Rechercher des projets européens

27 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

HST Integration

Date du début: 31 août 2002, Date de fin: 29 juin 2008,

...s to contribute to the overall objective of more sustainable transport within NWE by promoting a modal shift from air to rail Specific actions will include: improving the environmental quality of the public transport hubs, train and bus stations; providing better links with cross-border regional public transport; improving and extending the existing feedering lines; creating public transport links ...
Voir le projet

 19

 TERMINÉ 

Wood Energy and Cleantech (Woodenergy)

Date du début: 30 avr. 2010, Date de fin: 30 nov. 2012,

...he work packages (Policies and planning - Business and wood sector - Technology and production) and cross border transfer of knowledge is important to realize coming investments. Decision makers in public sector, individuals (forest owners, households, students) and other stakeholders need a high level of awareness of the green society and they are important target groups for information activitie ...
Voir le projet

 6

 TERMINÉ 

Sustainable Use of Regional Funds for Nature (SURF-Nature)

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2012,

The Sustainable Use of Regional Funds for Nature (SURF – Nature) project is a partnership of 14 authorities and public bodies (or bodies under public law) working together to optimise regional policies and practices with regard to promotion and preservation of natural heritage, biodiversity, and nature conservation through improving opportunities for and the impacts of financing these measures fro ...
Voir le projet

 14

 TERMINÉ 

South Baltic Offshore Wind Energy Regions (South Baltic OFFER)

Date du début: 28 févr. 2010, Date de fin: 30 mai 2013,

...dustry (OWI). Therefore, South Baltic OFFER will establish a vital network between the partners, businesses and stakeholders (C1&2) and communicate the importance of OWE for the region to the general public as well as to stakeholders from all levels (C2&3). It will also foster the transfer of knowledge within the region as well as from experienced partners from outside the region in order to speed ...
Voir le projet

 10

 TERMINÉ 
...e the fesability studiesin order to implement an investment project for the rehabilitation of wetlands; 14 environmental NGOs (5 from Bihor County and 9 from Hajdu - Bihar County) and environmental public institutions, such as the National Environmental Protection Agency - territorial body from Bihor and the correspondent body from Hajdu - Bihar; • 10 universities (6 in Bihor County and 4 in Hajdu ...
Voir le projet

 2

 TERMINÉ 
...e Europes energy supply sustainable and future proof.An important obstacle for wide-spread introduction of renewable energy production capacity and energy efficiency measures is the fact that actors (public and private) willing to invest in sustainable energy hardware and infrastructure often have difficulties to attract financial means to support their investments. The private financial sector (b ...
Voir le projet

 16

 TERMINÉ 

REGIONAL ACTION PLANS for INNOVATION DEVELOPMENT AND ENTERPRISE (RAPIDE)

Date du début: 31 août 2008, Date de fin: 29 nov. 2010,

RAPIDE is a propsal for a capitalisation network involving 13 partners from 11 Member States. Its aim is to implement good practice relating to the role of the public sector in stimulating innovation in partner regions, in particular helping businesses (primarily SMEs) to bring innovative products and services to market more quickly. The long term objective of the project is to stimulate innovatio ...
Voir le projet

 13

 TERMINÉ 

Tackling the "Broadband Gap" in SEE Rural areas through PPP model  (PPP4Broadband)

Date du début: 30 nov. 2012, Date de fin: 29 nov. 2014,

...kbps which is limit for classification as Broadband existence based on EC. Aforementioned areas are affected by market failure as there is no interest of private providers to build infrastructure and public initiatives and activities substituting the private service are missing. To solve those problems 16 partners from 9 countries across SEE territory joined force focusing to develop transnational ...
Voir le projet

 11

 TERMINÉ 

Mechanism for Enhancement of Synergy and Sustainability among Enterprises (MESSE)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

...e School for Social Entrepreneurs as good practices. Both institutions have the aim of improving the social entrepreneurship facilitating coordination and cooperation between Social Enterprises -SE-, public authorities and companies at local level.Many initiatives in this sector have been conducted in the past, but in a more isolated way, mostly on local and regional level. The MESSE partnership h ...
Voir le projet

 9

 TERMINÉ 
Project in brief According to a study carried out in 2009 by the recruitment agency Talent Republic, 54% of students and high level managers from Arab countries which have been trained abroad (in particular in Europe) do not go back to their home country. How can we better mobilise this great reservoir of economic talents (still underused), by encouraging the return of project holders from the dia ...
Voir le projet

 5

 TERMINÉ 
...or SMARTAgriFor, there is already strong support from important stakeholders including regional development authorities ensuring access to European structural funds. Further, 10 universities and 1 public research institute – representing the top performing organizations in the selected scientific domain in Portugal - will support FCT by helping develop SMARTAgriFor’s business plan in collaboration ...
Voir le projet

 3

 TERMINÉ 
... Achievements: Outputs*Ivangorod fortress access road (370m length), descent (336m2) and ascent to fortress (90m) modernized, parking and public toilet constructed, landscaping and video-monitoring system developed; *Narva fortress access territory (13 538 m2) reconstructed and landscaping improved; *67 tourist objects in Narva (34) and in Ivan ...
Voir le projet

 3

 TERMINÉ 
...ering Committee. The Task Force, a leading transnational team of experts in cluster formation and capacity building has proposed design and implementation of a number of training modules to the public actors in the Baltic Sea Region. BSR InnoNet has financed development of the Task Force’s plan. However, no budget is available to implement the activities. During two annual rounds of national consu ...
Voir le projet

 3

 TERMINÉ 

Innovative methods of Barta river basin management system (Barta club)

