Rechercher des projets européens

14 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
.... Unfortunately, current design methodologies do not explore the trade-offs offered by the above mapping, especially in dynamic contexts where tasks are frequently created and completed.We propose to research a methodology to fill this gap. It would allow better exploitation of hardware resources and eliminate the overheads of the suboptimal best-effort operating system and middleware solutions us ...
Voir le projet

 1

 TERMINÉ 

Hardware- and Network-Enhanced Software Systems for Cloud Computing (HARNESS)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

...rogeneity and complexity makes integrating them into the platform a fundamental challenge.The HARNESS project aims to bring these innovative resources into cloud platforms through a rich programme of research, validated by commercial and open source case studies. The innovations brought by HARNESS include: precise models describing requirements, policies, and expected performance of heterogeneous ...
Voir le projet

 6

 TERMINÉ 

Digital and environmental skills for facilities management

Date du début: 1 oct. 2016, Date de fin: 31 mars 2019,

...developed learning outcomes across the EU. THE DEFMA PARTNERSHIPThe partnership comprises 6 organisations from 5 countries, from the world of VET, the Facility Management segment, energy efficiency research, as well as learning innovation experts. The South West College (SWC) leads the research in innovative technologies for the building construction sector and has strong expertise in the design o ...
Voir le projet

 6

 TERMINÉ 
... sustainability approach, beacause at the moment nobody is counting with the consequences of removing a vast quantity of organic material from the fields. Therefore partners convinced Altic, a Dutch research company developing state-of-the art technology for input optimisation and experienced in advising farmers, to provide their knowledge for adaptation into the new training.Considering the struc ...
Voir le projet

 5

 TERMINÉ 
...al Manufacturing Branch and Students of Industrial Engineering willing to become FEM Forging Specialists. According that, 3 courses – basic, intermediate and advanced – were produced. A research on needed competencies involving at least 100 forging industries and 5 national associations, who participated too providing industrial cases studies, validating by tests of evaluation and providing train ...
Voir le projet

 6

 TERMINÉ 
...rs; and Contribution to the writing of the new edition of BREFs (best available techniques reference documents), by providing data on the relevant agricultural subsectors to the Joint Research Centre (JRC) in Seville.
Voir le projet

 4

 TERMINÉ 
Background The Institute for Prospective Technological Studies (IPTS) is one of the seven scientific institutes of the European Commission's Joint Research Centre (JRC). In 2006, it published a report on the Environmental Impact of Products (EIPRO), which analysed the lifecycle environmental impacts related to consumption in the EU-25 countries. EIPRO fou ...
Voir le projet

 3

 TERMINÉ 

Local Authorities Improving Kyoto Actions (LAIKA)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

... Municipality of Bologna, and the Municipality of Lucca. The other project partner was the Italian inter-university Centre for the Development of Product Sustainability (CESiSP), an interdisciplinary research group involving academic institutions from Genoa, Turin and Pisa, with a range of expertise in climate science. Through its Action Plans, the project set a GHG emission reduction target for 2 ...
Voir le projet

 5

 TERMINÉ 

H2POWER_Hydrogen in fuel gas (H2POWER)

Date du début: 1 sept. 2010, Date de fin: 31 oct. 2013,

...olicymaker, regional transport company, dissemination and communication experts, and a local consultancy experienced in environmentally-friendly low-energy technological solutions; with scientific research being outsourced to a local university. The project team identified parameters for the amount of hydrogen (H2) to mix with methane (CH4) in the hydro-methane fuel; set up the Engine Control Unit ...
Voir le projet

 5

 TERMINÉ 

Working with Industrial Spaces to Exemplify Reuse (WISER LIFE)

Date du début: 2 juin 2014, Date de fin: 1 juin 2017,

...nstrating excellence in reuse at every level of interaction, supported by an eco-cluster of resource-efficient enterprises, and complemented by a suite for environmental education, training and research programmes, to support the development of a low-carbon society in which waste reuse plays a pivotal role. Specifically, the project aims to: Create a prototype ‘3-D textbook’ reuse education ...
Voir le projet

 2

 TERMINÉ 

Solutions for Microgeneration to ALLow Energy Saving Technology 4.8 (SMALLEST)

Date du début: 14 juin 2009, Date de fin: 29 juin 2012,

...n Shetland and which aims at producing the Shetland Renewable Energy Strategy.More information see: http://nppoutcomes.eu/Title: SEAM Centre training facilityDescription : A training, information and research facility for sustainable energy and micro-renewables based at Inverness College UHI. The centre provides short course training for experienced plumbers, electricians and heating engineers to ...
Voir le projet

 9

 TERMINÉ 

Energetic Recovery of Waste (VEDER)

Date du début: 19 févr. 2013, Date de fin: 18 août 2015,

Development of a sustainable energy sector in perspective of a sustainable use of energy resources, through the implementation of a system for electricity and heat production from biomass, municipal, agricultural and industrial waste. Expect ...
Voir le projet

 8

 TERMINÉ 
Nowadays, the training references that are part of the national catalogues of qualifications do not integrate Units of Short-term Training (UST) concerning sustainability issues. Although the construction industry has adopted several new technical improvements enabling companies to build more sustainable buildings, the training offer is still limited and the European cooperation is relatively weak ...
Voir le projet

 10

 TERMINÉ 
...t concretely SMEs innovation strengthening the existing transnational cluster network and widening services and facilities, developing a self-sustaining system based on a fruitful cooperation between research centers, bodies supporting SMEs and regional administrations. - Exploit the existing capitalization process started by strategic MED projects and developing it through a series of targeted in ...
Voir le projet

 6