Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
mySMARTLife project aims at the development of an Urban Transformation Strategy to support cities in the definition of transition models, as a suitable path to reach high level of excellence in its development process, addressing the main city challenges and progressing to the smart people and smart economy concepts.The main instrument to achieve this very ambitious strategy will be the definition ...
Voir le projet

 28

 TERMINÉ 

Towards Smart Zero CO2 Cities across Europe (SmartEnCity)

Date du début: 1 févr. 2016, Date de fin: 31 juil. 2021,

SmartEnCity’s main Objective is to develop a highly adaptable and replicable systemic approach towards urban transformation into sustainable, smart and resource-efficient urban environments in Europe through the integrated planning and implementation of measures aimed at improving energy efficiency in main consuming sectors in cities, while increasing their supply of renewable energy, and demonstr ...
Voir le projet

 35

 TERMINÉ 

European Research and Innovation Centre of Excellence in ChiNA (ERICENA)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

Europe actively engages internationally to strengthen its leadership in the field of Science, Technology and Innovation (STI) in the global scene and improve synergies between Member States. Europe aims to foster international cooperation and strengthen its STI presence in China due to its growing importance and STI opportunities for European actors. ERICENA (European Research Innovation Centre of ...
Voir le projet

 13

 TERMINÉ 
The Triangulum project will demonstrate how a systems innovation approach based around the European Commission’s SCC Strategic Implementation Plan can drive dynamic smart city development. We will test the SIP across three lighthouse cities: Manchester, Eindhoven and Stavanger, which represent the main typologies of European cities. They will be complemented by our follower cities Prague, Leipzig ...
Voir le projet

 22

 TERMINÉ 
The COSMHYC project aims at answering the needs identified by the MAWP of the FCH2 JU of increasing the energy efficiency of hydrogen production while reducing operating and capital costs, in order to make hydrogen a competitive fuel for transport applications. COSMHYC will develop and test an innovative compression solution from 1 to 1000 based on a hybrid concept, combining a metal hydride compr ...
Voir le projet

 5

 TERMINÉ 
The aim of INN-BALANCE is to develop a novel and integrated development platform for developing advanced Balance of Plant components in current fuel cell based vehicles, in order to improve their efficiency and reliability, reducing costs and presenting a stable supply chain to the European car manufacturers and system integrators. Accordingly, INN-BALANCE technical objectives are (i) to develop h ...
Voir le projet

 9

 TERMINÉ 

REgeneration MOdel for accelerating the smart URBAN transformation (REMOURBAN)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2019,

REMOURBAN aims at the development and validation in three lighthouse cities (Valladolid-Spain, Nottingham-UK and Tepebasi/Eskisehir-Turkey) of a sustainable urban regeneration model that leverages the convergence area of the energy, mobility and ICT sectors in order to accelerate the deployment of innovative technologies, organisational and economic solutions to significantly increase resource and ...
Voir le projet

 22

 TERMINÉ 

eHealth Hub, The European Hub for eHealth Business Support (eHealth Hub)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

The business opportunities in eHealth are equally as important as the health care challenges they are trying to solve. Therefore, the participation of this emerging industry in building a strong EU economy is potentially proportional to the impact it will have on the health of our citizens.If the eHealth market is accelerating globally, it is still up and coming in Europe and has not accelerated t ...
Voir le projet

 9

 TERMINÉ 
Forest biomass is currently one of the most important source of renewable energy and accounts for almost half of the EU’s total renewable energy consumption. In addition to raw materials, forests also provide a wide range of vital non-wood services that should be protected during wood extraction. The innovation project Forwarder2020 has the main aim of improving sustainability of wood production a ...
Voir le projet

 14

 TERMINÉ 

Industrial scenarios for connected factories (ConnectedFactories)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

There is a consensus among industry and policymakers that Europe is currently in the middle of an industrial revolution initiated by the digitisation of industrial processes. Cyber Physical Systems (CPS), the Industrial Internet and the Internet of Things (IoT) connect people, devices, machines and enterprises like never before. For many years companies and research organisations have been address ...
Voir le projet

