Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

SOLUTIONS: Sharing Opportunities for Low carbon Urban transporTatION (SOLUTIONS)

Date du début: 1 mai 2013, Date de fin: 31 oct. 2016,

Transport is a key enabler of economic activity and social connectedness. While providing essential services to society and economy, transport is also an important part of the economy and it is at the core of a number of major sustainability challenges, in particular climate change, air quality, safety, energy security and efficiency in the use of resources (EC 2011: Transport White Paper).The ove ...
Voir le projet

 23

 TERMINÉ 
"SOLUTIONS will deliver a conceptual framework for the evidence-based development of environmental and water policies. This will integrate innovative chemical and effect-based monitoring tools with a full set of exposure, effect and risk models and assessment options. Uniquely, SOLUTIONS taps (i) expertise of leading European scientists of major FP6/FP7 projects on chemicals in the water cycle, (i ...
Voir le projet

 41

 TERMINÉ 

Demonstration of coordinated offshore wind farm connection solutions

Date du début: 31 déc. 2009, Date de fin: 30 déc. 2018,

The Krieger’s Flak Combined Grid Solution project is a joint Danish-German project managed by the two Transmission System Operators 50Hertz Transmission, Germany and Energinet.dk, Denmark. It is a project to combine the connection of offshore plants at Kriegers Flak with interconnections between Denmark and Germany.The traditional way to connect offshore wind power plants is to use national, radia ...
Voir le projet

 1

 TERMINÉ 

Smart Magnetic Solutions for Minimally Invasive Surgery (Smart Mag Solutions)

Date du début: 1 nov. 2010, Date de fin: 31 oct. 2014,

The objective of this proposal is the reintegration of Dr. Pádraig Cantillon-Murphy, a research fellow at Harvard Medical School and MIT (Boston, USA), back to Europe, as Assistant Lecturer at Cork Institute of Technology (CIT). His reintegration will result in (i) research independence and increased European collaboration and funding support for Dr. Cantillon-Murphy, (ii) novel and high-impact re ...
Voir le projet

 1

 TERMINÉ 
Objective of the projectThe overall objective of the project was to strengthen cross‐border cooperation for novel solutions in forestry and bioenergy. Main activities• Modification of Metla's Motti simulation programme to Russian conditions for assessing different forest management practices on stand development.• Development of GIS-based decision-support tools for industrial and energy wood harve ...
Voir le projet

 5

 TERMINÉ 
"Computational chemistry is playing an increasingly important role for research in the pharmaceutical industry, oils & plastic, and materials development. Simulation and high-throughput screening can be orders of magnitude cheaper than experiments in the early stages of drug design. The ERC project preceding this application has developed several new techniques that make it orders-of-magnitude mor ...
Voir le projet

 2

 TERMINÉ 
The project aims at reducing green house gas (GHG) emissions caused by the uncontrolled exhausting of coal mine methane (CMM) to atmosphere and to explore suitable economically interesting schemes for its energetic use by the development of an universal decision guidance for optimal use of CMM under varying conditions, an analysis and comparison of the current legal and administrative situation in ...
Voir le projet

 9

 TERMINÉ 

Anti-dust solutions in Bucharest (LIFE ADB)

Date du début: 1 sept. 2014, Date de fin: 30 mai 2018,

Background In order to improve the quality of air and to reduce the level of particulate matter (PM10) in urban areas, different methods of coagulating dust particles through dust-binding agents have been used, but only in separate actions. Scope exists to produce broader environmental benefits (concerning PM10 reduction) by combining different types of m ...
Voir le projet

 1

 TERMINÉ 

Electromobility solutions for cities and regions (ELMO`s)

Date du début: 1 déc. 2011, Date de fin: 30 nov. 2014,

The overall goal of the proposed project is to promote more sustainable transport through the development of electromobility solutions for cities and regions (ELMOS). The projects aims at delivering concepts for a better exchange of electromobility knowledge at regional and EU level, concepts for new business models and for cross-border field tests which should lead to an improved standardisation ...
Voir le projet

 10

 TERMINÉ 

Sustainable Solutions for Small Ruminants (3SR)

