Rechercher des projets européens

37 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Advanced Radio Astronomy in Europe (RadioNet)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

RadioNet is a consortium of 28 institutions in Europe, Republic of Korea and South Africa, integrating at European level world-class infrastructures for research in radio astronomy. These include radio telescopes, telescope arrays, data archives and the globally operating European Network for Very Long Baseline Interferometry (EVN). RadioNet is de facto widely regarded to represent the interests o ...
Voir le projet

 29

 TERMINÉ 

EUROPLANET 2020 Research Infrastructure (EPN2020-RI)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

The Europlanet 2020 Research Infrastructure (EPN2020-RI) will address key scientific and technological challenges facing modern planetary science by providing open access to state-of-the-art research data, models and facilities across the European Research Area. Its Transnational Access activities will provide access to world-leading laboratory facilities that simulate conditions found on planetar ...
Voir le projet

 35

 TERMINÉ 
The MiARD project will use a wide range of data sets from the Rosetta mission (including the Philae lander) to refine the 3D topography of specific areas of comet 67P/Churyumov-Gerasimenko, to study the activity and changes caused by subliming volatiles as the comet nears the Sun, to make inferences about the nature of the top 10 cm of the surface of the comet, to assess whether the landing site o ...
Voir le projet

 9

 TERMINÉ 

Aeroelastic Gust Modelling (AEROGUST)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

Encounters with atmospheric turbulence are a vitally important in the design and certification of many manmade structures such as aircraft and wind turbines. Gusts cause rapid changes in the flow about the structures which leads to rigid and flexible unsteady responses. Knowledge of aircraft/gust interactions is therefore vital for loads estimation during aircraft design as it impacts on control s ...
Voir le projet

 13

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 

High Altitude Ice Crystals (HAIC)

Date du début: 1 août 2012, Date de fin: 31 janv. 2017,

...ising 34 partners representing the European stakeholders of the aeronautical industry from eleven European countries and 5 partners from Australia, Canada and the United States.HAIC will also develop international cooperation and collaboration thanks to the involvement of key international organisations and companies as partners of the project or through the HAIC Advisory Board.Letters of support ...
Voir le projet

 40

 TERMINÉ 

Innovative continuous upgrades of high investment product-services (USE-IT-WISELY)

Date du début: 1 sept. 2013, Date de fin: 30 nov. 2016,

In the past, customers invested in high cost, long service-life products. Today, they demand complex product-services capable of adapting to new customer goals and rapidly changing markets. The Use-it-wisely project will enable European manufacturers to operate successfully within this new paradigm.The project will investigate a new business model that implements continuous product-service adaptat ...
Voir le projet

 22

 TERMINÉ 

Improving Low Earth Orbit Security With Enhanced Electric Propulsion (LEOSWEEP)

Date du début: 21 oct. 2013, Date de fin: 1 nov. 2016,

...technology and policy development roadmap, (6) the pre-phase A design of a small technology demonstration mission and (7) the exploitation and dissemination of the proposal outcomes.A world-class international team of universities and industrial partners from Europe and Ukraine has been formed in order to perform this study with a high level of theoretical and technical expertise in all relevant f ...
Voir le projet

 11

 TERMINÉ 
...ering activities to be organised with other on-going R2I projects targeting the MED region. These activities will be defined in coordination with the European Commission notably in the context of the International Learning Network (ILN), the idea will be to exchange information and best practices between the different projects and identify issues and possible activities of common interest in order ...
Voir le projet

 13

 TERMINÉ 

GReener Aeronautics International Networking-2 (GRAIN 2)

Date du début: 1 oct. 2013, Date de fin: 31 mai 2016,

As mentioned in the Executive Summary of the Strategic Research & Innovation Agenda, Aviation has an important role to play in reducing greenhouse gas emissions as well as noise and local air quality issues. The continuous increase of air passenger transport generates an increasing use of hydrocarbon fuel with excessive emission of CO2 and NOX (greenhouse gases, pollutants and noise). It is well k ...
Voir le projet

 25

 TERMINÉ 
Landmines and the cluster munitions still kill or maim civilians every day in an indiscriminate manner even long after conflicts are over. At the current rate of clearance of about 500,000 mines per year and assuming no additional mines are laid from now on, it could still take hundreds of years to find and clear all the landmines around the world.D-BOX will tackle the burning issue of anti-person ...
Voir le projet

 24

 TERMINÉ 
The transportation industry has for a long time been engaged in the application of new lightweight materials for primary structural design in an effort to develop more energy efficient structures to meet low emissions targets without compromising public safety.This is also true for the rail industry, but the implementation of new lightweight materials has been slow mainly due to the lack of suita ...
Voir le projet