 16

 TERMINÉ 
VicInAqua will follow an integrated approach in order to develop a sustainable combined sanitation and recirculating aquaculture system (RAS) for wastewater treatment and reuse in agriculture in the Victoria Lake Basin area. In this decentralized integrated treatment system wastewater from households and fish processing industry as well as RAS production water will radically reduce stress on the ...
Voir le projet

 11

 TERMINÉ 
PHABLABS 4.0 aims to integrate photonics in a durable way into the rapidly expanding ecosystem of European Fab Labs and Makerslabs, resulting in a larger and better skilled photonics workforce with superior innovation capacity to achieve a lasting, positive impact on the next revolution in digitization. Combining the forces of top experts from 13 European photonics institutes and STEM-oriented org ...
Voir le projet

 13

 TERMINÉ 

NEW Business models for ITS (NEWBITS)

Date du début: 1 oct. 2016, Date de fin: 31 mars 2019,

The overall objective of the NEWBITS project is to provide with a deep understanding of the changing conditions and dynamics that affect and/or influence C-ITS innovations. New KPIs will be designed to feed reactive and network oriented value creation propositions that improve the collaborative decision-making process across the various stakeholders. This improved value definition must minimize th ...
Voir le projet

 9

 TERMINÉ 

RepliCable and InnovaTive Future Efficient Districts and cities (CITYFIED)

Date du début: 1 avr. 2014, Date de fin: 31 mars 2019,

"CITyFiED project aims to develop a replicable, systemic and integrated strategy to adapt European cities and urban ecosystems into the smart city of the future, focusing on reducing the energy demand and GHG emissions and increasing the use of renewable energy sources by developing and implementing innovative technologies and methodologies for building renovation, smart grid and district heating ...
Voir le projet

 18

 TERMINÉ 
OptEEmAL aims to develop an Optimised Energy Efficient Design Platform for refurbishment at district level, which will deliver an optimised, integrated and systemic design based on an Integrated Project Delivery (IPD) approach for building and district retrofitting projects, reducing time delivery and uncertainties, resulting in improved solutions when compared to business-as-usual practices. This ...
Voir le projet

 14

 TERMINÉ 

MinWaterCSP - Minimized water consumption in CSP plants (MinWaterCSP)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

MinWaterCSP addresses the challenge of significantly reducing the water consumption of CSP plants while maintaining their overall efficiency. Its objective is to reduce evaporation losses and mirror cleaning water usage for small- and large-scale CSP plants through a holistic combination of next generation technologies in the fields of i) hybrid dry/wet cooling systems ii) wire structure heat tran ...
Voir le projet

 12

 TERMINÉ 
This project will develop an innovative therapeutic approach for the treatment of Cystic Fibrosis (CF). This condition originates from the defective function of the CFTR protein, a chloride and bicarbonate permeable transmembrane channel. This project will evaluate small molecules capable of facilitating the transmembrane transport of anions such as chloride and bicarbonate and will thus enable CF ...
Voir le projet

 8

 TERMINÉ 
SDHp2m stands for ‘Solar District Heating (SDH)’ and actions from ‘Policy to Market’. The project addresses market uptake challenges for a wider use of district heating and cooling systems (DHC) with high shares of RES, specifically the action focuses on the use of large-scale solar thermal plants combined with other RES in DHC systems.The key approach of the project is to develop, improve and imp ...
Voir le projet

 15

 TERMINÉ 
The project will deploy and demonstrate local storage technologies which have reached TRL 5-6 in a real electrical grid, and will develop ICT tools to exploit the synergies between them, the smart grid and the citizens. The demonstration in this real environment will be driven by five use cases covering low voltage and medium voltage scenarios and a wide range of applications and functionalities. ...
Voir le projet

 14

 TERMINÉ 
Support for development and integration of Cyber-Physical Systems is seen as essential for the future. As the embedded world meets the Internet world there will be an increasing number of interacting systems with strong connectivity utilised in both society and in industry. Platforms4CPS targets the transport, manufacturing, energy and health sectors. Europe is a world leader in the area of time-c ...
Voir le projet

