 30 déc. 2015,

... percent of its former floodplains, and with them the most biologically productive areas and essential ecosystem services, from flood protection to water purification. This project will contribute to WWF goal to be achieved by 2020: 1.5 million ha of floodplains on 1,500 km of free-flowing river sections are protected and connected to the river system in order to sustain biodiversity, build resili ...
Voir le projet

 1

 TERMINÉ 

Wet area for tourism envir and recreation (WATER)

Date du début: 31 janv. 2005, Date de fin: 29 nov. 2006,

...ional environments, to join some interesting naturalistic-environmental areas: the Laghetti di Martellago park, the Nuove Gemme di Spinea park, the former Salzano quarries, the former Luneo quarries (WWF oasis) and a new area included in the urban territory in the municipality of Spinea. Research and studies will be carried out to foster the environmental restoration of the Cimetto drain and to cr ...
Voir le projet

 1

 TERMINÉ 

Conservation and Monitoring at the National Park of Dadia-Lefkimi-Soufli

Date du début: 30 sept. 2016, Date de fin: 29 mars 2018,

...mating the abundance and distribution of terrestrial tortoises.7. Estimating the abundance and distribution of terrestrial tortoises.8. Literature reviews of scientific issues relating to WWF’s actions in the area.9. Participating in social events10. Inserting all the data produced from the field work, arranging other office documents etc.The methodology used is specific to each activity ...
Voir le projet

 3

 TERMINÉ 

Conservation and Monitoring at the National Park of Dadia-Lefkimi-Soufli

Date du début: 1 août 2016, Date de fin: 30 nov. 2017,

...dia NP) and in focused areas in Thrace.4. Monitoring of wind farms’ impact on raptors within policy and lobbying for the acceptance of a zoning map for the proper planning of wind farms proposed by WWF5. Promotion of collaboration and synergies among the involved authorities within WWF's participation in the boards of 2 National Parks, Dadia NP and Evros Delta NP6. Awareness events for land users ...
Voir le projet

 2

 TERMINÉ 

Conservation and Monitoring at the National Park of Dadia-Lefkimi-Soufli

Date du début: 15 juin 2016, Date de fin: 14 déc. 2017,

...mating the abundance and distribution of terrestrial tortoises.7. Estimating the abundance and distribution of terrestrial tortoises.8. Literature reviews of scientific issues relating to WWF’s actions in the area.9. Participating in social events10. Inserting all the data produced from the field work, arranging other office documents etc.The methodology used is specific to each activity ...
Voir le projet

 2

 TERMINÉ 

Conservation and Monitoring at the National Park of Dadia-Lefkimi-Soufli

Date du début: 1 mai 2016, Date de fin: 30 sept. 2017,

...timating the abundance and distribution of terrestrial tortoises.7. Estimating the abundance and distribution of terrestrial tortoises.8. Literature reviews of scientific issues relating to WWF’s actions in the area.9. Participating in social events10. Inserting all the data produced from the field work, arranging other office documents etc.The methodology used is specific to each activity a ...
Voir le projet

 2

 TERMINÉ 

LIVING ANVERSA: VOLUNTEERING FOR ALL

Date du début: 1 févr. 2016, Date de fin: 31 mai 2017,

...ch in second round).The number of volunteers is: eight and number of Countries involved is four (Bulgary, Germany, Spain and Slovakia).The context in which we work is that of the Regional Reserve and WWF Oasis Gole of Sagittario in the town of Anversa degli Abruzzi, in L’Aquila province. The Reserve, only 450 hectares is a real treasure of nature in just over an hour from Rome, and is an SIC of Co ...
Voir le projet

 5

 TERMINÉ 

Conservation and Monitoring at the National Park of Dadia-Lefkimi-Soufli

Date du début: 1 janv. 2016, Date de fin: 30 juin 2017,

...ting the abundance and distribution of terrestrial tortoises.8. Estimating the abundance and distribution of terrestrial tortoises.9. Literature reviews of scientific issues relating to WWF’s actions in the area.10. Participating in social events11. Inserting all the data produced from the field work, arranging other office documents etc.The methodology used is specific to each activity a ...
Voir le projet

