Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
... potential polluters. A final project workshop presented the draft legislation produced by the project. A project website was launched and a link was to be made available through the Ministry of Physical Planning and Environment website. The project has also produced a video which has been widely distributed. E. Proposal of a draft legislation for the monitoring and control of nitrogen and ...
Voir le projet

 1

 TERMINÉ 
...m was provided to the exchanges through the involvement of external experts - researchers, academics and administrators from other departments. In Algeria, cooperation between the Focal Unit, the Ministry and the scientific and technical experts led to a new management plan for the protected wetland area. This has set out the tools and vision necessary for the follow-up of the plan and calls for ...
Voir le projet

 3

 TERMINÉ 
...in the national system of education and teaching. Objectives The overall objective of the project was to support the Ministry in the implementation of its environmental education strategy. The specific objectives of the project were to: Formulate a national strategy of environmental education; Elaborate an implement ...
Voir le projet

 2

 TERMINÉ 

Preserving the Marine Environment of Oludeniz Lagoon (LAGOON)

Date du début: 1 janv. 2003, Date de fin: 31 déc. 2004,

...s in the most sensitive lagoon area and restrict construction (for example, benches and commercial buildings) on the lagoon's beaches. The Turkish Ministry of Environment and Forest, which is preparing emergency action plans for Turkish coastal areas, incorporated some of the main ideas developed by the LAGOON project into its policies. The protection of the Mediterranean Sea is one of the prio ...
Voir le projet

 1

 TERMINÉ 

Viru and Peipsi Catchment Area Management Plan (VIRU-PEIPSI CAMP)

Date du début: 1 déc. 2001, Date de fin: 30 sept. 2005,

... Results The main result of the project is a draft River Basin Management Plan (RBMP). This was developed through expert and publication consultation. The Ministry will use the draft as the basis for the final RBMP in coming years, according to the schedule set in the WFD. In addition to the draft RBMP, the project provided assistance to the Ministry o ...
Voir le projet

 7

 TERMINÉ 

Innovative methods of Barta river basin management system (Barta club)

Date du début: 1 déc. 2001, Date de fin: 31 août 2005,

...area. More specifically, the project planned the establishment of a steering committee that would establish a new public institution for river basin management (the participants of which would be the Ministry for Environment Protection and Regional Development, the Regional Environment Management Agency, eight local governments (Barta, Dunika, Gramzda, Kaleti, Nica, Otanki, Rucava and Virga), the ...
Voir le projet

 9

 TERMINÉ 
... changed from being a ‘phantom’ species to be a ‘flag’ species. The National working group was reinforced thanks to the project. The Spanish Ministry of Environment assumed more readily the coordination role and as a result some important initiatives were brought to fruition: the species was listed as ‘endangered’ at the national level and a national plan for the eradication or contr ...
Voir le projet

 1

 TERMINÉ 

Conservation and management of the biotope 'S. Genuario Wetland' (San Genuario)

Date du début: 1 juin 2001, Date de fin: 31 mars 2005,

...station and a capture area for game. Fortunately, in the last case the province assigned the management of the area to the Park. On the other hand, for the building of the power plant the Environment Ministry and regional authorities have granted all the necessary permits for the power station to be built. The beneficiary and some NGOs and other interested parties have presented formal complaints, ...
Voir le projet

 2

 TERMINÉ 

Conservation of the dolphins from the Romanian Black Sea waters (Dolphins)

Date du début: 1 juil. 2001, Date de fin: 30 juin 2004,

...e of Vama Veche-Doi Mai and the Danube Delta Biosphere Reserve. A management plan has been drawn up for the former and the beneficiary received the custody for the management of this area from the Ministry of Environment, in accordance with Romanian legislation regarding the management of protected areas. The project helped raise local awareness of the conservation of cetaceans through the implem ...
Voir le projet

 3

 TERMINÉ 

Implementation of management measures at the Agras wetland (AGRAS WETLAND)

Date du début: 1 juil. 2003, Date de fin: 1 juil. 2007,

...ment of the SPA, the various stakeholders signed a memorandum of co-operation for the conservation of the wetland, establishing a management committee that will meet twice yearly till the Ministry of the Environment establishes a Wetland Management Body, as required under Greek law. Project partner Endiatima drew up a restoration plan for the wetland, covering aspects such as restoration of habi ...
Voir le projet