Date du début: 1 déc. 2001, Date de fin: 31 août 2005,

... overall of objective was to reduce the pollution levels of the Barta River catchment area. More specifically, the project planned the establishment of a steering committee that would establish a new public institution for river basin management (the participants of which would be the Ministry for Environment Protection and Regional Development, the Regional Environment Management Agency, eight lo ...
Voir le projet

 9

 TERMINÉ 
...oduced in Spain and Portugal, and then implemented pilot experiments in specific Galician and Portuguese ports. In these autonomous ports (Marin, Vigo and Coruña) and ports managed directly by the public agency Portos de Galicia, participants committed to undertake project actions for each type of waste targeted: a) fishing nets and fishing gear, b) expanded polystyrene packaging (EPS), and c) ba ...
Voir le projet

 6

 TERMINÉ 

Integrated green life-cycle management of waste oils and petroleum residues (ELINA)

Date du début: 1 sept. 2011, Date de fin: 28 févr. 2015,

... distributed. Furthermore, a database of more than 1 000 stakeholders was compiled, and events, newsletters and other printed communication materials targeted stakeholders from the public and private sector in Greece. Overall, the project paved the way for the management of WO&PR as a separate waste stream, through a dedicated scheme, similar to the one applying to waste lube oils. WO&PR has in f ...
Voir le projet

 3

 TERMINÉ 
...ems, will get a piece of the pie of the market of smart houses. The production of electricity with alternative methods, for domestic consumers, for home consumption and reinforcing the network of the Public Power Corporation, is important and it is a long-term goal of the European Union to solve the problem of energy production by combustion. As a result the authorities suggest solutions such as s ...
Voir le projet

 3

 TERMINÉ 

International Benchmarking on CVET – 4 European Regions

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2017,

...ons for the promotion of adult participation in continuing education, especially those with less access to training opportunities. This will be achieved through cooperation and partnership between public authorities and CVET stakeholders from different countries and regions of the EU. The Blue Economy – for its special importance in the partnering countries – has been chosen as the scope of applic ...
Voir le projet

 8

 TERMINÉ 

Gençler Kariyer Yolunda, Karar Alıcılar Hep Yanında

Date du début: 4 janv. 2016, Date de fin: 3 sept. 2016,

...try and Technology. This activity will be quite beneficial for the participants in terms of concerting with decision makers and acquainting themselves with the area of employment at the public institutions and organizations and presenting draft action plan proposals which are prepared by them. The methods which will be utilized throughout the conducting process of this project are outcome driven a ...
Voir le projet

 9

 TERMINÉ 
...or the transnational project meetings will be: young peer educators, representatives of the participating partner organisations; partner youth associations; experts, politicians and public authorities (business and/or youth sector) who will be involved for cooperation on the issues of the project. The meetings will be facilitated by the professional non-formal education facilitators with relevant ...
Voir le projet

 4

 TERMINÉ 
Energy Performance Contracting (EPC) is a proven model for modernizing mostly public buildings by ESCOs with guaranteed energy and cost savings. Nevertheless, a broad roll-out of EPC is being prevented mainly because of two unresolved issues: the split incentives dilemma and the lack of adequately flexible contract models.The guarantEE project will address prevailing barriers to EPC in a team of 1 ...
Voir le projet

 14

 TERMINÉ 

Reconstruction of the Automobile BCP Borisoglebsk

Date du début: 31 déc. 2013, Date de fin: 29 sept. 2015,

The (only) border crossing point between Norway and Russia needs developing, since the trade and cross-border cooperation has increased during the last few years. The programme has contracted a project for reconstructing the border crossing point. The amount of investments vs. purely planning costs will be specified during July 2015. ...
Voir le projet

 3

 TERMINÉ 

sharing methodologies on FINancial ENgineering for enterprises (FIN-EN)

Date du début: 31 déc. 2011, Date de fin: 30 déc. 2014,

... Achievements: The FIN-EN project gathers together 13 partners representing national and regional public banks, public authorities, development agencies, European associations, most of them being Managing Authorities or Holding Fund Managers of Financial Engineering Instruments (FEI) set up or in ...
Voir le projet

 13

 TERMINÉ 
...sbon Strategy with respect to innovation and the knowledge based economy, when access to finance is one of the main problems of innovative SMEs.Thus, it becomes a field for stronger engagement of the public sector. However, public financial resources are limited and need to be used as effective as possible. The development of interregional financial assistance to SMEs and of non-grant instruments ...
Voir le projet

 26

 TERMINÉ 
...Os and financial intermediaries in charge to test firstly the new methodology of evaluation and then develop new local plans for continue and strenghten the IA evaluation - the strict connection with public policy makers (particularly NPOs) in seeking to alleviate the problem Achievem ...
Voir le projet

 15

 TERMINÉ 
Economic and demographic development in Baltic non-metropolitan regions is increasingly weak compared to the metropolitan regions. In order to gain balanced regional development, it is important to narrow the gap and support economic performance in non-metropolitan regions. BSR InnoReg utilizes the results of VBN InnoReg project (2006–2007) whose main outcome was a common understanding of regional ...
Voir le projet

 18

 TERMINÉ 

Network for Regional SME Finance (FinNetSME)

Date du début: 30 juin 2004, Date de fin: 29 juin 2007,

The Network for Regional SME Finance, FinNetSME, is a network project designed to encourage an intensive exchange between regional public financiers on how to improve access to finance for Small and Medium Size Enterprises (SMEs). To this end, 20 partners from nine EU Member States will discuss current problems of SME finance, compare the situation in their respective regions and will suggest prac ...
Voir le projet

 22