Rechercher des projets européens

13 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Percorsi Ludici

Date du début: 1 août 2016, Date de fin: 31 déc. 2017,

...ctions.The project involves two French volunteers that will be welcomed in Padua (Italy) by Contatto CEMEA Veneto in two distinct period, each lasting nine months.Volunteer Camille Thomas will arrive on 03/10/2016 and leave 29/06/2017Volunteer Mélanie Boulanger will arrive on 03/01/2017 and leave 29/09/2017Both volunteers are sent by the association CEMEA Centre, active in region Centre-Val de Loi ...
Voir le projet

 3

 TERMINÉ 

Tabačka Kulturfabrik - New Beginning

Date du début: 3 nov. 2014, Date de fin: 2 mai 2015,

...uestionnaires, interviews via Skype and mutual consensual interest. The first was Patricia Ana Garcia Naranjo from Spain, who was a recent graduate in architecture. The second was Liam Thomas Archer from England, who was employed full-time at the time of his application. The activities carried out were very closely connected with the events in the centre. The volunteers at the start spent some tim ...
Voir le projet

 4

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 30 sept. 2015,

...SHIPS Since 2013, LISAA has been developing close links and signed bilateral agreements with: Universidad IEU - Mexique University of Applied Sciences MACROMEDIA - Allemagne HelmO Liège - Belgique Thomas More Mechelen - Belgique VDK- Vilnius Design College - Lituanie Art Com' - Maroc Manchester Metropolitan University - Angleterre John Moore University LIverpool - Angleterre IED Milan - Italie ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

... 1, 2014 to 28/10/2015 - Académie Royale des beaux-arts, Brussels, student Sherine El Sol, 4th year graphic design (2nd cycle), stay 17/09/2014, 17/01/2015 - Fachhochschule Potsdam, student Thomas Vaillant, 4th year graphic design (2nd cycle), stay 1/10/2014, 01/02/2015. -description of the activities carried out: followed by the course predicted by the learning agreement, observation and discover ...
Voir le projet

 1

 TERMINÉ 

Higher education student and staff mobility project

Date du début: 1 juin 2014, Date de fin: 31 mai 2016,

...cess. In the period 1st June 2014 – 31st May 2016, the following Flemish Higher Education institutions have realized mobilities: Arteveldehogeschool, VIVES (both juridical entities), KU Leuven, Thomas More (both juridical entities), Artesis Plantijn Hogeschool Antwerpen, Hogeschool Gent, Hogeschool West-Vlaanderen, Erasmushogeschool Brussel, Universiteit Antwerpen, Universiteit Gent, LUCA School o ...
Voir le projet

 1

 TERMINÉ 

Creating Cultures

Date du début: 1 mars 2013,

...d time with other projects that partner/work with A Mind Apart in the local area, to experience a range of different types of organisations. These may include Sheffield City Council. Sheffield FC, St Thomas’ Church Philadelphia Campus and The Burton Street Foundation. Volunteers will experience non formal ways of learning while participating in the community and sharing knowledge and skills. Activ ...
Voir le projet

 3

 TERMINÉ 
"The objective of this project is to regroup a cluster of private and academic laboratories supported by key manufacturers from both aeronautic, automotive and railway sectors in order to investigate the possibility to benchmark specific composites :• from the aeronautics. Depending on the application targeted, the cluster will be able to take advantage of the mutual return on experiment in order ...
Voir le projet

 19

 TERMINÉ 

Property-based testing of Web services (PROWESS)

Date du début: 1 oct. 2012, Date de fin: 31 oct. 2015,

This project will develop advanced software engineering technologies suitable for the networked, distributed dimension of software and access to services and data (Objective 1.2). Specifically, we develop approaches to improve quality assurance: the challenge is to reduce time spent on testing, whilst increasing software quality, in order to quickly launch new, or enhancements of existing, web ser ...
Voir le projet

 6

 TERMINÉ 

Archives Portal Europe network of eXcellence (APEX)

Date du début: 1 mars 2012, Date de fin: 30 sept. 2015,

APEX will be the follow-up of the APEnet project, in which national archival institutions from 14 European countries have realised – in collaboration with Europeana – the Archives Portal Europe, the first version of an internet portal for documents and archives in Europe and an archives aggregator for Europeana. APEX aims at widening, deepening, improving and sustaining this initiative, thus expan ...
Voir le projet

 31

 TERMINÉ 
The EMPhAtiC objective is to develop, evaluate and demonstrate the capability of enhanced multicarrier techniques to make better use of the existing radio frequency bands in providing broadband data services in coexistence with narrowband legacy services. The project will address the Professional Mobile Radio (PMR) application, especially the evolution of the Public Protection & Disaster Relief (P ...
Voir le projet

 13

 TERMINÉ 

Towards Zero Waste in Industrial Networks (ZeroWIN)

Date du début: 1 mai 2009, Date de fin: 30 avr. 2014,

The first work package will define a common vision on zero-waste entrepreneurship within the first 6 months. The mythos Individual Producer Responsibility will be investigated if it can become the all-healing-solution in electronics industry as well as how this concept can be applied to other industrial sectors. WP2 concentrates on new technological developments, WP3 on waste prevention methodolog ...
Voir le projet

 33

 TERMINÉ 

Osteoporotic Virtual Physiological Human (VPHOP)

Date du début: 1 sept. 2008, Date de fin: 31 oct. 2012,

Nearly four million osteoporotic bone fractures cost the European health system more than 30 billion Euro per year. This figure could double by 2050. After the first fracture, the chances of having another one increase by 86%. We need to prevent osteoporotic fractures. The first step is an accurate prediction of the patient-specific risk of fracture that considers not only the skeletal determin ...
Voir le projet

 21

 TERMINÉ 
SERVIVE net proposes the enlargement of the assortment of customizable clothing items currently on offer, the enhancement of all co-design aspects (functionality and fun) and the development and testing of a new production model based on decentralized networked SME cells.The Servive net will not only seamlessly link critical Mass-Customisation (MC) enabling services, but more important it will ada ...
Voir le projet

 17