 5

 TERMINÉ 

MALSIS, a soil information system for the Maltese Islands (MALSIS)

Date du début: 1 mars 2002, Date de fin: 29 févr. 2004,

... • Created a computer-based soil information system (MALSIS); • Increased the capacity of project staff; and • Created a National Soil Office (NSU) within the Ministry. The beneficiary’s efforts to involve the stakeholders throughout the project, the dissemination and training activities undertaken, and the improvement in the quality of data on soils have likely contributed to an inc ...
Voir le projet

 1

 TERMINÉ 
...tergents containing phosphorus. So far, the terms of reference for an assessment and identification study have been developed by the Central Research Institute for Complex Use of Water Resources, the Ministry of the Environment, Finland, the European Bank for Reconstruction and Development (EBRD) and HELCOM, and agreed with the Belarusian Ministries of Natural Resources and Environmental Protectio ...
Voir le projet

 1

 TERMINÉ 
...y chaired the Baltic Master II Political Committee. A number of political seminars and meetings has taken place, e.g. in the Swedish Parliament, at EU Maritime Day in Gdansk and at the Estonian ministry of environment in Tallinn. The Political Committee’s work was crowned by the signing of the Baltic Master II Vision for the Baltic Sea December 1st 2011 in Brussels. The vision was communicated and ...
Voir le projet

 30

 TERMINÉ 
...scientists and students to work together and thus bridging science and school.Also, teachers’ training courses and science-meets-school conferences with science communicators, teachers, and ministry authorities, were carried out and documented. Additional trainings for teachers were carried out regionally on other occasions. Public awareness has been raised via press articles, TV and radio broadca ...
Voir le projet

 7

 TERMINÉ 

FUTUREforest - Woodlands for Climate Change (FUTUREforest)

Date du début: 30 sept. 2008, Date de fin: 29 sept. 2011,

...forest management practices. The partnership consists of six regional public forestry authorities, one regional association and one national public forestry authority from seven EU Member States. (1) Ministry of Rural Development, Environment and Consumer Protection of the Federal State of Brandenburg, Germany, (short: Brandenburg); (2) Forestry Commission Wales, United Kingdom, ( Wales); (3) Fren ...
Voir le projet

 8

 TERMINÉ 
...d plan for managing the water quality and resources of the Gauja/Koiva River, shared by Latvians and Estonians – this is the goal for cooperation among Latvian Institute of Aquatic Ecology, Latvian Ministry of Environmental Protection and Regional Development, Biology Institute of Latvian University, Baltic Environmental Forum in Estonia and Latvia, Tallinn Technological University and Estonian Un ...
Voir le projet

 7

 TERMINÉ 

SDF (Sustainable Development of Flood Plains) (SDF)

Date du début: 31 déc. 2002, Date de fin: 29 juin 2008,

...e drastic long-term action to cope with rising water levels. One way of doing this is to address the storage and drainage capacity of the river Rhine. Thus, the key objective of SDF, led by the Dutch Ministry of Transport, Public Works and Water Management), and in collaboration with 8 partners from Germany and the Netherlands, is to take steps to expand the Rhines main drainage capacity. The proj ...
Voir le projet

 11

 TERMINÉ 

Capacity building for sustainable tourism development (CBSTD)

Date du début: 22 janv. 2007, Date de fin: 21 déc. 2009,

...of engagement the project was able to achieve from the relevant Albanian institutions and the lack of environmental monitoring expertise. It remains to be seen how supportive the Ministry of Tourism and local governments will be towards application of the tools and instruments developed under the project. Further information on the project can be found in the project's layman report and After-L ...
Voir le projet

 6

 TERMINÉ 
...trated at international level and there was confirmed interest from other European countries to replicate the ReStEP approach. At national level, the methodology has already been certified by the Ministry of Agriculture as a new voluntary tool and some of its principles were also incorporated into the national Action Plan for Biomass (2012-2020). The project team hoped the responsible ReStEP appr ...
Voir le projet