 2

 TERMINÉ 

"Low cost, easy to use Intelligent Irrigation Scheduling System" (WATER-BEE)

Date du début: 1 oct. 2008, Date de fin: 30 sept. 2010,

"Agriculture, the largest industry in the world, is also the biggest threat to the environment. According to the WWF, agriculture wastes 60% or 1,500 trillion litres, of the 2,500 trillion litres of water it uses each year - which is 70% of the world’s accessible water. One of the main culprits is inefficient water irrigation systems. Looking at the European context, 65% of total water consumption ...
Voir le projet

 10

 TERMINÉ 

Nature Friends

Date du début: 1 févr. 2015, Date de fin: 31 déc. 2015,

...ood, fair-trade, green-entrepreneurship, ecology, biodiversity, education, recycling, sustainable development, eco-citizenship. These local partner organizations are: Jonian Dolphin Conservation, WWF Taranto, Cea Solinio, Bottega del Mondo, The Hub. The Study Visit’s objectives are: - Develop among the Youth Workers new knowledge, competences and skills - Increase the awareness about environmental ...
Voir le projet

 12

 TERMINÉ 

Conservation and Monitoring at the National Park of Dadia

Date du début: 1 janv. 2015, Date de fin: 31 juil. 2016,

...ng the abundance and distribution of terrestrial tortoises. 8. Estimating the abundance and distribution of terrestrial tortoises. 9. Literature reviews of scientific issues relating to WWF’s actions in the area. 10. Updating the project’s library 11. Participating in social events 12. Inserting all the data produced from the field work, arranging other office documents etc. The method ...
Voir le projet

 2

 TERMINÉ 
According to WWF (World Wide Fund for Nature), the speed that people consume the natural resources is 50% more than the speed that nature renews itself. They claim that if all the people in the world consume in the speed of an average European citizen, there will be a need of 3 more earths. Therefore, it is obvious that the awareness about nature is crucial to have an earth that is enough both for ...
Voir le projet

 5

 TERMINÉ 

MONTADO & CLIMATE; A NEED TO ADAPT (LIFE-Montado-adapt)

Date du début: 1 sept. 2016, Date de fin: 1 sept. 2021,

...lting in certified ILU designs for their land; and Creation of synergies with national governments, forest authorities, agricultural and environmental authorities, the WWF, and other public and private entities in order to achieve policies and legislation beneficial to M/D development.
Voir le projet

 17

 TERMINÉ 
...thods. The project also aims to improve the knowledge base and experience for the restoration and management of this habitat by compiling a manual, as well as building the capacities of the EFA, WWF and two of its regional directorates. Public awareness will also be increased, reaching out to local groups within the project area to secure support for the conservation of this target habitat. Expec ...
Voir le projet

 4

 TERMINÉ 
Background The biggest threat to Bulgaria's rivers and their dependent species is fragmentation caused by the construction of artificial barriers, such as hydropower plants, bridges and erosion control features. Bulgaria has no national requirements for river infrastructure works to take into account the protection of river habitats by allowing for the ...
Voir le projet

 2

 TERMINÉ 
...pulations, to the long-term economic benefit of fishing communities. The project’s findings concerning sturgeon poaching and the illegal caviar trade were added to official WWF comments regarding the public EC Consultation on the EU approach against Wildlife Trafficking in 2014.
Voir le projet

 2

 TERMINÉ 
Background The lesser white-fronted goose (Anser erythropus) is an Annex I species of the Birds Directive, classified as ‘vulnerable’ by the IUCN Red List. The global population trend for the species has shown rapid decline (30-49%) during the period 1998-2008, accompanied by breeding range fragmentation. The wild population of the goose in the Fennos ...
Voir le projet

 7