Date du début: 1 mai 2010, Date de fin: 31 oct. 2013,

"The 3SR project (Sustainable Solutions for Small Ruminants) brings together a strong and unique international consortium of 14 partners that will mine genomic information of sheep and goats to deliver a step-change in our understanding of the genetic basis of traits underlying sustainable production and health. To do this we will build on existing research resources in the major sheep and goat pr ...
Voir le projet

 9

 TERMINÉ 
"""Sea2grid"" project is developed in the field of Renewable Energy and it is targeted towards the exploitation of sea waves for the production of electricity to be injected into the power grid. To allow the grid connection of Wave Energy Converters it is necessary that the delivered power is conveniently smoothed and satisfies strict Grid Codes requirements. This is a critical point for very inte ...
Voir le projet

 1

 TERMINÉ 
"During the last decades, artificial lighting have been increasing at a rate of 6% the World, increasing the light pollution levels. Currently, lighting constitutes the 16% of global electricity. The European Ecodesign Directive established a framework to phase out particularly energy-intensive lights. Until now, economic and energetic optimization has solely driven eco-friendly lighting strategie ...
Voir le projet

 1

 TERMINÉ 
The proposal will investigate young people’s views of the EU and of their role in building the EU through their participatory practices at EU, national, regional and local levels. These issues will be examined from an interdisciplinary perspective (Political Sciences, Sociology, History, Media and Communications, Education, Psychology) as building blocks for a new and groundbreaking conceptualiza ...
Voir le projet

 9

 TERMINÉ 
Crossing SBA as foot passenger by ferry has lost its importance during the last decades. This trend has triggered a circuit of negative effects, becoming evident esp. in interface areas. Services of infrastructure providers & transport operators are adjusted to cargo & car passenger traffic only, whereas raising service requirements of foot passengers were neglected completely. Ferry ports do not ...
Voir le projet

 12

 TERMINÉ 

bringing coastal SUBsurface water SOLutions to the market (SUBSOL)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

Coastal areas are the most productive and economically dominant regions of the world. The high water demand in these regions, however, puts tremendous pressure on their freshwater resources and ecosystems. This leads to problems like seasonal water shortage, saltwater intrusion, and disappearance of wetlands. Building on national, regional and European research and innovation programs, in the past ...
Voir le projet

 15

 TERMINÉ 
RurInno acknowledges social enterprises as promising but often neglected drivers of social innovations in structurally weak rural regions that tackle social problems and stabilise and improve the living conditions in these regions. But reports show that social entrepreneurs still lack specialised trainings and education, a supporting infrastructure and recognition. Against this background, RurInno ...
Voir le projet

 6

 TERMINÉ 

Bacterial motion in polymer solutions and biogels (GelSwimming)

Date du début: 26 févr. 2016, Date de fin: 25 févr. 2018,

Many cavities in the human body such as the lungs, the stomach or the reproductive tract are covered and protected by a thin layer of mucus gel. Under certain conditions pathogenic bacteria are able to penetrate the mucus layer which leads to serious infections. For example, in cystic fibrosis motile bacteria swim through the mucus layer and form biofilms which can be resistant to antibiotic medic ...
Voir le projet

 1

 TERMINÉ 
The transalpine traffic accessability is essential for Europe. Catastrophes in the Alp tunnels and traffic contrasts show the European dimension of this problems. The raise of road traffic within the alpine region cause an escalation of CO2 emmissions, noise pollution and use of road infrastructure which is not designed for the actual traffic volume. The "alpine" policy of traffic has abandoned th ...
Voir le projet

 17

 TERMINÉ 

Optimisation of Transport Solutions for Compressed Hydrogen (DeliverHy)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2013,

Compressed hydrogen trailers are cost efficient for near term distribution. However, with the currently used 20 MPa trailers the supply of larger refuelling stations would result in multiple truck deliveries per day, which is often not acceptable. In order to increase the transported quantities, lighter materials and higher pressure must be adopted. The cost increase of the hydrogen trailers resul ...
Voir le projet