 5

 TERMINÉ 
...NAP) – including the potentially harmful health problems resulting from improper management of manure. An extensive information and communications campaign was planned by the beneficiary, the Ministry for Sustainable Development, the Environment and Climate Change (MSDEC; formerly the Ministry for Resources and Rural Affairs), along with training sessions for the country’s 850-plus full-time f ...
Voir le projet

 1

 TERMINÉ 
...round Shabla and Durankulak lakes. The project produced management prescriptions which were incorporated into the revised National Species Action Plan, in accordance with the regulations of the Ministry of the Environment and Water (MoEW), as well as guidelines and other strategic documents important for red-breasted goose conservation. This included specific guidelines for investors (particularly ...
Voir le projet

 5

 TERMINÉ 
...ocal stakeholder groups. The management plans for all four project sites - Aizkraukle Mire and Forests, Aklais Mire, Melnais Lake Mire and Rozu Mire Nature Reserves - were approved by the Ministry of Environmental Protection and Regional Development. These management plans serve as guidelines for the implementation of restoration actions on these Natura 2000 sites and, as such, are a useful tool f ...
Voir le projet

 3

 TERMINÉ 
...experience can be replicated in similar Mediterranean environments. At a national level, the project collaborated with the Spanish Ministry of the Environment in the development of indicators of climate change effects in the Biosphere Reserves. The project will bring socio-economic benefits thanks to the information generated and capacity building for land owners and managers, and six companies i ...
Voir le projet

 1

 TERMINÉ 
...evelop international cooperation in order to facilitate conservation including public education efforts; Draw up habitat-related protection measures in order to facilitate the Estonian ministry of the environment in preserving the Aspius aspius, Gobitis taenia, Misgurnus fossilis and Cottus gobio habitats in Estonian Natura 2000 rivers; Promote the management and preservation of Natura 2000 biot ...
Voir le projet

 3

 TERMINÉ 
...ject’s sites under further conservation status. Such a proposal is in line with the current Conservation Strategy for Protection Areas (SCAP) of the French Ministry of Environment. Further information on the project can be found in the project's layman report and After-LIFE Conservation Plan (see "Read more" section).
Voir le projet

 2

 TERMINÉ 

Conservation of Senne and Medzibodrozie SPAs in Slovakia (SENNERESTSK)

Date du début: 15 nov. 2005, Date de fin: 14 mai 2011,

...s as well as for the restoration of the main dyke in Senne National Nature Reserve. The proposal for the pilot aqua-environmental scheme on fishponds was developed and submitted to the ministry of agriculture. However, it was not formalised through inclusion into the operational programme “Fisheries of the Slovak Republic 2007-2013”, neither was it tested by fish farming company Dona at Senne ...
Voir le projet

 8

 TERMINÉ 
...y, and birds linked to water bodies or to open and steppic environments, all of which are included in Annex I of the Birds Directive. An Infrastructure and Transport Strategic Plan, drawn up by the ministry of public works, proposes the introduction of more than 7 000 km of new high-performance lines during the period 2005-2020. This has important consequence for several Natura 2000 sites. Speci ...
Voir le projet

 5

 TERMINÉ 
... the ancient city of Hierapolis (from the Hellenic and Roman period) and its thermal water resources.The area falls under the statutory protection of the Special environment Protection Council of the Ministry. However, the use of thermal water is not regulated or controlled. Excessive usage, unauthorised wells, and improper management of water after use pose a serious environmental problem, whic ...
Voir le projet

 1

 TERMINÉ 
...EUR 1 000) commercially viable version of the device after LIFE. Other elements of the after-LIFE communication plan include: the establishment of a project (TICSAD) - part funded by the French Ministry of Agriculture - that will develop the use of ICT for sustainable agriculture; adaptation of the data recorder for the fight against mosquitoes; use of the data gathered by the device for further ...
Voir le projet

 10

 TERMINÉ 

Conservation of Falco vespertinus in the Pannonian Region (F.VESPERTINUS-HU/RO)

Date du début: 1 janv. 2006, Date de fin: 31 déc. 2009,

...(mammals and insects) in each habitat category was carried out. In both countries an agro-environmental programme proposal for F. vespertinus-friendly management was prepared and submitted to the Ministry of Agriculture and Rural Development. The data obtained from satellite transmitters proved to be highly informative on large scale movements of the tracked individuals and allow a better under ...
Voir le projet

