Rechercher des projets européens

Viru and Peipsi Catchment Area Management Plan (VIRU-PEIPSI CAMP)
Date du début: 1 déc. 2001, Date de fin: 30 sept. 2005 PROJET  TERMINÉ 

Background Oil-shale mining and oil-shale based electricity production, chemical and other industrial activities, mine- and quarry-dewatering, mismanagement of oil and fuel stocks, inadequate waste management and untreated wastewater, and poor environmental management of agricultural activities have caused serious damage to ground and surface water in the Viru-Peipsi catchment area in Estonia. Negative consequences include the development of depression cones, an accelerated movement of pollutants from one aquifer to another, and the eutrophication of the shallow Lake Peipsi. These problems also impact on the Russian coast of Lake Peipsi. The Water Framework Directive (WFD) dictates that water management plans must be introduced for all river basins in the European Union to ensure the sound and sustainable management of water resources. In Estonia, actions coherent with the WFD are also foreseen under national legislation and the National Environmental Action Plan. Objectives The overall objective of the project was to assist Estonia in achieving the implementation of EU Water Framework Directive (WFD) in the Estonian part of the Viru-Peipsi catchment area. The project aimed to develop a management plan for the Viru-Peipsi catchment area, in order to enhance the protection of the water resources of the Narva river and Lake Peipsi basins. The expected long-term impacts included a progressive move towards a cessation of discharges, emissions and release of hazardous substances listed in the EU Priority List, in EU Lists I and II of Dangerous Substances, and in an Estonian-specific list of hazardous substances. Results The main result of the project is a draft River Basin Management Plan (RBMP). This was developed through expert and publication consultation. The Ministry will use the draft as the basis for the final RBMP in coming years, according to the schedule set in the WFD. In addition to the draft RBMP, the project provided assistance to the Ministry of Environment in revision of legislation concerning delineation of river basin districts and groundwater bodies. The project also contributed to the compilation of the Article 5 report on existing status of water bodies. To develop the draft RBMP, the project carried out inventory and data gathering activities, in cooperation with the relevant national institutions. The project also elaborated an economic assessment of the expense of reducing the municipal, agricultural and industrial pollution load and proposed water protection and clean-up measures. The project provided valuable experience and expertise that will contribute to the further development of the final RBMP. Capacity building activities included the training of technical staff in monitoring and sampling, as well as the upgrading of technical equipment (PCs, and GIS and MIS applications, for example). The project was instrumental in improving stakeholder dialogue and participation. The project carried out an extensive dissemination and exchange of information in Estonia including national-level television broadcasts. The project has also contributed to an international dialogue with Russia, as the Lake is a transboundary lake. This project has been selected as one of the 22 "Best" LIFE Environment projects in 2006-2007

Details

Projet Website

6 Participants partenaires