 8

 TERMINÉ 
AGRIFORVALOR will close the research and innovation divide by connecting practitioners from agriculture and forestry to research and academia as well as with associations and clusters, bio -industry, policy makers; business support organisations, innovation agencies and technology transfer intermediaries in multi-actor innovation partnership networks. Theses networks will be managed by three Biom ...
Voir le projet

 16

 TERMINÉ 

Steinbeis EVS 16.02

Date du début: 1 août 2016, Date de fin: 31 juil. 2018,

The Innovation Centre „European Projects“ - a department of the Steinbeis Innovation gGmbH" - coordinates several EVS hosting projects in the border triangle between Germany, Switzerland and France. Whereas the host organisations provide places with learning opportunities and task related support for European Volunteers the coordinating organisation takes over the administrative preparation and im ...
Voir le projet

 15

 TERMINÉ 

Steinbeis EVS 16.01

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

he Innovation Centre „European Projects“ - a department of the Steinbeis Innovation gGmbH" - coordinates several EVS hosting projects in the border triangle between Germany, Switzerland and France. Whereas the host organisations provide places with learning opportunities and task related support for European Volunteers the coordinating organisation takes over the administrative preparation and imp ...
Voir le projet

 5

 TERMINÉ 
The EU-US eHealth Workforce Development Consortium has an overall goal of mapping, quantifying and projecting the need, supply and demand for workforce skills and competences, utilising these results to further develop IT skills and training programmes for the healthcare workforce. This work is a continuation and further development of the EU-US collaboration under the EU-US MoU eHealth Roadmap, l ...
Voir le projet

 6

 TERMINÉ 
China is already an important global actor in the fields of research and innovation, and has the potential of becoming a leading force in the next few decades. The shift in China’s strategy focusing towards R&I and transforming the essence of its economy has been complimented with massive public investments in research and technology. The EU having recognised the leading role China is expected to ...
Voir le projet

 13

 TERMINÉ 
Smart cyber-physical systems (CPS) are considered to be the next revolution in ICT with lots of game-changing business potential for integrated services and products.Mastering the engineering of complex and trustworthy CPS is key to implementing CPS-based business models. Current CPS, however, are often engineered and maintained at very high cost and sometimes with unknown risks, and recent techno ...
Voir le projet

 11

 TERMINÉ 

Share best Practices for the Support of EVS volunteers

Date du début: 1 août 2016, Date de fin: 31 déc. 2017,

S.P.S. EVS is a project focused on volunteering, on proper support and training to EVS volunteers, on interculturality and on the work in socio-educational contexts. The main goal of the project is to offer volunteers an intercultural learning experience and new competences in the socio-educational field and to give youth workers with experience in hosting and coordinating EVS volunteers the chanc ...
Voir le projet

 21

 TERMINÉ 

Steinbeis EVS 15.03

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

The Innovation Centre „European Projects“ - a department of the Steinbeis Innovation gGmbH" - coordinates several EVS hosting projects in the border triangle between Germany, Switzerland and France. Whereas the host organisations provide places with learning opportunities and task related support for European Volunteers the coordinating organisation takes over the administrative preparation and im ...
Voir le projet

 10

 TERMINÉ 

Thinking Smart: Toolkit for the engagement of HEI in regional growth

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

Higher Education Institutions (HEIs) are among the most important actors to be involved in the Smart Specialisation Strategy (RIS3) process. However, the potential of European HEIs to fulfil their role in society and contribute to Europe's prosperity remains underexploited.In this regard, the objective of the project is to support HEIs in contributing to and benefiting from S3, so they can maximis ...
Voir le projet

 8

 TERMINÉ 

Resource Efficient Production Route for Rare Earth Magnets (REProMag)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

The overall objective of the REProMag project is to develop and validate an innovative, resource-efficient manufacturing route (SDS process) for Rare Earth magnets that allows for the economically efficient production of net-shape magnetic parts with complex structures and geometries, while being 100% waste-free along the whole manufacturing chain. The new Shaping, Debinding and Sintering (SDS) pr ...
Voir le projet