 19

 TERMINÉ 

Advanced Radio Astronomy in Europe (RADIONET3)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

... SKA in its TNA Program. It has a transparent and efficient management structure designed to optimally support the implementation of the project.RadioNet is now recognized by funding agencies and international project consortia as the European entity representing radio astronomy and facilitating the access to and exploitation of excellent facilities in this field. This is of paramount importance, ...
Voir le projet

 29

 TERMINÉ 

Self-deployable Habitat for Extreme Environments (SHEE)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

"The main objective of the SHEE project is the exploration of an effective integration of architecture and robotics for space applications. The goal is to develop a robotically-deployable habitat design introducing generic principles which would help in defining main themes for further development of the standards for robotics integrated into the architecture regarding safety and for the developme ...
Voir le projet

 7

 TERMINÉ 

5G: A LeadershIp Vision for Europe (5-Alive)

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2015,

The approach of the 5-Alive project will be to use an innovative mix of community and industrial support to produce the essential material and to perform an intensive communications programme. The project proposes to establish effective processes to capture, synopsise and present frequent news updates on the activities of the European 5G initiative and ensure their widespread dissemination. The ...
Voir le projet

 11

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

Alliance Permanent Access to the Records of Science in Europe Network (APARSEN)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

Description Digital preservation offers the economic and social benefits associated with the long-term preservation of information, knowledge and know-how for re-use by later generations. However, digital preservation has a great problem, namely that preservation support structures are built on projects which are short lived and is fragmente ...
Voir le projet

 33

 TERMINÉ 

OPtimisation for low Environmental Noise impact AIRcraft (OPENAIR)

Date du début: 1 avr. 2009, Date de fin: 30 sept. 2014,

Reducing noise from aircraft operations perceived by airport neighbouring communities is a major challenge facing the aircraft manufacturing industry, social society and the air transport business. By adopting a whole aircraft approach based on the latest developments in active / adaptive technologies, flow control techniques and advances in computational aero-acoustics applied to the major causes ...
Voir le projet

 51

 TERMINÉ 

Networked Society (NetSoc)

Date du début: 1 juil. 2012, Date de fin: 30 juin 2014,

The strategic objective of the Networked Society project is to define the requirements for future networks that can seamlessly support the Networked Society of 2020. This will be achieved by enabling an informed dialogue and policy debate between the terrestrial, satellite and content delivery communities and the industrial and social application sectors. This project will create new and lasting r ...
Voir le projet

 10

 TERMINÉ 
The ENIAC JU project ESiP is addressing the issues of reliability, failure analysis and testing in innovative system-in-package (SiP) solutions. Highly integrated systems with greater miniaturisation and increased functionality open new markets and improve the quality of life through a wide range of applications. In particular, higher systems integration technologies using multi-chip packaging, th ...
Voir le projet

 40

 TERMINÉ 

Future Fast Aeroelastic Simulation Technologies (FFAST)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

"The upstream FFAST project addresses the topic Design Systems and Tools (AAT.2008.4.1.1) by developing, implementing and assessing a range of numerical simulation technologies to accelerate future aircraft design. Critical load identification methods and reduced order modelling techniques developed will potentially provide a step change in the efficiency and accuracy of the dynamic aeroelastic “l ...
Voir le projet

 14

 TERMINÉ 

European Planetology Network Research Infrastructure (EuroPlaNeT RI)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2012,

The Europlanet RI project will provide the European planetary science community with a unique research infrastructure, combining access to a suite of state of the art facilities while fostering their joint development and integration in terms of capacity and performance. This research infrastructure will include access to laboratory and field site facilities, advanced modelling, simulation and dat ...
Voir le projet

 28

 TERMINÉ 

GReener Aeronautics International Networking (GRAIN)

Date du début: 1 oct. 2010, Date de fin: 31 déc. 2012,

"Aerochina1&2 have been networking projects co-funded by FP7 and AVIC (China) and coordinated by CIMNE. Many of the GRAIN partners have participated in them. These collaborative projects gathered experts on the two Europe (13) and China (17) sides to foster cooperation and debate future trends in the field of integrated multi physics modeling, computer simulations and code validation, experimental ...
Voir le projet

 18

 TERMINÉ 
"The IMG4 project CRESCENDO addresses the Vision 2020 objectives for the aeronautical industry by contributing significantly to the fulfilment of three specific targets of the aeronautical industry’s Strategic Research Agenda. CRESCENDO will develop the foundations for the Behavioural Digital Aircraft (BDA), taking experience and results from VIVACE, and integrating these into a federative system ...
Voir le projet

 59

 TERMINÉ 

Advanced Turbulence Simulation for Aerodynamic Application Challenges (ATAAC)