 6

 TERMINÉ 
A key EU policy aims to reduce the Union dependency on raw materials imports, in particular (candidate) Critical Raw Materials that are vital for the EU innovative technologies. Topic SC5-11c-2015 scope focuses on “developing new highly-automated technological sustainable solutions for deep mining … in the sea bed combined with in-situ processing of minerals”. An existing but challenging raw mater ...
Voir le projet

 14

 TERMINÉ 

Building and district thermal retrofit and management solutions (THERMOSS)

Date du début: 1 sept. 2016, Date de fin: 29 févr. 2020,

The 20% primary energy consumption reduction targets set by the European Energy Efficiency Directive (EED), published in 2012, call for effective and wide-scale building heating and cooling systems upgrade strategies. These will be successful only if they base upon the right combination of technology innovation, industrial commitment and building owners awareness.In line with this statement, THERM ...
Voir le projet

 13

 TERMINÉ 
The current economic crisis is generating a paradigm shift in the European job market. The assumption that Knowledge Workers, irrespective of their education, are immune from unemployment is no longer valid. In such a context, the domain of adult learning needs to readjust to better cope with the double challenge of Ageing Knowledge Workers who tend to have lower education and engage in less trai ...
Voir le projet

 6

 TERMINÉ 
Dangerous goods are nowadays primarily transported by trucks – despite higher safety risks and higher environmental costs compared to other transport modes like rail. Intermodal transport offers an alternative but developing efficient interfaces between different transport modes is a challenge to be solved. Regions in central Europe are further disadvantaged due to missing connections across the ...
Voir le projet

 15

 TERMINÉ 
IMPRESSIONS will provide empirically-grounded, transformative science that quantifies and explains the consequences of high-end climate scenarios for both decision-makers and society. IMPRESSIONS will develop and apply a novel participatory methodology that explicitly deals with uncertainties and strong non-linear changes focussing on high-end climate change, but also including intermediate warmin ...
Voir le projet

 25

 TERMINÉ 
The identification of degradation pathways relevant for organic micropollutants in biological wastewater treatment processes is currently a major gap, preventing a profound evaluation of the capability of biological wastewater treatment. By elucidating the responsible enzymatic reactions of mixed microbial populations this project will cover this gap and thereby allow finding technical solutions t ...
Voir le projet

 3

 TERMINÉ 
The general objective of this Thematic Network (TN) is to foster and promote large-scale integration of domestic and distributed micro generation and improve energy efficiency through the implementation of innovative ICT solutions into local smart power grids.The TN will bring together key relevant players in the telecommunications and energy sector. They will overview and provide insight of exist ...
Voir le projet

 15

 TERMINÉ 
Flintstone2020 aims to provide a perspective for the replacement of two important CRMs – tungsten (W) and cobalt (Co) – which are the main constituents for two important classes of hard materials (cemented carbides/WC-Co, and PCD/diamond-Co), by developing innovative alternative solutions for tooling operating under extreme conditions. Fundamental knowledge on mechanical properties and wear of dif ...
Voir le projet

 9

 TERMINÉ 
International Seminar "DIY – Do It Yourself, Do It as a Youth-worker – creative solutions for unemployment among young artists” took place in village Wolimierz (Poland) from 13/09/ till 19/09/2015 In project were involved 14 Partner and Program Countries – Armenia, Belarus, Bulgaria, Czech Republic, Egypt, Georgia, Italy, Moldova, Romania, Serbia, Spain, Turkey, Ukraine In Seminar participated 28 ...
Voir le projet

 20

 TERMINÉ 

Supporting intermodal transport solutions in the Adriatic area (INTERMODADRIA)

Date du début: 30 sept. 2012, Date de fin: 27 févr. 2015,

The project objective is the improvement of the integration of the short sea shipping transport in the logistics chains crossing the Adriatic sea, and more specifically the provision of the best environment for the activation on intermodal rail-sea transport services between the ports and their own hinterlands. Currently, the Adriatic ports have different level of accessibility to the inland trans ...
Voir le projet