 15

 TERMINÉ 
RespiceSME will reinforce the innovative capacity of Europe’s photonics SMEs, clusters and national platforms by stimulating increased collaborations in and beyond photonics. RespiceSME proposes new approaches for stronger innovative effectiveness using a 3-dimensional approach, led by an experienced, representative, interdisciplinary team. In the 1st dimension, the project will develop a measure ...
Voir le projet

 10

 TERMINÉ 
Fit for Health 2.0 aims to promote and enhance a sustainable participation of European industry in the Health-related sector of Horizon 2020 (H2020). Focusing on research-intensive, high technology SMEs the project offers targeted support measures, covering the entire innovation cycle of research projects. Key assets are highly qualified advice and support including a mentoring and coaching approa ...
Voir le projet

 11

 TERMINÉ 
The project is focused on efficient integration of city districts with industrial parks through smart thermal grids. The overall objective of the project is to demonstrate a highly replicable, cost-effective and high energy efficiency large scale energy generation system that will allow sustainable urban planning of very low energy city districts.The main focus of the project is medium (150-400ºC) ...
Voir le projet

 13

 TERMINÉ 
"A scalable, replicable, high energy efficient, zero emissions and cost effective SYSTEM to refurbish existing public-owned non-residential buildings to achieve at least 50% energy consumption reduction through:a) A systemic methodology for optimal building retrofitting towards zero emissions, developed to ensure cost effectiveness, scalability and replicability of the interventions taking into ac ...
Voir le projet

 18

 TERMINÉ 
IMMODGEL aims to identify adverse immune reactions to dental and larynx titanium implants and to develop a novel therapeutic strategy to significantly decrease the implant and medical device failure caused by these reactions via design of an innovative immunomodulatory system. The system will be designed to be fixed to an implant via an adhesive polyelectrolyte multilayer and control the immune re ...
Voir le projet

 9

 TERMINÉ 

Volunteers Fighting Against Xenophobia

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

By this project we aim to provide non-formal learning opportunities- social integration, sense of anti discrimination for youngster inclduing youth with fewer opportunities and then we will let them learn about the opportunities after short term EVS such as Long term EVS,This project has also beed designed to be able to host long term EVS volutneers. Our Long Term voluneters will assist our camp ...
Voir le projet

 8

 TERMINÉ 

Danube Region INCO-NET (DANUBE-INCO.NET)

Date du début: 1 janv. 2014, Date de fin: 30 juin 2017,

Danube-INCO.NET understands itself as strategic high-level coordination and support action. Its background is the macro-regional approach of the European Union, in particular the EU Strategy for the Danube Region (EUSDR) and its Priority Areas for Knowledge Society (PA7) and for Competitiveness (PA8). Based on strong institutionaliszed links with the PA Coordinators and the PA Steering Groups, a c ...
Voir le projet

 22

 TERMINÉ 
R2CITIES aims to develop and demonstrate an open and easily replicable strategy for designing, constructing, and managing large scale district renovation projects for achieving nearly zero energy cities. For this purpose, it will be developed a demonstration and dissemination framework of very innovative strategies and solutions for building energy renovation at district level, based in the follow ...
Voir le projet

 16

 TERMINÉ 

Steinbeis EVS 15.01

Date du début: 1 mai 2015, Date de fin: 30 avr. 2017,

The Innovation Centre „European Projects“ - a department of the Steinbeis Innovation gGmbH" - coordinates several EVS hosting projects in the border triangle between Germany, Switzerland and France. Whereas the host organisations provide places with learning opportunities and task related support for European Volunteers the coordinating organisation takes over the administrative preparation and im ...
Voir le projet

 9

 TERMINÉ 

EeB Cluster Activities Coordination Action (EeB-CA2)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2017,

EeB-CA2 initiative is to provide the right set of instruments supporting technology-clustering and geo-clustering upon the whole set of EeB PPP EC-funded projects related to energy efficiency in the built environment, with the following primary ambition: to enhance and rationalise coordinated and broader dissemination, technology transfer and future exploitation activities of clustered projects, s ...
Voir le projet

 4