Date du début: 1 avr. 2009, Date de fin: 30 juin 2012,

"The ATAAC project aims at improvements to Computational Fluid Dynamics (CFD) methods for aerodynamic flows used in today’s aeronautical industry. The accuracy of these is limited by insufficient capabilities of the turbulence modelling / simulation approaches available, especially at the high Reynolds numbers typical of real-life flows. As LES will not be affordable for such flows in the next 4 d ...
Voir le projet

 22

 TERMINÉ 

Advanced Radio Astronomy in Europe (RadioNet-FP7)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2012,

RadioNet is an integrating activity that has pulled together ALL of Europe's leading radio astronomy facilities to produce a focused, coherent and integrated proposals that will significantly enhance the quality and quantity of science performed by European astronomers. RadioNet FP7 has 25 partners. They range from operators of major radio telescope facilities to laboratories that specialise in m ...
Voir le projet

 28

 TERMINÉ 
The general objective of the current project is to create the necessary conditions for utilizing the existing and emerging potential of the consortium partners in Nordic-Baltic dimension for continuous and sustainable contribution in major on-going and planned European space programmes. There is urgent need in emerging space countries for national space programme. For emerging space countries it c ...
Voir le projet

 8

 TERMINÉ 

UP-GRADE BLACK SEA SCIENTIFIC NETWORK (UP-GRADE BS-SCENE)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2011,

...he regional capacity and performance of marine environmental data and information management, underpins harmonization with European marine data quality control/assessment procedures and adoption of international meta-data standards and data-management practices, providing improved data & information delivery services for the Black Sea region at a European level. The Up-Grade of Black Sea SCENE pro ...
Voir le projet

 50

 TERMINÉ 

Contract-based air transportation system (CATS)

Date du début: 1 nov. 2007, Date de fin: 31 oct. 2010,

The targets addressed through Contract-based Air Transport System project are to propose an innovative Air Traffic Management solution able to face the challenge of traffic growth (2012+ horizons) & improve efficiency of the European Air Transport System. Two ACARE/SRA II's high-level target concepts: Highly Cost-Efficient Air Transport System & Highly Time-Efficient Air Transport System are addre ...
Voir le projet

 9

 TERMINÉ 
...onments based on shared computation, storage, and generic service resources offered by EGEE and DILIGENT at a European level, as well as on data and domain-specific service resources offered by large international organizations, such as ESA, FAO, and CGIAR. The envisioned D4Science e-Infrastructure will have a multiplicative benefit to many scientific fields and will also act as a catalyst for the ...
Voir le projet

 11

 TERMINÉ 
"The aim of the AEROCHINA2 Coordination Support Action (CSA) is to foster the cooperation between a number of industry, university and research organizations in the aeronautics sector in Europe and China in the field of multi-physics modelling, computer simulation and code validation, experimental testing and design methods for the solution of multi-physics problems of interest to the aeronautic s ...
Voir le projet

 14

 TERMINÉ 

European network for training and research into cross-border practices (Interform )

Date du début: 30 sept. 2004, Date de fin: 30 mars 2008,

Problems addressed• Cross-border practices are emerging throughout Europe, and require an appropriate training organisation for the practices and requirements of the Interreg programmes financing them.• There are many sources of training for cross border cooperation - these require organisation and adaptation for cross border professions and activities. • An extremely diverse range of initiatives ...
Voir le projet

 8

 TERMINÉ 

Multifunctional Intensive Land Use in Europe (MILUNET)

Date du début: 31 déc. 2003, Date de fin: 30 déc. 2007,

The overall objective of MILUnet is to create an effective partnership network, aiming to promote Multifunctional Intensive Land Use as a means to achieve more sustainable (urban) development in the EU. By utilising expertise and know-how on MILU, regional and local governments have the possibility to increase the effectiveness of both urban policy implementation and planning towards sustainabilit ...
Voir le projet

 24

 TERMINÉ 
...rs are taken into account. Due to apparent difficulties associated with Central Asian countries, priority is given to universities which already have existing links with EU partners and experience in international projects (like with METU, Ljubljana and other international organizations). Moreover, in most cases preference was given to institutions that are leading in their home country and/or are ...
Voir le projet

 24

 TERMINÉ 

Learn! Include! Respect!

Date du début: 1 déc. 2011,

Voir le projet

 27

 TERMINÉ 
"Gewährleistung der steigenden Anforderungen an die Hochschulbildung in KZ, RU und UA. Gemeinsame Entwicklung und Implementierung drei neuen Curricula in BStudiengang ""Space Technology"" in Universitäten der KZ, RU und UA." The specific objectives are: "• Entwicklung und Implementorung des neuen Curriculums ""Entwurf von Micro- und Picosatelliten"" inkl. ECTS• Entwicklung und Implementorung des n ...
Voir le projet

 24