 11

 TERMINÉ 
Biological research heavily relies on visualization of biological samples by microscopy. In recent years light-sheet microscopy has emerged as a paradigm shifting technique. Only with light sheet microscopy it is for instance possible to follow every cell in a living system throughout development, to monitor brain activity of a live animal or to study cancer cells in their native three dimensional ...
Voir le projet

 1

 TERMINÉ 
The COSMICC consortium gathers key industrial and research partners with world-leading positions in the fields of Silicon photonics, CMOS electronics, Printed Circuit Board-Packaging, Optical transceivers and Data-Centers around a strong vision: mass commercialization of Si-photonics-based transceivers is possible starting in 2019 by enhancing the existing photonic integration platform of one of t ...
Voir le projet

 11

 TERMINÉ 
"Sixty percent of the human body consists of water. Water provides the 3D-network for life’s constituents. In a cell there are many interfaces: the average distance between two molecules or a molecule and a membrane interfaces is ~1 nm. Water and the interfaces it interacts with are of paramount importance for biological processes. The structural, dynamic, and biological properties of water, aqueo ...
Voir le projet

 1

 TERMINÉ 
Public Procurement of Innovation (PPI) is a crucial challenge for public bodies to be implemented during next years. The “usual” way of purchasing goods is based solely on the price of the product. Life cycle costing, supply chain analysis or group purchase are rarely used, which means missing some opportunities to get innovative products that would give purchasers competitive advantage. Therefore ...
Voir le projet

 8

 TERMINÉ 
Description The global objective of INSIDDE project is unveiling unknown features – hidden paint layers, overpaintings, possibly underdrawing steps, brushstroke textures, sealed contents of both 2D/3D artworksBecause cultural heritage is one of the most valuable assets of our continent, European institutions are strongly committed with it ...
Voir le projet

 10

 TERMINÉ 

Crystallization in Ionic Liquid Solutions (CRYSTILS)

Date du début: 1 avr. 2010, Date de fin: 28 août 2013,

"Crystallization is an essential process in the manufacture of products as varied as pharmaceuticals, electronic devices or biomimetic materials. In order to obtain a crystalline product with desirable characteristics (e.g. crystal size, morphology, structural organization) for specific applications it is crucial to control the mechanism and kinetics of crystal nucleation and growth. Yet, our unde ...
Voir le projet

 1

 TERMINÉ 
The project UPSIDE aims at delivering economic and societal benefits by fostering the emergence and development of User-driven Participatory Solutions for Innovation in Digitally-centered Ecosystems.The project aims at promoting the development of cooperation frameworks and synergy linkages between research, innovation activities within the companies, urban development policies and open user-drive ...
Voir le projet

 14

 TERMINÉ 
The implementation of educational interventions was fostering actions different and integrative with respect to the scholastic and “traditional” ones (counselling, socialization, transferring of competences related to the freetime management), represented an efficacious strategy when coping with young unease, apt to support the reintegration of subjects dropped out of compulsory education and trai ...
Voir le projet

 4

 TERMINÉ 

CHildren's Empowerment, Children's Solutions

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

The central aim of this project is to develop awareness, self-esteem and wellbeing amongst all participants in the knowledge triangle. Empowering children to inform themselves is the most powerful theme of the project. The children create their own narrative to guide them to wellbeing and positive self-image. In turn the parents and teachers use this narrative to inform their own guidelines for we ...
Voir le projet

 5

 TERMINÉ 

Sharing Solutions on Structural Funds (S3)

Date du début: 31 août 2004, Date de fin: 30 août 2006,

Regional and local authorities are increasingly involved in the elaboration and implementation of EU policies For instance, in EU regional policy they are involved in programming, managing, monitoring and evaluating Structural Funds programmes. To enhance institutional capacities and the success of authorities in dealing with Structural Funds, regions need to develop new ways to involve local stak ...
Voir le projet

 14

 TERMINÉ 
Removing barriers to accessing Information and Communication Technologies (ICTs) by persons with Intellectual Disabilities (IDPs) is crucial. Being excluded from ICTs implies being shut down from the information society, but also from accessing essential public services, as well as from the opportunity of living an independent life. Application of ICTs for IDPs must be evaluated based their contri ...
Voir le projet

 7