 8

 TERMINÉ 
...wareness work, such as the wide distribution of dissemination products.At the end of the project, the establishment of a park administration was pending approval by the Romanian environment ministry. However, national legislation has declared the designated Natura 2000 sites as protected areas. Tourism and other such activities could bring economic and social benefits to local communities near th ...
Voir le projet

 4

 TERMINÉ 

Establishing institutional capacities for protection of river Mura landscape (MURA)

Date du début: 1 déc. 2004, Date de fin: 30 nov. 2006,

Background In 2001, under the initiative of a local NGO and with the support of the Ministry of Environmental Protection and Physical Planning, Medimurje County in northern Croatia declared the area surrounding the Mura River a Protected Landscape. Despite this status, effective protection and sustainable development measures were still lacking. In additi ...
Voir le projet

 2

 TERMINÉ 
...themselves to supporting future activities. Moreover, national policymaking bodies actively participated in this process, a good sign for the sustainability of the project. For example, in Jordan the ministry of environment is now seeking a policy response to the issue of plastic bag waste through the use of economic tools. The replication of the project’s activities (e.g. policy development pro ...
Voir le projet

 4

 TERMINÉ 

Conservation of NATURA 2000 biotopes in Räpina polder ( RAPINA )

Date du début: 1 août 2003, Date de fin: 31 oct. 2006,

...lder land during the project period and starting implementation of the plan; • creating a secure wetland area to stabilise populations of endangered water birds; • assisting the Ministry of the Environment to develop a system for managing SPAs that would ensure the maintenance of habitats which are valuable for endangered bird species; and • educating the local population and involving th ...
Voir le projet

 4

 TERMINÉ 

Tackling Water Challenges in the International Context (IC4WATER)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2021,

The Joint Programming Initiative Water Challenges for a Changing World, the Water JPI, is an intergovernmental initiative which strives to achieve sustainable water systems for a sustainable economy in Europe and abroad.IC4WATER’s objectives include supporting agencies in stepping up international cooperation: through the sharing of best practices, networking, closer coordination of existing activ ...
Voir le projet

 19

 TERMINÉ 
The WaterWorks2015 proposal responds to the Horizon 2020 (H2020) Societal Challenge 5 2015 Call topic Water-3 [2015]: Stepping up EU research and innovation cooperation in the water area.WaterWorks2015 aims at pooling resources from the 32 participating research programme owners / managers of 23 countries to implement a joint call for proposals, with EU co-funding in the area of sustainable water ...
Voir le projet

 31

 TERMINÉ 

Water Works 2014-2019 in Support of the Water JPI (WaterWorks2014)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2020,

Water is a critical resource for the European society. Beside its main life function, freshwater also provides many other functions essential to our economy. Water challenges cannot be successfully tackled through the isolated effort of individual national research and innovation programmes. This ERA-NET cofund proposal is submitted in the name of the Joint Programming Initiative “Water Challenges ...
Voir le projet

 25

 TERMINÉ 

Tackling European Water Challenges (WATEUR)

Date du début: 1 janv. 2013, Date de fin: 30 juin 2016,

Water is a critical resource for the European society. Beside its main life function, freshwater also provides many other functions essential to our economy such as transport, energy provision, heat exchange, cleaning, washing, and constitutes a necessary raw material for many industries. Water availability in sufficient quantities and adequate quality is an issue of highest priority and represent ...
Voir le projet

 18

 TERMINÉ 

Static Acoustic Monitoring of the Baltic Sea Harbour porpoise (SAMBAH)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2015,

Background The Baltic Sea subpopulation of harbour porpoise (Phocoena phocoena) is small and has been drastically reduced in recent decades. The species is listed in Annexes II and IV of the Habitats Directive as well as in the national red lists of several Member States. This, in combination with a complex of threats and problems that are still fairly po ...
Voir le projet

 10

 TERMINÉ 
SedAlp contributes to integrated management of sediment transport in Alpine basins directed to an effective reduction of sediment-related risk while promoting the enhancement of riverine ecosystems and reducing the impacts of hydropower plants (balancing the implementation of EU Directives e.g. RES, Floods and WFD). The project includes piloting actions in various representative Alpine river basin ...
Voir le projet

 14